Part IV | Jakarta MRT
MRT Jakarta ![]() Rail-based MRT Jakarta will stretch over ±110.3 km Jakarta roads, consists of South-North Corridor (Lebak Bulus – Kampung Bandan) of about 23,3 km and East-West Corridor of about 87 km. • The construction of South-North Corridor that stretches along Lebak Bulus – Kampung Bandan will be carried out in 2 stages: - Stage I will be carried out to connect Lebak Bulus with Bundaran HI over 15.2 km railway with 13 stations (7 elevated stations and 6 underground stations) which is targeted to operate by the end of 2016. - Stage II will expand South-North Corridor from Bundaran HI to Kampung Bandan over 8.1 km railway, which construction will have been initiated before Stage I operates and is targeted to be completed on 2018 (from the earlier target of 2020). Feasibility study for this stage has been completed. • A pre-feasibility study is on progress for East-West Corridor, which is targeted to operate at the latest on 2024-2027. Project Feature MRT Jakarta Future Network The rail-based Jakarta MRT is planned to stretch across ± 110.3 kilometres, which includes the 23.3 kilometres for the North-South Corridor (Lebak Bulus-Kampung Bandan) and 87 kilometres for East- West Corridor. The North-South corridor will be built in two phases. •Phase I, will be constructed in advance connects Lebak Bulus to Bundaran HI along 15.2 km including 13 stations (7 elevated stations and 6 underground stations), targeted to operate at the end of 2016. Basic Engineering Design started in November 2009 and will be completed in 14 months. •Phase II, will extend the North-South line from Bundaran HI to Kampung Bandan along 8.1 Km (+8 underground stations), targeted to operate in 2018 (accelerated from 2020 as the original plan). Feasibility study already completed. While the east-west corridor currently is in pre-feasibility study phase. This line is targeted to operate in 2024. ![]() ![]() ![]() ![]() Previous thread Part III | Jakarta MRT source : MRT Jakarta |
|
|
|
|
#2 |
|
Registered User
Join Date: Oct 2010
Posts: 2,886
Likes (Received): 67
|
@Acen,
Boss bisa tolong di jadikan satu gak jalur MRT, Commuter sama jalan toll ringroad. Kita bisa tau Jakarta akan spt apa. Kita bisa belajar prediksi apa yg kurang dari plan, called controlling. |
|
|
|
|
#3 | |
|
Kaskus Holic
Join Date: Mar 2006
Location: Stamford Bridge
Posts: 1,886
Likes (Received): 70
|
Quote:
disana uda didiskusikan secara panjang lebar dan mendetail ttg masterplan Jakarta secara komprehensif..jadi disini biar fokus ttg MRT saja gt..hehe
__________________
SWISS FRANC TRADER: can u put 6m swiss libor in low pls?... PRIMARY SUBMITTER: Whats it worth SWISS FRANC TRADER: ive got some sushi rolls from yesterday?... PRIMARY SUBMITTER: ok low 6m, just for u SWISS FRANC TRADER: wooooooohooooooo. . . thatd be awesome |
|
|
|
|
|
#4 |
|
Half Geek
Join Date: Apr 2007
Location: Iacárta
Posts: 9,895
Likes (Received): 217
|
Thank you bro
|
|
|
|
|
#5 |
|
Registered User
Join Date: Nov 2009
Posts: 98
Likes (Received): 0
|
part IV and still waiting........
|
|
|
|
|
#6 |
|
edan sepur stadium 4
Join Date: Jul 2011
Location: tapal batas dki
Posts: 483
Likes (Received): 5
|
saya mau berkomentar sedikit.
itu koridor timur-barat yang alternatif 1 (digambar yang sebelah atas), mulai dari tanah abang hingga tangerang sejajar dengan krl koridor tangerang. lho? nanti jadi tumpang tindih antara krl dengan mrt? sekedar informasi, koridor krl tangerang sekarang sudah benar2 seperti koridor mrt dimana kereta yang lewat hanya krl saja. lain dengan koridor krl yang lain dimana selain krl, ada beberapa kereta lokal yang melintas (bahkan koridor bekasi juga dilewati intercity train). untuk koridor tangerang ini. mengapa tidak sebaiknya mengoptimalkan koridor krl yang sudah eksis saja? sementara mrt bisa dipilh alternatif 2 yang melewati ciledug-blok m.
__________________
"dari sebab koedanja djahat maka kemaren ada satoe sado soeda berbentoekan dengen trem di molenvliet. itoe sado mendjadi roesak sama sekali. tetapi beroentoeng penoempangnja tiada koerang satoe apa" (pembrita betawi, 10 october 1908) |
|
|
|
|
#7 |
|
Valid User
Join Date: Jul 2008
Location: Jakarta
Posts: 1,828
Likes (Received): 2
|
Pembangunan MRT Terganjal Pembebasan Lahan
Jumat, 28 Oktober 2011 - 12:39 WIB http://www.poskota.co.id/berita-terk...mbebasan-lahan CILANDAK (Pos Kota) – Rencana pembangunan moda transportasi massal (MRT) di Jakarta Selatan hingga kini terkendala kesepakatan harga ganti rugi. “Kami tidak mau ngelepas tanah dan rumah jika hanya dihargai sesuai Nilai Jual Objek Pajak,” cetus Wawan, pemilik rumah di Kecamatan Cilandak, Jaksel. Sejumlah pemilik rumah yang datang saat sosialisasi MRT di aula kantor Kecamatan Cilandak nekad pulang. Mereka tampak kesal karena belum ada kesepakatan ganti rugi sesuai harapan. Kepala Bagian Tata Ruang Pemko Jaksel Shita Damayanti menjelaskan, Panitia Pengadaan Tanah (P2T) Jaksel untuk proyek MRT Lebak Bulus-Bunderan HI kembali bernegosiasi dengan pemiliki tanah. Dari 31 pemilik tanah yang terkena rencana pembebasan MRT, hanya 22 pemilik yang datang. “Sosialisasi untuk negosiasi harga pembebasan tanah,” kata Shita, Kamis (27/10). Dari 22 orang yang hadir dalam pertemuan tersebut, hanya 12 orang yang setuju harga penawaran dari Pemprov DKI Jakarta. Salah satu pemilik tanah yang juga artis Syahrul Gunawan mengaku ikhlas melepas halaman rukonya seluas 6 meter persegi di Jln Raya Fatmawati, asalkan untuk kepentingan umum. “Saya berpartisipasi tapi perhatikan juga dong hak-hak saya secara wajar,” tandasnya. Bidang tanah di Jaksel yang terkena proyek MRT meliputi 60 bidang di Kelurahan Lebak Bulus, 65 bidang di Kel. Pondok Pinang dan 157 bidang di Kel. Cilandak Barat. Dari jumlah itu, baru 66 bidang yang sudah dibebaskan dengan biaya Rp33 Miliar. (Rachmi/b) |
|
|
|
|
#8 | |
|
SSC Indonesia
Join Date: Jun 2004
Location: Jakarta
Posts: 3,213
Likes (Received): 14
|
Quote:
Kalau untuk MRT jalur Barat - Timur sendiri bisa bermacam2 skenario. Bisa terintegrasi dengan KRL Jabotabek, atau terpisah. Misal KRL Jabotabek at grade, MRT diatasnya / dibawahnya, atau MRT memang pakai jalur KRL. Tapi yg pernah saya baca di koran yang mengutip pernyataan salah satu pejabat MRT, kayaknya emang bakal utilisasi dengan jalur KRL Tangerang - Duri. Jadi rutenya memang terusan dari jalur ini.
__________________
The only thing necessary for the triumph of evil is for good man to do nothing. (Edmund Burke 1729-1797) |
|
|
|
|
|
#9 |
|
Registered User
Join Date: Aug 2011
Posts: 339
Likes (Received): 2
|
Itu koridor Barat-Timur kan ada 2 alternatif... kalau saya sih berharapnya kedua2nya difungsikan, jadi yg satu dibangun baru dan yg satu pakai jalur KRL agar ngirit...
|
|
|
|
|
#10 | |
|
Registered User
Join Date: Nov 2009
Posts: 98
Likes (Received): 0
|
Quote:
![]() kalau yang di Sudirman HI silakan mulai hari ini juga bisa karena gak pakai tanah warna MUSTAHIL BIN MUSTAHAL
|
|
|
|
|
|
#11 |
|
semangat pembangunan
Join Date: Oct 2011
Posts: 961
Likes (Received): 20
|
Pembebasan Lahan Jalur MRT Selesai Maret 2012
Budiman Tanuredjo | Robert Adhi Ksp | Rabu, 9 November 2011 | 12:38 WIB TOKYO, KOMPAS.com — Pembebasan lahan untuk jalur mass rapid transit (MRT) diharapkan bisa selesai pada Maret 2012, termasuk di dalamnya pengalihan utilitas di bawah jalur yang akan dilalui MRT dari Lebak Bulus hingga Bundaran HI. Hal itu dikatakan oleh Direktur Utama PT MRT Jakarta Tribudi Rahardjo kepada sejumlah wartawan Indonesia di Tokyo, Rabu (9/11/2011), termasuk wartawan Kompas Budiman Tanuredjo. Rabu siang ini, Direksi PT MRT akan bertemu dengan JICA untuk membicarakan soal rencana pembangunan dan pendanaan MRT Jakarta yang menggunakan dana pinjaman dari JICA. Pembebasan lahan yang akan dilalui MRT itu menjadi tanggung jawab Pemerintah Provinsi DKI Jakarta. Dikatakan Tribudi, pembangunan MRT sedikit terlambat dari jadwal karena persetujuan dari JICA soal prakualifikasi tender yang seharusnya selesai pada minggu pertama Oktober belum turun. Kendati demikian, Tribudi mengatakan, kelambatan itu masih bisa ditangani PT MRT dengan mempercepat proses pembangunan konstruksi sipil. Source: http://megapolitan.kompas.com/read/2...sai.Maret.2012 |
|
|
|
|
#12 | |||
|
BANNED
Join Date: Dec 2010
Posts: 199
Likes (Received): 0
|
lumayan banyak berita
![]() Quote:
Quote:
Quote:
|
|||
|
|
|
|
#13 |
|
kim jiyeon
Join Date: Aug 2011
Posts: 256
Likes (Received): 0
|
Many good news but no progress -__-"
|
|
|
|
|
#14 |
|
Registered User
Join Date: Jun 2006
Location: Jakarta
Posts: 20,789
Likes (Received): 213
|
Still wait the progress
http://m.korantempo.com/content?idfo...tgl=2011-11-10 JICA Berkomitmen Mendanai Proyek MRT TOKYO -- Japan International Corporation Agency (JICA), lembaga yang mengatur pendanaan pinjaman luar negeri Jepang, memastikan bahwa proyek pembangunan mass rapid transit (MRT) di Jakarta tak akan telantar karena masalah dana. �Komitmen JICA adalah mendanai seluruh proyek yang sudah disepakati. Namun pencairan dana tahap berikutnya akan tergantung progress report proyek yang berjalan," kata Penasihat Senior JICA, Yuho Hayakawa, di Tokyo, Jepang, kemarin. Pernyataan itu dikemukakan saat JICA |
|
|
|
|
#15 |
|
Registered User
Join Date: Jun 2006
Location: Jakarta
Posts: 20,789
Likes (Received): 213
|
http://www.suarapembaruan.com/home/j...ast-west/13388
Still news JICA Incar MRT East-West Kamis, 10 November 2011 | 8:30 Dirut PT MRT Jakarta Tribudi Rahardjo (Foto: Inilah.com) Investasi Jepang Mengalir ke Indonesia [Tokyo] Jakarta segera memiliki mass rapid transit (MRT), sebuah moda angkutan umum yang dapat mengangkut penumpang dalam jumlah besar. Japan International Cooperation Agency (JICA), tertarik mendanai semua jaringan MRT berbasis rel atau heavy rail transit di Jadebotabek. Selain MRT South-North I, Lebak Bulus-Bundaran HI, Lembaga keuangan Jepang itu mengincar South-North II, HI-Kampung Bandan, dan MRT East-West atau Balaraja-Cikarang. Dana pinjaman 50,5 miliar yen yang sud |
|
|
|
|
#16 | |
|
BANNED
Join Date: Dec 2010
Posts: 199
Likes (Received): 0
|
Quote:
|
|
|
|
|
|
#17 | ||
|
BANNED
Join Date: Dec 2010
Posts: 199
Likes (Received): 0
|
Bukti Keseriusan Foke, Pemprov DKI Mulai Memotret Problema Jakarta
Selasa, 06 Desember 2011 00:03 WIB Quote:
Selasa, 6 Desember 2011 - 19:05 WIB Quote:
|
||
|
|
|
|
#18 | ||
|
Registered User
Join Date: Jan 2006
Posts: 2,742
Likes (Received): 34
|
Quote:
Quote:
For many years 'news' about ambitious plans, but no action (money).
|
||
|
|
|
|
#19 |
|
Registered User
Join Date: May 2010
Location: jakarta
Posts: 506
Likes (Received): 0
|
lah ko jadi 4 stasiun underground?? bukannya 6?
|
|
|
|
|