NAGUABO | Parque Eólico Punta Lima | Gestamp Eólica | Parque Eólico | 23.4 MW | Com
PARQUE EÓLICO GESTAMP WIND
Naguabo Facts: 39 MW Existe otro parque propuesto para el municipio llamado Parque Eolico Costa Verde. El mismo tendra 15 turbinas y producira unos 8 MW iniciales con miras para producir 20 MW. Proyectos Energéticos a nivel isla. ![]() AEE Segun aparezca informacion se ira editando el thread. Last edited by Jaykar; July 14th, 2011 at 03:46 AM. |
|
|
|
|
|
#2 |
|
Ex-Caribbean Mod
Join Date: Jan 2007
Posts: 23,024
Likes (Received): 1006
|
Concretan pacto millonario
La misión comercial a España rinde sus primeros frutos, incluyendo un acuerdo para financiar megaproyecto en Naguabo Madrid, España – “Es el día más feliz de mi vida”. Así respondió ayer Justino Orozco, presidente de Go Green Puerto Rico, cuando este diario le preguntó acerca del saldo del primer Foro Empresarial de Puerto Rico en España. La razón para el júbilo de Orozco, quien impulsa un parque de turbinas de viento de 40 megavatios, estaba asociada con la determinación de Gestamp Eólica, de invertir en definitiva entre $75 y $80 millones para viabilizar el referido proyecto en la zona de Naguabo y que ya cuenta con un acuerdo de compra de energía por parte de la Autoridad de Energía Eléctrica (AEE). La información fue confirmada a este diario ayer por Javier Mateache Sacristan, principal oficial ejecutivo de Gestamp Wind, la operación de la multinacional española en América y que ubica en Houston. Mateach Sacristan indicó que la empresa se comprometió a invertir entre $75 y $80 millones en el parque eólico y que éste debiera iniciar construcción entre junio y septiembre de este año. Ello, permitiría tomar partido de los fondos federales disponibles a través de la Ley para la Recuperación y Reconstrucción de América (ARRA), que complementarían la financiación del proyecto. “Hemos visto que los objetivos del gobierno están alineados con nuestros planes”, comentó el ejecutivo al agregar que una vez terminado el proyecto, la empresa buscará otras oportunidades para enclavar, en el corto plazo, otros parques energéticos en la Isla, ya sea eólico, fotovoltaico o de biomasa. Orozco y Mateach Sacristan fueron dos de los más de 125 ejecutivos de empresas españolas que acudieron a Ciudad Santander como parte de la misión económica de Puerto Rico en el país europeo. Allí, motivados por el director general de América para Grupo Santander, Francisco Luzón y el gobernador Luis Fortuño, los empresarios conocieron acerca del programa de Alianzas Público-Privadas (APP), que promueve la Isla, las reformas al marco regulatorio implementadas por la administración en el poder y la oferta de incentivos contributivos para quienes viabilicen iniciativas energéticas, de bienes raíces, turismo e infraestructura en suelo boricua. Las sesiones plenarias o de trabajo fueron seguidas de diversas reuniones, tipo “uno a uno” entre los altos funcionarios del Gobierno de Puerto Rico como el secretario de Desarrollo Económico y Comercio (DDEC), José Pérez-Riera; el director ejecutivo de las APP, David Álvarez, el presidente del Banco Gubernamental de Fomento, Carlos M. García, y el propio Fortuño con representantes de las empresas que ya expresaron interés definitivo de invertir en la Isla. “Es el primer foro, pero no debiera ser el último. He visto mucho interés de las empresas españolas hacia Puerto Rico y Puerto Rico debe seguir haciendo el esfuerzo de promocionarse”, dijo Salvador Marín Bordeira, un experimentado consultor, aliado de la empresa Pirorec-Black&Green, una compañía dedicada al reciclaje de neumáticos a través del método de termólisis ecológica, patentizado por ésta a nivel mundial y que ahora interesa definitivamente plantar bandera en la Isla. Según Marín Borderia y Juan Carlos Bonet, gerente para la empresa con sede en Guadasequies, Valencia, el objetivo a corto plazo consiste en desarrollar una planta de descomposición de neumáticos en la Isla a través de un proceso que genera gas natural, diesel y negro de carbono, proyecto que acabaría “definitivamente” con el problema de disposición de llantas. El objetivo de Pirorec, dijo Marín Borderia, consiste en establecerse en la Isla y utilizar su operación en el Caribe como plataforma para servir a los estados de Texas y Florida, que enfrentan un reto ambiental similar. “A raíz de este foro, nos hemos dado cuenta de la necesidad que tiene Puerto Rico de disminuir su dependencia al petróleo y tanto el gas natural, como el diesel y negro de carbono se obtiene del petróleo”, explicó Bonet. “La intención es llegar a Puerto Rico e implementarlo (el modelo)”, continuó Marín Borderia al agregar que Pirorec está en la búsqueda de socios en la Isla y que uno de éstos viajará a Valencia la semana entrante para ver la planta en funcionamiento. Interesado el Grupo Barceló “Ha sido muy positivo. Hemos visto una presentación acerca de las excelentes ventajas para las inversiones hoteleras. Ha sido una oportunidad para aprender de (Puerto Rico) y ver las oportunidades que hay”, dijo por su parte Vicente Fenollar Molina, director general económico financiero de la reputada multinacional hotelera Grupo Barceló, mientras hacía referencia al saldo del encuentro. Fenollar Molina reconoció que a la cadena hotelera le ha ido “muy bien” en otros países de la región como Cuba, México y República Dominicana, entre otros, pero todavía no deja huella en Puerto Rico. “Esperamos encontrar el proyecto en Puerto Rico, ver su viabilidad y realizarlo”, dijo Fenollar Molina al tiempo que indicaba que el encuentro se ha convertido en un punto de partida para analizar a la Isla como un posible destino de inversión a mediano plazo. “Sería muy fácil tener un establecimiento porque tenemos infraestructura en la zona, el equipo comercial y de operaciones y sistemas en la zona, tenemos la infraestructura para aterrizar en Puerto Rico”, agregó el ejecutivo. Molina destacó que en lo que respecta a criterios como el marco legal, ventajas fiscales, financiación y seguridad jurídica y fiscal en la Isla “se cumplen todas”. “Ojalá encontremos el proyecto”, reiteró. “Nos ha sorprendido la calidad de la presentación y los proyectos”, dijo por su parte Juan F. Jiménez Fernández De Palencia, director comercial de Atesvi, una de las constructoras de gran escala de mayor reconocimiento en España y con sede en A Coruña. Lo que sigue De acuerdo con el ingeniero, luego de la presentación de ayer, tanto el Santander como el Gobierno de Puerto Rico debieran fomentar encuentros adicionales y probablemente en Puerto Rico, de forma tal, que las empresas españolas puedan tener un cuadro más claro de las oportunidades disponibles. “Es muy importante desarrollar el segundo tejido empresarial”, agregó Jiménez Fernández De Palencia haciendo referencia a la necesidad de establecer sociedades o alianzas estratégicas con empresas en la Isla para viabilizar las iniciativas de inversión. La clave para el futuro Mientras reiteraba que las economías emergentes que integran la América Latina han salido fortalecidas de la crisis financiera e inician una década de avance y pujanza, el director general de América para Grupo Santander, Francisco Luzón, señaló ayer que el futuro de Puerto Rico se encuentra en una estrategia de internacionalización en la que las empresas españolas podrían aportar significativamente. “Puerto Rico no puede desaprovechar la oportunidad que le abren estos desarrollos políticos y económicos. Puerto Rico no puede vivir de espaldas al continente ahora que América es fuente de prosperidad y crecimiento, y no de volatilidad y desestabilización”, dijo Luzón al inaugurar el primer Foro Empresarial de Puerto Rico en España, evento cumbre de la misión económica que lleva a cabo la administración de Luis Fortuño en este país europeo. La coordinación del evento por parte del Grupo Santander pareció ser otra reafirmación del compromiso del conglomerado español con Puerto Rico, cuando Luzón señaló que “nosotros también somos boricuas”. “Hemos vivido sus bonanzas, sus crisis y sus recuperaciones”, agregó el banquero al tiempo que reiteraba que si la Isla adopta una postura de apertura hacia el exterior, su economía podría regresar “a la prosperidad”. |
|
|
|
|
|
#3 |
|
Ex-Caribbean Mod
Join Date: Jan 2007
Posts: 23,024
Likes (Received): 1006
|
Grandes proyectos energéticos para 2011 en Puerto Rico
Vía Verde y otros proyectos ayudarán a reducir los precios de la energía eléctrica en el largo plazo. Con una nueva reforma de la legislación para la energía local y el Gobierno Federal presionando para que se incremente la presencia de energías renovables en la Isla, el sector energético continuará siendo uno de los más activos durante el año 2011. Entre los proyectos que van a tener lugar este año en Puerto Rico, en primer lugar hay que destacar el gasoducto Vía Verde, que va a suponer una inversión de $450 millones. Ya ha obtenido el 70% de los permisos requeridos para su construcción, por lo que parece que será el que reportará mayores y más rápidos beneficios. Este gasoducto, con una extensión de más de 150 Km. entre Peñuelas y San Juan, reducirá la dependencia del petróleo, ahorrará $1 billón en energía y reducirá la contaminación en un 64%. Además, creará entre cuatro y cinco mil nuevos empleos durante su construcción. Por otro lado, se está desarrollando el Santa Isabel Wind Project, en el que se invertirán $215 millones y que estará operativo para el próximo año. Se ha firmado un contrato de abastecimiento de energía de 20 años entre la planta eólica y el gobierno puertorriqueño, por la cantidad de 75 megavatios. Además, también se pretende construir un parque eólico de 30 megavatios en Guayanilla, que finalmente parece que tendrá luz verde para este año. El proyecto, que podría ampliarse para contar también con energía solar y llegar a los 45 megavatios, va a suponer un desembolso de más de $80 millones. También se va a construir otro parque eólico en Naguabo por la empresa española Gestamp Eólica. Ya se ha firmado el compromiso por parte del gobierno puertorriqueño para la compra de los 40 megavatios que generará la planta, tras los $80 millones que va a suponer su construcción. Por último, Western Wind Energy Corp. ha mostrado su interés en la construcción de una planta incineradora de residuos que requerirá una inversión de $500 millones que transformará 2.000 toneladas diarias de residuos en 80 megavatios de energía. |
|
|
|
|
|
#4 |
|
Registered User
Join Date: Jan 2007
Location: Mayagüez, Puerto Rico
Posts: 7,802
Likes (Received): 19
|
Que mucho se estan tardando con estos proyectos....
|
|
|
|
|
|
#5 |
|
Registered User
Join Date: May 2009
Location: Chicago
Posts: 355
Likes (Received): 12
|
Y se van a tardar mas con todo el mundo protestando. Esto no me sorprende porque en P.R. todo lo que signifique desarrollo lo detienen
|
|
|
|
|
|
#6 |
|
Registered User
Join Date: Aug 2010
Location: San Juan
Posts: 2,162
Likes (Received): 13
|
Yo solo me opongo a via verde.
__________________
Que ViVan Los Fantasmas Arquitectonicos!!! :D |
|
|
|
|
|
#7 |
|
Registered User
Join Date: Jan 2007
Location: Mayagüez, Puerto Rico
Posts: 7,802
Likes (Received): 19
|
Numeratzi,ya todos sabemos tu opinion, no la tienes que escribir vez tras vez tras vez...
|
|
|
|
|
|
#8 |
|
Registered User
Join Date: Aug 2006
Location: Guaynabo/Cayey
Posts: 451
Likes (Received): 7
|
No se donde poner esto, pero mi abuelo es dueño de una finca en Corozal y me conto q hace poco lo llamaron de una compañia para preguntarle si le podian rentar sus tierras para construir un parque eolico.
Esto todavia esta en veremos, asi q no les puedo dar mas detalles. |
|
|
|
|
|
#9 |
|
Secretario del DTOP SSCPR
Join Date: May 2010
Location: Mayagüez
Posts: 1,477
Likes (Received): 56
|
El problema es que varios de estos desarrollos se están dando en áreas ecológicamente muy sensitivas (ej. Punta Verraco en Guayanilla, por la alta concentración de aves migratorias) o porque el proyecto no es suficientemente ecológico (los sistemas de incineración de basura pa' energía eléctrica--si no es supermoderno, superestricto y superbienmantení'o, entonces contamina el aire peor de lo que el vertedero contaminaría el suelo y el agua).
|
|
|
|
|
|
#10 |
|
Ex-Caribbean Mod
Join Date: Jan 2007
Posts: 23,024
Likes (Received): 1006
|
Wind farm taking shape in Naguabo as developer places order for 13 turbines
By : KEVIN MEAD kevin@caribbeanbusinesspr.com A planned wind farm in Naguabo continues to take shape as the developer has ordered 13 turbines for the project in the Punta Lima area of the southeast coastal town. Denmark-based Vestas has received an order for a total of 23.4 megawatt (MW) consisting of 13 units of the V100-1.8 MW platform for the Punta Lima project being developed by Gestamp Wind, the wind energy division of Spain-based Gestamp Renewables, specialized in the development, construction and operation of wind farms in the world’s leading wind energy markets. Go Green Puerto Rico and Gestamp reached a deal in January for the Spanish multinational to invest between $75 million and $80 million in the Naguabo project. The Vestas order comprises supply, delivery, installation, transportation and commissioning of the wind turbines, a supervisory control and data acquisition (SCADA) system, as well as a five-year service and availability agreement. Delivery of the turbines is expected to start before the end of 2011 and the project is expected to be completed by the first half of 2012. “We are pleased to award this project to Vestas, the world leader in wind technology and a trustworthy global partner with strong local presence, Gestamp Wind North America CEO Javier Mateache said. “We are confident that the V100-1.8 MW turbine suits perfectly well the wind conditions in Puerto Rico and therefore the turbines will deliver as agreed, helping us maximizing the energy output and consequently capitalizing on our return on the investment.” “We are very glad to support Gestamp Wind in building its first wind farm in Puerto Rico. Gestamp Wind is a very important customer for Vestas and we highly value our partnership,” said Adrian Katzew, director of Vestas Mexico, Central America & Caribbean. “Vestas has been present in the Caribbean since 1991 and has the local knowledge, resources and capabilities needed to meet the highest standards and quality requirements for this project. We are confident we can further support the island in diversifying its energy mix and contribute to achieving the target of 15 per cent of renewable energy production by 2020,” he said. The wind power plant of this order will produce approximately 52 GWh per year, which represents an annual savings of almost 34,000 tons of carbon dioxide compared with average Puerto Rican electricity. “We are pleased to be chosen by Gestamp Wind for this project. This new order is a very important step for Vestas’ presence and further consolidation in the Caribbean area, a fast growing wind power market,” said Juan Araluce, president of Vestas Mediterranean. Go Green Puerto Rico has already signed a power purchase agreement with the Puerto Rico Electric Power Authority for the Naguabo project. Plans call for construction to start by September. That ambitious timeframe is designed to allow the project to tap federal American Recovery & Reinvestment Act (ARRA) funding to complete financing. The project represents another development on Puerto Rico’s newly active energy front. Things began heating up in the sector in 2010 as the Fortuño administration backed up its commitment to diversify power production to bring down high electricity costs that are a major obstacle to investment and economic development in Puerto Rico. Among other wind projects in the pipeline and on track to start spinning in 2012 are Pattern Energy’s $215 million Santa Isabel wind farm that is aiming to be operational by 2012 and the 45 MW Windmar Renwable Energy wind farm in Guayanilla. Pattern signed a 20-year power-purchase agreement for the sale of 75 megawatts to Prepa. The agreement between Prepa and Pattern calls for the public utility to buy power at 12.5 cents per kilowatt-hour (kWh), with the cost increasing 1.5% annually throughout the contract’s life, according to Prepa. Meanwhile, local firm WindMar Renewable Energy is developing a 30-megawatt wind farm in Guayanilla that could increase to 45 megawatts and could add a solar component as well. Some $7 million has already been invested and total project costs are $80 million. Meanwhile, other private investors are developing large wind, solar and WTE projects and planning to sell the power they produce back to Prepa. Western Wind Energy Corp. announced this year plans to have a 30 MW solar project in Yabucoa. Currently, the island produces about 70 percent of its power from imported oil, with the rest split evenly between natural gas and coal. With the projects on board this year, however, Puerto Rico’s dependence on costly, volatile and dirty oil will be cut to 12 percent in two years, while natural gas will increase to nearly 70 percent. Renewable and waste-to-energy (WTE) projects currently in the works will account for 12 percent of total energy by 2015. Prepa says its Vía Verde natural-gas pipeline, which remains under evalaution by the U.S. Army Corps of Engineers, will deliver annual energy savings of $1 billion and will cut current pollution by 64 percent. The pipeline will allow four existing power plants to switch to natural gas from oil. That will cut oil down to 12 percent of total power production, and bring natural gas up to around 70 percent. New York-based firm Energy Answers is proposing a $500 million WTE plant, which is slated to operate in Arecibo’s Barrio Cambalache by 2013. The plant will burn and separate 2,000 tons of garbage a day to generate 80 megawatts of electricity to be sold to Prepa, and to recover recyclable materials. This plant also received approval of its EIS by local authorities, but now must get federal permits. There is a lot of action in the solar field as well. AES Illumina is developing a $70 million, 20-megawatt solar project in Guayama that will use polycrystalline photovoltaic panels, which are among the most cost-effective being produced today. Prepa pledged in a 20-year contract to buy the power at the rate of 13 cents per kWh. Florida-based Yarotek LLC is negotiating to build what would be the island’s largest solar power plant, a 50-megawatt facility in Aguadilla. Also, the Ciro Group, comprised of local investors, is proposing to develop a 63-megawatt solar power plant in Salinas and a factory to build the solar panels at the site of the shuttered Commonwealth Oil Refining Co. (CORCO) in Guayanilla. Windmar is already developing a smaller solar power project in Ponce. |
|
|
|
|
|
#11 |
|
Ex-Caribbean Mod
Join Date: Jan 2007
Posts: 23,024
Likes (Received): 1006
|
Fragmento de noticia
13 molinos para Naguabo De otra parte, la empresa de producción de molinos de viento Vestas informó en su página web que ha recibido una orden de compra para 13 molinos por parte de la empresa española Gestamp Wind que serán instalados en Punta Lima en Naguabo y producirán 23.4 MW de energía. Se espera que este proyecto esté operando en la primera mitad del 2012, informó Vestas. Javier Mateache, principal ejecutivo de Gestamp Wind en Norteamérica, dijo en un comunicado que las turbinas modelo V100-1.8 MW de Vestas son ideales para las condiciones de viento en Puerto Rico y “nos ayudarán a maximizar nuestra producción de energía y, por ende, capitalizar en nuestro retorno de inversión”. La planta de energía eólica producirá unos 52 GWh anualmente, lo que corresponde a un ahorro anual en emisiones de carbono de 34,000 toneladas, en comparación con la electricidad producida actualmente en Puerto Rico, asegura Vestas. |
|
|
|
|
|
#12 |
|
boricaneer!
Join Date: Nov 2009
Location: Metro, PR
Posts: 2,433
Likes (Received): 34
|
creo que se debe de hacer un subforo para Energia Sustentable.
__________________
No abogues por ideales cuando te beneficias del ideal que tanto criticas. |
|
|
|
|
|
#13 |
|
TRUST Me
Join Date: Jul 2009
Location: New York City
Posts: 6,275
Likes (Received): 135
|
__________________
My country, 'tis of thee, Sweet land of liberty, Of thee I sing; Land where my fathers died, Land of the pilgrims' pride, From ev'ry mountainside! Let freedom ring! |
|
|
|
|
|
#14 |
|
boricaneer!
Join Date: Nov 2009
Location: Metro, PR
Posts: 2,433
Likes (Received): 34
|
no, me refiero a un Subforo, no thread.
__________________
No abogues por ideales cuando te beneficias del ideal que tanto criticas. |
|
|
|
|
|
#15 |
|
Registered User
Join Date: Aug 2008
Location: Juana Diaz
Posts: 3,804
Likes (Received): 185
|
Desde la página de Vestas:
Vestas receives 23 MW order in Puerto Rico 11:05 CET - 08 Jul. 2011 Vestas has received an order for a total of 23.4 MW consisting of 13 units of the V100-1.8 MW platform for the Punta Lima project which will be located in Puerto Rico. The order has been placed by Gestamp Wind, the wind energy division of Gestamp Renewables, specialized in the development, construction and operation of wind farms in the world’s leading wind energy markets. The order comprises supply, delivery, installation, transportation and commissioning of the wind turbines, a VestasOnline® Business SCADA system, as well as a five-year service and availability agreement. Delivery of the turbines is expected to start before the end of 2011 and the project is expected to be completed by the first half of 2012. Resto del comunicado aquí: http://www.vestas.com/en/media/news/...=3&NewsID=2767 |
|
|
|
|
|
#16 |
|
Ex-Caribbean Mod
Join Date: Jan 2007
Posts: 23,024
Likes (Received): 1006
|
Gestamp Eólica invertirá en el sector energético de Puerto Rico
21/01/2011 Fuente: El Nuevo Dia La misión comercial puertorriqueña vuelve de España con un acuerdo de financiación para un ‘megaproyecto’ en Naguabo. La iniciativa en cuestión consiste en la construcción de un parque de turbinas de viento de 40 megavatios (MW) por parte de Gestamp Eólica, que llevará a cabo una inversión de entre 75 y 80 millones de dólares (entre 53,7 y 57,3 millones de euros). La Autoridad de Energía Eléctrica (AEE), por su parte, ya ha firmado el acuerdo para la compra de la energía que se genere en el mismo. Fuentes de Gestamp Wind han confirmado el compromiso de la empresa de realizar dicha inversión en el parque eólico, cuya construcción debería iniciarse entre junio y septiembre de este año. Ello permitirá disponer de los fondos federales que otorga la ‘Ley para la Recuperación y Reconstrucción de América’ (ARRA, por sus siglas en inglés), que complementarían la financiación del proyecto. |
|
|
|
|
|
#17 |
|
Ex-Caribbean Mod
Join Date: Jan 2007
Posts: 23,024
Likes (Received): 1006
|
Aparentemente estara operacional el 28 de febrero de 2012. Ver link: http://www.gestampwind.com/en/business/wind-farms
|
|
|
|
|
|
#18 |
|
Registered User
Join Date: Aug 2008
Location: Juana Diaz
Posts: 3,804
Likes (Received): 185
|
Reviviendo este tema... Este proyecto por alguna razón está atrasado. Alguien tiene información nueva? Puedo decir que las turbinas llevan al menos desde marzo o abril en el puerto de Ponce. LLegaron calladitas o tal vez se colaron bajo el manto de la atención que recibieron las turbinas de Santa Isabel. Hoy estuve por el área y todavía permanecen allí en el muelle. Dicen Gestamp en la góndola. Pensaba que eran más pequeñas que las de Santa Isabel pero encontré las especificaciones y son prácticamente del mismo tamaño.
http://www.vestas.com/Files/Billeder...100-1.8_MW.pdf |
|
|
|
|
|
#19 |
|
Registered User
Join Date: Jul 2012
Posts: 12
Likes (Received): 0
|
Este proyecto debe estar listo para septiembre
|
|
|
|
|
|
#20 |
|
Registered User
Join Date: Aug 2008
Location: Juana Diaz
Posts: 3,804
Likes (Received): 185
|
Pues tienen que apurarse porque septiembre ya está ahí. La última vez que pasé por el área de la Guancha fue el 4 de julio y las turbinas todavía estaban en el puerto. Que yo sepa esos movimientos no se han dado a menos que lo estén haciendo sin ninguna promoción. No he visto los arrastres vacíos de regreso por la autopista en las mañanas como veía los de Santa Isabel.
A menos, Maximo, que tengas información que confirme que ya están levantando las turbinas. Son similares en tamaño a las de Santa Isabel por lo que no es fácil pasarlas sin que nadie se de cuenta. |
|
|
|
![]() |