daily menu » rate the banner | guess the city | one on oneforums map | privacy policy | DMCA | news magazine | posting guidelines

Go Back   SkyscraperCity > World Development News Forums > City/Metro Compilations

City/Metro Compilations Help report active highrise/urban developments occurring in your city to the global SSC community.



Global Announcement

As a general reminder, please respect others and respect copyrights. Go here to familiarize yourself with our posting policy.


Reply

 
Thread Tools
Old November 5th, 2015, 11:30 PM   #181
JustWatch
Master !
 
JustWatch's Avatar
 
Join Date: Apr 2014
Location: Lyon | Luanda
Posts: 5,684
Likes (Received): 12778

BAM International has received a contract to commence the phase two of the new Terminal 3 complex at Julius Nyerere International Airport in Dar es Salaam, Tanzania. In this project or second phase will expand the 60,000mē terminal's capacity to six million passengers and work is scheduled to be completed in 2017.

__________________

BenjaminEli liked this post
JustWatch no está en línea   Reply With Quote

Sponsored Links
Old November 27th, 2015, 05:55 PM   #182
JustWatch
Master !
 
JustWatch's Avatar
 
Join Date: Apr 2014
Location: Lyon | Luanda
Posts: 5,684
Likes (Received): 12778

Quote:
Kigamboni Bridge | 680m | Under Construction
Quote:
Originally Posted by tanzan View Post
CONSTRUCTION OF KIGAMBONI CABLE STAYED BRIDGE (680 m) AND ITS APPROACH ROADS (2.5 km) TO BITUMEN STANDARD

1. Kigamboni area is located on the eastern side of Dar es Salaam City and is separated from the main City by a sea creek. The proposed Kigamboni Bridge will be located at Kurasini Creek in Dar es Salaam. The Bridge will connect to an approach road of about 1.0 km that will cross the TAZARA Railway line to the north and will intersect with Mandela Road at grade. On the Kigamboni side the Bridge will connect to an approach road of about 1.5 km that will intersect with the Kigamboni Ferry - Kibada Road. The works shall involve the following;

(i) Construction of two reinforced concrete pylons of a cable stayed bridge with centre span of 250m and total bridge length of 680m,

(ii) Installation of wax coated stay cables including anchorages,

(iii) Construction of Six (6) lanes dual carriageway with two (2) sidewalks pre-stressed box girder concrete deck of 680m total length and 27.5m total width,

(iv) Construction of two (2) reinforced concrete abutments founded on piles,

(v) Construction of retaining structures of 450m length,

(vi) Construction of six (6) lanes dual carriageway to bitumen standard approach roads ofabout 2.5 km,

(vii) Construction of one toll plaza on Kigamboni side. (Toll Plaza Shopping Mall)
Quote:
Originally Posted by tanzan View Post


Construction Update

Quote:
Originally Posted by kizibo View Post
My fav pics for the day!!






And that is all folks!!
__________________

BenjaminEli liked this post
JustWatch no está en línea   Reply With Quote
Old November 27th, 2015, 05:59 PM   #183
JustWatch
Master !
 
JustWatch's Avatar
 
Join Date: Apr 2014
Location: Lyon | Luanda
Posts: 5,684
Likes (Received): 12778

Quote:
Seven Eleven Towers - KAWE | Dar-es-Salaam | U/C
Quote:
Originally Posted by kiligoland View Post
UPDATES

















---
__________________

BenjaminEli liked this post
JustWatch no está en línea   Reply With Quote
Old November 27th, 2015, 06:00 PM   #184
JustWatch
Master !
 
JustWatch's Avatar
 
Join Date: Apr 2014
Location: Lyon | Luanda
Posts: 5,684
Likes (Received): 12778

MOROCCO SQUARE AND PALOMA PARK

Quote:
Originally Posted by kiligoland View Post






__________________

BenjaminEli liked this post
JustWatch no está en línea   Reply With Quote
Old November 27th, 2015, 06:01 PM   #185
JustWatch
Master !
 
JustWatch's Avatar
 
Join Date: Apr 2014
Location: Lyon | Luanda
Posts: 5,684
Likes (Received): 12778

Quote:
DAR ES SALAAM | CITY MALL | U/C
Quote:
Originally Posted by kiligoland View Post
MJUMBE HAUWAWI NAWASILISHA




---
__________________

BenjaminEli liked this post
JustWatch no está en línea   Reply With Quote
Old November 27th, 2015, 06:05 PM   #186
JustWatch
Master !
 
JustWatch's Avatar
 
Join Date: Apr 2014
Location: Lyon | Luanda
Posts: 5,684
Likes (Received): 12778

Quote:
AVIC Town Amani Beach, Kigamboni New City | 5000 Houses |2360,000㎡ Area | UC

More here :

here

here



Quote:
Originally Posted by kiligoland View Post












__________________

BenjaminEli, peninsular liked this post
JustWatch no está en línea   Reply With Quote
Old November 27th, 2015, 06:06 PM   #187
JustWatch
Master !
 
JustWatch's Avatar
 
Join Date: Apr 2014
Location: Lyon | Luanda
Posts: 5,684
Likes (Received): 12778

Quote:
PSPF Commercial Towers | 35 fl x2 | 152.800 M|501.312 FT|COMPLETED
Quote:
Originally Posted by kiligoland View Post
---
__________________

BenjaminEli, aquaticko liked this post
JustWatch no está en línea   Reply With Quote
Old November 27th, 2015, 06:09 PM   #188
JustWatch
Master !
 
JustWatch's Avatar
 
Join Date: Apr 2014
Location: Lyon | Luanda
Posts: 5,684
Likes (Received): 12778

Quote:
Mzizima Towers | 35+33 fl | U/C
Quote:
Originally Posted by kiligoland View Post
---

Quote:
MNF SQUARE | 32 fl | 32 fl | U/C
Quote:
Originally Posted by kiligoland View Post
__________________

BenjaminEli liked this post
JustWatch no está en línea   Reply With Quote
Old December 15th, 2015, 03:14 AM   #189
urban stylin
Registered User
 
urban stylin's Avatar
 
Join Date: Mar 2010
Location: Kampala
Posts: 150
Likes (Received): 21

am loving the airport and the 711 towers cant wait to see them complete. I like the fact that Daar has a multicolored skyline but it still needs more high rises to define it an the moment it doesn't have a properly defined skyline.
__________________

JustWatch liked this post
urban stylin no está en línea   Reply With Quote
Old February 19th, 2016, 06:59 AM   #190
BenjaminEli
Shrewd
 
BenjaminEli's Avatar
 
Join Date: May 2013
Location: top floor
Posts: 14,650
Likes (Received): 17382

Terminal III will have eight boarding gates and five conveyor belts at baggage claim area once two phases constructions of the terminal is concluded. In this project or second phase will expand the 60,000mē [/URL]terminal's capacity to six million passengers and work is scheduled to be completed in 2017.





Source: Tanzania Tourist Board Visit to JNIA.






http://i782.photobucket.com/albums/y...psa018spf3.jpg
__________________
Click any video then ctrl+shift+J and paste
vid = document.getElementsByTagName("video"); vid[vid.length-1].playbackRate = 2.0;

el palmesano, JustWatch liked this post
BenjaminEli no está en línea   Reply With Quote
Old February 19th, 2016, 07:04 AM   #191
BenjaminEli
Shrewd
 
BenjaminEli's Avatar
 
Join Date: May 2013
Location: top floor
Posts: 14,650
Likes (Received): 17382

7/11 towers updates









__________________
Click any video then ctrl+shift+J and paste
vid = document.getElementsByTagName("video"); vid[vid.length-1].playbackRate = 2.0;

JustWatch, odilrak liked this post
BenjaminEli no está en línea   Reply With Quote
Old February 24th, 2016, 11:49 AM   #192
JustWatch
Master !
 
JustWatch's Avatar
 
Join Date: Apr 2014
Location: Lyon | Luanda
Posts: 5,684
Likes (Received): 12778

Quote:
Kigamboni Bridge | 680m | Under Construction
Quote:
Originally Posted by tanzan View Post
CONSTRUCTION OF KIGAMBONI CABLE STAYED BRIDGE (680 m) AND ITS APPROACH ROADS (2.5 km) TO BITUMEN STANDARD

1. Kigamboni area is located on the eastern side of Dar es Salaam City and is separated from the main City by a sea creek. The proposed Kigamboni Bridge will be located at Kurasini Creek in Dar es Salaam. The Bridge will connect to an approach road of about 1.0 km that will cross the TAZARA Railway line to the north and will intersect with Mandela Road at grade. On the Kigamboni side the Bridge will connect to an approach road of about 1.5 km that will intersect with the Kigamboni Ferry - Kibada Road. The works shall involve the following;

(i) Construction of two reinforced concrete pylons of a cable stayed bridge with centre span of 250m and total bridge length of 680m,

(ii) Installation of wax coated stay cables including anchorages,

(iii) Construction of Six (6) lanes dual carriageway with two (2) sidewalks pre-stressed box girder concrete deck of 680m total length and 27.5m total width,

(iv) Construction of two (2) reinforced concrete abutments founded on piles,

(v) Construction of retaining structures of 450m length,

(vi) Construction of six (6) lanes dual carriageway to bitumen standard approach roads ofabout 2.5 km,

(vii) Construction of one toll plaza on Kigamboni side. (Toll Plaza Shopping Mall)
Quote:
Originally Posted by tanzan View Post


Construction Update

Quote:
Originally Posted by kiligoland View Post
from facebook

__________________

BenjaminEli, odilrak liked this post
JustWatch no está en línea   Reply With Quote
Old June 6th, 2016, 08:32 AM   #193
JustWatch
Master !
 
JustWatch's Avatar
 
Join Date: Apr 2014
Location: Lyon | Luanda
Posts: 5,684
Likes (Received): 12778



Tanzania Medical Center | Dar es Salaam


Quote:
Tanzania Medical Center | Dar es Salaam
  • Project Name : Tanzania Medical Center
  • Number of Beds : 1200
  • Floor Count : The ground floor - 3/10
  • Uses : Hospitals, Medical, Residential, Offices and Logistics
  • Area : 580 000 sq. m | 6 243 068.04 sq. ft

Tanzania Medical Center is a comprehensive medical complex, including a general hospital, a Medical University, integrating the park's residential facilities and logistics services. General hospital medical unit modular design according to the design, can be divided between each medical unit and can be configured according to the medical random function, so the hospital has high adaptability.
Renders

Quote:
Originally Posted by kizibo View Post









__________________

AbidM, BenjaminEli liked this post
JustWatch no está en línea   Reply With Quote
Old June 6th, 2016, 08:36 AM   #194
JustWatch
Master !
 
JustWatch's Avatar
 
Join Date: Apr 2014
Location: Lyon | Luanda
Posts: 5,684
Likes (Received): 12778

Dar Es Salaam | Ports Authority Headquarters | 40 fl. | U/C

Quote:
Originally Posted by kiligoland View Post
__________________

BenjaminEli liked this post
JustWatch no está en línea   Reply With Quote
Old June 6th, 2016, 08:39 AM   #195
JustWatch
Master !
 
JustWatch's Avatar
 
Join Date: Apr 2014
Location: Lyon | Luanda
Posts: 5,684
Likes (Received): 12778

DAR ES SALAAM | MNF SQUARE | 32 fl + 32 fl | U/C

Quote:

__________________

BenjaminEli liked this post
JustWatch no está en línea   Reply With Quote
Old July 1st, 2016, 05:16 PM   #196
BenjaminEli
Shrewd
 
BenjaminEli's Avatar
 
Join Date: May 2013
Location: top floor
Posts: 14,650
Likes (Received): 17382

Noble Victoria|16 fl|U/C

__________________
Click any video then ctrl+shift+J and paste
vid = document.getElementsByTagName("video"); vid[vid.length-1].playbackRate = 2.0;

JustWatch liked this post
BenjaminEli no está en línea   Reply With Quote
Old July 1st, 2016, 05:19 PM   #197
BenjaminEli
Shrewd
 
BenjaminEli's Avatar
 
Join Date: May 2013
Location: top floor
Posts: 14,650
Likes (Received): 17382

Sky Tower|22 fl|U/C





__________________
Click any video then ctrl+shift+J and paste
vid = document.getElementsByTagName("video"); vid[vid.length-1].playbackRate = 2.0;
BenjaminEli no está en línea   Reply With Quote
Old September 25th, 2016, 04:51 AM   #198
BenjaminEli
Shrewd
 
BenjaminEli's Avatar
 
Join Date: May 2013
Location: top floor
Posts: 14,650
Likes (Received): 17382

Muhas Hospital Complete Opening 2017



http://1.bp.blogspot.com/-5G2toyoui4.../s1600/mlo.jpg



















Images credit: Avila Kakingo via http://michuzi-matukio.blogspot.com/...muhimbili.html
__________________
Click any video then ctrl+shift+J and paste
vid = document.getElementsByTagName("video"); vid[vid.length-1].playbackRate = 2.0;

el palmesano, JustWatch, Bylina liked this post
BenjaminEli no está en línea   Reply With Quote
Old September 25th, 2016, 04:54 AM   #199
BenjaminEli
Shrewd
 
BenjaminEli's Avatar
 
Join Date: May 2013
Location: top floor
Posts: 14,650
Likes (Received): 17382

Foreign Affairs ministry UC




__________________
Click any video then ctrl+shift+J and paste
vid = document.getElementsByTagName("video"); vid[vid.length-1].playbackRate = 2.0;

JustWatch liked this post
BenjaminEli no está en línea   Reply With Quote
Old September 25th, 2016, 04:56 AM   #200
BenjaminEli
Shrewd
 
BenjaminEli's Avatar
 
Join Date: May 2013
Location: top floor
Posts: 14,650
Likes (Received): 17382

City Lodge UC














__________________
Click any video then ctrl+shift+J and paste
vid = document.getElementsByTagName("video"); vid[vid.length-1].playbackRate = 2.0;

JustWatch liked this post
BenjaminEli no está en línea   Reply With Quote


Reply

Tags
dar es salaam

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Related topics on SkyscraperCity


All times are GMT +2. The time now is 10:28 AM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2017, vBulletin Solutions Inc.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2017 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2017 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu