daily menu » rate the banner | guess the city | one on oneforums map | privacy policy | DMCA | news magazine | posting guidelines

Go Back   SkyscraperCity > Infrastructure and Mobility Forums > Subways and Urban Transport

Subways and Urban Transport Metros, subways, light rail, trams, buses and other local transport systems



Global Announcement

As a general reminder, please respect others and respect copyrights. Go here to familiarize yourself with our posting policy.


Reply

 
Thread Tools
Old August 25th, 2016, 09:51 AM   #1701
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,226
Likes (Received): 11945

Rio de Janeiro BRT - City's Olympic BRT extensions start being used by general population


Quote:
Originally Posted by acpinto View Post
BRTs olímpicos começam a transportar o grande público
Passageiros esperam perder menos tempo para chegar aos seus destinos

POR PATRÍCIA DE PAULA 24/08/2016 4:30 / atualizado 24/08/2016 7:34

Passageiros aguardam o BRT: novas linhas são consideradas parte do legado dos Jogos Olímpicos e devem beneficiar cerca de 640 mil pessoas por dia - Guilherme Leporace
PUBLICIDADE
PUBLICIDADE

RIO - Os BRTs Transolímpico e Transoeste Lote Zero começaram a transportar o grande público nesta terça-feira e, entre os passageiros, havia grande curiosidade e empolgação diante da possibilidade de redução no tempo de viagem. Teve gente que levou cronômetro para verificar se o trajeto seria mais rápido, conforme prometido. Os dois corredores são considerados parte do legado dos Jogos Olímpicos para a cidade e devem beneficiar cerca de 640 mil pessoas por dia.

PUBLICIDADE

inRead invented by Teads

Veja também

Via Transolímpica, que vai ligar Deodoro a Barra da TijucaPrefeitura e consórcio ainda discutem valor de pedágio a 2 dias da abertura da Transolímpica
O sistema BRT colocou em circulação algumas unidades do veículo conhecido como "minhocão", que tem 28 metros de comprimento e comporta 270 passageirosMais de 9 milhões de passageiros utilizaram o BRT na Olimpíada
Via ligará Barra e Recreio a DeodoroTransolímpica será inaugurada, mas terá só três estações durante Jogos
Construção é erguida perto de encosta sobre um dos túneis do BRT Transolímpico, em JacarepaguáÁreas vizinhas ao BRT Transolímpico já são alvo de ocupação irregular


Morador do Recreio, o servidor público Fabrízio Quiroga queria saber exatamente quanto tempo gastará até o Centro do Rio, onde trabalha. Por isso, levou um cronômetro para a viagem. Ele conta que costumava pegar o BRT até a estação Alvorada, depois um ônibus até o Shopping Nova América e, por fim, o metrô até a Central do Brasil.

— Espero ganhar 40 minutos, pelo menos. Com a nova linha, eu desço na Vila Militar e pego o trem até a Central — explica Quiroga.

MAIS TEMPO LIVRE NO DIA A DIA

O BRT Transolímpico liga o Recreio a Deodoro. O BRT Transoeste Lote Zero faz o trajeto do Terminal Alvorada ao Jardim Oceânico, possibilitando a integração com a Linha 4 do metrô. Uma equipe do GLOBO fez o trajeto de cerca de 40 minutos do Transolímpico. No mesmo ônibus havia passageiros como a segurança Daylane Rodrigues, que também espera ganhar tempo no dia a dia. Ela já usava o transporte desde o dia 4, pois trabalhou no Parque Olímpico. Agora, para ir de Padre Miguel até a região, diz que vai economizar quase uma hora:

— Antes, eu levava mais de uma hora para chegar ao meu destino. Agora são 25 minutos.

O representante comercial Maurício Veloso embarcou para conhecer o percurso:

— Por causa do meu trabalho, a cada dia vou a um lugar diferente. Agora posso pegar só uma condução e deixar o carro em casa.

Para a dona de casa Vilma Rodrigues, moradora da Taquara, a viagem foi um passeio:

— Vou até Deodoro e depois volto para casa. Já fiz até amizades aqui.

PUBLICIDADE

Aposentado, Amaro José de Santana, fazia questão de anotar o nome de cada uma das 18 estações em uma folha de papel, para guardar de recordação.

— Os primeiros dias são para os usuários testarem os serviços. Os corredores aumentam a possibilidade de deslocamento, e a baldeação pode ser uma opção a mais. O passageiro pode escolher se quer fazer uma parte em BRT, trem ou metrô — diz Suzy Balloussier, diretora de relações institucionais do BRT Rio.

A tarifa cobrada pelo BRT Rio é a estabelecida pela prefeitura para o Bilhete Único Carioca, R$ 3,80. Para integração com os trens da Supervia, o blihete custa R$ 6,60. O Bilhete Único Metropolitano, de R$ 6,50, vale para a integração da Supervia com ônibus intermunicipais.



ANTERIOR
Metrô ainda não tem data para entrar nos trilhos até a Gávea
PRÓXIMA
Site oficial da organização dos Jogos reúne relíquias à venda


Leia mais sobre esse assunto em http://oglobo.globo.com/rio/brts-oli...#ixzz4IGqfQ9GJ
© 1996 - 2016. Todos direitos reservados a Infoglobo Comunicação e Participações S.A. Este material não pode ser publicado, transmitido por broadcast, reescrito ou redistribuído sem autorização.

Last edited by mopc; August 25th, 2016 at 06:07 PM.
mopc no está en línea   Reply With Quote

Sponsored Links
Old August 25th, 2016, 10:45 PM   #1702
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,226
Likes (Received): 11945

Salvador Metro - Line 2 construction update - Imbuí station


Quote:
Originally Posted by Sanjos View Post
Externa

























Interna


















Bonus: CAB station

Quote:
Originally Posted by Tennyson Vital View Post











Last edited by mopc; August 25th, 2016 at 11:34 PM.
mopc no está en línea   Reply With Quote
Old August 26th, 2016, 04:20 AM   #1703
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,226
Likes (Received): 11945

Sao Paulo Suburban Rail (CPTM) - Line 13 International Airport update


Quote:
Originally Posted by Edson Fukumoto View Post
Por dentro da Linha 13-Jade da CPTM


AUTOR: RENATO LOBO // AGOSTO 18, 2016 TWEETSHARE
Colaboração de Caio Lobo e Gabriel Garcia


“A ultima vez que um trem esteve em Guarulhos foi na década de 60″. E assim se iniciava a visita monitorada nas obras da Linha 13-Jade da Companhia Paulista de Trens Metropolitanos – CPTM, na qual o Via Trolebus participou, e conta a seguir:

A linha:

A nova ferrovia terá 12,2 quilômetros de extensão, se​​ndo que uma parte do trajeto será feita em superfície (4,3 km) e outra em elevado (7,9 km).

As obras foram iniciadas no final de 2013 e são divididas em quatro lotes pelos consórcios que ganharam a licitação: HFTS Jade (Helleno e Fonseca-Trail-Spavias) e CST Linha 13-Jade (Consbem-​Serveng-TIISA). Foram instalados os canteiros de obras do lote 1, próximo à estação Engenheiro Goulart e o canteiro de obras do lotes 2 a 4 situado às margens da avenida Hélio Smidt, próximo a Rodovia Presidente Dutra. ​

As estações:

Estação Engenheiro Goulart

Parada inicial da Linha 13, a antiga estação da Linha 12-Safira foi demolida, dando lugar a um novo prédio que será o ponto de conexão da nova ferrovia, com o restante da malha metroferroviária. Terá plataformas centrais. No piso superior haverá conexão com uma rampa de acesso ao Parque Ecológico do Tietê, além de um bicicletário, possibilitando acesso com uma ciclovia existente na região.

De acordo com um dos engenheiros que acompanharam a visita, no final de agosto chegará uma parte do material de cobrimento da cobertura; A CPTM trabalha para finalizar a estação em 2017. No local serão instalados 8 escadas rolantes entre mezanino e plataforma;


Estação Engenheiro Goulart | Foto: Renato Lobo


à esquerda, plataforma da L12 e a direita da L13 | Foto: Renato Lobo


Estação Engenheiro Goulart | Foto: Renato Lobo


Estruturas da cobertura sendo montadas | Foto: Renato Lobo


Acesso da estação ao Parque Ecológico e bicicletário | Foto: Renato Lobo


Acesso à Avenida Assis Ribeiro, onde funciona o posto| Foto: Renato Lobo




Estação Engenheiro Goulart | Foto: Renato Lobo


Região dos bloqueios | Foto: Renato Lobo


Trem da série 4400 nas proximidades da obra | Foto: Renato Lobo

Estação Guarulhos – Cecap

A segunda parada terá plataforma central, e passarela com acesso apenas de um lado, possibilitando os passageiros a chegarem do trem ao Hospital Geral de Guarulhos e ao Terminal Rodoviário da cidade.

Um dos engenheiros nos contou que por conta da baixa demanda do outro lado da Rodovia Hélio Smidt, o projeto não contou com uma passarela sobre a via.


Elevado ao lado da Rodovia Ayrton Senna | Foto: Renato Lobo


Elevado ao lado da Rodovia Ayrton Senna. No ar, aeronave ATR-72 da Passaredo | Foto: Renato Lobo


Ponte sobre Rio Tietê | Foto: Renato Lobo


Estação Aeroporto de Guarulhos

Estação terminal da Linha 13 terá plataformas laterias, e deve atender a 60 mil passageiros por dia. Um dos lados dará acesso ao Terminal Taboão da EMTU. Do outro, os passageiros poderão acessar o complexo do aeroporto e um eventual serviço que ligue o local com os terminais de embarque. Falou-se na construção de um sistema de People mover, no entanto o projeto do meio de transporte está a cargo da GRU Airport.

O empreendimento terá 8 escadas rolantes entre mezanino e plataforma, 2 escadas rolantes nos acessos. As passarelas públicas devem funcionar 24 horas para atendimento dos funcionários e moradores da região.

Na parte inferior da estação haverá Ponto de ônibus na Rodovia Hélio Smidt, além de baias para embarque e desembarque de passageiros dos automóveis. Após a estação, está sendo construído mais um trecho de aproximadamente 1 km para a área de manobra dos trens.
Linha13-jade-cptm-renatolobo13Linha13-jade-cptm-renatolobo16
Via após estação Aeroporto sentido Jardim São João | Foto: Renato Lobo


Estação Aeroporto de Guarulhos | Foto: Renato Lobo


Via após estação Aeroporto sentido Jardim São João | Foto: Renato Lobo


Estação Aeroporto de Guarulhos| Foto: Gabriel Garcia


Estação Aeroporto de Guarulhos| Foto: Gabriel Garcia


Acesso do outro lado da Rodovia Helio Smidt | Foto: Gabriel Garcia

Operação

A viagem entre Engenheiro Goulart e o Aeroporto será de 17 minutos, com intervalo entre os trens de 8 minutos. Devem ser atendidos 120 mil passageiros dia. A linha terá mão inglesa.

A manutenção dos trens será a mesma das linhas 11 e 12, assim como a estocagem das composições. Estão sendo construídos também 3 subestações e 2 seccionadoras, para o sistema de energia.

Trens

Os 8 trens que devem operar na Linha 13 serão licitados entre setembro e outubro, e seguem as mesmas caraterísticas das demais composições, com um diferencial de portar bagageiros. Terão financiamento pelo Banco Europeu de Investimentos (BEI).

Trem da série 2700 ao lado das obras da Linha 13 | Foto: Renato Lobo
Trem da série 2700 ao lado das obras da Linha 13 | Foto: Renato Lobo

Futuras Expansões

Está na fase do projeto funcional futuras expansões, em uma ponta rumo a Estação Chácara Klabin, que abriga as linhas 2-Verde e futuramente 5-Lilás, e a leste de Guarulhos até o Jardim São João.

Números e curiosidades

– 2 mil operários nas obras;
– Atravessa 2 rios;
– 120 mil passageiros dia serão atendidos;
– 4 espaços socioambientais para atender à população;
– “Prazo violento na primeira ordem de serviço”, comentou um dos engenheiros sobre entrega da linha;
– 17 minutos de viagem;
– Intervalo de 8 minutos entre os trens;
– R$ 1,8 bilhão, sendo as obras civis financiadas pela Agência Francesa de Desenvolvimento (AFD) e recursos do Governo do Estado de São Paulo (GESP), e a energia, sinalização e telecomunicação pela Caixa Econômica Federal (CEF/PAC);
– Vigas são içadas na Rodovia Hélio Smidt durante intervalo dos voos;
– Problemas com desapropriações contribuíram para lentidão a obra;
– A via elevada terá isolamento acusto na região da USP leste;
– Todos os AMV’s (Aparelhos de Mudança de Via) serão no padrão UIC;
– Será erguido um viaduto estaiado sobre a Rodovia Hélio Smidt;;




AUTOR: RENATO LOBO

http://viatrolebus.com.br/2016/08/po...-jade-da-cptm/
mopc no está en línea   Reply With Quote
Old August 28th, 2016, 07:33 AM   #1704
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,226
Likes (Received): 11945

Sao Paulo Suburban Rail (CPTM) - BW picture of Luz station (Lines 11, 7, and CMSP lines 4, 1)

mopc no está en línea   Reply With Quote
Old August 28th, 2016, 07:36 AM   #1705
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,226
Likes (Received): 11945

Rio de Janeiro Light Rail - picture

mopc no está en línea   Reply With Quote
Old September 2nd, 2016, 07:41 AM   #1706
carl_Alm
Brazil
 
carl_Alm's Avatar
 
Join Date: Aug 2012
Location: SSA - BA
Posts: 5,841
Likes (Received): 12876

Salvador Metro - Line 2 - Under construction

Quote:
Originally Posted by -Hatori-Amaral View Post
Avanços da linha 2 do metrô de Salvador - Brasil















http://www.secom.ba.gov.br/galeria/1...o-Linha-2.html
__________________
"The boy with the thorn in his side..."

Last edited by carl_Alm; September 2nd, 2016 at 07:51 AM.
carl_Alm no está en línea   Reply With Quote
Old September 2nd, 2016, 09:38 AM   #1707
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,226
Likes (Received): 11945

Sao Paulo Suburban Rail (CPTM) - Line 13 update - airport station gains shape. Line 13 is scheduled to open by early 2018, and will connect the city with the International Airport in Guarulhos (Brazil's busiest airport)

Quote:
Originally Posted by RMeier View Post
Estação Aeroporto



Acesso do lado do aeroporto


Do Instagram
mopc no está en línea   Reply With Quote
Old September 6th, 2016, 08:05 AM   #1708
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,226
Likes (Received): 11945

Rio de Janeiro Light Rail - 30 fare dodgers get fine on first day of enforcement

Quote:
Originally Posted by acpinto View Post
Guarda Municipal multa 33 pessoas no primeiro dia de cobrança de tarifa no VLT

Do total, dez eram turistas. Penalidade para quem foi flagrado é de R$ 170. Em caso de reincidência, é de R$ 225

05/09/2016 18:49:33
O DIA
Rio - No primeiro dia de cobrança de tarifa para utilizar o Veículo Leve Sobre Trilhos (VLT), a Guarda Municipal multou 33 pessoas, nesta segunda-feira, que não pagaram o valor. A multa para quem foi flagrado pelos agentes foi de R$ 170. Caso seja multado novamente, o valor da reincidência vai para R$ 255 (multa mais 50%).


Passageiros que não pagarem tarifa do VLT serão multados
Sandro Vox / Agência O Dia
Dos 33 multados, dez são turistas, sendo um do Equador. A primeira autuação aconteceu às 7h33. A maior parte das multas foi emitida na parte da manhã: foram 19 infrações até o meio-dia.

Os usuários flagrados utilizando o serviço sem pagar receberam a notificação emitida na hora, com informações sobre a autuação, instruções para impressão da guia de pagamento, na internet, e orientações para recurso.

A fiscalização, realizada em conjunto com um agente da concessionária, que utiliza um equipamento para verificação do último débito efetuado no cartão de passagem, acontecerá diariamente, durante todo o horário de funcionamento do VLT, que atualmente é das 6h à meia noite.

http://odia.ig.com.br/rio-de-janeiro...fa-no-vlt.html
mopc no está en línea   Reply With Quote
Old September 20th, 2016, 06:18 PM   #1709
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,226
Likes (Received): 11945

Rio de Janeiro Light Rail - pics

Quote:
Originally Posted by xrtn2 View Post

VLT no Rio de Janeiro by WRI Brasil Cidades Sustentáveis, no Flickr


VLT no Rio de Janeiro by WRI Brasil Cidades Sustentáveis, no Flickr


VLT no Rio de Janeiro by WRI Brasil Cidades Sustentáveis, no Flickr


VLT no Rio de Janeiro by WRI Brasil Cidades Sustentáveis, no Flickr


VLT no Rio de Janeiro by WRI Brasil Cidades Sustentáveis, no Flickr


VLT no Rio de Janeiro by WRI Brasil Cidades Sustentáveis, no Flickr


VLT no Rio de Janeiro by WRI Brasil Cidades Sustentáveis, no Flickr


VLT no Rio de Janeiro by WRI Brasil Cidades Sustentáveis, no Flickr


VLT no Rio de Janeiro by WRI Brasil Cidades Sustentáveis, no Flickr


VLT no Rio de Janeiro by WRI Brasil Cidades Sustentáveis, no Flickr


VLT no Rio de Janeiro by WRI Brasil Cidades Sustentáveis, no Flickr


VLT no Rio de Janeiro by WRI Brasil Cidades Sustentáveis, no Flickr


VLT no Rio de Janeiro by WRI Brasil Cidades Sustentáveis, no Flickr


VLT no Rio de Janeiro by WRI Brasil Cidades Sustentáveis, no Flickr


VLT no Rio de Janeiro by WRI Brasil Cidades Sustentáveis, no Flickr


VLT no Rio de Janeiro by WRI Brasil Cidades Sustentáveis, no Flickr


VLT no Rio de Janeiro by WRI Brasil Cidades Sustentáveis, no Flickr


VLT no Rio de Janeiro by WRI Brasil Cidades Sustentáveis, no Flickr


VLT no Rio de Janeiro by WRI Brasil Cidades Sustentáveis, no Flickr


VLT no Rio de Janeiro by WRI Brasil Cidades Sustentáveis, no Flickr
mopc no está en línea   Reply With Quote
Old September 27th, 2016, 07:46 PM   #1710
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,226
Likes (Received): 11945

Santos Light Rail (SIM - VLT da Baixada Santista) - platform screen doors being installed

Quote:
Originally Posted by Donniel Galdino View Post
Um rápido update das obras...

Estação Bernardino com PSDs


Painéis instalados dos dois lados


Ponte sobre o C3




Trilhos instalados entre C3 e estação Cons. Nébias




AMV


Estação Cons. Nébias


Lado sentido São Vicente da linha concretada


Cruzamento da Afonso Pena com Campos Melo







Mais detalhes sobre o andamento das obras:

- Subestação da Bernardino já está sendo alimentada pela CPFL;

- Estações Ana Costa e Washington Luis quase prontas;

- Trechos entre C1 e Pátio Porto que ainda não tem trilho instalado:
Cruzamento com Manoel Vitorino (próx Ana Costa);
Cruzamentos com Sen Feijó e C3;
Entre estação Cons. Nébias e Campos Melo (o mais atrasado).
mopc no está en línea   Reply With Quote
Old September 29th, 2016, 05:30 PM   #1711
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,226
Likes (Received): 11945

Sao Paulo Metro (CMSP) - Line 5 update - Brooklin station

Quote:
Originally Posted by AntonioBR View Post
Pequena amostra de Brooklin.





Trilhos instalados na Via 1


Acesso lado oposto da Av. Santo Amaro
mopc no está en línea   Reply With Quote
Old September 29th, 2016, 05:38 PM   #1712
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,226
Likes (Received): 11945

Sao Paulo Metro (CMSP) - Line 15 monorail update

Quote:
Originally Posted by sergiomazzi View Post

Os trabalhos em São Lucas nesta madrugada estavam relacionados às fundações e ou blocos de pilares.

A movimentação nos AMVs leste de Oratório (ontem e hoje), podem estar relacionados sim ao içamento das vigas metálicas num futuro próximo.

E parece que os trabalhos noturnos madrugada á dentro em São Lucas irão render também nesta noite,
outro guindaste além deste que aparece na imagem estava se posicionando:
P1280181 by sergiomazzi, no Flickr
P1280179 by sergiomazzi, no Flickr

"Vamos AMVs do Leste!!!"
P1280160 by sergiomazzi, no Flickr
P1280177 by sergiomazzi, no Flickr

"Panorama Fail"
Panorama 2 by sergiomazzi, no Flickr
Panorama 2 by sergiomazzi, no Flickr
mopc no está en línea   Reply With Quote
Old September 29th, 2016, 06:40 PM   #1713
carl_Alm
Brazil
 
carl_Alm's Avatar
 
Join Date: Aug 2012
Location: SSA - BA
Posts: 5,841
Likes (Received): 12876

Salvador metro - Line 2 - between Detran and Rodoviária.





Detran Station





Rodoviária Station








http://www.sedur.ba.gov.br/galeria/3...l#menu-galeria

Quote:
Originally Posted by Tennyson Vital View Post
__________________
"The boy with the thorn in his side..."

Last edited by carl_Alm; September 29th, 2016 at 06:59 PM.
carl_Alm no está en línea   Reply With Quote
Old October 1st, 2016, 07:48 PM   #1714
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,226
Likes (Received): 11945

Sao Paulo Suburban Rail (CPTM) - Line 11 trains aligned at Luz station platform



original
mopc no está en línea   Reply With Quote
Old October 6th, 2016, 05:58 PM   #1715
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,226
Likes (Received): 11945

Sao Paulo Metro (CMSP) - Line 15 Monorail - Jardim Planalto station update

Quote:
Originally Posted by sergiomazzi View Post



Agora sim! Lançamentos de vigas-guias em Jardim Planalto, e nesta noite tem mais!

P1280196 by sergiomazzi, no Flickr
P1280189 by sergiomazzi, no Flickr
P1280191-2 by sergiomazzi, no Flickr
P1280192 by sergiomazzi, no Flickr

"Long Exposition Fail"
P1280193 by sergiomazzi, no Flickr


Vila União station

Quote:
Originally Posted by sergiomazzi View Post
Vila União:

P1280201 by sergiomazzi, on Flickr
P1280219 by sergiomazzi, on Flickr
P1280220 by sergiomazzi, on Flickr
P1280221 by sergiomazzi, on Flickr
mopc no está en línea   Reply With Quote
Old October 7th, 2016, 02:01 AM   #1716
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,226
Likes (Received): 11945

Sao Paulo Metro (CMSP) - Line 17 monorail update

Quote:
Originally Posted by LucianoFC View Post
Estação Chucri Zaidan
Fotos de hoje 6-out-2016

A todo vapor !!!










mopc no está en línea   Reply With Quote
Old October 10th, 2016, 08:18 PM   #1717
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,226
Likes (Received): 11945

Sao Paulo Metro (CMSP) - Line 5 Brooklin station update

Quote:
Originally Posted by RMeier View Post
Estação Brooklin: piso, estrutura das claraboias e Kiss & Ride na rua lateral.



http://www.metrocptm.com.br/estacao-...aca-futurista/
mopc no está en línea   Reply With Quote
Old October 13th, 2016, 08:03 PM   #1718
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,226
Likes (Received): 11945

Sao Paulo Metro (CMSP) - Line 5 September 2016 update

Quote:
Originally Posted by RMeier View Post




Last edited by mopc; October 13th, 2016 at 09:01 PM.
mopc no está en línea   Reply With Quote
Old October 16th, 2016, 10:37 PM   #1719
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,226
Likes (Received): 11945

Sao Paulo Suburban Rail (CPTM) - TV report on delays on lines 9 and 13. They will be completed only by late 2018.

mopc no está en línea   Reply With Quote
Old October 16th, 2016, 10:48 PM   #1720
arctic_carlos
Recondita armonia
 
arctic_carlos's Avatar
 
Join Date: Dec 2007
Location: Sitges - Barcelona
Posts: 4,701
Likes (Received): 3894

I guess the delay on line 9 refers exclusively to the extension Grajaú - Varginha. In the video they just mention that the line goes from Osasco to Vargnha but don't say anything about the extension currently under construction (although the images shown are from the extension, I imagine).
__________________
Wer kämpft, kann verlieren. Wer nicht kämpft, hat schon verloren.

Bertolt Brecht
arctic_carlos está en línea ahora   Reply With Quote


Reply

Tags
brazil, buses, commuter rails, monorails, subways, trams, transport, transporte coletivo

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Related topics on SkyscraperCity


All times are GMT +2. The time now is 06:23 PM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2018, vBulletin Solutions Inc.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

tech management by Sysprosium