Old October 21st, 2017, 03:37 AM   #1861
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,228
Likes (Received): 11945

Salvador Metro - system to stay open until 1am today (Oct 20, 2018) due to Paul McCartney show at the World Cup Arena

Quote:
Originally Posted by tonyssa View Post
mopc no está en línea   Reply With Quote

Sponsored Links
Old October 24th, 2017, 04:34 PM   #1862
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,228
Likes (Received): 11945

Sao Paulo Metro - U2 performs in São Paulo with future Line 17 monorail visible in the background

Quote:
Originally Posted by Marcio Staffa View Post
U2 em São Paulo com skyline da Água Espraiada ao fundo.


forumer update line 17 and 5 (Campo Belo station)

Quote:
Originally Posted by felipeco View Post
mopc no está en línea   Reply With Quote
Old October 25th, 2017, 06:42 PM   #1863
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,228
Likes (Received): 11945

Santos Light Rail (SIM - VLT da Baixada Santista) - Environmental council approves Line 2, which will have 8.2km and 14 stations.

Quote:
Conselho Estadual do Meio Ambiente aprova segunda fase do VLT - confira infográfico
Atualizado em: 25 out 2017 às 11h
VLT em estação com movimento de passageiros. #pracegover
Mais uma etapa foi vencida para a segunda fase do VTL se tornar realidade.

Em reunião nesta terça-feira (24), na Capital, o Conselho Estadual do Meio Ambiente (Consema) aprovou o estudo de impacto ambiental prévio da obra, que prevê a ligação do modal entre a Avenida Conselheiro Nébias e a região do Valongo.



Pelo projeto, a segunda fase do VLT terá 8,2km e 14 estações passando por vias como Campos Melo, Dr. Cóchrane, João Pessoa, Visconde de São Leopoldo, ruas São Bento, Visconde do Embaré, Amador Bueno, da Constituição e Luiz de Camões.

A aprovação do Consema será encaminhada à Cetesb, que fica responsável pela concessão da licença prévia ambiental para o empreendimento. “O parecer técnico confirma a viabilidade socioambiental da fase 2”, explica o secretário de Meio Ambiente de Santos, Marcos Libório, que esteve na reunião do Consema.



A licença da Cetesb é o último requisito para a abertura do edital de contratação da obra, que ficará a cargo da Empresa Metropolitana de Transportes Urbanos (EMTU).

PLANILHA ORÇAMENTÁRIA

A EMTU estima que a licença ambiental prévia seja publicada no Diário Oficial do Estado até final de outubro. Atualmente, a planilha orçamentária do projeto executivo do trecho está em fase final de revisão.

A estimativa de investimento em obras civis é de R$ 270 milhões, com recursos do Tesouro do Estado e financiamento da Caixa Econômica Federal. Os sistemas e subestações de fornecimento de energia estão contratados para o trecho.

Até o primeiro trimestre de 2018, terão desembarcado em Santos os quatro últimos VLTs dos 22 contratados e que serão disponibilizados para a futura operação. Em seu primeiro trecho já implantado, o VLT tem 11,5 km de extensão, ligando as estações Barreiros (São Vicente) e Porto (Santos).

Conforme a EMTU, os dois trechos do VLT da Baixada Santista atenderão cerca de 70 mil passageiros por dia.
mopc no está en línea   Reply With Quote
Old October 26th, 2017, 10:48 PM   #1864
Rodalvesdepaula
Scooter/motorbike lover
 
Rodalvesdepaula's Avatar
 
Join Date: Apr 2008
Location: Sorocaba (SP), Brazil
Posts: 49,476
Likes (Received): 40779

Santos LRT Line 2 will be built as street-running type. Amador Bueno St. will share LRT and trolleybuses in the same way.
__________________


mopc liked this post
Rodalvesdepaula está en línea ahora   Reply With Quote
Old October 28th, 2017, 02:06 PM   #1865
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,228
Likes (Received): 11945

Sao Paulo Metro (CMSP) - Line 5 - Santa Cruz station (transfer to line 1) update. The next batch of Line 5 stations is still promised to open by December 2017, but will probably delay a few months.

Quote:
Originally Posted by Polar50 View Post
Fotos que achei postadas no facebook da Sta Cruz tiradas recentemente (máximo uma semana atrás):





Eucaliptos station

Quote:
Originally Posted by RMeier View Post
Estação Eucaliptos recentemente:





https://www.instagram.com/dimu28/?hl=en

AACD Servidor station

Quote:
Originally Posted by Igor_sp View Post
Esqueci de postar /=
Foi dia 16/10






bonus: Line 5 train active map with all future stations lit



source




Line 17 Monorail - Chucri Zaidan station update


Quote:
Originally Posted by Renaudt View Post
Tirei algumas fotos da estação da Chucri Zaidan na terça feira.
















Campo Belo station (Line 17 + Line 5)


Last edited by mopc; October 28th, 2017 at 02:26 PM.
mopc no está en línea   Reply With Quote
Old October 28th, 2017, 02:31 PM   #1866
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,228
Likes (Received): 11945

Sao Paulo Suburban Rail (CPTM) - Line 13 (International Airport) update. The line is scheduled to open by March 2018

Quote:
Originally Posted by Hello_World View Post
Fotos feitas pelo RRC na tarde de hoje (24/10/2017)







mopc no está en línea   Reply With Quote
Old October 31st, 2017, 02:25 AM   #1867
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,228
Likes (Received): 11945

Salvador Metro - TV report on improvements caused by the metro, already used by over 230,000 passengers a day

Quote:
Originally Posted by Colossal1931 View Post
mopc no está en línea   Reply With Quote
Old October 31st, 2017, 02:42 PM   #1868
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,228
Likes (Received): 11945

Rio de Janeiro Metro - TV report - Line 4 Gávea station/extension was promised for January 2018 but works are halted only 42% of construction has been completed. Line 4 was proposed for the 2016 Olympics and it was delivered before the games, except for the Gavea branch, which branches off from the main line northward and may become a separate line in the future.





watch video = https://globoplay.globo.com/v/6099867/programa/
mopc no está en línea   Reply With Quote
Old November 2nd, 2017, 02:52 AM   #1869
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,228
Likes (Received): 11945

Porto Alegre BRT - Why transportation projects in Porto Alegre do not go forward

Quote:
Metro canceled and BRT postponed: why public transport does not move in Porto Alegre


The City Council decided to dehydrate money for fast buses with an argument that the full implementation of the system would cost about R $ 1 billion

In paper and speeches, Porto Alegre has already received subway lines with different routes and extensions, modern bus corridors with air-conditioned stations and comfortable terminals similar to shopping malls.
In practice, in three decades of studies, promises, and course changes, neither of the two public transport plans that concentrated efforts in that period took off. Now, after successive deadlines announced to revolutionize mobility, the city was left with none.
A new change of plans - to create a network of BRTs integrated to the Metropolitan Region - left the project undated and motivates debate among experts on the best way forward. Last week, the city revealed a negotiation with Caixa to allocate R $ 115 million originally reserved for the BRT (Bus Rapid Transit) system to complete road works for the Cup and paving and drainage of two more roads (see below) .



As a result, the initiative promised to clear streets and avenues before the 2014 World Cup has no timeline in sight. Earlier this year, the federal government had already buried the dream of the subway by vetoing public transfers of R $ 3.5 billion for the project because of the economic crisis.
The city government argued, in justifying the decision to dehydrate the BRT budget, that the total implantation of the system would cost about R $ 1 billion - much more than the previous figure estimated at up to R $ 285 million to create corridors in João Pessoa , Protasio Alves and Bento Gonçalves, plus terminals and complementary stations. But the comparison between these figures is improper: the billion quoted by the city council refers to the estimated cost to implant a network of BRTs in 74 kilometers of roads in the municipality (based on an average price of R $ 16 million per kilometer), much more than the 18 kilometers of the three corridors hit with the Box.
The head of the Municipal Secretariat for Planning and Management, José Alfredo Parode, also reminds that no executive projects were left for the terminals and stations of the BRT, which would prevent the immediate application of resources. According to him, the transfer of funds was the output found to finish the works of the World Cup:
- We had a responsibility to find a solution for these works.
Luís Ribeiro, the manager of Strategic Transportation Planning at the Public Transport and Movement Company (EPTC), presented another argument to put the bus project in motion: the idea is to put together a mobility plan - to be done by large cities of the country until April 2018 - and, from the guidelines of this document, to recreate the BRT project.
- The intention is to form an integrated network to the Metropolitan Region. But it will still be detailed how this integration will be made, as will the operation, the tariff - says Ribeiro.
Transportation specialist Renato Petry, managing director of Cibertran Engenharia Consultiva, points out that the delay in the implementation of the highways complicates mobility in the Capital.
- Failure to apply these resources in the collective transportation system will imply the continuation of the deterioration and its unfeasibility. The system is steadily falling in quality associated with the inability of users, the only source of financing, to support the increase in cost - the expert analyzes.
CEO of EPTC in the previous management, Vanderlei Cappellari evaluates that the municipality could give a green light to the BRTs, since the repavimientos of the first three axes are in progress and the areas for the construction of the terminals had little pending of expropriations.
- You can adapt the design of terminals and stations to the resource you have, ensuring the minimum for the system to work. Today, we have no alternative to BRT - says Cappellari.
The prefecture intends to start the executive project of the first BRTs until the end of the current management, but there is no longer prediction of when the system can begin to operate.
WHAT IS BRT?
The acronym stands for Fast Bus Transportation and is similar to a subway system. The vehicles travel through exclusive corridors and have their own system of stations and terminals. The passenger pays the ticket when entering the system, not when entering the bus, which reduces the time of stop.
WHERE DOES BRT'S MONEY GO?
Allocation of R $ 115 million withdrawn from bus corridors (approximate values):

Plínio Brasil Milano trench: R $ 2 million
Clause 2 of the Volunteers of the Homeland: R $ 48 million
Severo Dullius: R $ 15 million
Macrodrainage and paving of Avenida Ernesto Ne
mopc no está en línea   Reply With Quote
Old November 2nd, 2017, 03:58 AM   #1870
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,228
Likes (Received): 11945

Brasília Metro - 110 South station to be completed by late 2018. The station is one of many that were left unfinished when the system opened in 2002, so the skeleton of the station is already completed.

Quote:
Originally Posted by bsbals View Post
10/3/17 10:13 AM UPDATED ON 10/3/17 AT 17:02
[B]
110 Sul subway station will be delivered by the end of 2018 [/ B]

Bidding notice to complete the works was released this Tuesday (3). Companhia do Metropolitano do DF estimates that 2,500 people will travel through the new terminal

The government of Brasilia will deliver the 110 South Station, from the Companhia do Metropolitano do Distrito Federal (Metrô-DF), [B] until the end of 2018 [/ B]. The public notice of bidding for the conclusion of the works of the subway terminal, initiated and paralyzed in the 1990s, was published in the Federal Official Gazette on Tuesday (3).



In order for the station to be ready, it is necessary to complete the works and build pedestrian access and surface access.

The contracting has estimated value of R $ 20,735,702.34 and 18 months of validity as of the signing of the contract. The Metro-DF estimate is that around 2,500 people circulate daily through the new platform, expected to be inaugurated in December next year.

This is the second edict that the government launches for the completion of subway system stations this year. In August, the bidding process was completed to finish the 106 South. Bound by the Federal District Court of Audit, the process is under secrecy. However, the Companhia do Metropolitano has already taken the necessary steps and has complied with the recommendations of the Court for the new public competition.

According to the Metrô-DF, [B] this month will be published notice to complete a third station: Estrada-Parque, near Águas Claras and Vicente Pires.



"The funds come from the financing of Banco do Brasil. So, we already have guaranteed capital for the conclusion of the Stations of 106 South, 110 South and Road-Park, "said Metro-DF's CEO, Marcelo Dourado.

The document brings the requirement of signing the term of commitment to conduct ethics and fight against corruption. The public session for the receipt of proposals is scheduled for November 3.

Source: www.agenciabrasilia.df.gov.br

Last edited by mopc; November 2nd, 2017 at 04:04 AM.
mopc no está en línea   Reply With Quote
Old November 2nd, 2017, 11:05 PM   #1871
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,228
Likes (Received): 11945

GENERAL - Forumer-made schemes of Brazilian rail transport systems

Southern Brazil

Northeast Brazil
mopc no está en línea   Reply With Quote
Old November 4th, 2017, 01:15 AM   #1872
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,228
Likes (Received): 11945

Sao Paulo GENERAL -



2017 Metro, CPTM, EMTU (bus) & future intercity train PDF presentation



BONUS

Line 9 train passing in front of new high rise




Where by 2020 a new station on Line 9 is expected, called João Dias

Quote:
Originally Posted by ed.seykota View Post
Segue texto do metrocptm.com.br

"Questionada a respeito do prazo para construção da estação, a CPTM estimou que ela deverá estar pronta apenas no segundo semestre de 2020. Serão dois anos para erguê-la, tempo necessário para desviar as vias de onde será construída a plataforma de embarque. Até mesmo a execução da obra ainda não está decidida: segundo a empresa do estado, isso está sendo resolvido pela Secretaria dos Transportes Metropolitanos."

https://www.metrocptm.com.br/estacao...penas-em-2020/

Veja nessa foto que esse prédio fica atrás do prédio da estação



Só se esse prédio for parte da estação o que eu não acredito porque ainda não há projeto
mopc no está en línea   Reply With Quote
Old November 4th, 2017, 01:32 AM   #1873
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,228
Likes (Received): 11945

Fortaleza Metro - light rail train hits armored vehicle

Quote:
Originally Posted by Wendel csc View Post
ACIDENTE! VLT bate em carro forte em passagem de nível em fortaleza-ce


BONUS - tunnel for underpassage update


Quote:
Originally Posted by Zhukov_bbs View Post
Do Facebook da SEINFRA-CE:

Como tem feito semanalmente, o Secretário da Infraestrutura, Lucio Gomes, visitou, na manhã desta sexta-feira (1), algumas ações da Secretaria em Fortaleza. O roteiro foi finalizado na Av Borges de Melo, onde a obra da passagem inferior sob os trilhos do VLT Parangaba-Mucuripe e de carga seguem em ritmo acelerado. Acompanhado do Coordenador de Transportes e Obras da SEINFRA, André Pierre, o Secretário percorreu o trecho, que está com 75% de execução.







Secretário Lucio Gomes confere ações da Seinfra em Fortaleza
Sex, 01 de Setembro de 2017 22:10
Como tem feito semanalmente, o Secretário da Infraestrutura, Lucio Gomes, visitou, na manhã desta sexta-feira (1), algumas ações da Secretaria em Fortaleza. O roteiro foi finalizado na Av Borges de Melo, onde a obra da passagem inferior sob os trilhos do VLT Parangaba-Mucuripe e de carga seguem em ritmo acelerado. Acompanhado do Coordenador de Transportes e Obras da SEINFRA, André Pierre, o Secretário percorreu o trecho, que está com 75% de execução.

Os trabalhos se concentram na escavação do túnel, que já está com as paredes prontas. Para concluir as lajes, falta apenas o desvio da linha de carga do trem para a via definitiva, que deve ocorrer até a próxima semana.

“Os trabalhos estão em bom ritmo. Nossa meta é liberar o tráfego na parte de baixo até o Natal. Mas, no que for possível, antes, abrir as alças, as ruas laterais”, reforça o secretário.

Depois do último segmento de laje superior, previsto para ser concretado dia 16, e execução dos tirantes laterais, o próximo passo da obra é a laje de fundo da passagem inferior, por onde irão passar os veículos.


Avanços na obra
Desde a retomada da obra do ramal Parangaba-Mucuripe, em 2015, o objetivo do Governo do Ceará tem sido colocar o VLT pra funcionar, ligando pontos de forma contínua, favorecendo o deslocamento da população. Por conta disso, o trecho que liga as estações Parangaba e Borges de Melo já está em operação assistida, com o transporte de passageiros de forma gratuita. Já o trecho que fica entre as estações Borges de Melo e Iate, foi relicitado e deve ter as obras retomadas em sua totalidade ainda na primeira quinzena deste mês.

Saiba mais
Quando finalizado, o VLT terá 13,4 quilômetros ligando os bairros Parangaba e Mucuripe. Desta extensão, serão 12 quilômetros em superfície e 1,4 quilômetro de trechos elevados. O Ramal atravessará 22 bairros, área que concentra mais de 500 mil moradores de Fortaleza. A previsão de demanda potencial do novo modal é de 90.000 passageiros por dia.

http://www.seinfra.ce.gov.br/index.p...a-em-fortaleza
mopc no está en línea   Reply With Quote
Old November 4th, 2017, 01:38 AM   #1874
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,228
Likes (Received): 11945

Sao Paulo Metro (CMSP) - historical pics from the 70

Quote:
Originally Posted by Anderson79 View Post
Linha Norte-Sul na década de 1970 à 1990:














mopc no está en línea   Reply With Quote
Old November 4th, 2017, 03:02 AM   #1875
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,228
Likes (Received): 11945

Rio de Janeiro - BRT and Metro seen in Barra Da Tijuca region

mopc no está en línea   Reply With Quote
Old November 6th, 2017, 09:17 PM   #1876
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,228
Likes (Received): 11945

Rio de Janeiro Metro - Time-lapse of Line 2 from Botafogo to Pavuna 6x

Quote:
Originally Posted by Nighto View Post


[]s
mopc no está en línea   Reply With Quote
Old November 9th, 2017, 02:34 AM   #1877
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,228
Likes (Received): 11945

Brasília Metro - government opens bid process for new Estrada Parque station between existing stations. The station is promised for late 2018.

Quote:
Originally Posted by Jad.Bal.Ja View Post
MOBILIDADE

8/11/17 11:48 ATUALIZADO EM 8/11/17 ÀS 14:35

Metrô abre licitação para obras da Estação Estrada Parque

Plataforma deverá atender cerca de 10 mil passageiros diariamente, principalmente moradores de Águas Claras e de Vicente Pires

DA AGÊNCIA BRASÍLIA


As obras da Estação Estrada Parque da Companhia do Metropolitano do Distrito Federal (Metrô-DF) estão mais perto de serem finalizadas. Nesta quarta-feira (8), o governo de Brasília abriu a licitação para concluir as intervenções. A concorrência foi publicada no Diário Oficial do DF de hoje.

O valor estimado da licitação é R$ 3.033.050,77, e o pagamento será feito conforme cronograma financeiro. As obras devem durar seis meses, com conclusão prevista para o segundo semestre de 2018.





“Com essa estação, já são três para serem entregues à população: Cine Brasília, 110 Sul e agora a da Estrada Parque. Isto é Brasília no rumo certo, com a ampliação do metrô para toda a população”, afirmou o governador Rodrigo Rollemberg nesta quarta em vídeo nas redes sociais.

De acordo com a companhia, a previsão é receber 10 mil passageiros na nova plataforma. Serão principalmente moradores de Águas Claras e de Vicente Pires, que há tempos reivindicavam a estrutura.

Serão feitas:

- Readequação das instalações elétricas e hidrossanitárias;
- Recuperação das esquadrias e revestimentos (pintura, pisos, impermeabilizações);
- Adequação de acessibilidade (substituição da escada existente e instalação de sinalização tátil e visual de piso);
- Troca dos reservatórios de água; a restauração estrutural;
- Urbanização do acesso e do entorno da estação – como o estacionamento.

https://www.agenciabrasilia.df.gov.b...strada-parque/

____________________________________________________________________________________________________________

Ué, não ia ser uma PPP?? E que percurso de pedestres idiota é esse? O cara vai ter que dar a volta no terreno todo? E o terreno vai virar um matagal? Que coisa sem explicação nenhuma!

Quem quiser ver os projetos:

http://www.licitacoesmetrodf.com.br/?page_id=35209
mopc no está en línea   Reply With Quote
Old November 9th, 2017, 04:09 AM   #1878
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,228
Likes (Received): 11945

Niteroi BRT (Greater Rio de Janeiro) - project and updates

Quote:
Originally Posted by Abu.EdL View Post
Na verdade tinha também o outro corredor, de construção muito mais complexa, que seria o TransNiterói.

Quote:
Originally Posted by acpinto View Post

Transoceanic station budget grows 51% over initial forecast
BHS Corridor will only be operational in the second half of 2018

POR IGOR MELLO 19/08/2017 4:30

Buses pass next to the BHS station of Charitas, still deactivated: [B] forecast is to conclude other 11 terminals until July 2017, according to bidding notice [/ B] -

Ana Branco / Agência O Globo


NITERÓI - Transoceanic BHS corridor stations may cost much more than initially designed by the city. GLOBO-Niterói survey shows that the estimated value for the construction of the 11 terminals still pending in the work - R $ 36.7 million - is 51% higher than the initial estimated budget of the work in 2014. The municipality states that the cost, equivalent to the ceiling in the current tender to choose the company that will build the stations, was defined by public call.

According to the initial Transoceanic budget, made in January 2014, to which O GLOBO-Niterói had access, the nine Type 1 (lower capacity) stations and the two Type 2 (which carry more passengers) would cost approximately R $ 24.2 million. Even corrected for the inflation of the period, the value still falls short of what can be practiced in the current hiring: R $ 30.8 million. In a note, the city hall says that there was no change in the design of the stations. It also says that the value of 2014 was only an estimate, and that the R $ 36.7 million result from projections presented by companies at the beginning of the year, as part of the bidding process: "Thus, this amount of R $ 36.7 million is an estimate for the bid and not the final value. Therefore, it was not the city that stipulated this value, "he adds, noting that he does not usually use inflation as a parameter of prices in construction.

Since the company is scheduled to be contracted in September this year, Transoceanica's BHS corridor will only start operating in July 2018 if the ten-month period for the construction of the stations is fulfilled. The city council says it will keep the road completion deadline for the first quarter of 2018, but confirms that buses will only operate in the corridor in the second half.

According to Paulo Corval, Professor of Tax and Financial Law at UFF, the variation of 50% between the amounts is not desirable, but can not be considered illegal. He argues that the public call is necessary to define the costs of public works, but the ideal is to be added to other estimates, such as those made by consultancies or based on similar services already contracted by other public agencies.

- The call for the determination of market prices is essential, but it should not be the sole criterion. More research should be done because the cost estimate should be as detailed as possible. In cases of very large works, such as the case of Transoceanica, municipalities in the Niterói port usually hire engineering consultancies - explains the specialist in public administration.

Councilman Bruno Lessa (PSDB) will present a representation to the Federal Public Prosecutor's Office (MPF) next week, denouncing what he considers possible irregularities in the Transoceanic project. According to the parliamentarian, there are several points not clarified in the work that require the attention of researchers.

- There are indications that the work is not being done in the best way for the citizen, who pays the bill. I will add this question of the stations to the representation. Both the increase in value and the lack of transparency of the city hall not making it clear that they would be the target of another contract - says.

This is not the first controversy involving cost increases in Transoceanic. Initially budgeted at R $ 310.9 million, the corridor already costs the public coffers R $ 417.6 million, after seven additives (which together total more than R $ 60 million) and two apostilles - revisions of values ​​made by half of formula already provided in contract, without additions of items and other changes - which increased expenses by another R $ 44.2 million.



Leia mais: https://oglobo.globo.com/rio/bairros...#ixzz4qFk5bOJi
stest
mopc no está en línea   Reply With Quote
Old November 10th, 2017, 06:10 AM   #1879
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,228
Likes (Received): 11945

Porto Alegre Metro (Trensurb) - New Alstom trains delivered recently presented many problems and remain out of service. Local government wants Federal governmento to mediate talks with train manufacturer to find a solution

Quote:
Originally Posted by Ramos View Post
Retirados para ''recall'', parte dos novos trens da Trensurb segue sem circular

Trensurb notificou Ministério Público Federal para que medie reunião com fabricantes dos veículos


Diário de Canoas
Amilton Belmonte 01/11/2017




http://www.diariodecanoas.com.br/_co...-circular.html

https://gauchazh.clicrbs.com.br/port...clbl7ppcm.html

=========

.
mopc no está en línea   Reply With Quote
Old November 12th, 2017, 08:40 AM   #1880
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,228
Likes (Received): 11945

Sao Paulo Metro (CMSP) - Line 5 - newly opened Brooklin station gets platform screen doors

Quote:
Originally Posted by nicolassousa View Post
(Muitas edições depois...)
Portas da plataforma 1 da estação Brooklin hoje.








Enquanto isso, a plataforma 2... (Será que existe a possibilidade de a operação assistida migrar para a via 1 para instalar as PSDs da plataforma 2 de Brooklin? Continuar sendo 1 trem só que vai e que volta entre Adolfo Pinheiro e Brooklin, mas pela via sentido CPR?)



New access to Borba Gato station

Quote:
Originally Posted by nicolassousa View Post
Obrigado pelas dicas, ed.seykota

Acesso C de Borba Gato nos finalmentes.



mopc no está en línea   Reply With Quote


Reply

Tags
brazil, buses, commuter rails, monorails, subways, trams, transport, transporte coletivo

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Related topics on SkyscraperCity


All times are GMT +2. The time now is 08:16 PM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2018, vBulletin Solutions Inc.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

tech management by Sysprosium