KHARTOUM l Al-Dabasin Bridge l 1760 M l U/C
Schüßler-Plan Group
One of the leading independent consulting engineering practices in Germany The Al-Dabasin Bridge crosses the White Nile about 20 km from the centre of Khartoum. This steel box girder bridge forms part of the outer ring road linking the two cities of Khartoum and Omdurman. As the White Nile is extremely wide at this point, the bridge has a total length of 1670 m divided into three structures of equal length. The bridge cross-section consists of two box girders plus an orthotropic deck. Technical data: Total length: 1670 m Main span: 80 m Location Sudan Owner / Employee State Khartoum, Ministry of Physical Planning & Public Utilities Service Project planning (transport infrastructure, civil engineering) Structural engineering - Draft design - Consulting services for detailed design - Checking and approval of planning work
|
|
|
|
|
|
#2 |
|
๏̯๏
Join Date: Jun 2011
Location: Dammam(current)|Khartoum
Posts: 13,498
Likes (Received): 85
|
__________________
Briefly I'm someone who have weird ideas, just wanna be successful in my society. |
|
|
|
|
|
#3 |
|
๏̯๏
Join Date: Jun 2011
Location: Dammam(current)|Khartoum
Posts: 13,498
Likes (Received): 85
|
انتهاء الخلافات حول كبري الدباسين
الجمعة, 10 حزيران/يونيو 2011 15:17 الاخبار المحلية الخرطوم: هبة عبد العظيم أقر والي الخرطوم د.عبد الرحمن الخضر بتوقف العمل في جسر الدباسين لعدة سنوات بسبب خلاف مالي بين الولاية والمقاول التركي، وأعلن عن انتهاء الخلاف عقب مبادرة قادها سفير تركيا بالخرطوم أوردغان كوك لحل الخلاف وتم التوصل الى تسوية خرجت بموجبها شركة أوشين التركية كمقاول منفذ للمشروع وتم فسخ العقد الموقع معها، وقال الخضر في تصريحات إنهم أوضحوا للسفير أن هذه القضية لن تؤثرعلى العلاقة مع الجانب التركي وأضاف بالقول: "السفير متفهم تماما لمبدأ أكلوا أخوان واتحاسبوا تجار" ومضى: "شددنا على أننا لن نتهاون في مصلحة ناسنا والبلد "، وأكد الخضر أن الخلاف كان مالياً وليس فنياً وأن كل الأعمال التي تمت فى الجسر سليمة 100% . وفيما يتعلق باستئناف العمل فى الجسر بعد حسم الخلاف أوضح أن هيئة الطرق والجسور اتفقت مع استشاري جديد واتفقت مع شركتين صينية وسودانية لإكمال الجسر
__________________
Briefly I'm someone who have weird ideas, just wanna be successful in my society. |
|
|
|
|
|
#4 |
|
paradox
Join Date: Apr 2011
Location: Khartoum. Sudan
Posts: 903
Likes (Received): 14
|
توقيع اتفاق لاستكمال كوبري الدباسين الخرطوم: سنهوري عيسى
وقعت ولاية الخرطوم أمس، على اتفاقية لاستكمال كوبري الدباسين خلال (18) شهراً من الآن بعد توقف عن العمل دام (3) سنوات بتمويل من بنك أمدرمان الوطني قدره (97) مليون جنيه للمرحلة الثانية، فيما بلغ تمويل المرحلة الأولى نحو (60) مليون جنيه، بينما تنفذ الكوبري شركة (تارقت) للعقارات كمقاول رئيسي تساندها شركة صينية بعد انهاء التعاقد مع المقاول الأول (الشركة التركية) التي أخفقت في تنفيذ المشروع. وعزا د. عبد الرحمن الخضر والي الخرطوم، توقف العمل بالكوبري طيلة الفترة الماضية الى أن التفاوض مع المقاول التركي على انهاء العقد بعد اخفاقه في التنفيذ استغرق وقتاً طويلاً بسبب أن التعاقدات الدولية معقدة وفيها تحكيم دولي، وأضاف الوالي: نحن سعداء بانتهاء هذه القصة واليوم نكمل الفصول النهائية لقضية كوبري الدباسين، بعد المفاوضات الشاقة التي قادها وزير التخطيط العمراني بالولاية، وتوجت بتسوية ودية. |
|
|
|
|
|
#5 |
|
๏̯๏
Join Date: Jun 2011
Location: Dammam(current)|Khartoum
Posts: 13,498
Likes (Received): 85
|
خرطوم (smc)
تعكف وزارة التخطيط والتنمية العمرانية ولاية الخرطوم على إكمال تنفيذ بعض المشروعات المعمارية والهندسية وعدد كبير من الطرق والجسور الهامة التي تربط شبكة الطرق الداخلية بالولاية. وقال المهندس عبد الواحد عبد المنعم مدير إدارة المشروعات بهيئة الطرق والجسور بولاية الخرطوم في تصريح لـ (smc) إن هناك عدداً من المشروعات الهندسية الهامة تقوم بتنفيذها الهيئة مع عدد من الشركات المحلية والعالمية وذلك في إطار تنفيذ المخطط الهيكلي الجديد مبيناً أن الهيئة وقعت كافة الترتيبات الخاصة بالعقودات والخرط وإعداد وحدات لتنفيذ المشروعات. وكشف عن إبرام عقودات مع مجموعة (نيوتيك) الإستثمارية لتكملة وتنفيذ مشروع كبري الدباسين الذي يربط منطقة الدباسين بالخرطوم ومنطقة الصالحة بأم درمان البالغ طوله (1760) متر مربع بعرض (18,5) متر، فضلاً عن إبرام عقداً أخر مع شركة تارقيت الصينية لرصف الكبري بالأسفلت وتكملة مقتربات الكبري الواقعة على الجانبين وأضاف قائلاً: إن الشركة المنفذة ستقوم بربط الكبري بالطرق الداخلية بالولاية. وأبان عبد الواحد أن التكلفة التقديرية للمشروع تبلغ (68) مليون جنيه سوداني بالإضافة إلى (10) مليون دولار عملة حرة.
__________________
Briefly I'm someone who have weird ideas, just wanna be successful in my society. |
|
|
|
|
|
#6 |
|
๏̯๏
Join Date: Jun 2011
Location: Dammam(current)|Khartoum
Posts: 13,498
Likes (Received): 85
|
__________________
Briefly I'm someone who have weird ideas, just wanna be successful in my society. |
|
|
|
|
|
#7 |
|
๏̯๏
Join Date: Jun 2011
Location: Dammam(current)|Khartoum
Posts: 13,498
Likes (Received): 85
|
__________________
Briefly I'm someone who have weird ideas, just wanna be successful in my society. |
|
|
|
|
|
#8 |
|
Structural Engineer
Join Date: Mar 2012
Posts: 147
Likes (Received): 5
|
ولاية الخرطوم :استئناف العمل في جسر الدباسين بمقاول جديد
إستأنفت ولاية الخرطوم اليوم العمل بجسر الدباسين بعد توقف دام لاكثر من عامين تم فيها إستبدال المقاول (الأول) بمقاول (سوداني ـ صيني) بعد أن عجز الأول فى مواصلة العمل بالجسر . ووقف والي الخرطوم د.عبدالرحمن الخضر اليوم يرافقه د.أحمد قاسم وزير المياه والبنى التحتيه على بداية العمل بالجسر بتنفيذ العلبة رقم (27) من مجموع العلب المكونة للجسر وعددها (30) علبة ويعتبر جسر الدباسين أطول جسر نيلي فى البلاد بطول 1670 متر وهو يساوى 4 أضعاف طول جسر المك نمر وعرض 18.5 متر فيما تبلغ أطوال المداخل من جهتي أم درمان والخرطوم 40 متراً ويكتسب الجسر أهميته بانه يربط الطريق الدائري بطريق الريف الجنوبي أم درمان ويضم ممرات للمشاة فى كلا الجانبين وتم تطوير التصميم القديم للكبري بتصميم جديد تم فيه إستيعاب كل تجارب الولاية الناجحة فى الكباري الاخرى ليتم تنفيذ هذا الجسر بدرجة أمان عالية زادت من عمره الافتراضي وقللت أعمال الصيانة مستقبلاً وثمن والي الخرطوم المقاول والاستشاري السوداني الذى إكتسب خبرة كبيرة فى السنوات العشرين الأخيرة فى تشييد الجسور والأنفاق فى خطوات واثقة لتوطين صناعة الجسور فى البلاد كما ثمن والي الخرطوم خطوة وزارة المياهـ والبنى التحتية التى أرسلت مجموعة من المهندسين الى الصين ليشهدوا المعالجات الهندسية لبعض أجزاء الكبري ويكتسب بذلك المهندس السوداني خبرة تؤهله للقيام بكل الأعمال الهندسية محلياً . الجدير بالزكر أن المقاول المنفذ للمشروع هو شركة تارجت السودانية وتقوم بالاعمال الخرصانية وشركة هوبي وتسي الصينية التى تقوم باعمال الحديد والصلب ويعمل بالجسر إستشاريان هما إسبان ونيوتك السودانيتين وتبلغ تكلفة الجسر 10 مليون دولار كمكون أجنبي و68 مليون جنيه كمكون محلي وسيكتمل فى منتصف العام القادم |
|
|
|
|
|
#9 |
|
Structural Engineer
Join Date: Mar 2012
Posts: 147
Likes (Received): 5
|
إستئناف العمل بكبرى الدباسين و إكتمال فتح المسارات والتعويضات لجسرى توتى وسوبا
الخرطوم(smc) أعلنت وزارة التخطيط العمرانى والبنى التحتية بولاية الخرطوم إكتمال تجهيز المسارات لجسرى توتى وسوبا شرق بجانب إكتمال عمليات الحصر والتعويض لأكثر من 70% للجسرين. ووجه الفريق مهندس الرشيد عثمان فقيرى وزير التخطيط في جولة تفقدية رصدتها (smc) بسرعة إكمال إجراءات المتبقى من الحصر والتعويضات وتسليم الموقع للمقاولين على ان يبدأ العمل في تنفيذ دعائم وركائز الجسرين بعد عطلة عيدالفطر المبارك. وأشار الفريق الرشيد إلى تفقدهم سير العمل بمشروع كبرى الدباسين والإطمئنان على إستنئاف العمل وتنفيذ الدعائم والركائز في المحاور الجديدة. من جانبه أكد مدير مشروع كبرى الدباسين أن الشركة بدأت في تنفيذ وصنع الوحدات الجديدة في الصين ويجرى الآن إجراء الإختبارات اللازمة حتى تتمكن من بدء التصنيع والتركيب. http://www.sudacon.net/2012/08/blog-post_5945.html Last edited by Amged; August 14th, 2012 at 06:40 PM. Reason: editing |
|
|
|
|
|
#10 |
|
๏̯๏
Join Date: Jun 2011
Location: Dammam(current)|Khartoum
Posts: 13,498
Likes (Received): 85
|
great news
__________________
Briefly I'm someone who have weird ideas, just wanna be successful in my society. |
|
|
|
|
|
#11 | |
|
๏̯๏
Join Date: Jun 2011
Location: Dammam(current)|Khartoum
Posts: 13,498
Likes (Received): 85
|
Resumed construction works
فقيرى: مشروع القطار المحلي والترماي من أولويات خطط ولاية الخرطوم الخرطوم (smc) Quote:
__________________
Briefly I'm someone who have weird ideas, just wanna be successful in my society. |
|
|
|
|
|
|
#12 |
|
Structural Engineer
Join Date: Mar 2012
Posts: 147
Likes (Received): 5
|
مواصلة دؤوبة للعمل بكبري الدباسين
================== ![]() يتواصل العمل الدوؤب بكبري الدباسين وقد تم انجاز كثير من الاعمال المهمة والتي تؤكد سير العمل علي مستوي عالي من الاحترافية والاداء المميز ولقد تم الانتهاء من صب 9 خوازيق من الناحية الغربية . وعدد 20 خازوق في وسط النهر . وعدد 7 خازوق من الناحية الشرقية Piles . تم الانتهاء من صب عدد (4) تاج الدعامات الوسطية ( للمحاور (140 ,150,160A , 160B). تم الانتهاء من صب الحوائط الساندة للدعامات الوسطية لعدد (4) دعامات وسطية( للمحاور140 150,160A , 160) . More photos: http://www.sudacon.net/2013/04/blog-post_9309.html |
|
|
|
![]() |