Old July 13th, 2017, 05:38 AM   #1821
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,227
Likes (Received): 11945

Sao Paulo Metro (CMSP) - Line 13 (international airport) - CECAP station

Quote:
Originally Posted by MatheusObst View Post


Estação Cecap vista do Hotel Matiz. Foto tirada no dia 09 de julho de 2017.
mopc no está en línea   Reply With Quote

Sponsored Links
Old July 15th, 2017, 05:36 AM   #1822
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,227
Likes (Received): 11945

Fortaleza Light Rail - construction advances only 5% in the past 7 months. The first section of the metro-like diesel light rail line is likely to open before September, the remaining sections until 2018. The line is 13km long, of which 1.4km is elevated.

Quote:
Originally Posted by Indio Kariri View Post
Em 7 meses, VLT avançou só 5%



Iniciadas em 2012, as obras do Veículo Leve sobre Trilhos (VLT) Parangaba-Mucuripe deveriam ter ficado prontas para a Copa do Mundo de 2014. Os serviços foram suspensos em maio de 2014 devido à quebra de contrato com o consórcio CPE*VLT, em razão de descumprimento de prazos, sendo retomados em julho de 2015. Responsável pelo empreendimento, a Secretaria da Infraestrutura do Ceará (Seinfra) informa que a obra, dividida em três trechos, está em andamento com 65%. Em novembro do ano passado, o percentual de execução era de 60%, mostrando que o trabalho pouco avançou em sete meses. O primeiro trecho a entrar em operação é o 2, que está com 95% de execução e fica entre as estações Borges de Melo e Parangaba. Este trecho já está em operação experimental (sem passageiros) desde setembro do ano passado e deverá entrar em operação assistida até o fim deste mês, segundo a Seinfra. "Nesta fase, o sistema operará com passageiros, em horários reduzidos e terá embarque gratuito. Esta é a etapa de implantação do VLT em que a população começa a se habituar com a disponibilidade do novo serviço", diz a Seinfra. O trecho 1, que contempla a construção da passagem inferior da Avenida Borges de Melo, está com 60% dos serviços executados e deverá ser entregue em setembro deste ano. Já o trecho 3, que compreende o percurso entre as estações Iate e Borges de Melo, está com o cronograma em execução, com expectativa de entrega em 2018. Quando finalizado, o VLT terá 13,4 quilômetros ligando os bairros Mucuripe e Parangaba. Desta extensão, serão 12 quilômetros em superfície e 1,4 quilômetros de trechos elevados. Demanda O Ramal atravessará 22 bairros, área que concentra mais de 500 mil moradores de Fortaleza. A previsão de demanda potencial do novo modal é de 90 mil passageiros por dia. Os serviços nos três trechos são executados pelo Consórcio VLT Fortaleza, formado pelas empresas AZVI S/A do Brasil e Construtora e Incorporadora Squadro Ltda. A obra é estimada em R$ 284,6 milhões.

Fonte:http://diariodonordeste.verdesmares....rada-1.1772946

Parangaba station pics

/
Quote:
Originally Posted by Fortalezense da Gema View Post
Hj fui ao Shopping Parangaba e tirei umas fotos da estação vista do estacionamento <br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
mopc no está en línea   Reply With Quote
Old July 15th, 2017, 07:29 AM   #1823
00Zy99
Registered User
 
Join Date: Mar 2013
Posts: 2,980
Likes (Received): 1506

DIESEL?????

How do they expect to get adequate performance, energy savings, and emissions out of DIESEL????
00Zy99 no está en línea   Reply With Quote
Old July 16th, 2017, 09:57 PM   #1824
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,227
Likes (Received): 11945

Sao Paulo Metro (CMSP) - Line 5 update - Santa Cruz station, including preparations for integration to current Line 1 Santa Cruz station. Line 5 extension (10 stations) will open between later this year and late 2018.

Quote:
Originally Posted by Marcio Staffa View Post
Estação Santa Cruz











mopc no está en línea   Reply With Quote
Old July 16th, 2017, 11:17 PM   #1825
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,227
Likes (Received): 11945

Sao Paulo Suburban Rail (CPTM) - New Hyundai-Rotem 9500-series train made in Brazil for Line 8

Quote:
Originally Posted by Zaz965 View Post

train 9500 cptm
mopc no está en línea   Reply With Quote
Old July 23rd, 2017, 12:39 AM   #1826
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,227
Likes (Received): 11945

Sao Paulo Metro (CMSP) - Line 15 monorail - 8 new stations to São Mateus approach completion - tests to start in a few months, last beams installed, full commercial opening by March 2018

Quote:
Originally Posted by Edson Fukumoto View Post
Metrô: linha 15 do monotrilho entra na última fase; trecho até Cidade Tiradentes continua parado


Por: BandNews FM
21 de julho 2017 / 15:33 hrs

Já estão instaladas as últimas duas vigas do monotrilho da Linha 15, na zona leste de São Paulo, que faz parte do projeto de expansão do metrô na Capital. É a última etapa antes da fase de testes do trecho entre Oratório e São Mateus



Metrô: linha 15 do monotrilho entra na última fase; trecho até Cidade Tiradentes continua parado


As oito estações desse trajeto deverão ficar todas prontas e entrar em operação até março de 2018, de acordo com o cronograma do Metrô. Mas ainda falta licitar a estação do Jardim Iguatemi.

O problema, no entanto, é o trecho projetado para ir de lá até Cidade Tiradentes. Ali, as obras estão interrompidas sem previsão de retorno e dependem de desapropriações, que deverão ser feitas pela prefeitura e sequer foram iniciadas.

O secretário dos Transportes Metropolitanos afirma que a gestão de Fernando Haddad, do PT, previa mais obras, como um corredor de ônibus e o alargamento das pistas na região, e isso tornaria o monotrilho mais caro; agora, o governo vai discutir mudanças com a administração de João Doria, do PSDB.

A Linha 15 do monotrilho tem um orçamento estimado em R$ 4,5 bilhões.

Hoje, o monotrilho funciona apenas entre Vila Prudente e Oratório, com cerca de 18 mil passageiros transportados por dia.

Quando a linha estiver operando, em março do ano que vem, esse número deverá chegar a 300 mil usuários do transporte, segundo estimativas do próprio Metrô.


https://www.metrojornal.com.br/foco/...-linha-15.html
mopc no está en línea   Reply With Quote
Old July 24th, 2017, 04:01 AM   #1827
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,227
Likes (Received): 11945

Sao Paulo Metro (CMSP) - Line 5 Campo Belo transfer to Line 17 Monorail update

Quote:
Originally Posted by felipeco View Post
Atualização da semana.
mopc no está en línea   Reply With Quote
Old July 24th, 2017, 04:05 AM   #1828
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,227
Likes (Received): 11945

Salvador Metro - pics


Quote:
Originally Posted by Jesse Ferreira View Post
Licitação para integrar metrô e ônibus será lançada até a próxima semana.

Secretário estadual da Casa Civil, Bruno Dauster, pôs três condições para haver acordo com a prefeitura de Salvador



O secretário estadual da Casa Civil, Bruno Dauster, disse, na manhã desta segunda-feira (10), que a licitação para a integração do metrô ao ônibus será lançada até a próxima semana, já que não houve avanços nas negociações com a prefeitura de Salvador.

“Já saiu a licitação do ônibus do CAB, como previsto, na quinta ou sexta [da semana passada]. E de hoje, no máximo até a próxima semana, a licitação das linhas integradoras. Conforme previsto no contrato do programa, linhas de cinco quilômetros da estação até o seu ponto de retorno nos bairros”, afirmou, em entrevista ao bahia.ba.

Perguntado se ainda pode ocorrer a integração com os ônibus municipais, Dauster pôs três condições: 1) cortar as linhas no trajeto do metrô; 2) a prefeitura subsidie parte da tarifa e 3) o passageiro pague apenas uma passagem.


Sem entrar em detalhes, o secretário municipal de Mobilidade Urbana, Fábio Mota, afirmou, no 2 de Julho, que estava “perto de resolver” o impasse entre o governo e a prefeitura sobre a integração do metrô.

No último dia 4, o Ministério Público instaurou inquérito para investigar e acompanhar o impasse entre os executivos estadual e municipal.

http://bahia.ba/politica/licitacao-p...roxima-semana/


Quote:
Originally Posted by Tennyson Vital View Post

Quote:
Originally Posted by Tennyson Vital View Post
Quote:
Originally Posted by Tennyson Vital View Post
mopc no está en línea   Reply With Quote
Old July 24th, 2017, 10:25 PM   #1829
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,227
Likes (Received): 11945

Recife Metro (Metrorec) - videos







mopc no está en línea   Reply With Quote
Old July 25th, 2017, 08:31 PM   #1830
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,227
Likes (Received): 11945

Sao Paulo Metro (CMSP) - Line 4 - São Paulo-Morumbi station update - first pics ever of its interior. The station will open by 2018.

Quote:
Originally Posted by Murillo B View Post
Fotos minhas, da Estação São Paulo-Morumbi, tiradas no último sábado (22/07/2017):

Prédio administrativo (esse estará pronto bem rápido, segundo o engenheiro):



Lado Norte (Principal):









Lado Sul:



Plataformas:







mopc no está en línea   Reply With Quote
Old July 25th, 2017, 10:11 PM   #1831
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,227
Likes (Received): 11945

Fortaleza Metro - new Purple Line opened - first forumer pics & videos

Quote:
Originally Posted by Fortalezense da Gema View Post
Fotos e vídeos que gravei hoje na inauguração do primeiro trecho da nova linha do Metrô de Fortaleza.

Linha 4 - Roxa: Mucuripe

Estação Parangaba



Trem horrível entrando na plataforma da Linha Vermelha


Mais da Estação Parangaba




Trem na plataforma da Linha Roxa



Estação Borges de Melo



Trem (parte interna)



Painel informativo


Vídeos







P.S.: A memória do celular me traiu e não consegui gravar o percurso nem até a Estação Montese, que é a mais próxima à Parangaba.

P.P.S.: Quem anuncia as estações é o próprio maquinista, e não uma voz gravada.

P.P.P.S.: Consegui tirar uma foto com o governador rsrsrs

Fotos e vídeos todos de minha autoria
mopc no está en línea   Reply With Quote
Old July 26th, 2017, 02:27 AM   #1832
Zaz965
Temer Out!
 
Zaz965's Avatar
 
Join Date: Jan 2015
Location: CCCP
Posts: 3,095
Likes (Received): 27752

recife metropolitan train
__________________

dimlys1994, Infraholic, djole13 liked this post
Zaz965 no está en línea   Reply With Quote
Old July 27th, 2017, 08:23 AM   #1833
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,227
Likes (Received): 11945

Fortaleza Metro - new purple line pics

Quote:
Originally Posted by Gregory Luiz View Post
Secretaria Municipal de Infraestrutura: "Nesta manhã, o Governo do Ceará deu início a Operação Assistida do Veículo Leve sobre Trilhos (VLT), no trecho entre as estações Borges de Melo e Parangaba. A Secretária de Infraestrutura, Manuela Nogueira esteve presente para acompanhar o início da operação.

Na ocasião, Manuela ressaltou que a Prefeitura de Fortaleza deu início, neste mês, às obras de construção dos túneis na Via Expressa, possibilitando a passagem livre do VLT, entre as avenidas Padre Antônio Tomás e Santos Dumont. “ É uma satisfação poder acompanhar, junto ao Governo do Estado, estas obras e saber que, em breve, a população de Fortaleza terá mais um meio de transporte que vai garantir um tempo menor no trânsito”, disse.
"













https://www.facebook.com/seinffortaleza/


forumer video

Quote:
Originally Posted by Indio Kariri View Post
Mais um "videozim"

mopc no está en línea   Reply With Quote
Old July 27th, 2017, 10:24 AM   #1834
Ghostpoet
Registered User
 
Ghostpoet's Avatar
 
Join Date: Nov 2016
Posts: 66
Likes (Received): 34

Quote:
Originally Posted by mopc View Post
Fortaleza Metro - new purple line pics
The line is operational, or under tests?

Ghostpoet
Ghostpoet no está en línea   Reply With Quote
Old July 27th, 2017, 11:24 AM   #1835
dimlys1994
Moderator
 
dimlys1994's Avatar
 
Join Date: Dec 2010
Location: Dniepropetrovsk
Posts: 16,337
Likes (Received): 26123

Quote:
Originally Posted by Ghostpoet View Post
The line is operational, or under tests?

Ghostpoet
It has limited operations between Parangaba and Borges de Melo. Updated map from urbanrail.net:
http://www.urbanrail.net/am/fort/fortaleza.htm

__________________
Для Вас:
Страница в ВК:

For you:
Facebook & Flickr pages

Tennyson Vital, carl_Alm, Arthur Baz liked this post
dimlys1994 no está en línea   Reply With Quote
Old July 31st, 2017, 02:40 AM   #1836
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,227
Likes (Received): 11945

Salvador Metro - Detran station forumer pics

Quote:
Originally Posted by Tourniquet View Post






















mopc no está en línea   Reply With Quote
Old July 31st, 2017, 06:06 AM   #1837
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,227
Likes (Received): 11945

Santos - Sao Vicente Light Rail (SIM - VLT da Baixada Santista) - State governor Alckmin signs light rail - bus discount transfer system and promises Phase 2 construction later thus year/early 2018, a new yet unheard of Phase 3 going south from Conselheiro Nebias avenue to the beach and returning up Oswaldo Cruz street, and Phase 4 to the East /Ponta da Praia.


Quote:
Originally Posted by mark 69 View Post
Alckmin anuncia integração entre VLT e ônibus municipais de Santos e ampliação do sistema
Governador participou da inauguração da Vila Criativa e assinou um repasse para o Hospital dos Estivadores.






Alckmin também anunciou a ampliação da extensão do sistema. Na fase III do VLT o trajeto começa na avenida Conselheiro Nébias, segue pela avenida Afonso Pena, Senador Dantas, Pedro Lessa, Aristóteles Menezes, Dino Bueno, avenida dos Bancários, Rei Alberto e termina na avenida Fernando Costa. Durante o percurso haverá 9 estações. Já a fase 4 também começa na avenida Conselheiro Nebias, segue até a avenida da praia e retorna pela rua Oswaldo Cruz até o bairro Liberdade. Neste trajeto, serão estão previstas cinco estações.

http://g1.globo.com/sp/santos-regiao...-sistema.ghtml

Nessa proposta, que me parece ainda distante e soa mais como campanha extra-oficial (principalmente o ramal da praia), acho um erro a escolha pelo traçado seguir a apertada Av. Pedro Lessa depois da Av Sen. Dantas ao invés de continuar pela Afonso Pena.


Quote:
Originally Posted by mark 69 View Post
Mais detalhes sobre o ainda apenas: "termo de cooperação com a EMTU para iniciar estudos "

Santos estuda implantação de duas novas fases do VLT
Objetivo é que o modal chegue à região da orla e também à Ponta da Praia


Santos assinou um termo de cooperação com a EMTU para iniciar estudos que podem viabilizar duas novas etapas de ampliação do Veículo Leve sobre Trilhos (VLT) na Cidade: a fase 3, para o modal trafegar da Avenida Conselheiro Nébias à Praia; e a fase 4, que levará passageiros da Conselheiro Nébias até a Ponta da Praia pela Avenida Afonso Pena.

Além disso, em 60 dias a Prefeitura quer entregar a documentação para que o Estado abra, até dezembro, licitação das obras da fase 2 – trecho entre a Conselheiro Nébias e o Valongo. A assinatura ocorreu na presença do governador Geraldo Alckmin (PSDB), no sábado (29), durante cerimônia da Vila Criativa na Vila Progresso.

O diretor-presidente da EMTU, Joaquim Lopes, explicou que a parceria permite que a empresa, que é responsável pelo VLT, trabalhe em conjunto com a Prefeitura de Santos para desenvolver os projetos que são estritamente municipais.

“Como (nas fases 3 e 4) os deslocamentos serão de Santos para Santos, não podemos desenvolver isso.
O protocolo de intenção assinado vai virar um convênio de cooperação técnica. Com ele, o prefeito solicita que se permita o trabalho em conjunto, para desenvolver o projeto. O documento pronto cria condições para que Santos se habilite para buscar recursos (para as obras)”, disse Lopes.

O prefeito Paulo Alexandre Barbosa (PSDB) ressaltou que, apesar de a fase 2 não estar finalizada ainda, a ideia é garantir celeridade. “A segunda etapa está no processo final de licenciamento e a expectativa é que em 60 dias isso esteja concluído – o que vai possibilitar o Estado licitar ainda este ano para tirar (a obra) do papel. Aí, a gente tem a necessidade de pensar na expansão do modal dentro da Cidade. Por isso, a ideia da fase 3, que é a conexão com a Praia, e da fase 4, que é a conexão com a Ponta da Praia”.

Barbosa quer todo esse trâmite pronto para conseguir apoio financeiro dos governos federal e estadual. “Com os estudos feitos, projetos concluídos e valores atribuídos, poderemos dividir as competências em termos de recursos para executar as obras”.

http://www.atribuna.com.br/noticias/...f6d660f25ab0eb
mopc no está en línea   Reply With Quote
Old August 2nd, 2017, 02:23 AM   #1838
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,227
Likes (Received): 11945

Sao Paulo Metro (CMSP) - British Finance Minister visits Sao Paulo and Line extension construction sites.


Quote:
Originally Posted by RMeier View Post

Ministro britânico conhece oportunidades de investimento em São Paulo

A subsecretária de Parcerias e Inovação do governo paulista Karla Bertocco recebeu na manhã desta terça-feira (01) o ministro das Finanças do Reino Unido Philip Hammond. O ministro visitou as instalações da nova estação do metrô do Brooklin em fase de finalização.

Durante o encontro, a subsecretária apresentou as oportunidades de investimento do governo paulista, principalmente o novo programa de concessão recentemente adaptado para o atendimento de exigências estrangeiras.

Acompanharam a visita a assessora Internacional Ana Paula Fava e o embaixador inglês no Brasil Vijay Rangarajan.



https://www.facebook.com/stm.oficial...gTrIh9ZDba6vr4
mopc no está en línea   Reply With Quote
Old August 5th, 2017, 04:19 AM   #1839
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,227
Likes (Received): 11945

Sao Paulo Metro (CMSP) - Line 6 to resume construction. After its main builder, Odebrecht, failed to obtain funds from Brazil's investment bank due to corruption charges, it seems a new corporation will take over construction "until late 2017", says report.

Quote:
Originally Posted by Edson Fukumoto View Post
Metrô de São Paulo inicia retomada das obras da linha 6-Laranja

Por: Metro Jornal 04 de agosto 2017 / 15:05 hrs
O governo de São Paulo afirmou nesta sexta-feira que serão retomadas as obras da linha 6-Laranja do Metrô. Parado há quase 1 ano, o projeto deve voltar a ser tocado até o fim de 2017





Quando ficar pronta, a chamada “linha das universidades” vai ligar a Brasilândia, na zona norte, à estação São Joaquim, no centro, com integração com a linha 1-Azul. No futuro, será feita a integração com a linha 13-Jade até o aeroporto de Guarulhos.

Investigadas na Lava Jato, as empresas inicialmente responsáveis – Odebrecht, Queiróz Galvão e UTC – não conseguiram financiamento no BNDES, o que obrigou o governo do Estado a buscar uma nova parceria.

Em nota, a Secretaria dos Transportes explicou que o recebeu uma proposta de uma empresa internacional para assumir as obras da linha 6-Laranja e que aguarda o prazo de 60 dias para poder divulgar os detalhes.

Confira a nota na íntegra:

A Move São Paulo comunicou à Secretaria de Estado dos Transportes Metropolitanos (STM), na última quinta-feira (27), que recebeu proposta de uma empresa internacional interessada em adquirir a concessão da linha 6-Laranja de metrô de São Paulo.

Caso o acordo tenha êxito, o governo não precisará relicitar e as obras serão retomadas ainda neste semestre.

“Trata-se de uma das maiores construtoras do mundo, com total capacidade para obter financiamento. Por isso, estamos confiantes de que o desfecho será favorável”, afirma o secretário de Estado dos Transportes Metropolitanos, Clodoaldo Pelissioni.

A negociação, de caráter confidencial, tem validade de 60 dias. Por essa razão, a concessionária solicitou à STM este prazo para a conclusão das análises jurídica, financeira e técnica da oferta.

A implantação da linha 6-Laranja teve início em janeiro de 2015 e, em 2 de setembro do ano passado, por decisão unilateral, a Move São Paulo, única responsável pela implantação do trecho, informou a paralisação integral das obras civis, alegando dificuldades na obtenção de financiamento de longo prazo junto ao Banco Nacional de Desenvolvimento Econômico e Social (BNDES).

Nos termos do contrato de concessão, a concessionária é a única responsável pela obtenção dos financiamentos necessários ao desenvolvimento dos serviços delegados. Não há pendências do Governo do Estado junto à concessionária que impeçam a retomada das obras, cuja execução atingiu 15%. Foram aportados pelo Governo do Estado até o momento R$ 694 milhões para pagamento de obras civis e R$ 979 milhões para pagamento das desapropriações de 371 ações.

A STM tem tomado todas as medidas legais previstas em contrato para que a Move São Paulo retome e conclua as obras da linha 6, que ligará Brasilândia, na zona norte da capital, à estação São Joaquim, na região central. Até o momento a pasta já aplicou multas que somam R$ 27,8 milhões.

Caso o atual concessionário não consiga dar prosseguimento às obras, o Governo do Estado poderá decretar a caducidade do contrato e iniciar um novo processo licitatório respeitando os devidos prazos legais .

Secretaria dos Transportes Metropolitanos – Assessoria de imprensa

https://www.metrojornal.com.br/foco/...6-laranja.html
mopc no está en línea   Reply With Quote
Old August 5th, 2017, 04:29 PM   #1840
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,227
Likes (Received): 11945

Sao Paulo Suburban Rail (CPTM) - Rebuilt Engenheiro Goulart station, Lines 12/13, just reopened yesterday (July 04, 2017). Engenheiro Goulart station has been rebuilt from scratch to serve as a transfer between Line 12 and future Line 13, which will serve the International Airport, and its slated to open next year (2018).


Quote:
Originally Posted by SavianoMarcio View Post
Minha passagem pela estação hoje a tarde. O governador foi na inauguração.

05) https://goo.gl/maps/jUNsgMr7qQx
L13-EngGoulart-04082017 (8) by Marcio Saviano, no Flickr

06)
L13-EngGoulart-04082017 (9) by Marcio Saviano, no Flickr

07)
L13-EngGoulart-04082017 (14) by Marcio Saviano, no Flickr

08) Mapas dos arredores no padrão da CPTM.
L13-EngGoulart-04082017 (15) by Marcio Saviano, no Flickr

09) Mapa de Rede sem as 3 estações da Linha 5.
L13-EngGoulart-04082017 (16) by Marcio Saviano, no Flickr

10)
L13-EngGoulart-04082017 (17) by Marcio Saviano, no Flickr

11) 4400(?) chegando
L13-EngGoulart-04082017 (18) by Marcio Saviano, no Flickr

17)Fiquei só na area não paga.
L13-EngGoulart-04082017 (24) by Marcio Saviano, no Flickr

18)
L13-EngGoulart-04082017 (25) by Marcio Saviavno, no Flickr

19) Passarela para o PET.
L13-EngGoulart-04082017 (26) by Marcio Saviano, no Flickr

20) Bela vista emoldurando a estação.
L13-EngGoulart-04082017 (27) by Marcio Saviano, no Flickr

21) Linha de bloqueios.
L13-EngGoulart-04082017 (28) by Marcio Saviano, no Flickr

22) Plataforma oposta bloqueada. Tinha alguns funcionários trabalhando nela.
L13-EngGoulart-04082017 (29) by Marcio Saviano, no Flickr

23)
L13-EngGoulart-04082017 (30) by Marcio Saviano, no Flickr

24) Vias de passagem.
L13-EngGoulart-04082017 (31) by Marcio Saviano, no Flickr

25) A terrível passarela mal projetada!
L13-EngGoulart-04082017 (34) by Marcio Saviano, no Flickr

26)SQN.
L13-EngGoulart-04082017 (37) by Marcio Saviano, no Flickr



P.S: this is what the station used to be like:

mopc no está en línea   Reply With Quote


Reply

Tags
brazil, buses, commuter rails, monorails, subways, trams, transport, transporte coletivo

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Related topics on SkyscraperCity


All times are GMT +2. The time now is 11:06 AM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2018, vBulletin Solutions Inc.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

tech management by Sysprosium