Old May 13th, 2012, 12:43 PM   #181
Sven G
Registered User
 
Sven G's Avatar
 
Join Date: Jul 2010
Location: Pavia (Milan)
Posts: 154
Likes (Received): 18

Talking about railways, Henning Makholm has just updated his very detailed Copenhagen trackmap:

http://dk.trackmap.net/a

BTW, the insertion of the new high-speed line into the central station seems to be rather odd: no Richtungsbetrieb (as for the two previous lines)...?

But probably it will also merge with the Øresund line, thus permitting grade-separated access to København H.
__________________
The world is a dangerous place to live, not because of the people who are evil, but because of the people who don't do anything about it. - Albert Einstein

Last edited by Sven G; May 13th, 2012 at 12:50 PM.
Sven G no está en línea   Reply With Quote

Sponsored Links
Old May 13th, 2012, 07:08 PM   #182
Spikespiegel
Used Registrant
 
Spikespiegel's Avatar
 
Join Date: Jul 2009
Location: Copenhagen
Posts: 411
Likes (Received): 27

Quote:
Originally Posted by Sven G View Post
Talking about railways, Henning Makholm has just updated his very detailed Copenhagen trackmap:

http://dk.trackmap.net/a

BTW, the insertion of the new high-speed line into the central station seems to be rather odd: no Richtungsbetrieb (as for the two previous lines)...?

But probably it will also merge with the Øresund line, thus permitting grade-separated access to København H.
The old "inbound" track from Sweden will become the outbound track for the new line. When completed, the new inbound track from Sweden will run through the new underpass and will meet up with the inbound track from Ringsted just nex tto the inbound track from Roskilde.

The map is nice, but it contains several smaller errors, unfortunately
Spikespiegel no está en línea   Reply With Quote
Old May 14th, 2012, 08:10 AM   #183
Sven G
Registered User
 
Sven G's Avatar
 
Join Date: Jul 2010
Location: Pavia (Milan)
Posts: 154
Likes (Received): 18

Thanks for the explanation: and probably it had already been said before, in this or another thread (well, I should have re-read it).

Those small errors probably originate from the fact that the maps are largely based on direct observation (and often also with work in progress).

BTW, I haven't yet found any other trackmaps (on the web) of the Copenhagen area...
__________________
The world is a dangerous place to live, not because of the people who are evil, but because of the people who don't do anything about it. - Albert Einstein
Sven G no está en línea   Reply With Quote
Old May 14th, 2012, 10:26 AM   #184
Spikespiegel
Used Registrant
 
Spikespiegel's Avatar
 
Join Date: Jul 2009
Location: Copenhagen
Posts: 411
Likes (Received): 27

Quote:
Originally Posted by Sven G View Post
Thanks for the explanation: and probably it had already been said before, in this or another thread (well, I should have re-read it).

Those small errors probably originate from the fact that the maps are largely based on direct observation (and often also with work in progress).

BTW, I haven't yet found any other trackmaps (on the web) of the Copenhagen area...
Well, that is what I don't get. Banedanmark has all the trackinformation in Denmark published in "Trafikal Information om Banestrækningen" (http://www.bane.dk/db/filarkiv/12484/TIBOE_19052012.pdf)

An example of these many small errors can be seen on page 218-33. As you can see there is switches that allow you to go directly from track one to three in Holte, Northbound, which is not marked on the trackmap posted earlier in this thread.

Last edited by Spikespiegel; May 14th, 2012 at 01:49 PM.
Spikespiegel no está en línea   Reply With Quote
Old May 14th, 2012, 01:42 PM   #185
Sven G
Registered User
 
Sven G's Avatar
 
Join Date: Jul 2010
Location: Pavia (Milan)
Posts: 154
Likes (Received): 18

Anyway, here, on his blog, is a description of the recent changes:

http://blog.henning.makholm.net/2012...openhagen.html

The Banedanmark PDF is very interesting, indeed; even if, of course, it's rather of the single lines type (vs. global, all-inclusive maps).

BTW, here is a good trackmap site:

http://www.sporenplan.nl

(Dutch, but with many European countries included).

(I hope we aren't too much OT...)
__________________
The world is a dangerous place to live, not because of the people who are evil, but because of the people who don't do anything about it. - Albert Einstein
Sven G no está en línea   Reply With Quote
Old May 20th, 2012, 12:41 AM   #186
Henning Makholm
Registered User
 
Join Date: May 2012
Posts: 3
Likes (Received): 0

Quote:
Originally Posted by Spikespiegel View Post
Well, that is what I don't get. Banedanmark has all the trackinformation in Denmark published in "Trafikal Information om Banestrækningen" (http://www.bane.dk/db/filarkiv/12484/TIBOE_19052012.pdf)

An example of these many small errors can be seen on page 218-33. ...
As for "not getting it": these are not so much "errors" as obsolete information. The map for Hellerup-Holte-Hillerød dates back to sketches I made in the late 1990s, before Banedanmark started making TIB available to outsiders.

I'm not routinely using TIB as a source for updates, because (1) there seems to be no way to be notified of changes to it, except to pay money for a paper subscription (which I'm not even sure is available to individuals), and (2) the diagrams in TIB are in some respects less detailed than I like my maps to be. For example, they generally don't show sidings that don't have hovedtogveje, and they don't distinguish between double-slips and pairs of facing switches. I prefer to show an accurate rendering of an old situation compared to up-to-date guesswork.

It is not clear to me what has happened with the crossover at Holte that you point out. It was present in my original sketches from the late 1990s, but disappeared from my map between archive backups taken January 2006 and April 2006, together with a siding east of the northbound main track. Perhaps I simply lost it in the heat of editing?

Last edited by Henning Makholm; May 20th, 2012 at 01:36 AM.
Henning Makholm no está en línea   Reply With Quote
Old May 20th, 2012, 11:22 AM   #187
Sven G
Registered User
 
Sven G's Avatar
 
Join Date: Jul 2010
Location: Pavia (Milan)
Posts: 154
Likes (Received): 18

Well, your trackmaps are very well-made: and that's the most important thing, after all...

BTW, talking about the Øresund line, one wonders why they didn't make the Kastrup Airport station with 4 tracks (with 2 island platforms) from the beginning: were there such space constraints that it couldn't have been made?

Also, they could have made the goods flyover (which they talk about today) right from the beginning, too; or a TGV-like station, with additional bypassing tracks without platforms at the centre (see CDG Airport* or Lille Europe) or at the outside (see Eurodisney**).

The "afterthought" solution of making two additional platforms on the existing goods line is not as elegant, anyway.

* http://carto.metro.free.fr/cartes/re...e+Gaulle+2+TGV

** http://carto.metro.free.fr/cartes/re...all%E9e-Chessy
__________________
The world is a dangerous place to live, not because of the people who are evil, but because of the people who don't do anything about it. - Albert Einstein

Last edited by Sven G; May 20th, 2012 at 11:37 AM.
Sven G no está en línea   Reply With Quote
Old May 20th, 2012, 02:15 PM   #188
Fab 5
Registered User
 
Fab 5's Avatar
 
Join Date: Jan 2008
Posts: 2,097
Likes (Received): 3

I like these maps - and thanks for posting Henning. Please note that the whole Lersøen area has been completely revamped, with Banedanmark being only a few months away from finalization of their project there.

Sven, sorry to be a little bit direct, but, what planet are you living on?;-) Politics is about who gets what, when - and how. It is never easy to prioritize and decide on these matters - and it is, almost twenty years later, so easy to be wise after the event. You can apply such questions to every single infrastructure project that exists on the planet - why didn't the Great Belt Fixed Link's West Bridge for instance be prepared for high-speed train service? Politicians are rarely foresightful; what they care about - sorry to be a bit simplistic - is getting re-elected and making impacts within that shorter timeframe. They won't be thanked and receive any credits for decisions that will only materialize 20 or 30 years later. Now, that is changing a bit these years with trying to apply longer-term planning approaches (i.e. all Metro stations are prepared for a fourth car to be added to the existing trains at some point, Ørestad Station includes large ground reservations etc. etc.).

BTW, CPH has three runways (technically six).
__________________
Fab 5 no está en línea   Reply With Quote
Old May 20th, 2012, 02:51 PM   #189
Sven G
Registered User
 
Sven G's Avatar
 
Join Date: Jul 2010
Location: Pavia (Milan)
Posts: 154
Likes (Received): 18

Yes, I substantially agree with what you say; but, then, I also don't think that it was the politicians themselves who made the projects...

Well, personally I'm more for direct democracy, anyway (politicians won't ever change anything; and representative democracy has degenerated into ochlocracy, in most "evolved" - really? let's rather say big-business-driven, maybe? - western countries): if only people were more interested in the society they live in, we could indeed have a more direct democracy, also with the help of modern communication technologies...

... CPH, indeed, has 3 runways: but the perpendicular one, besides being shorter, is also of lesser use, being heavily limited by the city on one of its sides (with a very longly displaced threshold).

Of course, historically, Kastrup is also the evolution of a former almost star-like layout, with runways for the several wind directions (as also Heathrow, for example): but today, it could maybe be sufficient with the two main runways, as has happened also for Heathrow (the others have been inglobated into the apron and taxiway system).

Anyway, there don't seem to be any real runway expansion projects for the future of CPH...
__________________
The world is a dangerous place to live, not because of the people who are evil, but because of the people who don't do anything about it. - Albert Einstein

Last edited by Sven G; May 20th, 2012 at 03:14 PM.
Sven G no está en línea   Reply With Quote
Old May 20th, 2012, 03:12 PM   #190
Sven G
Registered User
 
Sven G's Avatar
 
Join Date: Jul 2010
Location: Pavia (Milan)
Posts: 154
Likes (Received): 18

... BTW (I often like to compare different European realities), an example of how a previously rather small airport can be expanded in a very good way is Barcelona's El Prat; see, for example:

http://en.wikipedia.org/wiki/Barcelona_El_Prat_Airport

http://www.bcnair-route.com/index.ph...infrastructure

http://www.airport-technology.com/pr...tional-airport

etc. etc.

... effectively doubling its facilities.

But Spain is indeed a country which seems to have more vision of the future than others (maybe because they got back democracy at a later stage? or also because they had many EU economical contributions? who knows...).

(OK, also just shamelessly trying to raise my still quite low post count on SSC...)
__________________
The world is a dangerous place to live, not because of the people who are evil, but because of the people who don't do anything about it. - Albert Einstein
Sven G no está en línea   Reply With Quote
Old May 21st, 2012, 12:24 AM   #191
Henning Makholm
Registered User
 
Join Date: May 2012
Posts: 3
Likes (Received): 0

Quote:
Originally Posted by Sven G View Post
BTW, talking about the Øresund line, one wonders why they didn't make the Kastrup Airport station with 4 tracks (with 2 island platforms) from the beginning: were there such space constraints that it couldn't have been made?
My understanding is that the constraints there were financial. Remember that the airport station was a more-or-less incidental feature of the fixed link project, and not the result of a principled decision to build an airport rail link. Since the two platform tracks we got are sufficient to handle the traffic that actually goes across the bridge, I suspect that none of the organizations involved were willing to fund additional capacity that would be used only on the Danish side.

(But I've also heard a rumor that the planners were modeling platform dwelling times -- and hence the capacity -- based on passenger-number forecasts, without taking into account that a much larger fraction of passengers would have bulky luggage than on a "standard" railway station).

The reason for the substandard connection of the freight tracks west of the station, however, is almost certainly space constraints, considering that the original project had funding for a full set of flyovers in the eastern end. It is difficult to fit in a flyover between the roads passing above the line -- some proposals to do so were sketched recently in connection with the Femern Belt project, but the space is so cramped that they involve track gradients of 2.7 %...


[Also, thanks to Spikespiegel for pointing out the missing crossover at Holte. Fixed now, and apologies for my somewhat defensive initial reply.]
Henning Makholm no está en línea   Reply With Quote
Old May 21st, 2012, 11:24 AM   #192
Fab 5
Registered User
 
Fab 5's Avatar
 
Join Date: Jan 2008
Posts: 2,097
Likes (Received): 3

Exactly - hence my point about prioritization and who gets what, when and how. Several models were of course discussed back in the days, a decision was made, which is not particular future-proven, but much cheaper - and then when various challenges one day arise, i.e. capacity issues, then it is up to those present-day politicians to try to dismantle these. That's how politics work - being not necessarily very strategical oriented nor long-term economically sound. It is the exact same thing that we are currently witnessing with the ramp re Nordhavnsvejen.
__________________
Fab 5 no está en línea   Reply With Quote
Old May 21st, 2012, 11:25 AM   #193
Spikespiegel
Used Registrant
 
Spikespiegel's Avatar
 
Join Date: Jul 2009
Location: Copenhagen
Posts: 411
Likes (Received): 27

Some other small errors I've found you can fix:

The abandoned freight terminal at Hellerup has been torn down a year ago. Most of the tracks there have been removed, only the few tracks used by Banedanmark remains.

The exit from Helgoland (towards Østerport) was changed a month ago. It's hard to tell the exact changes, but the dead end track at the end of track 19 was removed, and some switches were changed.

That's all I could find from the quick glance at it
Spikespiegel no está en línea   Reply With Quote
Old June 12th, 2012, 11:49 PM   #194
Babser
Registered User
 
Join Date: Feb 2011
Posts: 184
Likes (Received): 80

Overground stations on the metro will get glass doors to increase capacity - according to the new transport agreement:
Quote:
Parterne er derfor enige om at afsætte 200 mio. kr. til opgradering af den eksisterende metro, så det bliver muligt at øge kapaciteten i metroen. Med opgraderingen vil kapaciteten i metroen øges med ca. 20 pct. i øvrigt med anvendelse af eksisterende infrastruktur og materiel. Som en del af opgraderingen opsættes perrondøre, som det kendes fra de underjordiske stationer, på de stationer der ligger over jorden. Med perrondørene bliver det muligt at køre flere tog i myldretiden samt øge driftsstabiliteten i hele metrosystemet.
http://trm.dk/~/media/Files/Publicat...ni%201901.ashx
Babser no está en línea   Reply With Quote
Old June 13th, 2012, 12:45 AM   #195
vester
Registered User
 
Join Date: Dec 2011
Location: Copenhagen
Posts: 381
Likes (Received): 223

I don't see how installing doors help improve the capacity.
vester no está en línea   Reply With Quote
Old June 13th, 2012, 01:08 AM   #196
Lars_HH
Registered User
 
Join Date: Mar 2008
Posts: 604
Likes (Received): 56

En der ganske kort kan forklare, hvorfor perrondøre kan udvide kapaciteten? Det ændrer da intet at der kommer glasdøre op.
Lars_HH no está en línea   Reply With Quote
Old June 13th, 2012, 01:09 AM   #197
Lars_HH
Registered User
 
Join Date: Mar 2008
Posts: 604
Likes (Received): 56

Edit: Got it: http://www.trm.dk/~/media/Files/Publ...20metroen.ashx
Lars_HH no está en línea   Reply With Quote
Old June 13th, 2012, 01:45 AM   #198
Fab 5
Registered User
 
Fab 5's Avatar
 
Join Date: Jan 2008
Posts: 2,097
Likes (Received): 3

Welcome to what a complex society that we have created (which explains the above).
__________________
Fab 5 no está en línea   Reply With Quote
Old June 26th, 2012, 05:55 PM   #199
Never give up
Registered User
 
Never give up's Avatar
 
Join Date: Apr 2009
Location: Copenhagen and Dublin
Posts: 4,271
Likes (Received): 7242

The Nordhavnsvej tunnel has now advanced so far that soon the S train lines (to the left of the Øresund train) will be closed for a number of weeks in order to construct a temporary bridge for the trains. The road tunnel will be then constructed underneath the bridge.
The road tunnel runs parallel to the Farum S line tunnel.
Afterwards it will be the Kystbanes turn for a similar exercise.

[IMG]http://i49.************/smdpgj.jpg[/IMG]
Never give up no está en línea   Reply With Quote
Old June 29th, 2012, 12:03 PM   #200
Never give up
Registered User
 
Never give up's Avatar
 
Join Date: Apr 2009
Location: Copenhagen and Dublin
Posts: 4,271
Likes (Received): 7242

Copenhagen - Malmö metro news.

http://ing.dk/artikel/130503-nu-begy...tro-til-malmoe
Never give up no está en línea   Reply With Quote


Reply

Tags
infrastructure

Thread Tools
Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Related topics on SkyscraperCity


All times are GMT +2. The time now is 06:23 AM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2017, vBulletin Solutions Inc.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2017 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2017 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu