Old October 10th, 2013, 01:07 AM   #461
friedrichstrasse
BANNED
 
Join Date: Jan 2007
Posts: 6,654
Likes (Received): 2540

I partly agree, but both of them are much better than the one by Mr. Goloub.
friedrichstrasse no está en línea   Reply With Quote

Sponsored Links
Old October 10th, 2013, 03:50 PM   #462
GENIUS LOCI
No More Italian Mod
 
GENIUS LOCI's Avatar
 
Join Date: Nov 2004
Location: Milano
Posts: 35,327
Likes (Received): 11131

Nice report on Lotto M5 metro station by metroricerche

http://www.metroricerche.it/blog/?p=672&preview=true







__________________
URBANFILE
GENIUS LOCI no está en línea   Reply With Quote
Old October 21st, 2013, 01:01 PM   #463
GENIUS LOCI
No More Italian Mod
 
GENIUS LOCI's Avatar
 
Join Date: Nov 2004
Location: Milano
Posts: 35,327
Likes (Received): 11131

Nice map by the forumer
friedrichstrasse
which shows S+R lines

Quote:
Originally Posted by friedrichstrasse View Post
E se nelle mappe si mettessero anche le linee Regionali?



Uploaded with ImageShack.us
__________________
URBANFILE

Arnorian, friedrichstrasse, Galro liked this post
GENIUS LOCI no está en línea   Reply With Quote
Old October 21st, 2013, 10:27 PM   #464
friedrichstrasse
BANNED
 
Join Date: Jan 2007
Posts: 6,654
Likes (Received): 2540

"S lines" are the suburban lines, while the "R lines" are the regional services.

Unfortunately only the suburban lines are numbered and drawn on the official maps, so I thought it would be easier for the commuters if both of them were shown.
The system is quite similar to the rail network in Paris, where the S-lines are the RER, and the R-lines the Transilien.
friedrichstrasse no está en línea   Reply With Quote
Old October 22nd, 2013, 06:23 PM   #465
Suburbanist
on the road
 
Suburbanist's Avatar
 
Join Date: Dec 2009
Location: the rain capital of Europe
Posts: 27,539
Likes (Received): 21253

Why don't you add the subway lines (putting names only on transfer stations, and unnamed dots for the other)?
__________________
YIMBY - Yes, in my backyard!
Suburbanist no está en línea   Reply With Quote
Old October 23rd, 2013, 12:37 AM   #466
friedrichstrasse
BANNED
 
Join Date: Jan 2007
Posts: 6,654
Likes (Received): 2540

It would be a good idea, but drawing those maps requires a lot of time.
My purpose with this map was only on making the regional lines more attractive than today.
__________________

Suburbanist liked this post
friedrichstrasse no está en línea   Reply With Quote
Old October 24th, 2013, 06:54 PM   #467
GENIUS LOCI
No More Italian Mod
 
GENIUS LOCI's Avatar
 
Join Date: Nov 2004
Location: Milano
Posts: 35,327
Likes (Received): 11131

Some infos about M4 >>> http://www.metroricerche.it/blog/201...tura-cantieri/





__________________
URBANFILE

geometarkv liked this post
GENIUS LOCI no está en línea   Reply With Quote
Old November 7th, 2013, 11:05 PM   #468
garibaldi tower
BANNED
 
Join Date: Jul 2012
Posts: 545
Likes (Received): 23

Metro 4 construction sites close
for five years, streets and squares

In December, in part via Solari: first Dezza , Foppa and cones Zugna , immediately after Jasmine and St Christopher. In 2014 it will be the turn of Dateo . There are fears of heavy discomfort: "It 's the price to pay ." And the traders have already asked for a table
ALESSIA Gallio
I read it after
Metro 4 , the shipyards closed for five years, streets and squares So far the shipyards had sprung up only in Forlanini . It is there that have focused efforts to be able to deliver the first two stops (Linate Forlanini - Fs) of line 4 of the metro in time for Expo . A race. Yet now , the subway waiting for years and for years seemed to exist only in the promises of directors, out of the paper to materialize also the other side of Milan. E Palazzo Marino inaugurates a "tour" in the affected areas to warn in advance of the districts of the revolution that they will soon live.

First stop in Zone 6 , where whole pieces of the city will be transformed by barriers and work . With the inevitable chaos that will create so important excavations in streets and blocks densely populated and frequented . Starting with Solari is here, in a vast area that builds on the last stretch of road to the border with Dezza via Foppa and who gets to capture a slice of the park until Cones Zugna that probably at the end of the year, will be mounted enclosures for the first preparatory works . Soon after , the workers will come in off the Jasmine in Lorenteggio , and the future terminus of St. Christopher . And then , within the next four or five months , start activities also Dateo .

It is the eternal promise that is now beginning to take shape. To see them all over, the 21 stations of the M4, it was not until 2020. If you do not , at this point, the year 2021 : the dealer will have six and a half years after the signing of the Convention - is not there yet - to end it. But after work parties at Linate to be able to carry out the enterprise Expo (the " moles" should start digging the first months of 2014 ) , it is also warm up the engines for trafficking LorenteggioSolari . In this quadrant , the means of communication may only be given when you get the final approval of the project by the CIPE . Palazzo Marino , however, prepare it: "It is conceivable that the first construction can start as early in 2013 ," says Councillor for Mobility, Pierfrancesco Maran .

The start will be from Solari , one of the more delicate because it is here that needs to be dropped the "mole" that will have to dig tunnels to San Babila (another will depart from San Cristoforo ) . It serves a very large surface area to prepare in advance. "Phase 1 " to the end of 2013 provides for the perimeter fence , cutting of trees ( ' will be replanted when the surface area will be rearranged and improved , " anticipates Maran ) , the excavations preparatory to move underground services and to understand for example, if there are weapons of war down there . Then , start the actual construction that will last, in more complex cases , 60 months : five years. A long wait , punctuated by predictable discomfort: the price needed to have a stop on the blue line under the house .

From the first meeting in Zone 6 , the major concerns were traders : "Those of avenue Lorenteggio have asked a specific table - said the Councillor for Mobility - Obviously, the sites of the subway have a very strong impact on neighborhoods involved. We are aware and we are doing everything possible to reduce critical . Even for those who live and work in Solari will be five difficult years, but then the service that will be extraordinary and , for the area, there will be great benefits . "

The President of Zone 6 , Gabriele Rabaiotti , he knows that in his district are intended to check three of the most important shipyards : stop around the future of Jasmine , for

example, the traffic will be under special surveillance . He, too, agrees : " We are witnessing the construction of a work that represents the backbone of the city." At Palazzo Marino has already sent the first requests : " On the site of the City should be converted into a section dedicated to building sites to inform, to be cared for restoration projects from the preparatory phase of the areas and the work will not have to spend too much time ."
garibaldi tower no está en línea   Reply With Quote
Old November 8th, 2013, 12:19 AM   #469
friedrichstrasse
BANNED
 
Join Date: Jan 2007
Posts: 6,654
Likes (Received): 2540

friedrichstrasse no está en línea   Reply With Quote
Old December 16th, 2013, 08:35 PM   #470
GENIUS LOCI
No More Italian Mod
 
GENIUS LOCI's Avatar
 
Join Date: Nov 2004
Location: Milano
Posts: 35,327
Likes (Received): 11131

Interesting infos on Milano-Asso railway projects (to be completed within 2015)

Quote:
Originally Posted by MoltoLunatico View Post
La serie di lavori che interesseranno la Milano - Asso prossimamente la trovo stuzzicante... non risolveranno tutti i problemi della linea (e forse nemmeno i più gravi... ma non ho le competenze per giudicare) ma da qualche parte si doveva pur cominciare!

Ovviamente come nella migliore tradizione nostrana è quasi impossibile ottenere qualche informazione in più che vada oltre le quattro baggianate che accompagnano i comunicati ufficiali.

Mi sono però imbattuto nel video pubblicato QUI da FerrovieNord dal quale ho potuto estrapolare una serie di fotogrammi moooolto interessanti. O che almeno sono interessanti per me!

Parto da quello che più mi sta a cuore: Paderno Dugnano. Fin'ora tutto quello che avevo era la descrizione per punti degli interventi:
  • adeguamento a standard della stazione con realizzazione di due banchine alte, dotate di pensiline, illuminazione, cartelli teleindicatori e impianto di diffusione sonora per informazioni al pubblico;
  • accessibilità alle due banchine mediante due sottopassi di stazione, uno in prossimità del FV dotato di ascensore e rampe ciclopedonali) ed uno in corrispondenza del PL di via Roma;
  • rettifica del tracciato dei 2 binari di linea e realizzazione di un 3° binario tronco con tutti i binari collocati in posizione definitiva rispetto alla futura configurazione a 3 binari; adeguamento della Trazione Elettrica e degli impianti di segnalamento.

Ora ho finalmente una planimetria che mi da un'idea più precisa di ciò di cui si sta parlando. Partiamo da una vista generale:

[IMG]http://i42.************/oj0ac1.png[/IMG]

Le banchine saranno lunghe 250 metri e avranno circa 150 metri di pensilina ciascuna. Perché non 200 metri (come i treni da 8 carrozze) non lo so, ma dato che adesso non c'è niente... Davanti al fabbricato viaggiatori la banchina resterà bassa e si notano le due rampe di raccordo con le parti alte.

Ci saranno due sottopassi. Uno in corrispondenza di Via Roma dotato di rampe ciclabili:

[IMG]http://i41.************/fw2kq9.png[/IMG]

L'altro a nord della stazione, con ascensori e un collegamento diretto al parcheggio interrato:

[IMG]http://i41.************/156zg8w.png[/IMG]
Quote:
Originally Posted by MoltoLunatico View Post
Procedendo più a nord troviamo la fermata di Varedo, dove è previsto quando segue:
  • Realizzazione di due banchine;
  • Miglioramento dell'accessibilità;
  • Realizzazione di un sottopasso di collegamento tra le banchine;
  • Adeguamento degli impianti ferroviari.

Qui purtroppo niente planimetria, solo un pidocchioso rendering con fotinserimento:

[IMG]http://i43.************/2nlbcdg.png[/IMG]
Quote:
Originally Posted by MoltoLunatico View Post
Passiamo quindi a Bovisio Masciago:

1) ADEGUAMENTO FERMATA DI BOVISIO MASCIAGO (OPERE DI SECONDA
FASE)
  • Realizzazione delle pensiline;
  • Installazione degli ascensori;
  • Installazione/adeguamento degli impianti di informazione al pubblico, dei cartelli teleindicatori e di diffusione sonora;
  • Adeguamento dell'impianto di videosorveglianza.
2) REALIZZAZIONE SOTTOPASSO IN SOSTITUZIONE DEL PL DI VIA
MARANGONI
  • Realizzazione di un sottopasso ferroviario in via V. Veneto;
  • Realizzazione di una pista ciclabile;
  • Ampliamento dell'area destinata al parcheggio 4.

C'è lo scorcio di una planimetria che riguarda presumibilmente la sola fase 1:

[IMG]http://i39.************/2d1pp3s.png[/IMG]
Quote:
Originally Posted by MoltoLunatico View Post
A Casano Maderno dovrebbero realizzare la copertura dei passaggi pedonali tra le due fermate:

[IMG]http://i42.************/1037t38.png[/IMG]
Quote:
Originally Posted by MoltoLunatico View Post
A Seveso verranno installati gli ascensori in corrispondenza del sottopasso:

[IMG]http://i41.************/r0ecg5.png[/IMG]
Quote:
Originally Posted by MoltoLunatico View Post
A Camnago-Lentate gli interventi riguarderanno più i dintorni della stazione che la stessa:
  • Ampliamento e riqualificazione del parcheggio con la creazione di 77 posti auto (2 per disabili);
  • Realizzazione di un'area per la sosta di 3 autobus;
  • Sistemazione della viabilità;
  • Rifacimento delle recinzioni del parcheggio.

[IMG]http://i41.************/16hp5sj.png[/IMG]
Quote:
Originally Posted by MoltoLunatico View Post
Questo infine quando previsto ad Erba:
  • - Realizzazione di banchine alte 55 centimetri;
  • - Adeguamento del sottopasso pedonale;
  • - Adeguamento dell'impiantistica ferroviaria;
  • - Dotazione di un sistema di sorveglianza, ammodernamento
  • dell'impianto di diffusione sonora.

[IMG]http://i43.************/5anas3.png[/IMG]

Nel filmato è presente anche un rendering che si riferirebbe a Merone (dove però di vedono banchine che paiono alte, mentre mi pare che siano previste basse... boh?) e uno generico senza riferimenti che fa vedere una banchina con la pensilina che riassume gli interventi in tutte le fermate dove appunto installeranno la pensilina e/o alzeranno le banchine.
__________________
URBANFILE

geometarkv liked this post
GENIUS LOCI no está en línea   Reply With Quote
Old December 22nd, 2013, 03:37 AM   #471
garibaldi tower
BANNED
 
Join Date: Jul 2012
Posts: 545
Likes (Received): 23

Monza , the subway to the street of dreams Shipyard after thirty years from monday jobs to join the Brianza in Milan. The mayor Oldroyd is a work long overdue MILAN - How many missed trains and how many races jump . The subway is coming in Monza is delayed by at least three decades. The city brianzola still repents of the proud " great refusal " that Mm opposed to the hypothesis and the connection to the rails of Sesto San Giovanni. Hath been found alone. On a siding. For a long time , and in vain , he chased the dream of the line " Monza Liss - South" , an internal channel between the railway station and the Hospital San Gerardo : "The CIPE has approved a loan of 87 billion lire ! - Triumphantly announced the administration in November 1996 - . We will have an underground cable , automatically, without drivers . " Since then, for fifteen years, without advancing a step , it was even discussed money, designs and agreements . An infinite wait . Actually, no . Since Monday is another story. The yard really pops. The trains will travel from March 2015. The red line tip of the Brianza. The extension of the M1 motorway will connect the stop Sesto Fs on the outskirts of Monza , on the border with Cinisello . I'm a mile and a half mile underground path . Two stations : Sixth - Restellone and Monza - Bettola . Total cost of the operation : 206 million euro . The consortium who has won the contract with a bid to the bottom 33 percent - the temporary association of companies consists of Coestra , BONCIANI and Acmar - July 4 attack from the preliminary works , spades and underground utilities : there are no cables and pipes to move, the district heating network, electricity and gas. « À work that are waiting for decades - said the mayor of Sesto , George Oldroyd - . Finally we see the start of work . " On 9 December 2009, at the signing of the last agreement program , the Region promised the opening of the sites in September 2010 : a further nine months have passed , the delay seems to be the rule. The first 400 meters of the track will be excavated outdoors in Sesto , the remaining mile and a half will be " eaten " by the underground mechanical moles . The structural interventions 'heavy' will start in October and will end in 2014. The sixth station will be built up of large Levrino and the terminus will be located not far from the shopping center Auchan in Monza . Residents along the axis of the tunnel are worried : " We will have to endure three years of chaos." Even more alarm dealers and gas stations : " We will have a meltdown of the proceeds ." The administration of Sixth and met each other the other night public meeting at the district Restellone : "The disruption will be inevitable , but we will try to limit them ." The sites will disappear and dozens of stands to revolutionize the long road Viale Gramsci , between Via Bellini and Donizetti away . Parking for matching commuters will not be ready before 2015 : " Initially - notes Oldroyd - we'll have to be content with satin strips provided in Cinisello ." For the car park serving between 30 and 40 million Euros , "And at the time the funds are not there ." The new section of the M1 can carry up to 14 000 passengers per hour and so reduce the flow of traffic from the hinterland to Milan: " à a strategic work - said the municipal neoassessore Mobility, the young Pierfrancesco Maran - . We will work with other agencies to hold a maximum of inconvenience to citizens. " The mayor of Monza , the League's Marco Mariani , look beyond and ahead : " We asked Mm a feasibility study to extend the route to the Rondo of Pines , near the Villa Reale, nell'aerea the new management center that will host the Province Brianza , the Inland Revenue , the barracks of the Guardia di Finanza . " A technical summit is already scheduled for next week. At construction sites .
garibaldi tower no está en línea   Reply With Quote
Old December 22nd, 2013, 11:13 AM   #472
arctic_carlos
Recondita armonia
 
arctic_carlos's Avatar
 
Join Date: Dec 2007
Location: Sitges - Barcelona
Posts: 4,735
Likes (Received): 3978

Quote:
Originally Posted by garibaldi tower View Post
Monza , the subway to the street of dreams Shipyard after thirty years from monday jobs to join the Brianza in Milan. The mayor Oldroyd is a work long overdue MILAN - How many missed trains and how many races jump . The subway is coming in Monza is delayed by at least three decades. The city brianzola still repents of the proud " great refusal " that Mm opposed to the hypothesis and the connection to the rails of Sesto San Giovanni. Hath been found alone. On a siding. For a long time , and in vain , he chased the dream of the line " Monza Liss - South" , an internal channel between the railway station and the Hospital San Gerardo : "The CIPE has approved a loan of 87 billion lire ! - Triumphantly announced the administration in November 1996 - . We will have an underground cable , automatically, without drivers . " Since then, for fifteen years, without advancing a step , it was even discussed money, designs and agreements . An infinite wait . Actually, no . Since Monday is another story. The yard really pops. The trains will travel from March 2015. The red line tip of the Brianza. The extension of the M1 motorway will connect the stop Sesto Fs on the outskirts of Monza , on the border with Cinisello . I'm a mile and a half mile underground path . Two stations : Sixth - Restellone and Monza - Bettola . Total cost of the operation : 206 million euro . The consortium who has won the contract with a bid to the bottom 33 percent - the temporary association of companies consists of Coestra , BONCIANI and Acmar - July 4 attack from the preliminary works , spades and underground utilities : there are no cables and pipes to move, the district heating network, electricity and gas. « À work that are waiting for decades - said the mayor of Sesto , George Oldroyd - . Finally we see the start of work . " On 9 December 2009, at the signing of the last agreement program , the Region promised the opening of the sites in September 2010 : a further nine months have passed , the delay seems to be the rule. The first 400 meters of the track will be excavated outdoors in Sesto , the remaining mile and a half will be " eaten " by the underground mechanical moles . The structural interventions 'heavy' will start in October and will end in 2014. The sixth station will be built up of large Levrino and the terminus will be located not far from the shopping center Auchan in Monza . Residents along the axis of the tunnel are worried : " We will have to endure three years of chaos." Even more alarm dealers and gas stations : " We will have a meltdown of the proceeds ." The administration of Sixth and met each other the other night public meeting at the district Restellone : "The disruption will be inevitable , but we will try to limit them ." The sites will disappear and dozens of stands to revolutionize the long road Viale Gramsci , between Via Bellini and Donizetti away . Parking for matching commuters will not be ready before 2015 : " Initially - notes Oldroyd - we'll have to be content with satin strips provided in Cinisello ." For the car park serving between 30 and 40 million Euros , "And at the time the funds are not there ." The new section of the M1 can carry up to 14 000 passengers per hour and so reduce the flow of traffic from the hinterland to Milan: " à a strategic work - said the municipal neoassessore Mobility, the young Pierfrancesco Maran - . We will work with other agencies to hold a maximum of inconvenience to citizens. " The mayor of Monza , the League's Marco Mariani , look beyond and ahead : " We asked Mm a feasibility study to extend the route to the Rondo of Pines , near the Villa Reale, nell'aerea the new management center that will host the Province Brianza , the Inland Revenue , the barracks of the Guardia di Finanza . " A technical summit is already scheduled for next week. At construction sites .
Could you post the original Italian version? These automatic translations are hard to understand...
__________________
Wer kämpft, kann verlieren. Wer nicht kämpft, hat schon verloren.

Bertolt Brecht
arctic_carlos no está en línea   Reply With Quote
Old December 23rd, 2013, 01:09 PM   #473
garibaldi tower
BANNED
 
Join Date: Jul 2012
Posts: 545
Likes (Received): 23

ella Sera del 14 marzo 2011 IL PROGETTO - AFFIDATO L&#039APPALTO: 48 MESI DI LAVORI Metrò per Monza, ad aprile primi cantieri Il prolungamento della linea 1 da Sesto atteso da vent&#039anni. Investimento da 206 milioni, treni inclusi MILANO - L&#039iter burocratico è finito, in ritardo di sei mesi sugli ultimi annunci e di vent&#039anni sulle prime promesse politiche. I cantieri del prolungamento della metropolitana rossa da Sesto San Giovanni a Monza apriranno entro la fine di aprile: le buste sono state aperte e l&#039appalto è già stato preassegnato all&#039impresa che dovrà eseguire i lavori. Ora si tratta solo di aspettare i termini di legge (35 giorni) che consentono agli sconfitti di presentare eventuali ricorsi. Se ne parla dal 1992 e la firma sull&#039originario protocollo d&#039intesa risale all&#039anno successivo. Sono serviti quasi vent&#039anni per concretizzare il progetto e sbloccare i fondi al Cipe: il nuovo tratto M1 prevede 1,9 chilometri di binari interrati, la costruzione di due fermate (Sesto Restellone e Monza-Bettola) e un parcheggio d&#039interscambio da 2.500 posti auto. Tempo di realizzazione: 48 mesi. Costo complessivo: 206 milioni di euro, treni inclusi. La nuova M1 ha la stessa capacità di carico della linea gialla per Maciacchini-Comasina che sarà inaugurata il prossimo 26 marzo: potrà trasportare 15 mila passeggeri l&#039ora. L&#039opera rientra nel masterplan di sviluppo delle reti metropolitane pensate per «alleggerire la pressione del traffico e offrire ai pendolari spostamenti ecologici, con tempi inferiori». Gli altri assi in via di definizione sono i prolungamenti della M2 e della M3 per Vimercate e Paullo. Dopo la bocciatura della Corte dei conti, che ha «stigmatizzato» la mancanza di copertura finanziaria, Mm ha archiviato i preliminari e si è messa al lavoro sui progetti definitivi: «Saranno portati al Cipe tra giugno e luglio». Problema: vanno recuperate le risorse. ------------------------------------------------------------------- fonte: Corriere sera - Milano Sesto-Monza, il metrò dei sogni Cantiere al via dopo trent&#039anni Da lunedଠi lavori per unire la Brianza a Milano. Il sindaco Oldrini: è un&#039opera attesa da tempo MILANO - Quanti treni persi e quante corse saltate. Il metrò che sta per arrivare a Monza è in ritardo di almeno trent&#039anni. La città brianzola ancora si pente dell&#039orgoglioso «gran rifiuto» che oppose ad Mm e all&#039ipotesi di allacciamento alle rotaie di Sesto San Giovanni. S&#039è ritrovata sola. Su un binario morto. A lungo, e invano, ha inseguito il sogno della linea «Monza-Lissone Sud», galleria interna tra la stazione ferroviaria e l&#039ospedale San Gerardo: «Il Cipe ha approvato un finanziamento da 87 miliardi di lire! - annunciò trionfante l&#039amministrazione, nel novembre 1996 -. Avremo una metropolitana a fune, automatica, senza macchinisti». Da allora, per quindici anni, senza avanzare d&#039un passo, si è discusso ancora di soldi, disegni e accordi. Un&#039attesa infinita. Anzi, no. Da lunedଠè un&#039altra storia. Il cantiere apre davvero. I treni viaggeranno dal marzo 2015. La linea rossa punta la Brianza. Il prolungamento della M1 collegherà la fermata di Sesto Fs alla periferia di Monza, sul confine con Cinisello. Sono un chilometro e ottocento metri di percorso interrato. Due le stazioni: Sesto-Restellone e Monza-Bettola. Costo complessivo dell&#039operazione: 206 milioni di euro. La cordata che s&#039è aggiudicata l&#039appalto con un offerta al ribasso del 33 per cento - l&#039associazione temporanea d&#039imprese composta da Coestra, Bonciani e Acmar - attaccherà il 4 luglio dalle opere preliminari, vanghe e sottoservizi: ci sono cavi e tubi da spostare, la rete di teleriscaldamento, luce e gas. «àˆ un&#039opera che aspettiamo da decenni - commenta il sindaco di Sesto, Giorgio Oldrini -. Finalmente vediamo l&#039inizio dei lavori». Il 9 dicembre 2009, alla firma dell&#039ultimo accordo di programma, la Regione promise l&#039apertura dei cantieri nel settembre 2010: sono passati altri nove mesi, il ritardo sembra la regola. I primi 400 metri di tracciato saranno scavati all&#039aperto, a Sesto, il restante chilometro e mezzo sarà «mangiato» sottoterra dalle talpe meccaniche. Gli interventi strutturali «pesanti» partiranno ad ottobre e finiranno nel 2014. La stazione di Sesto sarà realizzata all&#039altezza di largo Levrino e il capolinea sarà collocato poco distante dal centro commerciale Auchan, a Monza. I residenti lungo l&#039asse del tunnel sono preoccupati: «Dovremo sopportare tre anni di caos». Ancora pi๠in allarme i commercianti e i benzinai: «Avremo un tracollo degli incassi». L&#039amministrazione di Sesto ha incontrato gli uni e gli altri l&#039altra sera, assemblea pubblica al quartiere Restellone: «I disagi saranno inevitabili, ma cercheremo di limitarli». I cantieri faranno sparire decine di posteggi e rivoluzioneranno la viabilità lungo viale Gramsci, tra via Bellini e via Donizetti. Il parcheggio di corrispondenza per i pendolari non sarà pronto prima del 2015: «Inizialmente - osserva Oldrini - dovremo accontentarci delle strisce a raso previste a Cinisello». Per l&#039autosilo servono tra i 30 e i 40 milioni di euro: «E al momento i fondi non ci sono». La nuova tratta della M1 potrà trasportare fino a 14 mila passeggeri l&#039ora e ridurre cosଠil flusso di traffico dall&#039hinterland verso Milano: «àˆ un&#039opera strategica - sottolinea il neoassessore comunale alla Mobilità , il giovane Pierfrancesco Maran -. Collaboreremo con gli altri enti per contenere al massimo i disagi per i cittadini». Il sindaco di Monza, il leghista Marco Mariani, guarda oltre e avanti: «Abbiamo chiesto ad Mm uno studio di fattibilità per prolungare il tracciato fino al Rondò dei Pini, vicino alla Villa Reale, nell&#039aerea del nuovo centro direzionale che ospiterà la Provincia brianzola, l&#039Agenzia delle Entrate, la caserma della Guardia di Finanza». Un vertice tecnico è già fissato per la prossima settimana. A cantieri aperti. _______________________________________________________
garibaldi tower no está en línea   Reply With Quote
Old December 23rd, 2013, 07:03 PM   #474
Apteryx
Struthioniforme Apteryge
 
Apteryx's Avatar
 
Join Date: Apr 2007
Location: Milano|Monza
Posts: 8,124
Likes (Received): 1778

Scusami Garibaldi, ma se devi postare una roba del genere, completamente illeggibile, piuttosto metti il link all'articolo ma non aggiungere altro.
Apteryx no está en línea   Reply With Quote
Old December 23rd, 2013, 07:56 PM   #475
garibaldi tower
BANNED
 
Join Date: Jul 2012
Posts: 545
Likes (Received): 23

me l'avevano chiesto,non andare fuori tema...
garibaldi tower no está en línea   Reply With Quote
Old December 24th, 2013, 01:46 AM   #476
garibaldi tower
BANNED
 
Join Date: Jul 2012
Posts: 545
Likes (Received): 23

this is map of the project for milan!eleven subway lines

http://i26.************/6zopzr.jpg
garibaldi tower no está en línea   Reply With Quote
Old December 24th, 2013, 06:09 AM   #477
caulker68
Registered User
 
Join Date: Dec 2013
Posts: 5
Likes (Received): 3

Hi there, i can think of Napoli, Roma, Genova and Torino as cities having some form of subway.
__________________
My... address
caulker68 no está en línea   Reply With Quote
Old December 24th, 2013, 10:41 AM   #478
pccvspw999
Registered User
 
pccvspw999's Avatar
 
Join Date: Aug 2009
Location: Milan
Posts: 5,882
Likes (Received): 1883

Yes, but what's the point of your statement?
Anyway, just to rectify what the posted map means: Milan won't build 11 metro lines. It's a plan in which different routes a supposed to have a form of public transport facility with an high grade trasport capacity (>5000 ppdpd). Metros, of course, but also tram lines. "Linea 7", for example, is planned to be a tram link, partially build.
It's a mistification of the plan to difine these routes a metros: they won't.
pccvspw999 no está en línea   Reply With Quote
Old December 24th, 2013, 07:28 PM   #479
garibaldi tower
BANNED
 
Join Date: Jul 2012
Posts: 545
Likes (Received): 23

why not? was approved ..
garibaldi tower no está en línea   Reply With Quote
Old December 25th, 2013, 01:28 AM   #480
pccvspw999
Registered User
 
pccvspw999's Avatar
 
Join Date: Aug 2009
Location: Milan
Posts: 5,882
Likes (Received): 1883

Because the plan means "linee di forza" (more or less "heavy duty lines"), which isn't necessarely to be understood as metro lines, also tram lines or something in between.
And also logic tells that most of those lines don't need a metro, in short term nor in long terms.
Just the numeric assignment gives the impression that these are metro, but is just an impression: the numbers just show the "heavy duty" lines and of course the 5 existing metros are "heavy duty" lines as a matter of fact. Metro lines are "heavy duty", but not necessarely viceversa "heavy duty" linea are metros.
pccvspw999 no está en línea   Reply With Quote


Reply

Tags
milan, milano

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Related topics on SkyscraperCity


All times are GMT +2. The time now is 04:37 PM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2018, vBulletin Solutions Inc.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

tech management by Sysprosium