daily menu » rate the banner | guess the city | one on oneforums map | privacy policy | DMCA | news magazine | posting guidelines

Go Back   SkyscraperCity > Infrastructure and Mobility Forums > Subways and Urban Transport

Subways and Urban Transport Metros, subways, light rail, trams, buses and other local transport systems



Global Announcement

As a general reminder, please respect others and respect copyrights. Go here to familiarize yourself with our posting policy.


Reply

 
Thread Tools
Old February 8th, 2017, 02:42 PM   #1761
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,235
Likes (Received): 11982

Rio de Janeiro Light Rail - Line 2 inaugurated




Quote:
Originally Posted by Nighto View Post
Viagem no sentido oposto, Saara-Praça XV, hoje na hora do almoço. Filmei de um ângulo que dá para ver o velocímetro em grande parte do trecho.



Deu 8'20" a viagem, tá ótimo!

[]s

Quote:
Originally Posted by Nighto View Post
Estive agora na inauguração, junto de um outro forista de cujo nome não me recordo.

O prefeito chegou pouco depois das 10h e saiu em composição VIP somente para políticos, funcionários da concessionária e imprensa tradicional. Acompanhei o trajeto circulando de bicicleta.

Após retornar da parada terminal Saara, foi liberado o embarque para passageiros. A viagem inaugural "de verdade" levou exatos 10 minutos da estação Praça XV até a parada Saara, com direito a freio de emergência a poucos metros da parada terminal porque um comédia atravessou sem prestar atenção.

Seguem algumas fotos, e vídeos assim que o upload terminar.

Cruzamento com R. Primeiro de Março recém pintado


Composição 115, que fez a viagem inaugural com os políticos e imprensa e também depois com os passageiros. (O display dela está funcionando corretamente, por motivos de velocidade de atualização não é possível registrá-lo corretamente com câmeras normais)


Posição das máquinas de recarga da estação


Funcionários da concessionária aguardando políticos e imprensa


Um dos displays da estação Praça XV estava com um probleminha


Aguardando o prefeito


Mais detalhes, notem a faixa para ser cortada



Comitiva chegando na estação


Crivella e Índio da Costa na cabine




Enquanto a composição manobrava para voltar com a delegação exclusiva, registrei alguns detalhes da parada Saara. O diagrama de linhas mudou, e agora indica os sentidos das vias:


Em detalhes:



Viagem inaugural com lotação alta, hehe


(Nesse interim, segui a composição indo e voltando de bike. O vídeo vai mais tarde quando terminar de seguir. Na volta, havia uma fila para embarque



Prefeito dando coletiva de imprensa


Nesse momento teve uma única pessoa gritando "vice-prefeito, pague o IPTU!", fora isso nenhum tipo de protesto.

Visão da cabine sentido Saara:


Detalhe do diagrama de estações, que aparentemente será substituído porque não indica a integração entre Colombo e Sete de Setembro:





Detalhes a serem finalizados na parada Saara (via sentido Praça XV):


Voltando para a estação Praça XV:





[]s
mopc no está en línea   Reply With Quote

Sponsored Links
Old February 8th, 2017, 03:47 PM   #1762
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,235
Likes (Received): 11982

Salvador Metro - Line 2 station pics

Quote:
Originally Posted by Tennyson Vital View Post
Estações da linha 2

Acesso Norte



Detran



Rodoviária



• Estação Pernambués



• Estação Imbuí



• Estação CAB



• Estação Pituaçu



• Estação Flamboyant



• Estação Tamburugy



• Estação Bairro da Paz



• Estação Mussurunga




http://www.ccrmetrobahia.com.br
mopc no está en línea   Reply With Quote
Old February 13th, 2017, 08:53 AM   #1763
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,235
Likes (Received): 11982

Santos-Sao Vicente Light Rail (SIM - VLT da Baixada Santista) - video showing entire trajectory






Bonus - last station (Conselheiro Nebias) opened this weekend (Feb 12, 2017)

Quote:
Originally Posted by Donniel Galdino View Post
Estação Conselheiro Nébias começou a operar nesse fim de semana!


Catracas e agentes em cada lado da estação.


Há armários de cada lado e várias placas de identificação.


Como os trens não param lado a lado, colocaram cercas nos vãos onde o trem não para.


Primeira estação a receber o mapa com os arredores. Reparem a posição da estação Conselheiro no mapa, onde está circulado...


mopc no está en línea   Reply With Quote
Old February 13th, 2017, 11:19 AM   #1764
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,235
Likes (Received): 11982

Sao Paulo Suburban Rail (CPTM) - Line 13 (International Airport) update

Quote:
Originally Posted by Julio CAF View Post
Agora a pouco, a CPTM divulgou um vídeo do andamento das obras do mês de Janeiro na sua página oficial no Facebook. Segue algumas screens retirado do vídeo:

Estação Engenheiro Goulart:









Estação Guarulhos - CECAP







Estação Aeroporto:





Fonte: Facebook
mopc no está en línea   Reply With Quote
Old February 18th, 2017, 09:07 AM   #1765
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,235
Likes (Received): 11982

Sao Paulo Metro (CMSP) - Line 13 (International Airport Guarulhos) update, Airport Station


Quote:
Originally Posted by SavianoMarcio View Post

077) Vista geral da estação Aeroporto.


078) Ficou muito bem feito o acabamento.


079) A janela a direita será a conexão com o peoplemover no projeto básico, isso quanto a GRU tiver condições de realiza-lo.


080) Muito espaçoso tambem!


081) Piso podotátil.


082) Galera que veio com a gente. Só engenheiro, geólogo, estudante, só eu ilustrador e entusiasta...


083) Bela vistas também.


070) Agora a ESTAÇÃO AEROPORTO


071) Fachada em acabamento.


072) Duas escadas rolantes e uma fixa.


073) Daí para frente é da conta da GRU. Mas os sistemas de incêndio, água e esgoto do acesso estarão conectados a rede deles.


074) Poço do elevador e espaços que ficarão para a concessionária do Aerporto.


075) Esse também.


076)


mopc no está en línea   Reply With Quote
Old February 18th, 2017, 11:21 PM   #1766
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,235
Likes (Received): 11982

Sao Paulo Metro (CMSP) - Line 5 - Brooklin station Instagram update. Three new stations will probably open on line 5 still this year, Alto da Boa Vista, Borba Gato and Brooklin. Brooklin will provide transfer to the Brooklin-Diadema-Sao Mateus Rapid Bus System.

The current date given for opening of these 3 stations is around July this year (2017).

The remaining stations have the problem that the station after Brooklin, Campo Belo, is the least advanced one, with more than one year of construction ahead for sure. So Eucaliptos, Moema, AACD Servidor, Hospital Sao Paulo, Santa Cruz and Chácara Klábin may open before Campo Belo, but probably on restricted hours/service because the intermediate station Campo Belo will be the last one completed.

So full service on Line 5 won't happen until late 2018, most likely.

Quote:
Originally Posted by RMeier View Post
mopc no está en línea   Reply With Quote
Old February 19th, 2017, 06:21 AM   #1767
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,235
Likes (Received): 11982

Santos - São Vicente Light Rail (SIM - VLT da Baixada Santista) - more pics of fully operational phase 1


Quote:
Originally Posted by paulossj4 View Post
Olá pessoal.

Demorei para publicar o vídeo mas está ai. Trecho completo entre Barreiros e Porto, feito no dia 04/02/2017. Ele possui alguns cortes em alguns cruzamentos.



Algumas fotos que tirei:

Estação Ana Costa


Cruzamento com a Avenida Ana Costa


Comunicação visual do VLT




Terminal e Pátio Porto




Espero que gostem.
mopc no está en línea   Reply With Quote
Old February 21st, 2017, 10:41 AM   #1768
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,235
Likes (Received): 11982

Sao Paulo Metro (CMSP) - Line 5 new CAF train enters operations

Quote:
Originally Posted by Alberto Pardinho View Post


















mopc no está en línea   Reply With Quote
Old February 21st, 2017, 05:39 PM   #1769
carl_Alm
Brazil
 
carl_Alm's Avatar
 
Join Date: Aug 2012
Location: SSA - BA
Posts: 5,845
Likes (Received): 12879

Finally!!
__________________
"The boy with the thorn in his side..."
carl_Alm no está en línea   Reply With Quote
Old February 25th, 2017, 02:29 PM   #1770
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,235
Likes (Received): 11982

Salvador Metro - Government advertises new Line 2 station, opening soon, will be largest on Line 2 and have a bus terminal

Quote:
Originally Posted by Tennyson Vital View Post
Daqui a pouco os moradores dos bairros de Pernambués, Imbuí e Pituaçu vão poder ir para casa de metrô. Com ritmo avançado, a obra tem previsão de conclusão para maio. Maior estação da Linha 2, Pituaçu contará com um Terminal de ônibus, iluminação cênica, projeto paisagístico (com mais de 400 árvores nativas transplantadas no canteiro) e bicicletário.
Para melhorar ainda mais a mobilidade da região, estão sendo construídas e adaptadas diversas passarelas para que a Avenida Paralela se torne uma Via Expressa, sem semáforos ou retornos pelo canteiro central que atrapalham o fluxo do trânsito. Vamos ficar na contagem regressiva para a inauguração!


https://www.facebook.com/governodabahia/?fref=ts
mopc no está en línea   Reply With Quote
Old February 25th, 2017, 03:49 PM   #1771
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,235
Likes (Received): 11982

Sao Paulo Metro (CMSP) - Line 15 Monorail fantastic aerial drone footage of existing stations and train yard, must see.

mopc no está en línea   Reply With Quote
Old March 2nd, 2017, 03:23 PM   #1772
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,235
Likes (Received): 11982

Sao Paulo Metro (CMSP) - Line 17 monorail update

Quote:
Originally Posted by RMeier View Post

Quote:
Originally Posted by RMeier View Post
Uma visão um pouco diferente graças a uma visita a um consultório. Da próxima vez levo uma câmera de verdade...



Depois de sair dei uma esticada até o pátio. As obras pegaram mais ritmo. Tem dois guindastes imensos lá subindo vigas-trilho naquele trecho paralelo ao pátio. Agora vi que estão focando em concretar as colunas que faltavam por todo o terreno, mas notei que há muito andaimes no meio do piscinão. Acho que em breve retomam a concretagem da laje.

Quote:
Originally Posted by sergiomazzi View Post
Aproveitando a luz espetacular da manhã do dia 9/2 para uma rápida atualização:

P1330848 by sergiomazzi, no Flickr
P1330853 by sergiomazzi, no Flickr
P1330856 by sergiomazzi, no Flickr
P1330859 by sergiomazzi, no Flickr
P1330860 by sergiomazzi, no Flickr
P1330862 by sergiomazzi, no Flickr
P1330866 by sergiomazzi, no Flickr
P1330868 by sergiomazzi, no Flickr
P1330869 by sergiomazzi, no Flickr
P1330872 by sergiomazzi, no Flickr
P1330873 by sergiomazzi, no Flickr
P1330880 by sergiomazzi, no Flickr
P1330884 by sergiomazzi, no Flickr
P1330886 by sergiomazzi, no Flickr
P1330892 by sergiomazzi, no Flickr
P1330895 by sergiomazzi, no Flickr
P1330898 by sergiomazzi, no Flickr
mopc no está en línea   Reply With Quote
Old March 6th, 2017, 12:41 AM   #1773
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,235
Likes (Received): 11982

Sao Paulo Metro (CMSP) - Line 15 Monorail - aerial drone video of future station Camilo Haddad under construction

mopc no está en línea   Reply With Quote
Old March 8th, 2017, 05:37 PM   #1774
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,235
Likes (Received): 11982

Sao Paulo Metro (CMSP) - Line 2/Line 6 future Analia Franco station renders

Quote:
Originally Posted by RMeier View Post
Só de maldade, para eu não sofrer sozinho, algumas projeções da futura estação Anália Franco:









Fonte: https://www.pontodeapoio.eng.br/pg-a...-analia-franco
mopc no está en línea   Reply With Quote
Old March 14th, 2017, 08:32 PM   #1775
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,235
Likes (Received): 11982

Rio de Janeiro Suburban Rail (Supervia) - on-board camera captures section between Engenho de Dentro and Madureira stations, pure rail-fanning.

Quote:
Originally Posted by dipaula13 View Post
Então vamos curtir o ronco de um série 500 à noite entre E. de Dentro/Madureira!!!!!!!!!



https://www.youtube.com/channel/UCCY...gJoL_2leWDgEWg
mopc no está en línea   Reply With Quote
Old March 20th, 2017, 10:37 PM   #1776
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,235
Likes (Received): 11982

Sao Paulo Metro (CMSP) - Line 5 stations reaching final stages of construction

Quote:
Originally Posted by Bruno Moraes 007 View Post
Estação Alto da Boa Vista







Quote:
Originally Posted by Bruno Moraes 007 View Post
Estação Borba Gato




Quote:
Originally Posted by dmdagnone View Post
Acessos na Brooklin!!!

Last edited by mopc; March 21st, 2017 at 05:32 AM.
mopc no está en línea   Reply With Quote
Old March 21st, 2017, 05:30 AM   #1777
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,235
Likes (Received): 11982

Rio de Janeiro Suburban Rail (Supervia) - documentary from the 1950's about the system

mopc no está en línea   Reply With Quote
Old March 21st, 2017, 10:25 PM   #1778
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,235
Likes (Received): 11982

Sao Paulo Suburban Rail (CPTM) - train at Brás station

Quote:
Originally Posted by Issun View Post
Foto bacana que tiraram do mais novo 8500 na plataforma da linha 10 no Brás prestando serviço pela linha 7 devido ao descarrilamento do trem da linha 3:


https://www.facebook.com/photo.php?f...type=3&theater
mopc no está en línea   Reply With Quote
Old April 2nd, 2017, 11:17 PM   #1779
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,235
Likes (Received): 11982

Cuiabá Light Rail - news sources state the interrupted project may be resumed in a few months and have Line 1 operational by December 2018, and Line 2 by May 2019

Quote:
Originally Posted by mattCGB View Post
Governo anuncia acordo com consórcio para retomar obra do VLT


Cronograma prevê a entrega de um trecho, entre VG e o Bairro do Porto, até março de 2018



O Governo do Estado de Mato Grosso chegou a um acordo com o Consórcio VLT Cuiabá – Várzea Grande para a retomada das obras do Veículo Leve sobre Trilhos (VLT).

Pelo entendimento entre as partes, o Estado vai pagar R$ 922 milhões para a conclusão integral da implantação do modal. A previsão é de que as obras sejam retomadas em maio deste ano com prazo de conclusão total de 24 meses.

Entretanto, no acordo entre Governo e Consórcio, o cronograma das obras prevê a entrega da primeira etapa, em março de 2018, no trecho entre o aeroporto de Várzea Grande até a estação do Porto, em Cuiabá.

Até dezembro de 2018 deverá entrar em funcionado todo o trecho da linha 1, num total de 15 quilômetro, entre o aeroporto de Várzea Grande e o Terminal do Comando Geral, em Cuiabá.

Já a linha 2, que compreende o trecho de 7,2 km entre a avenida Tenente Coronel Duarte (Prainha) e o Parque Ohara, no Coxipó, será entregue até maio de 2019.

O termo do acordo foi discutido nos últimos meses em inúmeras reuniões entre o governador Pedro Taques, o secretário de Estado das Cidades, Wilson Santos, o controlador-geral do Estado, Ciro Rodolpho Gonçalves, o procurador-geral do Estado, Rogério Gallo, e suas respectivas equipes, com representantes do Consórcio VLT. Agora, o acordo depende apenas da homologação da Justiça Federal, após concordância do MPE e MPF.

Para financiar o valor necessário para a conclusão das obras, o Governo de Mato Grosso já obteve sinalização da União de empréstimo de R$ 600 milhões junto à Caixa Econômica Federal, faltando apenas aval da Secretaria do Tesouro Nacional (STN). Dos R$ 322 milhões restantes, o Governo já tem R$ 193 milhões em caixa do empréstimo anterior.

A renegociação para a retomada das obras ocorre quase três anos após a data inicialmente prevista para a entrega do modal, que era 31 de março de 2014.

Economia

Com a renegociação feita pelo Governo de Mato Grosso com o Consórcio VLT, o modal de Mato Grosso terá o menor preço por quilômetro do Brasil. O VLT de Cuiabá – Várzea Grande custará, ao final, R$ 44,8 milhões por quilômetro, enquanto o da cidade do Rio de Janeiro, por exemplo, custou R$ 56 milhões.

Já o VLT de Goiânia, cujas obras ainda não foram iniciadas, foi contratado por R$ 62,1 milhões por quilômetro.

“Isso é resultado da determinação do governador Pedro Taques para que tratássemos esse assunto com o máximo zelo, transparência e seriedade, para que a obra fosse retomada com o menor prejuízo ao povo de Mato Grosso”, disse o Controlador Geral do Estado, Ciro Gonçalves.


http://www.midianews.com.br/politica...-do-vlt/292472
mopc no está en línea   Reply With Quote
Old April 4th, 2017, 04:07 PM   #1780
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,235
Likes (Received): 11982

Sao Paulo Metro (CMSP) - Line 5 station platform with destination signs installed

Quote:
Originally Posted by RMeier View Post
"Sonho meu..."



Do Instagram
mopc no está en línea   Reply With Quote


Reply

Tags
brazil, buses, commuter rails, monorails, subways, trams, transport, transporte coletivo

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Related topics on SkyscraperCity


All times are GMT +2. The time now is 07:07 PM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2018, vBulletin Solutions Inc.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

tech management by Sysprosium