daily menu » rate the banner | guess the city | one on oneforums map | privacy policy | DMCA | news magazine | posting guidelines

Go Back   SkyscraperCity > Infrastructure and Mobility Forums > Subways and Urban Transport

Subways and Urban Transport Metros, subways, light rail, trams, buses and other local transport systems



Global Announcement

As a general reminder, please respect others and respect copyrights. Go here to familiarize yourself with our posting policy.


Reply

 
Thread Tools
Old December 4th, 2012, 11:55 AM   #561
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,234
Likes (Received): 11980

Curitiba Bus System - new hybrid biodiesel/electric busses finally debute in the city

Quote:
Originally Posted by felipe slobodzian View Post
De nada FGB.

Mudando de assuntos, boa parte do Hibridos Convencionais estreou hoje:

160- Jd. Merces/Guanabara





180-Agua verde/Abranges:


http://onibusbrasil.com/foto/1443047/

285- Juveve/Agua Verde (que passou a ser operada pela Marechal, no lugar da Gloria)


http://onibusbrasil.com/foto/1443056/

Só não começaram a operar os carros da 380- Detran/Vic. Machado.
mopc no está en línea   Reply With Quote

Sponsored Links
Old December 6th, 2012, 02:21 AM   #562
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,234
Likes (Received): 11980

São Paulo Metro and CPTM - summary of updates

November Construction updates

Line 17


Line 15


Line 4


Line 5



****

São Paulo State Government to launch bid process for two new lines (Line 6 and Line 13) this month (December 2012), plus Santos Light Rail. Next year, they plan to bid Line 18 Monorail and Line 20 (Moema - Lapa)

Quote:
Originally Posted by RMeier View Post
SP lançará obras de três linhas de passageiros

O Governo do Estado de São Paulo lançará neste mês os editais para as obras de três linhas ferroviárias: Linha 13-Jade, Linha 6-Laranja e VLT da Baixada Santista. A primeira licitação lançada será a da Linha 13-Jade, prevista para esta quinta-feira (06/12). O trem de Cumbica terá 11,5 quilômetros ligando o Brás ao Aeroporto Internacional de Guarulhos. A primeira fase será entre a estação Engenheiro Goulart, na Linha 12-Safira, e o aeroporto. Segundo o secretário dos Transportes Metropolitanos, Jurandir Fernandes, será um trem comum, como os demais da Companhia Paulista de Trens Metropolitanos (CPTM), e está sendo avaliada a destinação de carros para bagagem.

Já o edital da Linha 6-Laranja do Metrô de São Paulo está previsto para ser lançado em 18 de dezembro. A linha será em regime de Parceria Público-Privada (PPP) e já está com os projetos funcional e básico prontos. A nova linha terá 34,1 quilômetros ligando a Bandeirantes, na Zona Oeste, a Cidade Líder, na Zona Leste.

A outra licitação que será lançada neste mês é das obras do primeiro trecho do VLT da Baixada Santista, entre Barreiros, em São Vicente, e o Porto, em Santos. A data do lançamento ainda não foi divulgada pelo governo paulista. O projeto também será em regime de PPP. Os 22 VLTs já foram licitados e serão fornecidos pelo consórcio Tremvia, composto por T´Trans e Vossloh.

Outros dois projetos em regime de PPP devem ser licitados no ano que vem. O monotrilho da Linha 18-Bronze, conhecido como monotrilho do ABC (Tamanduateí – Alvarenga), está previsto para ter o edital lançado em abril. Já a Linha 20-Rosa, ligando a Lapa à Moema, deve ser licitada no segundo semestre de 2013.

Fonte: Revista Ferroviária


******

Line 15 Monorail - forumer video sped-up full length of construction so far

Quote:
Originally Posted by sergiomazzi View Post

Valeu Tiago!

Acho que o erro aconteceu quando fui escolher os codecs do formato, ele ficou num modo ".avi" antigo.
Recodifiquei e ficou "viável" para enviar pro servidor, ficou com 415 megas, e uma ótima resolução!
Pena que contra o pavimento "sofrível" da avenida não tem estabilização de imagem que resolva!

Neste vídeo aos 36s, a inserção de parte de um vídeo oficial como mais um referencial.
Quem puder ver esta versão em alta resolução eu recomendo.

Neste dia fui para o Km 14 da Via Anchieta duas vezes, a imagem de tela do vídeo
fiz da primeira vez que voltei, por volta de 07h55.

Desta vez o "efeito psicodélico zoom-sky-pulse" não apareceu !

mopc no está en línea   Reply With Quote
Old December 10th, 2012, 07:42 AM   #563
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,234
Likes (Received): 11980

Curitiba BRT (RIT) - CNN video on the system (from 2010)



mopc no está en línea   Reply With Quote
Old December 10th, 2012, 07:46 AM   #564
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,234
Likes (Received): 11980

Cuiabá Light Rail - construction forumer pics and diagram

Quote:
Originally Posted by diegohdm View Post
Algumas fotos que tirei das obras na av do cpa.

É.. vai tudo ficar bem feio por um tempo.. mas depois vamos ter a recompensa.

[IMG]http://i46.************/4jv0k2.jpg[/IMG]

[IMG]http://i47.************/flwxy.jpg[/IMG]
Quote:
Originally Posted by BrunoTins View Post
A imagem responde sua pergunta!

mopc no está en línea   Reply With Quote
Old December 10th, 2012, 10:20 AM   #565
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,234
Likes (Received): 11980

Campo Grande Bus System - new articulated buses

Quote:
Originally Posted by rodrigo.rod.digo View Post
Aqui vai uma foto de cada um dos 5 articulados novos:

Viação Cidade Morena - 1000 - Linha 087

Vinícius Gonçalves - onibusbrasil.com

Viação São Francisco - 2516 - Linha 081

Vinícius Gonçalves - onibusbrasil.com

Jaguar Transportes Urbanos - 3006 - Linha 080

Eric Moises - onibusbrasil.com

Viação Campo Grande - 4190 - Linha 080

Rodrigo Pazinato - campograndenews.com.br

Auto Viação Floresta (Nova empresa que criaram para operar no lote da Serrana) - 7000 - Linha 070

Vinícius Gonçalves - onibusbrasil.com
mopc no está en línea   Reply With Quote
Old December 10th, 2012, 10:24 AM   #566
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,234
Likes (Received): 11980

Santos Public Bicycle System - just started working (December 2012). Free use for 30 minutes.

Quote:
Originally Posted by martche View Post


28/11/2012
Sistema de bicicleta pública começa a funcionar nesta quinta

A prefeitura dá início nesta quinta (29), às 18h, ao sistema de bicicleta pública denominado Bike Santos. O ponto inicial do serviço será no canal 2 com a orla, onde está instalada uma das 15 estações previstas na primeira etapa do projeto, com 150 bicicletas (10 por estação).

A iniciativa consiste em compartilhar o uso das bikes sem custo, desde que o usuário esteja cadastrado no site e obedeça as regras de utilização. A estrutura foi instalada pela empresa Serttel Ltda., vencedora do chamamento público feito pela CET (Companhia de Engenharia de Tráfego).

Além da estação no canal 2, outras 14 estações estão contempladas nesta fase: emissário submarino, canal 3/Concha Acústica, Aquário, ferry-boat (duas estações), orla x canal 4/praça Santo Antônio do Embaré, rua Francisco Hayden (próximo ao Clube Internacional de Regatas), av. Pinheiro Machado x rua Moura Ribeiro, av. Francisco Glicério x canal 2, av. Ana Costa x av. Francisco Glicério, Sesc/rua Vergueiro Steidel, rua Lobo Viana (em frente à Universidade Santa Cecília) e praça Rebouças.

Ainda nesta etapa, a av. Ana Costa receberá uma estação com o término da reurbanização no trecho entre a praia e a praça da Independência. Outras 15 estações, com mais 150 biciletas, poderão ser utilizadas até o final de janeiro.

Inscrições
O Bike Santos é composto de estações inteligentes, conectadas a uma central de operações via wireless, alimentadas por energia solar. O funcionamento será diário, das 6h às 22h, para retirada da bicicleta, e até as 24h, para sua devolução. O uso da bike é gratuito pelo tempo máximo contínuo de 30 minutos e sua devolução poderá ser feita em qualquer uma das estações. Após 15 minutos, o usuário poderá novamente retirar outra bicicleta.

As inscrições para o Bike Santos estão abertas. As informações sobre o projeto e os termos de adesão podem ser conferidos no endereço www.movesamba.com/bikesantos.



Fonte e foto: www.santos.sp.gov.br
mopc no está en línea   Reply With Quote
Old December 10th, 2012, 10:30 AM   #567
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,234
Likes (Received): 11980

Rio de Janeiro Bicycle System - overview

Quote:
Originally Posted by Nighto View Post
Amigos, criei este post para trocarmos informações, notícias e opiniões sobre as ciclovias do Rio de Janeiro. Espero que gostem!
Não deixem de visitar também meu projeto em parceria com a Transporte Ativo, o Mapa Cicloviário Unificado do Rio de Janeiro, uma plataforma colaborativa que conta com vias para bicicletas, bicicletários, oficinas de bicicleta e muito mais. Confira: http://ciclorio.ta.org.br/

Infraestrutura Cicloviária do Rio de Janeiro

Infraestrutura Cicloviária é, como denotado, toda a infraestrutura destinada a ciclistas. Abrange, na esfera pública, as diferentes vias - ciclovias, ciclofaixas, vias e calçadas compartilhadas - assim como bicicletários públicos e bicicletas públicas e, na esfera privada, lojas e oficinas de bicicletas, bem como sistemas particulares de aluguel, postos com bomba de ar etc.

Tipos de vias

Infraestrutura cicloviária não é necessariamente ciclovia. Existem 4 tipos de vias, que podem ser implantadas de acordo com o fluxo de ciclistas e o espaço físico disponível:
  • Ciclovia: Via segregada para o fluxo exclusivo de bicicletas. Geralmente separada por uma calçada ou canteiro central. Salvo exceções, o uso por corredores é permitido. Exemplo: Ciclovia da Orla de Copacabana.
  • Ciclofaixa: Faixa da via de rolamento separada para o fluxo de ciclistas. Geralmente pintada de vermelho e separada do restante da via por delimitadores tipo "tachão" ou "olho de gato". Exemplo: Ciclofaixa da Rua Figueiredo Magalhães, em Copacabana.
  • Via Compartilhada: Ruas com velocidade reduzida para compartilhamento de bicicleta, com prioridade para esse veículo e velocidade máxima reduzida para 30km/h. Também conhecido como "Sharrow". Exemplo: Zona 30 de Copacabana.
  • Calçada Compartilhada: Vias em que a calçada é compartilhada com as bicicletas. Geralmente pintadas de vermelho, são utilizadas em situações em que não é possível retirar espaço dos veículos sem grandes obras, como desapropriações para o alargamento da via, ou em áreas de lazer em que não há a necessidade da separação entre ciclistas e pedestres. Exemplo: Lagoa-Botafogo, Aterro do Flamengo etc.

A história das ciclovias no Rio começa na década de 90, mais especificamente em 1992, motivada pelo evento Rio 92, quando se discutiu a necessidade da criação de uma infraestrutura exclusiva para que o carioca pudesse utilizar as bicicletas com maior tranquilidade. Nesse ano, foram criados os primeiros 27km de ciclovias, todas na orla, em obras que foram muito questionadas pela população da época, uma vez que este espaço era utilizado como estacionamento.

Hoje, vinte anos depois, temos 294,77km de vias para bicicletas implantadas por toda a cidade (dados de outubro de 2012).


(Este mapa é de meados de 2012 e já se encontra desatualizado. Clique para abrir em tamanho maior)


Rio Capital da Bicicleta

A prefeitura do Rio de Janeiro mantém um programa chamado "Rio Capital da Bicicleta", dentro da SMAC - Secretaria Municipal do Meio Ambiente, que é quem cuida das "magrelas". Aqui me permito copiar o texto todo do site da secretaria. (Notem que o texto é de 2010.)



(Fonte: http://www.rio.rj.gov.br/web/smac/ex...icle-id=756384)

Dados e Mitos

Ao contrário do que muitos imaginam, a maior parte das vias para bicicletas não está na Zona Sul da cidade. Segundo dados de julho de 2012:


(Fonte: A MOBILIDADE POR BICICLETA ENQUANTO INSTRUMENTO DE TRANSFORMAÇÃO, BINATTI, GABRIELA - 2012)
mopc no está en línea   Reply With Quote
Old December 13th, 2012, 05:10 PM   #568
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,234
Likes (Received): 11980

Recife Metro (Metrorec) - new CAF train to enter operations in 2013 in the South line, another 16 to come next year.

Quote:
Originally Posted by Timbu View Post
mopc no está en línea   Reply With Quote
Old December 13th, 2012, 05:16 PM   #569
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,234
Likes (Received): 11980

Rio de Janeiro Light Rail - more detailed map surfaces

mopc no está en línea   Reply With Quote
Old December 14th, 2012, 02:50 PM   #570
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,234
Likes (Received): 11980

Rio de Janeiro Suburban Rail (Supervia) - heavy rains flood parts of the system

Quote:
Originally Posted by Mirolawren View Post
mopc no está en línea   Reply With Quote
Old December 17th, 2012, 03:34 PM   #571
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,234
Likes (Received): 11980

Recife Light Rail - pics of tram at depot

Quote:
Originally Posted by Paulo Magalhães View Post
Complexo de Edgard Werneck.





















mopc no está en línea   Reply With Quote
Old December 18th, 2012, 06:58 PM   #572
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,234
Likes (Received): 11980

Rio de Janeiro Suburban Rail (Supervia) - new video on project to renovate Central Station. Fantastic video.

mopc no está en línea   Reply With Quote
Old December 20th, 2012, 10:59 PM   #573
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,234
Likes (Received): 11980

Santos Light Rail - Order to purchase first tram to be signed today (December 20, 2012)

Quote:
Originally Posted by Rodalvesdepaula View Post
A promessa de anos começa a virar realidade.


20/12/2012 - AVISO DE PAUTA - Assinatura da autorização para a compra do 1º Veículo Leve Sobre Trilhos que vai operar na Baixada Santista



A Ordem de Serviço para a compra do 1º Veículo Leve Sobre Trilhos (VLT) da Baixada Santista será assinada nesta sexta-feira (21/12) em evento realizado no Emissário Submarino, em Santos, com a presença do Secretário dos Transportes Metropolitanos, Jurandir Fernandes, e do presidente da EMTU/SP, Joaquim Lopes. A previsão é de que o primeiro veículo de um lote de 22 VLTs comece a operar em maio de 2014 no trecho de 11km entre o terminal Barreiros, em São Vicente, e o Terminal Porto, em Santos.

Os VLTs fazem parte do Sistema Integrado Metropolitano (SIM), empreendimento do governo do Estado que é gerenciado pela EMTU/SP, empresa vinculada à Secretaria dos Transportes Metropolitanos.



Serviço

Assinatura da autorização para a Ordem de Serviço do 1º VLT da Baixada Santista (VLT)

Data: 21/12/2012

Horário: 10 horas

Local: Emissário Submarino - Av. Presidente Wilson, s/nº - altura do número 169 - Bairro José Menino - Santos - SP


Atualizado em: 20/12/2012 18:03:25


Fonte: http://www.emtu.sp.gov.br/emtu/impre...ve-sobre-t.fss
mopc no está en línea   Reply With Quote
Old December 21st, 2012, 02:50 PM   #574
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,234
Likes (Received): 11980

Rio de Janeiro BRTs - Transoeste amateur video

mopc no está en línea   Reply With Quote
Old December 21st, 2012, 02:51 PM   #575
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,234
Likes (Received): 11980

Belém BRT - project video

mopc no está en línea   Reply With Quote
Old December 21st, 2012, 02:52 PM   #576
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,234
Likes (Received): 11980

Belo Horizonte BRT - project video

mopc no está en línea   Reply With Quote
Old December 26th, 2012, 04:42 PM   #577
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,234
Likes (Received): 11980

Rio de Janeiro Metro - forumers visit

mopc no está en línea   Reply With Quote
Old December 28th, 2012, 05:17 AM   #578
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,234
Likes (Received): 11980

Rio de Janeiro Suburban Rail (Supervia) - BBC visits a "samba train"



Plus: forumer pic

mopc no está en línea   Reply With Quote
Old December 28th, 2012, 05:32 PM   #579
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,234
Likes (Received): 11980

Cuiabá Light Rail - contract assures funds for works

Quote:
Originally Posted by igor_carlos View Post

- Viaduct proceeds

Quote:
Originally Posted by CUIABA2014 View Post
Estrutura do viaduto da UFMT passa por teste de cargas



O Consórcio VLT Cuiabá-Várzea Grande realizou uma prova de carga na estrutura do viaduto da Universidade Federal de Mato Grosso (UFMT), que está sendo construído na avenida Fernando Correa da Costa, em Cuiabá. O teste teve duração de 19 horas, quando uma carga máxima de 265 toneladas, mais 50%, foi aplicada sobre uma estaca similar à da estrutura que está sendo erguida.

Para a realização das provas, o Consórcio VLT contratou uma empresa especializada que executou a prova de carga estática com estrutura e equipamentos específicos. Tudo ocorreu conforme o programado e a análise dos resultados das provas de carga permitirá um melhor conhecimento do comportamento do solo/elemento de fundação. Isso garante confiabilidade ao projeto e subsidia a equipe projetista na definição do comportamento das estacas nos carregamentos verticais na obra que está sendo executada.

Pelas normas NBR 6122 (projeto e execução de fundações) e NBR 12131 da Associação Brasileira de Normas Técnicas (ABNT) a cada 100 estacas cravadas em uma obra é necessária a realização de provas de carga (que simula o peso dos veículos que passam sobre o viaduto). No caso da obra de arte da UFMT, que terá 200 estacas, serão necessários dois testes, sendo que o segundo já está sendo programado. Até agora 176 estacas foram cravadas e compõem os blocos de concreto que vão sustentar os pilares do viaduto.

Esse teste será feito em todas as obras de arte especiais construídas pelo Consórcio VLT que possuírem mais de 100 estacas. No caso do viaduto da UFMT, a obra está na fase final da fundação, com a conclusão do 10° eixo de blocos (cada eixo tem três blocos, sendo que cada bloco possui seis estacas) que vão sustentar os pilares e vigas transversinas do viaduto, por onde passará o Veículo Leve sobre Trilhos (VLT) e os demais veículos.

O viaduto será composto por três tipos de estrutura, a infra (fundação – estacas e blocos), a supra (pilares e vigas) e a meso (laje e pavimento). Com a conclusão dos testes e da estrutura de fundação, o consórcio dará início à construção da supra estrutura.

OBRA

Viaduto da UFMT terá 428 metros e está sendo construído sobre os entroncamentos das avenidas Brasília, Tancredo Neves e a via de acesso ao campus da UFMT e será constituído de duas faixas de circulação por sentido para o tráfego geral e da via permanente do VLT.

http://www.acopadopantanal.com.br/?p..._noticia=15428

- Construction to close 22km of streets next year (2013)

Quote:
Originally Posted by igor_carlos View Post
Obras para VLT vão interditar 22 km ano que vem



Os 22 quilômetros de vias por onde passarão o Veículo Leve sobre Trilhos (VLT) estarão interditados em 2013. É o que garante a Secretaria Extraordinária da Copa (Secopa/MT) que prevê que as obras ocorram em ritmo acelerado. O titular da pasta, Maurício Guimarães, destaca que os bloqueios não ocorrerão todos ao mesmo tempo, mas que serão em intervalos cada vez menores, para garantir que a obra do modal de transporte fique pronta até março de 2014.

O VLT cuiabano prevê um sistema com 40 composições de 44 metros cada. Cada uma destas composições comporta até 71 passageiros sentados. Com uma composição em tráfego por estação no intervalo de 3 minutos, nos horários de pico, haverá uma demanda de até 8 mil passageiros. A tarifa prevista, segundo a Secopa, é de R$ 1,75 a custo atualizado em setembro de 2012. Cada uma das estações deverá receber um módulo de integração com o transporte coletivo tradicional (ônibus).

Veja mais informações sobre o VLT: http://www.acopadopantanal.com.br/?p=vltcuiaba


Fonte: Gazeta
mopc no está en línea   Reply With Quote
Old December 28th, 2012, 05:38 PM   #580
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,234
Likes (Received): 11980

Belo Horizonte Metro (Metrominas) / Porto Alegre Metro (Transurb) - CAF to build 10 4-car trainsets for Belo Horizonte's metro - and 15 4-car trainsets for the Porto Alegre Metro. The Cuiabá light rail traim will also be built by CAF. All of these vehicles will be built in Brazil.

Quote:
Originally Posted by Reinaldo MG View Post
Publicado no site da CAF:





19-11-2012

CAF se adjudica dos nuevos contratos en Brasil, para las ciudades de Belo Horizonte y Porto Alegre

El Consorcio FROTA BH, liderado por CAF, se há adjudicado el contrato para suministrar a CBTU (Companhia Brasileira de Trens Urbanos) la cantidad de 10 trenes de 4 coches cada uno para la ciudad brasileña de Belo Horizonte, capital del estado de Minas Gerais.

Se trata de unidades eléctricas de última generación que circularán sobre un ancho de vía de 1.600 mm. y a 3.000 voltios para la Superintendencia de Trenes Urbanos de dicha ciudad. Se trata de un vehículo bidireccional, con una capacidad de hasta 1.300 pasajeros, donde se proporciona un fácil acceso a las personas con movilidad reducida, y preparado para circular con una velocidad de servicio de 90 km/h.

La ciudad de Belo Horizonte, cuenta con una población de 2,3 millones de habitantes, y es una de las 12 ciudades designadas como sede de la Copa Mundial de Fútbol de 2014, así como una de las subsedes de los Juegos Olímpicos de Verano de 2016.

Por otro lado, CAF también suministrará todos los bogies de los 15 nuevos trenes de 4 coches cada uno, que la Ciudad de Porto Alegre, capital del Estado de Rio Grande do Sul, está adquiriendo para TRENSURB (Empresa de Trens Urbanos de Porto Alegre).

El conjunto de ambos proyectos representa para CAF una facturación superior a los 80 millones de euros. Ambos proyectos se llevarán a cabo en la planta que CAF tiene en Brasil, situada en el estado de Sao Paulo, y que pasa por ser una de las fábricas de material ferroviario más modernas de Latinoamérica.

Con estos dos nuevos suministros, CAF consolida su liderazgo en este mercado, así como la expansión del Grupo CAF por los diferentes estados de Brasil, donde cuenta con contratos para Sao Paulo, Recife y Cuiabá.

http://www.caf.es/caste/prensa/noticia.php?id=132

Last edited by mopc; December 28th, 2012 at 07:48 PM.
mopc no está en línea   Reply With Quote


Reply

Tags
brazil, buses, commuter rails, monorails, subways, trams, transport, transporte coletivo

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Related topics on SkyscraperCity


All times are GMT +2. The time now is 01:52 PM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2018, vBulletin Solutions Inc.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

tech management by Sysprosium