daily menu » rate the banner | guess the city | one on one

Go Back   SkyscraperCity > Asian Forums > India > West > West/Central India Projects > Gujarat > Surat


Reply

 
Thread Tools Display Modes
Old November 23rd, 2011, 09:29 AM   #1
meetmus2fa
Registered User
 
Join Date: Jul 2010
Posts: 2,483
Likes (Received): 130

Tapi Riverfront Project

Tapi Riverfront - Preliminary Concept Plan
Surat



PROJECT PROFILE
Client
Surat Municipal Corporation (SMC)
Area

Total length of river edge approx 45 Km

Salient Features

Surat is situated on the banks of River Tapi, the river has played a crucial role in its economic growth and development. Today the river is a major source of water and the river bank & bed provide shelter & livelihood support to the poor. There are many structures of historical significance on the bank. Many issues face the river edge today – the modern development is haphazard & the edge is neglected; there are slums which are prone to flooding & lack basic infrastructure services; inflow of domestic waste as well industrial waste into the river and tidal flooding as the city is very close to the mouth of river.
SMC intends to develop the Tapi River Front in a comprehensive manner and address some the issues and turn it into an asset for the city. As Surat is located very close to the point where Tapi meets the sea, the issue of flood management assumes crucial importance. A preliminary concept plan was therefore commissioned to undertake a hydraulic feasibility study so as to analyze the impacts of embanks and possible reclamations. The Preliminary Conceptual Plan examined the existing land use, broad ownership pattern, heritage structures, slum encroachments, environmental issues and other activities along 45 km stretch on both sides of the river edge to provide an overall vision for Tapi Riverfront Development. This plan was submitted to the CPWRS, Pune to undertake mathematical modeling for further hydraulics analysis. Subsequent to this a detailed feasibility study for the riverfront can be undertaken.
meetmus2fa no está en línea   Reply With Quote

Sponsored Links
 
Old November 23rd, 2011, 09:31 AM   #2
meetmus2fa
Registered User
 
Join Date: Jul 2010
Posts: 2,483
Likes (Received): 130

Tapi riverfront development project to kick off on Jan 25

SURAT: Surat Municipal Corporation (SMC) aims to convert river Tapi into an environment protector and a centre for public recreation and entertainment on the lines of Sabarmati riverfront project in Ahmedabad. The foundation stone for the Rs 44 crore project will be laid on January 25 as part of golden jubilee of Gujarat's statehood and Republic Day celebrations in the city.

Additional city engineer and project in-charge Ketan Patel told TOI, "This project on completion in 18 months will improve the urban atmosphere and landscape and provide additional protection to the flood-prone areas in the city."

The project will come up on 54 hectares of land on a three-km-long stretch of Tapi riverbank. About 30 hectares of this land was illegally occupied four months ago by slum dwellers. SMC in one of its biggest anti-encroachment drives shifted over 30,000 residents from the slums on the riverbank to the newly constructed EWS housing scheme in Kosad.

The Tapi riverfront development will have walkway development, food plaza, cycle track, walking track, festival ground for public festivals, green garden and mini floral park. It will also have parking for 2,200 four-wheelers and 3,000 two-wheelers.

"Our idea is to develop full-fledged facilities for people who want to come with their family and spend an entire evening relaxing and having fun," Patel said.

A SMC official said, "The development will not hinder the flow of water as the banks are not being narrowed down for development of any of the facilities. We have left the flow pattern untouched."

The time-frame fixed for this project is one-year excluding the monsoon months. The SMC expects to complete it in 18 months from January 26 onwards.

Source - http://articles.timesofindia.indiati...ers-riverfront
meetmus2fa no está en línea   Reply With Quote
Old November 23rd, 2011, 09:33 AM   #3
meetmus2fa
Registered User
 
Join Date: Jul 2010
Posts: 2,483
Likes (Received): 130

Surat to get sixth river bridge, Tapi river front project next week

So if Rajkot got its first flyover this week, the city of Surat will get its sixth river bridge next week on 25th of January.

Gujarat Cheif Minister Narendra Modi will inaugurate a bridge on river Tapi that connects Dabholi and Jahangirpura. Modi will also address a public meeting in Jahangirpura, but that programme will be about employment related state programmes.

On same day the Chief Minister will perform ground breaking for proposed riverfront project which is planned to serve 3 km long bank of river Tapi covering 54 hector land. This Rs.44 crore project will be second riverfront project after Ahmedabad.

As the state government is going to organize 26th of January in Surat, there are number of events planned on and around the day.

According to district prabhari minister Mangubhai Patel both Governor and the Chief Minister will meet select citizens during ‘At home’ event on 25th. On 26th, the main event will be held at Varachha based Yogi chowky.

On 22 January Sarthana will witness PT exercise show at 8.00 pm. During 24-26 January, Udhna based BRC ground will host a development fair consisting 55 stalls. On 23rd Killa ground will host Gujarati songs event. On

24th a lok dayro will be held at Katargam, and on same day the indoor stadium will witness folk dances and folk songs event. On 25th Katargam lake garden will host a quiz competition involving about 2500 students.

Ground breaking of Ugat botanical garden, Khubsurat Gujarat event on 25th at Vanita Vishram are other events planned for 26th January celebration in Surat.

Source - http://deshgujarat.com/2011/01/18/su...ect-next-week/
meetmus2fa no está en línea   Reply With Quote
Old November 23rd, 2011, 09:35 AM   #4
meetmus2fa
Registered User
 
Join Date: Jul 2010
Posts: 2,483
Likes (Received): 130

Tapi riverfront project: Govt clears allotment of 54 hectare land

SURAT: If all goes well, then the diamond city will have a beautiful riverfront on the lines of Sabarmati riverfront in Ahmedabad in the next two years. After a wait of eight months, the state government has finally sanctioned the proposal put forth by Surat Municipal Corporation to hand over to it 54 hectare (ha) land for the development of Tapi riverfront on Friday.

Official sources said SMC aims to convert Tapi into an environment protector and a centre for public recreation and entertainment on the lines of Sabarmati riverfront project. The foundation stone for the Rs 40 crore project was laid on January 25 as part of golden jubilee of Gujarat's statehood and Republic Day celebrations in the city by chief minister Narendra Modi.

Additional city engineer and Tapi riverfront project in charge, Ketan Patel, told TOI, "The tender procedure has been completed and the work orders to the parties given. We were waiting for the clearance of 54 hectare land by the state government."

Patel said, "Now, that the land has been handed over to the civic body, we intend to complete the project in the next 18 months. The project on completion will improve the urban atmosphere and landscape and provide additional protection to the flood-prone areas in the city."

The project will come up on 54 hectares of land on a three kilometre stretch on Tapi riverbank.

About 30 hectares of land was illegally occupied four months ago by slum dwellers. But, the civic body in one of its biggest anti-encroachment drive shifted over 30,000 residents from the slums like Bapunagar, Nehrunagar, Raja ovara etc. to the newly constructed EWS housing scheme at Kosad.

According to Patel, the Tapi riverfront project will have a walkway, food plaza, cycle track, ground for public festivals, green garden and mini floral park. It will also have parking for over 2,200 four-wheelers and 3,000 two-wheelers.

"The objective is to provide full-fledge facilities to people who want to come with their families and spend an entire evening on the river banks," Patel said.

Asked if the riverfront project would hinder the flow of the water in Tapi, Patel said, "The development will not hinder the flow of water as the banks are not being narrowed down for development of any of the recreational facilities."

Source -http://articles.timesofindia.indiati...-slum-dwellers
meetmus2fa no está en línea   Reply With Quote
Old November 23rd, 2011, 09:36 AM   #5
meetmus2fa
Registered User
 
Join Date: Jul 2010
Posts: 2,483
Likes (Received): 130

Tapi riverfront development project in Surat will add a new dimension to Surat

On January 25 as part of golden jubilee of Gujarat’s statehood a foundation stone for the Rs 44 crore projects to convert river Tapi into an environment protector and a centre for public recreation and entertainment on the lines of Sabarmati riverfront project in Ahmadabad by Surat Municipal Corporation (SMC). The project will come up on 54 hectares of land on a three-km-long stretch of Tapi riverbank. According to city engineer this project will be completed in approximately 18 months will improve the urban atmosphere and landscape and provide additional protection to the flood-prone areas in the city.

The Tapi riverfront development will have walkway development, food plaza, cycle track, walking track, festival ground for public festivals, green garden and mini floral park. It will also have parking for 2,200 four-wheelers and 3,000 two-wheelers for people who want to come with their family and spend an entire evening relaxing and having fun.

The development will not hinder the flow of water as the banks are not being narrowed down for development of any of the facilities. The flow pattern is left untouched.

Source - http://www.suratrealestate.com/info/?p=257
meetmus2fa no está en línea   Reply With Quote
Old November 23rd, 2011, 09:38 AM   #6
meetmus2fa
Registered User
 
Join Date: Jul 2010
Posts: 2,483
Likes (Received): 130

Tapi river front will have festival ground, ponk nagar and much more

First phase construction of Tapi river front project will cover about 54.45 Hector land and take place over 2.75 km long stretch of the river in Gujarat’s second largest and India’s fastest developing city Surat.

Rs. 44 crore project will include a festival ground, food plaza, mega parking area for 2200 four wheeler, and 3000 two wheelers, walk way with green belt, bicycle track, a big garden, mini floral park, ponk nagar, ecological park, and a memorial park presenting the story of Surat’s legends.

About 7800 people living in Tapi river slums of Bapunagar, Naherunagar, Subhashnagar, JP nagar, Jalaram nagar, Iqbal nagar etc will be relocated to new houses built by the Surat Municipal Corporation. State’s Road and Building and irrigation departments will transfer their about 1 lakh square meter land to Surat Municipal Corporation on token rate.

http://deshgujarat.com/2011/01/25/ta...and-much-more/
meetmus2fa no está en línea   Reply With Quote
Old November 23rd, 2011, 09:41 AM   #7
aks_sky
~AkZ~
 
Join Date: Dec 2009
Location: Auckland
Posts: 964
Likes (Received): 11

Finally all good to go.. Je loko javana hoy 25th e, phota lejo!!
__________________
Bharat ke is nirmaan par shaq hai mera!
aks_sky no está en línea   Reply With Quote
Old November 23rd, 2011, 05:25 PM   #8
AjayGJ21
Followtruth
 
AjayGJ21's Avatar
 
Join Date: Jan 2011
Posts: 603
Likes (Received): 93

Nice thread 'the Tapi riverfront developemen '.
But project doesnt start yet. Even no site preparation. I think it will take 2-3 years to complete.
Unlike Sabarmati riverfront, we would have less to discuss on this ambitious project as there is no progress. I hope project start early.
AjayGJ21 no está en línea   Reply With Quote
Old December 3rd, 2011, 08:05 AM   #9
reshapco
Registered User
 
Join Date: Sep 2010
Location: Ahmedabad
Posts: 230
Likes (Received): 0

It would be better they wait until Sabarmati Riverfront is completed.
reshapco no está en línea   Reply With Quote
Old December 9th, 2011, 12:07 PM   #10
GJ10
Registered User
 
GJ10's Avatar
 
Join Date: Apr 2007
Posts: 2,352
Likes (Received): 152

Diff ppl will class diff things as "site-prep", but FWIW, slums have been removed from Bapunagar slum area along the riverbank

April 2009


Feb 2011


Also, courtesy of SuratFirst Blog, Feb 2011 shots of same area, remaining are places of worship that have been spared from demolition.


Even after the building of the retaining walls, walkways etc in Ahmedabad, slum issues raised by opposition/activists have massively delayed the Sabarmati Riverfront project. So from that perspective, its noteworthy that slum clearance has happened for what was one of Surats largest slum areas.

From an engineering point of view, Sabarmati is little more than a glorified canal, even then, work was destroyed by flooding on more than one occasion. Tapi however, is an immensely powerful river in a region which receives much higher rainfall (and therefore floods more regularly), all of which will make this project a lot more technically demanding than the one in Ahmedabad.
GJ10 no está en línea   Reply With Quote
Old February 16th, 2012, 06:35 AM   #11
meetmus2fa
Registered User
 
Join Date: Jul 2010
Posts: 2,483
Likes (Received): 130

સુરતીઓ અફલાતુન રિવરફ્રન્ટ પર જલસા કરી શકશ

- પાળાના વાંકે રિવરફ્રન્ટને ડામ

- સિંચાઈ વિભાગના અણઘડ આયોજને પાલિકાના રિવર ફ્રન્ટ ડેવલપમેન્ટ પ્રોજેક્ટ પર જ પાણી ફેરવી દીધું

સિંચાઇ વિભાગે પૂર્વ આયોજન વગર રિવર પ્રોટેકશન વોલની ડિઝાઈન તૈયાર કરતાં ૧૨૫ કરોડનો તાપી રિવર પ્રોટેકશન વોલ પ્રોજેક્ટ અટકી પડ્યો, તાપી કિનારાને અડીને તૈયાર થઈ રહ્યો છે રિવર ફ્રન્ટ પ્રોજેક્ટ અને તેની પાછળ બનશે પ્રોટેકશન વોલ. બોલો હવે કેવી રીતે પહોંચશો રિવર ફ્રન્ટ સુધી...ક્યાં તો પ્રોટેકશન વોલમાં ગાબડાં પાડો કે પછી તેને કૂદીને જાવ

શહેર માટે મોરપિચ્છ સમાન બનનાર રિવર ફ્રન્ટ ડેવલપમેન્ટ પ્રોજેક્ટના વજૂદ સામે ખતરો સજૉયો છે. કેમકે સિંચાઇ વિભાગે પાળો બનાવ્યા બાદ તેની આગળ આ પ્રોજેક્ટનું નિર્માણ કર્યું છે. જેના કારણે અડાજણના ટ્રાફિકને રિવરફ્રન્ટ સુધી પહોંચવા પાળો કૂદાવવો પડે તેવી સ્થિતિ બની છે. આમ સિંચાઇ અને પાલિકા વચ્ચે સંકલનના અભાવે પ્રોટેકશન વોલ પ્રોજેક્ટ અટકી પડ્યો છે.

બીજી તરફ પ્રોટેકશન વોલના પ્રોજેક્ટ માટે રાજ્ય સરકારે રૂ.૧૨પ કરોડ મંજુર તો કર્યા પણ અત્યારનું અણધડ આયોજન જોતા પ્રોજેક્ટ પર નવેસરથી વિચાર કરવો પડે તેવી સ્થિતિ નિર્માણ પામી છે. અને તે માટે ગેરીને સરવેનું કામ સોંપાતા સોના કરતાં ધડામણ મોંઘું પડે તેવો ઘાટ થયો છે. આમ હવે દસ વર્ષ સુધી અડાજણથી ભાઠા વિસ્તારના સાત લાખ લોકોને પૂરથી રક્ષણ મળશે નહીં. આ મામલે દિવ્ય ભાસ્કરને સિંચાઇ વિભાગ અને મહાપાલિકા વચ્ચે થયેલા પત્રવ્યવહારના જડબેસલાક પુરાવા મળ્યાં છે.

આ પાળો વિવાદની જડ

રિવર ફ્રન્ટ પ્રોજેક્ટની બરાબર પાછળના ભાગે તૈયાર થનાર પાળા યોજના કારણે સુરતીઓ રિવર ફ્રન્ટ સુધી કેવી રીતે પહોંચશે તે સૌથી મોટો સવાલ છે.

લો, પહેલા રિવરફ્રન્ટ પછી પાળો!

નદી કિનારે તૈયાર થનાર અફલાતુન રિવર ફ્રન્ટ પ્રોજેક્ટની સુંદરતા આડે પાળાનું ગ્રહણ ઊભું છે. શું આ પાળો કૂદાવીને લોકો રિવરફ્રન્ટ સુધી પહોંચશે?

પાળાનું ગ્રહણ

તાપી પર કરોડોના ખર્ચે તૈયાર થનારા પાળા માટે હવે ફરીથી સરવે હાથ ધરવો પડે તેવી સ્થિતિનું નિર્માણ થયું છે. કેમ કે વાસ્તવિક રીતે નદી કિનારે તૈયાર થઈ રહેલા રિવર ફ્રન્ટ પ્રોજેક્ટનું પાછળના ભાગમાં બનનાર પ્રોટેકશન વોલનો પ્રોજેક્ટના અણઘડ આયોજનના પ્રતાપે રાંદેરના સાત લાખ લોકોને ન તો પૂર સામે રક્ષણ મળશે કે ના તેઓ રિવરફ્રન્ટનો લાભ લઈ શકશે.

રિવર ફ્રન્ટ આવો હશે

રિવર ફ્રન્ટ પ્રોજેક્ટમાં શહેરીજનોના એમ્યુઝમેન્ટ માટે ફૂડ કોર્ટ, ગાર્ડન, ચિલ્ડ્રન પ્લે એરિયા જેવા અનેક પ્રોજેક્ટો મુકાયા છે પણ હાલ તે નિરર્થક બની ગયા છે.

તાપી રિવર ફ્રન્ટ પ્રોજેક્ટ આ રીતે અવાસ્તવિક

મહાપાલિકા દ્વારા જે તાપી રિવર ફ્રન્ટ પ્રોજેક્ટ સાકાર પામી રહ્યો છે. તેની પાછળના ભાગે તાપી રિવર પ્રોટેકશન વોલ પ્રોજેક્ટ સિંચાઇ વિભાગે નિયત કરી દીધો છે.

હવે અડાજણ-પાલ-ભાઠા-ભાટપોર સુધી જનાર રિવર ફ્રન્ટ પ્રોજેક્ટ સુધી પહોંચવું હોય તો પ્રોટેકશન વોલમાં ગાબડા પાડવા પડે તેવી સ્થિતિ થાય તો નવાઈ નહી. કેમકે રિવર ફ્રન્ટની આગળ પ્રોટેકશન વોલ તાણી બાંધવાની હોવાથી આ પ્રોજેક્ટ તદ્ન અવાસ્તવિક બનશે.

પ્રોટેકશન વોલમાંથી રિવર ફ્રન્ટ સુધી જવા માટે રસ્તો કરાય તો આ રસ્તાના વાટે તાપી નદીના પાણી રાંદેરઝોનમાં સરળતાથી પ્રવેશી જાય. આમ પ્રોટેકશન વોલનો પ્રોજેક્ટ આખો પડતો મૂકવો પડે તેવી પરિસ્થિતિ સજૉઈ છે.

અલબત્ત સિંચાઇ વિભાગ પ્રોટેકશન વોલ પર સ્લોબ બનાવીને માર્ગ નિર્માણનું આયોજન કરી રહી છે. જે નિર્માણ વાસ્તવિક બને છે કે કેમ તેની સામે શંકા છે. એટલે હવે ગેરીને સરવેનું કામ સોંપાયું છે.

સમુદ્રની ભરતીમાં ધોવાણની શક્યતા

સિંચાઇ વિભાગ દ્વારા તાપી રિવર પ્રોટેકશન વોલ બનાવ્યા બાદ તેની આગળના ભાગે રિવર ફ્રન્ટ ડેવલપમેન્ટ પ્રોજેક્ટનું નિર્માણ કરવાનું આયોજન કરાયું હતું. અલબત્ત હાલમાં પરિસ્થિતિ તદ્ન વપિરીત થઈ ગઈ છે. તેમાં શહેરને પૂરથી રક્ષિત કરવા માટે તાપી રિવર પ્રોટેકશન વોલને બદલે રિવર ફ્રન્ટ પ્રોજેક્ટ તાપીના વહેતા પ્રવાહ પાસે નિર્માણ કરવામાં આવી રહ્યો છે. જ્યાં પ્રોટેકશન વોલ હોવી જોઇએ તે સ્થળે તાપી રિવર ફ્રન્ટ ડેવલપમેન્ટ પ્રોજેક્ટ બની રહ્યો છે. એટલે કે હવે કરોડો રૂપિયાનો રિવર ફ્રન્ટ ડેવલપમેન્ટ પ્રોજેક્ટ સમુદ્રની ભરતી સામે કે ધસમસતા પૂર સામે કેટલો સામનો કરી શકશે તેની સામે જ પ્રશ્નાર્થ ચહિન સજૉયું છે.

પાલિકાએ વાંધો લેતા પોલ ખુલી

સિંચાઇ વિભાગે મહાપાલિકા પાસે તાપી રિવર પ્રોટેકશન વોલ માટે એનઓસીની મંજૂરી માંગી હતી. પાલિકાએ નવેમ્બર ૨૦૧૦માં જ પ્રોટેકશન વોલના નિર્માણ મામલે સિંચાઇ વિભાગ પાસે સ્પષ્ટતા માંગી હતી. તેમાં તા.૨૬ જાન્યુઆરી , ૨૦૧૧માં મુખ્યમંત્રી દ્વારા જે તાપી રિવર ફ્રન્ટ પ્રોજેક્ટનું ખાતમૂહર્ત કરાયું હતું તે પ્રોજેક્ટને આ પ્રોટેકશન વોલથી અસર ન થાય તે માટે સ્પષ્ટતા કરવા માટે જણાવ્યું છે. પરંતુ આજ દિન સુધી સિંચાઇ વિભાગે કોઇ સ્પષ્ટતા મહાપાલિકા પાસે કરી નથી.

રાંદેર વાસીઓને પૂર સામે રક્ષણ નહીં

રાજ્ય સરકારે ભલે અડાજણથી ભાટપોર સુધી તાપીને પૂરથી બચાવવા માટે પ્રોટેકશન વોલની રચના માટે રૂ.૧૨પ કરોડ મંજૂર કરી દીધા છે. પરંતુ સુરત પાલિકા અને સિંચાઇ વિભાગ વચ્ચે સંકલનના અભાવે પ્રોટેકશન વોલનો પ્રોજેક્ટ પડતો મૂકવો પડે તેવી પરિસ્થિતિ સજૉઈ છે. રાંદેરઝોનના સાત લાખ લોકોને તાપીના પાંચ લાખ કયુસેક્સ પૂરના પાણીથી બચાવવા માટે કરાયેલું આયોજન તે કાગળ પર જ રહી જાય તેમ છે. માટે સમસ્યાનું ત્વરિત નિરાકરણ નથી.

ગંભીર સમસ્યા નિવારવા શું કહે છે તંત્ર

પાલિકા સાથે મસલત જારી છે

અમે ગેરી પાસે સરવે કરાવ્યો છે. એક વખત ગેરીનો રિપોર્ટ આવી ગયા બાદ આ બાબતે કેવી રીતે ટેકનીકલ નિકાલ કરવો તે અમે નક્કી કરીશું. આ બાબતે અમે મહાપાલિકા સાથે મસલત કરી રહ્યાં છે. સંયુક્ત રીતે અમે આ ગંભીર સમસ્યાનો નિકાલ કરવા પ્રયાસ કરીશું. આર.એમ.પટેલ, તાપી રિવર ફ્રન્ટ પ્રોટેકશન વિભાગ, સિંચાઇ અધિક્ષક

આ માટે અમે યોગ્ય નિરાકરણ કરીશું

આ બાબતે સિંચાઇ વિભાગ સાથે મસલત કરીને તેનો યોગ્ય નિકાલ કરીશું. તેમાં રિવર ફ્રન્ટ ડેવલપમેન્ટ પ્રોજેક્ટને ચોક્કસ રસ્તો મળે તે રીતે પ્રોટેકશન વોલ બને તેની અમે દરકાર લઇશું. કેતન પટેલ, રિવર ફ્રન્ટ ડેવલપમેન્ટ પ્રોજેક્ટ ઓફિસર, એડિશનલ સિટી ઇજનેર, મહાપાલિકા

Source :- http://www.divyabhaskar.co.in/articl...6400.html?OF1=
meetmus2fa no está en línea   Reply With Quote
Old March 2nd, 2012, 12:54 PM   #12
roopam005
Registered User
 
Join Date: Jan 2011
Posts: 120
Likes (Received): 0

i just confirmed with one of engineer at riverfront project,, and according to him, divyabhaskar has wrong information, and they misunderstood.. actually wall is next to rive and next to it is riverfront project...
roopam005 no está en línea   Reply With Quote
Old March 2nd, 2012, 12:58 PM   #13
roopam005
Registered User
 
Join Date: Jan 2011
Posts: 120
Likes (Received): 0

waht about magob entertainment park project ?? has it been cancelled due to sandesh reports............????
roopam005 no está en línea   Reply With Quote
Old March 2nd, 2012, 10:01 PM   #14
sixsigma1978
PRAETORIAN
 
sixsigma1978's Avatar
 
Join Date: Dec 2009
Location: New York/Bangalore
Posts: 2,439
Likes (Received): 49

Quote:
are those going to stay? I hope to god the've been left alone temporarily only, to build alternate places of worship -and will eventually be torn down!!
sixsigma1978 no está en línea   Reply With Quote
Old April 2nd, 2012, 07:35 AM   #15
tryindiffdrugsngirls
Registered User
 
Join Date: Sep 2011
Location: London
Posts: 375
Likes (Received): 19

haha look at that lil thing in the back spared cuz its a religious place? There should be minimum standards that should be met before a shanty on a statue could be called a temple or what ever
tryindiffdrugsngirls no está en línea   Reply With Quote
Old May 13th, 2012, 12:50 PM   #16
udit11
Registered User
 
udit11's Avatar
 
Join Date: Jan 2012
Location: Surat,Jalandhar
Posts: 175
Likes (Received): 1

Soon, Surtis can enjoy on riverside walkways

SURAT: How about strolling along Tapi river in the evening and enjoying the cool breeze or your daily jogging and workouts on the riverside? This is soon going to be a reality.

The riverside walkway project of Surat Municipal Corporation (SMC), which will connect Navadi Ovara in Nanpura with Hotel Taj Gateway in Athwalines on Tapi river, is on the verge of completion. Residents of the city will get an extended 3.5-km long walkway with beautiful lawns in the next couple of months.

According to sources, the walkway from Hotel Gateway to Sardar Bridge is about 2,375 metre long and the one connecting Navdi Ovara to Swami Vivekanand Bridge is about 1,100 metre long. However, both walkways will be merged at Sardar Bridge making it a 3.5-km long walkway for the denizens.

As the walkway on Tapi river has been developed for the first time, the civic body has placed a giant anchor on the elevated concrete structure to remind visitors about the glorious past of the erstwhile port city. The original anchor, believed to be of the 17th century, was recovered during the dredging exercise in Tapi many years ago.

Navadi Ovara and the adjoining Dakka Ovara were the trading ports from where traders in the erstwhile port city of Surat were doing business with other countries like England, Portugal, China, etc.

There will be about six approach ends on the walkway to facilitate the residents to effectively use it during the weekends. As the spot where the walkway is being developed is under the flood zone of Tapi, the civic body has taken precautions to see that the construction work is done as per flood zone rules.

"It is going to be a prestigious project for us. Once completed, residents will get to enjoy at the riverfront with their friends and family," said a senior civic officer.

http://timesofindia.indiatimes.com/c...w/13116367.cms

its really going to complete so soon???? yeyepie!!!!!!!!
can any1 post some recent images of the project
udit11 no está en línea   Reply With Quote
Old May 22nd, 2012, 07:44 PM   #17
meetmus2fa
Registered User
 
Join Date: Jul 2010
Posts: 2,483
Likes (Received): 130

Few days back i took the pic of River front project but was completely disappointed looking at the constructions works.... below are the few pics taken

Taken From Makai Bridge






CC-Myself
meetmus2fa no está en línea   Reply With Quote
Old May 22nd, 2012, 07:47 PM   #18
meetmus2fa
Registered User
 
Join Date: Jul 2010
Posts: 2,483
Likes (Received): 130

Taken from Dutch garden...Will this river front Survive one flood coz last flood water was overflowing from the place I have taken this pics







CC-Myself
meetmus2fa no está en línea   Reply With Quote
Old May 22nd, 2012, 07:51 PM   #19
meetmus2fa
Registered User
 
Join Date: Jul 2010
Posts: 2,483
Likes (Received): 130

Some Constructions works going on the Adajan side also...Don't know what it is









CC-Myself
meetmus2fa no está en línea   Reply With Quote
Old May 22nd, 2012, 08:33 PM   #20
udit11
Registered User
 
udit11's Avatar
 
Join Date: Jan 2012
Location: Surat,Jalandhar
Posts: 175
Likes (Received): 1

disappointing work by SMC
udit11 no está en línea   Reply With Quote


Reply

Tags
riverfront, smc, surat, tapi

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT +2. The time now is 04:39 PM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2013, vBulletin Solutions, Inc.
Feedback Buttons provided by Advanced Post Thanks / Like v3.1.2 (Pro) - vBulletin Mods & Addons Copyright © 2013 DragonByte Technologies Ltd.
vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2013 DragonByte Technologies Ltd. (Resources saved on this page: MySQL 25.00%)

SkyscraperCity - In Urbanity We Trust

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu