daily menu » rate the banner | guess the city | one on oneforums map | privacy policy (aug.2, 2013) | DMCA policy | flipboard magazine

Go Back   SkyscraperCity > Continental Forums > Middle East > Local Forums > Lebanon > Projects



Reply

 
Thread Tools
Old April 8th, 2011, 11:21 PM   #1
TAJ1990
Registered User
 
Join Date: Apr 2011
Posts: 31
Likes (Received): 0

#PROJECT-BCD: "Beirut Fitness Center"


The Beirut Fitness Center is located on Lots #146-01 and 02 in the New Waterfront District - reclaimed land in the BCD. The project is developed by Solidere on a designated stretch within the New Waterfront District for temporary programs that are expected to operate for a period of 8-10 years. The temporary master plan aims to establish activities that will generate new public destinations. The project site has an area of 9,700 m2 with a plot size of 125 x 80m. The developer proposes an exclusive sports facility and leisure activities that connect to the planned central pedestrian spine, Rue Patriarche Hwayek.

The program proposed by the client covers 8700 m2 serving up to 2000 members. As the proposed temporary project barely covers a fraction of the allowable built up area of our site, the scheme celebrates the abundance of available land at this very particular moment in time, which will no longer be possible when the zone reaches its real estate maturity.

A landscaped park is proposed at a new reference level, 6 meters lower than the street level. Unlike conventional urban sports facilities and gyms, which are typically closed and contained within buildings, our facility relies on its connection and exposure to outdoor spaces. The project develops around a 1260 m2 outdoor courtyard and 2 outdoor tennis courts of 1222 m2 located at the new reference level. Indoor activity spaces including fitness and aquatic zones, squash courts, reading rooms, and multipurpose spaces lie along the periphery of the outdoor courtyard and tennis courts separated only by clear glazed full-height operable panels. The boundary of indoor/outdoor is lost as visual and sensual permeability and transparency are enhanced through users’dynamic movement in and out. At this level, services including showers, lockers, treatment rooms and technical areas are inserted in a long narrow band along the north-south axis on the western side of the plot.

The street level ground is highlighted by 5690 m2 of red epoxy finished concrete floor extending on the totality of the surface defining the open and permeable boundaries of the project, specifically in connection to the pedestrian spine on the eastern edge. There is no built mass on the ground level, only transparent planes 2.2 meters high that frame the courtyard and tennis courts below, allowing the public to overlook sports and related activities through the vertical open-air transparent facades. The automobiles’ elliptical track and parking spots around the courts and the open voids frame the project’s activities. The entrance and drop-off to the fitness center are accessed from the western side of the site and celebrated with a 40 m long portico. No functions are housed in this structure. It serves to protect the center from concurrent construction sites and future developments to the West. The portico also celebrates the arrival of the visitors.



TAJ1990 no está en línea   Reply With Quote

Sponsored Links
 
Old April 8th, 2011, 11:50 PM   #2
MARTYR
جنوبي حر
 
MARTYR's Avatar
 
Join Date: May 2008
Location: Saida
Posts: 2,040
Likes (Received): 20

nice idea !!!! but is it gonna be another 8-10 years till construction starts in the reclaimed land??
__________________
يــــــا بــــــيــــــت صــــــامـــــــد بـــالجـــــــــنــــــــوب
MARTYR no está en línea   Reply With Quote
Old April 8th, 2011, 11:58 PM   #3
Hassoun
Son of the cedars
 
Hassoun's Avatar
 
Join Date: May 2006
Posts: 6,561
Likes (Received): 192

Why temporary??
__________________
Lebanon, Gateway to the Sun, Doorway to man's Spirit !
Hassoun no está en línea   Reply With Quote
Old April 9th, 2011, 12:20 AM   #4
MARTYR
جنوبي حر
 
MARTYR's Avatar
 
Join Date: May 2008
Location: Saida
Posts: 2,040
Likes (Received): 20

lol shu bek man !!! akid lezim temporary... such a prime piece of real estate shouldn't go to waste like this it should be invested with smth bigger... a highrise maybe ??
__________________
يــــــا بــــــيــــــت صــــــامـــــــد بـــالجـــــــــنــــــــوب
MARTYR no está en línea   Reply With Quote
Old April 9th, 2011, 09:42 AM   #5
GAJ1992
Registered User
 
GAJ1992's Avatar
 
Join Date: Jun 2010
Location: Beirut
Posts: 362
Likes (Received): 20

Not highrises.. are you kidding me.. SKYF***INGSCRAPERS!! thats what the reclamed land should become.
GAJ1992 no está en línea   Reply With Quote


Reply

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT +2. The time now is 07:13 PM.


Powered by vBulletin® Version 3.8.8 Beta 1
Copyright ©2000 - 2014, vBulletin Solutions, Inc.
Feedback Buttons provided by Advanced Post Thanks / Like v3.2.5 (Pro) - vBulletin Mods & Addons Copyright © 2014 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2014 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu