daily menu » rate the banner | guess the city | one on one

Go Back   SkyscraperCity > Asian Forums > India > Infrastructure & Transportation > Highways and Bridges


Reply

 
Thread Tools Rating: Thread Rating: 3 votes, 4.67 average. Display Modes
Old May 29th, 2011, 10:40 PM   #1
irutavias
cerebral fallout
 
irutavias's Avatar
 
Join Date: Jul 2007
Posts: 454
Likes (Received): 0

Arrow Hyderabad | Outer Ring Road | Phase II U/C

=============================================================



Hyderabad Outer Ring Road

Photos and Major Updates ONLY



=============================================================

Twin Thread in the Hyderabad City Subforum
http://www.skyscrapercity.com/showthread.php?t=545449
Please continue to discuss issues in the HYD subforum thread, and only post new pictures and major updates here


Hyderabad Growth Corridor Limited
State Agency responsible for developing the Outer Ring Road [ORR] and its adjacent real-estate
http://www.hyderabadringroad.com/

--------------------------------------------------------------------


A summary article highlighting Hyderabad's Outer Ring Road's importance and magnitude:
http://news.in.msn.com/business/arti...mentid=4843680

Quote:

Highway to the future

The urban landscape of India includes congested metropolitan cities such as Mumbai and Kolkata, on the one hand, and urban sprawls like Delhi, Bangalore and Hyderabad, on the other. Hyderabad's outer ring road is an attempt to decongest the city and plan for future development. It is the country's largest single road project outside the National Highway Development Programme (NHDP).

The Nehru Outer Ring Road known as Hyderabad's Growth Corridor is a 158 km long expressway covering an area of 3,000 sq km (including 83 villages) that frees up large parcels of land for development. By building a network of radial roads, it connects far flung areas with the city centre. The area covered within the outer ring road is about 6 times the area of the Greater Hyderabad Municipal Corporation. The road is designed to reduce travel distance between suburbs of Greater Hyderabad and create conditions for development of new growth hubs along and beyond.

In a short span of 10 years the city of Hyderabad has become an international hub for investments in IT and IT-enabled services, biotechnology, pharmaceuticals, and health services, besides becoming a centre for higher education and professional institutions such as the Indian School of Business, the National Law School and many colleges of engineering. This has generated a rapidly increasing demand for commercial, industrial, institutional and recreational spaces, and a growing demand for residential housing.

Planning for urban development to accommodate these demands required an urgent focus on transport and road network. The inner ring road had become a part of the city network system over the years. There was an urgent need for an outer bypass system that would divert traffic not destined for the city and ease congestion which would otherwise become a serious deterrent for investment and growth. The outer ring road project does just that.

Within the area encircled by the outer ring road, 33 radial roads have been identified connecting the inner ring road with the outer ring road, of which 6 have been completed and 5 have been taken up for construction. The radial roads will provide easy access to the airport road, IT parks, SEZs and other developments surrounding the Greater Hyderabad area. Roads have been planned in alignment with National Highways and State Highways, thereby ensuring connectivity with the wider region. The result is that Mumbai is connected to Bangalore via Hyderabad, and Vijayawada is also connected with Mumbai via Hyderabad.

Future satellite townships are being planned along the 1-km stretch growth corridor on either side of the ring with a view to attracting business parks, technology clusters, etc, and appropriate taxation of these should help finance the remaining infrastructure for the region. While development regulations have been prepared for this belt in line with the plans of the Hyderabad Metropolitan Development Authority (HMDA), it is important to ensure that the regulations are objective, transparent and clearly enforced.

The eight-lane expressway is designed to host moving vehicles of up to 120 km per hour speed. Trees are being planted to deflect the glare on the roads. To manage the high speed movement of vehicles, a Highway Traffic Management system is planned, as is a Toll Management system. Toll-free service roads are provided on either side of the expressway. There is provision for utility ducts to ensure that the roads are not dug up in the future.

The first phase of the expressway was opened in July 2010 with 24 km running from Gachibowli to Shamshabad. The first part of the second phase of 63 km is to be completed by April 2011 and the second part of the second phase covering 71 km is expected to be completed by December 2012. In all, the ring road crisscrosses 5 National Highways, 5 State Highways and 7 major district roads, and connects new urban nodes outside Hyderabad, e.g., Hi-Tech city, Games Village, Hardware Park, IT Park, Nano Park and the Indian School of Business.

Plans are in place to link the existing railway lines of the Eastern and Western corridors of the Hyderabad Metropolitan Area, and connect the existing network of the Northern and Southern Railways. Terminals and parking lots for trucks will be located at intersections of the ring road connecting National Highways with State Highways. A 25-km stretch has been earmarked for an integrated network of metro rail and buses.


The outer ring road is a fine example of regional planning by the government of Andhra Pradesh. The Hyderabad Metropolitan Development Authority (HMDA) was created in 2008 by merging the Hyderabad Urban Development Authority (HUDA), Cyberabad Development Authority and the Hyderabad Airport Development Authority, with a total jurisdiction of 7,100 sq km. The Hyderabad Growth Corridor Limited (HGCL) was set up as a Special Purpose Vehicle to serve as the executing agency of the project to build the outer ring road. HGCL is a fully publicly held company with 74% shares with HMDA and 26% with Infrastructure Corporation of Andhra Pradesh (INCAP). The Metropolitan Commissioner of the Hyderabad Metropolitan Development Authority (HMDA) is the Chairman of the HGCL Board. The company is headed by a Managing Director who also acts as a Special Collector to aid in the land acquisition process, along with a team of land acquisition officers.

Of the total project cost of Rs 6,696 crore, the first phase of Rs 699 crore was financed through loans from a consortium of commercial banks led by the Bank of Baroda. The first part of the second phase costing Rs 2,439 crore is being implemented on a PPP basis.

Following global tenders, the contracts were awarded to 5 concessionaires. A Build Operate Transfer (BOT) annuity model was used covering a 12½ year concession period, with 20% of the project cost provided as grant by the HMDA. The second part of the second phase is being financed by a long-term (30 year) loan from the Japan International Cooperation Agency (JICA) at an interest rate of 1.2% per annum, 10-year moratorium on payment, and sovereign guarantee. The loan from JICA of Rs 3,123 crore financed most of the project cost of Rs 3,558 crore for this phase.

The toll rates proposed by HGCL are currently under review of the state government. Impact fee on building permissions and new developments is expected to contribute significantly to revenue generation, which will help in repayment of the loan and finance the project.

As regards land acquisition, cash compensation amounting to 2 to 3 times the value of the land was given to families who sold their land. In cases where land was preferred by the seller in exchange, compensatory plots of 75% of the area were provided. A few cases of disputes on land acquisition are pending in the High Court and the Supreme Court.

As the process of urbanisation gathers momentum across the country, there is greater need for regional planning with due regard for connectivity within the region and across the regions. The Hyderabad Growth Corridor shows the way. Since land values would increase substantially on account of development of the ring road and change in land use, ways should be found for ensuring an equitable sharing of the additional value between land owners and the government so as to enable the latter to finance the large investments required for developing an expanded city of this nature.

Isher Judge Ahluwalia is chair of Icrier and chair of the high powered expert committee on urban infrastructure. Ranesh Nair is a consultant to the committee. Views are personal
--------------------------------------------------------------------


A detailed map of the ORR Project
http://www.clubhyd.com/wp-content/up...07/orr_map.jpg




--------------------------------------------------------------------



A few pictures from the Hyderabad Subforum
[Credit to the forum posters as well as the respective photographers]

Quote:
Originally Posted by p.raghavendra6 View Post







80 is the speed limit it says.


Nagarjuma Sagar HW Interchange.












Did not understand this sign board.






Toll booths u/c


The road between IRR and ORR on Sagar HW







Stay Tuned.




--------------------------------------------------------------------




Photos and Major Updates ONLY, Please


For discussion - please refer to the HYD Subforum thread:
http://www.skyscrapercity.com/showthread.php?t=545449


--------------------------------------------------------------------
__________________
Incredible!ndia

Last edited by irutavias; June 6th, 2011 at 03:48 AM. Reason: formatting.
irutavias no está en línea   Reply With Quote

Sponsored Links
 
Old May 29th, 2011, 11:38 PM   #2
tall_dreams
My Way The Highway
 
tall_dreams's Avatar
 
Join Date: Aug 2009
Location: India
Posts: 781
Likes (Received): 19

great road
tall_dreams no está en línea   Reply With Quote
Old May 30th, 2011, 01:19 AM   #3
nh9
Registered User
 
Join Date: Jul 2009
Posts: 173
Likes (Received): 58

Moderators please don't remove this thread from this section as the Hyderabad outer ring road is considered the huge road infrastructure project for urban India. This thread deserves to be in this section.
nh9 no está en línea   Reply With Quote
Old May 30th, 2011, 01:23 AM   #4
nh9
Registered User
 
Join Date: Jul 2009
Posts: 173
Likes (Received): 58

nh9 no está en línea   Reply With Quote
Old May 30th, 2011, 01:27 AM   #5
nh9
Registered User
 
Join Date: Jul 2009
Posts: 173
Likes (Received): 58









nh9 no está en línea   Reply With Quote
Old May 30th, 2011, 03:00 AM   #6
nh9
Registered User
 
Join Date: Jul 2009
Posts: 173
Likes (Received): 58

Moderators please don't remove this thread from this section as the Hyderabad outer ring road is considered the huge road infrastructure project for urban India. This thread deserves to be in this section.
nh9 no está en línea   Reply With Quote
Old May 30th, 2011, 03:28 AM   #7
Prodigist
High-derabaD
 
Prodigist's Avatar
 
Join Date: Jul 2006
Location: Hyderabad
Posts: 1,596
Likes (Received): 63

ORR Pics

X-Posting. Would be good if this thread is a PHOTOS ONLY THREAD with the discussion part being restricted to the thread in Hyd section
Quote:
Originally Posted by pvk View Post

Cloverleaf Intersection near Tukkuguda Junction

image hosted on flickr
Quote:
Originally Posted by bobbie501 View Post
Quote:
Originally Posted by harsh1802 View Post
Prodigist no está en línea   Reply With Quote
Old May 30th, 2011, 03:45 AM   #8
Prodigist
High-derabaD
 
Prodigist's Avatar
 
Join Date: Jul 2006
Location: Hyderabad
Posts: 1,596
Likes (Received): 63

Quote:
Originally Posted by _GrapeWine_ View Post
From my friends cam...
(c) Suyash

Quote:
Originally Posted by _GrapeWine_ View Post
more..
(c) Suyash


Satellite Image around Jan 2010

Quote:
Originally Posted by nh9 View Post
Prodigist no está en línea   Reply With Quote
Old May 30th, 2011, 06:51 AM   #9
tall_dreams
My Way The Highway
 
tall_dreams's Avatar
 
Join Date: Aug 2009
Location: India
Posts: 781
Likes (Received): 19

what is the total legth of this road?
tall_dreams no está en línea   Reply With Quote
Old May 30th, 2011, 08:19 AM   #10
rsrikanth05
Ladkiyon ka Hero
 
rsrikanth05's Avatar
 
Join Date: Mar 2009
Location: Kovai
Posts: 6,053
Likes (Received): 65

Lovely shots, I thought such roads were a dream in India.
Amazing.
rsrikanth05 está en línea ahora   Reply With Quote
Old May 30th, 2011, 02:29 PM   #11
hyderabadnawab
Registered User
 
Join Date: Dec 2006
Location: New York / Hyderabad
Posts: 158
Likes (Received): 0

Quote:
Originally Posted by tall_dreams View Post
what is the total legth of this road?
About 165 kms.
hyderabadnawab no está en línea   Reply With Quote
Old May 30th, 2011, 06:09 PM   #12
tall_dreams
My Way The Highway
 
tall_dreams's Avatar
 
Join Date: Aug 2009
Location: India
Posts: 781
Likes (Received): 19

As long as the Yamuna Expressway.
tall_dreams no está en línea   Reply With Quote
Old May 31st, 2011, 04:07 PM   #13
sixsigma1978
PRAETORIAN
 
sixsigma1978's Avatar
 
Join Date: Dec 2009
Location: New York/Bangalore
Posts: 2,438
Likes (Received): 46

Quote:
Originally Posted by rsrikanth05 View Post
Lovely shots, I thought such roads were a dream in India.
Amazing.
I'm too completely bowled over by this project!! Andhra is rampaging ahead.
Wonder what would've been the state of Andhra if Chandrababu Naidu hadn't pulled the coup and NTR was still the CM!!!
sixsigma1978 no está en línea   Reply With Quote
Old May 31st, 2011, 04:41 PM   #14
rsrikanth05
Ladkiyon ka Hero
 
rsrikanth05's Avatar
 
Join Date: Mar 2009
Location: Kovai
Posts: 6,053
Likes (Received): 65

Quote:
Originally Posted by sixsigma1978 View Post
I'm too completely bowled over by this project!! Andhra is rampaging ahead.
Wonder what would've been the state of Andhra if Chandrababu Naidu hadn't pulled the coup and NTR was still the CM!!!
If YSR was still alive this project would've been done ages ago.
rsrikanth05 está en línea ahora   Reply With Quote
Old May 31st, 2011, 04:52 PM   #15
Vara123
Registered User
 
Join Date: Jul 2007
Posts: 486
Likes (Received): 3

Quote:
Originally Posted by rsrikanth05 View Post
If YSR was still alive this project would've been done ages ago.
You are so wrong on this. The Phase-I of ORR was delayed by three years because of YSR Ruling. After his death there is a good progress on phase – I also. He did ever favor that he could do to the contractors. If he was alive other phases also would have been delayed.
Vara123 no está en línea   Reply With Quote
Old May 31st, 2011, 05:00 PM   #16
rsrikanth05
Ladkiyon ka Hero
 
rsrikanth05's Avatar
 
Join Date: Mar 2009
Location: Kovai
Posts: 6,053
Likes (Received): 65

Quote:
Originally Posted by Vara123 View Post
You are so wrong on this. The Phase-I of ORR was delayed by three years because of YSR Ruling. After his death there is a good progress on phase – I also. He did ever favor that he could do to the contractors. If he was alive other phases also would have been delayed.
Really?
All that hoo haa over nothing?
I must be mistaken. Someone told me YSR was doing all the good.
Haven't been to Hyd after he died.
rsrikanth05 está en línea ahora   Reply With Quote
Old May 31st, 2011, 05:53 PM   #17
sixsigma1978
PRAETORIAN
 
sixsigma1978's Avatar
 
Join Date: Dec 2009
Location: New York/Bangalore
Posts: 2,438
Likes (Received): 46

Still - I think NTR's demise was the best thing (dont want to sound insensitive - but until he went - Andhra was just another vegetative state)!! I still give Chandrababu Naidu credit for turining around Andhra's fortune!!

The others after him too have done a great job (compared to politicians say, in my Karnataka - owls like HD deve gowda and his progeny - who have nothing to do except hoard land and play destructive politics!! ) . Karnataka Politicians should learn a thing or two from their Andhra counterparts
sixsigma1978 no está en línea   Reply With Quote
Old May 31st, 2011, 06:07 PM   #18
rsrikanth05
Ladkiyon ka Hero
 
rsrikanth05's Avatar
 
Join Date: Mar 2009
Location: Kovai
Posts: 6,053
Likes (Received): 65

Quote:
Originally Posted by sixsigma1978 View Post
Still - I think NTR's demise was the best thing (dont want to sound insensitive - but until he went - Andhra was just another vegetative state)!! I still give Chandrababu Naidu credit for turining around Andhra's fortune!!

The others after him too have done a great job (compared to politicians say, in my Karnataka - owls like HD deve gowda and his progeny - who have nothing to do except hoard land and play destructive politics!! ) . Karnataka Politicians should learn a thing or two from their Andhra counterparts
This road should be a benchmark for Bangalore's NICE Road.
rsrikanth05 está en línea ahora   Reply With Quote
Old June 1st, 2011, 06:01 AM   #19
AutobotDelhi
Unregistered
 
Join Date: Feb 2010
Posts: 214
Likes (Received): 0

Wow ...great shots and nice updates.
AutobotDelhi no está en línea   Reply With Quote
Old June 6th, 2011, 03:50 AM   #20
irutavias
cerebral fallout
 
irutavias's Avatar
 
Join Date: Jul 2007
Posts: 454
Likes (Received): 0

Great pics everyone. A reminder:

Photos and Major Updates ONLY, Please


For discussion - please refer to the HYD Subforum thread:
http://www.skyscrapercity.com/showthread.php?t=545449



_________________________________________________________________________
__________________
Incredible!ndia
irutavias no está en línea   Reply With Quote


Reply

Tags
hgcl, hyderabad, orr, outer, ring road

Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT +2. The time now is 06:14 AM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2013, vBulletin Solutions, Inc.
Feedback Buttons provided by Advanced Post Thanks / Like v3.1.2 (Pro) - vBulletin Mods & Addons Copyright © 2013 DragonByte Technologies Ltd.
vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2013 DragonByte Technologies Ltd. (Resources saved on this page: MySQL 25.00%)

SkyscraperCity - In Urbanity We Trust

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu