Old August 2nd, 2013, 10:34 AM   #161
VDB
Registered User
 
VDB's Avatar
 
Join Date: Jun 2012
Posts: 6,490
Likes (Received): 1971

Actually Nathan you reminded me about a graph I started a few months back, I've updated it now.

Shows 1) The number of entries made to the Timeline each month since I started it back in February 2012, 2) The number of significant entries. This is the number of entries I've put in bold, and is usually to do with construction work beginning or the opening of a new Metrolink line, etc. and 3) the number of non-significant entries. Usually this is stuff like a new Tesco Express or Starbucks opening somewhere.

Clearly there isn't much of a trend at all so I'm beginning to think it's a bit of a useless graph in terms of what it shows. However I'm putting this down to the fact that I started it in a recession and we still are in a (post) recession era. Maybe when things start to pick up we'll start to see a slight rise in the graph.

Certainly as we veer out of recession one would expect the "Significant" line to pick up what with more and more construction work getting on the go - and with the exception of the last few months this appears to be happening (if you squint).

Anyway, babbling on;






Of course it also backs up Nathan's statement about August 2013 being a bit of a dead fish
VDB está en línea ahora   Reply With Quote

Sponsored Links
 
Old August 18th, 2013, 04:18 AM   #162
scproductions
Registered User
 
scproductions's Avatar
 
Join Date: Jan 2007
Posts: 332
Likes (Received): 31

Whatever happened to the supposed re-landscaping of King Street West / The Public Area outside Mojos?
scproductions no está en línea   Reply With Quote
Old August 18th, 2013, 10:54 AM   #163
VDB
Registered User
 
VDB's Avatar
 
Join Date: Jun 2012
Posts: 6,490
Likes (Received): 1971

I was thinking that the other day whilst stood on Bridge St facing the cluttered mess at Trinity Square.. I don't know sorry. Flange, nq or someone else in the know might
VDB está en línea ahora   Reply With Quote
Old August 29th, 2013, 01:16 PM   #164
VDB
Registered User
 
VDB's Avatar
 
Join Date: Jun 2012
Posts: 6,490
Likes (Received): 1971

SEPTEMBER 2013

Busy all weekend so here is the timeline for the month starting Sunday

Exact Dates

- 2nd - Peachy Keens will open at the Printworks
- 5th - Design competition for Meadows-Chapel St bridge will end
- 12th - Simon Rogan's Mr Cooper's House and Garden Restaurant will open at the Midland


Non-Exact Dates

(Significant projects are in bold

- James Martin Restaurant will open at the Great Northern
- Coronation Street / ITV Studios at Trafford Quays will complete
- Work will finish on Rochdale Transport Interchange
- £100m regeneration scheme will begin in Beswick, with 522 new home, shops and other facilities
- Lucha Libre bar and restaurant will open at the Great Northern
- Premier Inn Salford will start construction (7 floors)
- Manchester House Restaurant and Bar at Tower 12 will open
- Construction will begin on new 20 storey hotel at Manchester Business School on West Booth Street
- Redevelopment of Central Retail Park will begin with the recladding of shop fronts
- Ashton Metrolink Line due to open (testing ongoing)
- Bierkeller due to open in the Printworks
- Multistorey car park at Birley Fields will complete construction
- New college will open at MediaCityUK will open to teach young people in media digital
- Completion of electrification to Newton le Willows/WCML





Actually quite an exciting month there from September 2013 as the graph below shows, we have an 'upflick' in the graph now. September contains the highest number of 'significant' projects since the timeline began in Feb 2012 - which I think shows the construction sector starting to pick up (the only thing I put on significant is construction and infrastructure). Promises to be a pretty good month..




Also an exciting month for dining in Manchester - but more specifically for dining in the Great Northern; with Lucha Libre and James Martin's new restaurants opening there.
VDB está en línea ahora   Reply With Quote
Old September 29th, 2013, 09:31 PM   #165
VDB
Registered User
 
VDB's Avatar
 
Join Date: Jun 2012
Posts: 6,490
Likes (Received): 1971

OCTOBER 2013

Can't believe we're standing on the frontier of October already.

Here it is;

Exact Dates

7th - SACO Aparthotel will open on Minshull St Piccadilly
9th - Metrolink to Ashton will begin
10th - Vogue's Fashion Night Out in Manchester
24th-27th - Pop-up Drinks Emporium at the Corn Exchange


Non-Exact Dates

- Decked park-and-rides at Radcliffe and Whitefield Metrolink stations will begin construction
- Planning decision due for Greengate One (31 and 21 stories) development
- Approval expected for First St South
- University Technical College (UTC) at MediaCity will begin construction
- Lucha Libre will open at the Great Northern
- Whole roof at Victoria will be fully demolished and work will begin on the installation of new roof trusses
- Work will complete on Brown Brother's hotel off Chapel Street



KEY:

Significant Projects
Non-significant Projects


Last edited by VDB; September 30th, 2013 at 09:11 PM.
VDB está en línea ahora   Reply With Quote
Old September 30th, 2013, 12:09 AM   #166
d33206hg
Tram Enthusiast
 
d33206hg's Avatar
 
Join Date: Jan 2013
Location: Sale
Posts: 337
Likes (Received): 1171

Quote:
Originally Posted by VDB View Post
Can't believe we're standing on the frontier of October already.

Here it is;

Exact Dates

7th - SACO Aparthotel will open on Minshull St Piccadilly
10th - Vogue's Fashion Night Out in Manchester
19th - Metrolink to Ashton will begin
24th-27th - Pop-up Drinks Emporium at the Corn Exchange


Non-Exact Dates

- Decked park-and-rides at Radcliffe and Whitefield Metrolink stations will begin construction
- Planning decision due for Greengate One (31 and 21 stories) development
- Approval expected for First St South
- University Technical College (UTC) at MediaCity will begin construction
- Lucha Libre will open at the Great Northern
- Whole roof at thVictoria will be fully demolished and work will begin on the installation of new roof trusses
- Work will complete on Brown Brother's hotel off Chapel Street



KEY:

Significant Projects
Non-significant Projects

Metrolink Ashton is 9th October not 19th
d33206hg no está en línea   Reply With Quote
Old September 30th, 2013, 09:10 PM   #167
VDB
Registered User
 
VDB's Avatar
 
Join Date: Jun 2012
Posts: 6,490
Likes (Received): 1971

Quote:
Originally Posted by d33206hg View Post
Metrolink Ashton is 9th October not 19th
Thanks d3
VDB está en línea ahora   Reply With Quote
Old November 1st, 2013, 12:52 PM   #168
VDB
Registered User
 
VDB's Avatar
 
Join Date: Jun 2012
Posts: 6,490
Likes (Received): 1971

Construction Timeline November 2013

Busy months for restaurant openings in the city centre this month - as usual for November in the run-up to Christmas.


Exact Dates

- 9th - Zara opens after refurbishment
- 14th - Veeno Restaurant opens in Brazennose Street
- 14th - Jack Jones will open in the Arndale
- 15th - Indoor Victorian Christmas Markets in Castlefield begin
- 16th - Lucha Libre opens at the Great Northern
- 28th - Hamleys will open at the Trafford Centre


Non-Exact Dates

- 210,000sqft of office space at the Soapworks will be completed
- Winning bridge for Salford River Park (connection to the Meadows) will be announced
- New bridge at Etihad Collar Site will start construction
- Work will begin on conversion of 57 Newton Street into a 17 bed hotel called "Cow Hollow" (Northern Quarter)
- The Cenotaph in St Peter's Square will be deconstructed and put into storage after the 11th, so that the redevelopment of St Peter's Square can begin.
- Pret a Manger will open on Oxford Street
- Construction to begin on 3 new 10-storey student blocks at Salford Uni Peel Park campus (anyone know if this is going ahead??)
- Hawker's Restaurant will open in Spinningfields.
- (subject to Salford Planning Decision) work due to begin on One Greengate (the 31 & 21 storey tower blocks) this month however the application is still pending decision.
- Work will finish on reopening the subway at Oxford Road station
- Dredging around the landing docks for the City to Quays Water Taxi route will start



Have a happy November, I'll also be updating the Development Thread very soon too.

VDB está en línea ahora   Reply With Quote
Old November 11th, 2013, 09:32 PM   #169
VDB
Registered User
 
VDB's Avatar
 
Join Date: Jun 2012
Posts: 6,490
Likes (Received): 1971

Construction Timeline into 2014

Let's take a sneak peak into what's scheduled for December 2013 and into 2014.

As usual, significant projects are highlighted in bold - whereas less-significant projects are not highlighted at all

DECEMBER 2013

Non-specific dates

- Network Rail's North West Headquarters in Ardwick due for completion
- Steve Pilling, owner of the Damson chain of restaurants, will open 'Mr Pilling's Restaurant and Chophouse' at the Courthouse on Deansgate
- Citilabs on Oxford Road will complete
- Central Retail Park; work will complete on recladding of frontages
- Construction to begin on Ordsall Curve
- Work on Victoria station over Christmas will see OHLE poles installed
- Quays to City Waxi Route; construction of landing stages/pontoons will begin along the Manchester Ship Canal
- Rollout of SmartCards will begin across the Metrolink network
- Electric trains will begin between Victoria and Newton le Willows
- All T68s will be withdrawn from the Metrolink network
- Queens Road Metrolink Station will open


_______________________________________________________________


JANUARY 2014

Specific Dates

12th - Victoria station's Metrolink will close temporarily due to roof work
27th - Travelodge Piccadilly Gardens opens


Non-Specific Dates

- Phase 1 of Pendleton's redevelopment complete
- National House Cross Street; refurb into offices will be complete
- Royal Northern College of Music's refurbishment will begin
- Work will begin on extending the Eithad Stadium to seat 60,000 - making it the third largest stadium in the UK
- Installation of new ETFE roof will begin at Victoria station
- Construction will begin on One Greengate, 31 & 19 storey residential blocks


_______________________________________________________________



FEBRUARY 2014

Non-Specific Dates

- (Supposedly) Gateway House Piccadilly's redevelopment will begin
- Albert Hall music venue on Peter St will open
- The Corn Exchange will close; construction on a new casual dining destination inside will begin
- *Early in 2014*; driver training will begin on the Todmorden Curve between Victoria and Burnley
- *Q1 2014*, Hotel Indigo at Victoria will start construction
- "Red's True Barbeque" will open a 6,000sqft restaurant in Manchester
- Holiday Inn Aytoun St; demolition of former Employment Exchange will begin to make way for 9 storey hotel
- Rochdale Town Center Metrolink line will begin operation
- *Early in 2014*; Smithfield Phase 6 in the Northern Quarter will complete construction
- Reconstruction of St Peter's Square will begin


_______________________________________________________________



MARCH 2014

Specific Dates

- 7th - Transavia France will start running a weekly flight to Palma from Manchester.


Non-Specific Dates

- Central Library will reopen after extensive redevelopment
- 61,500sqft of office space is due to open up & complete at Sevendale House in the Northern Quarter
- Construction due to begin on 22-storey Axis Tower
- Cycle Hub will open at Victoria Station
- Construction will complete on City-to-Quays Water Taxi route (the route will begin operation in April)
- Burnley Manchester Road Station will complete construction, with a direct service to Victoria via Rochdale opening in December 2014
- Construction on Number 1 St Peter's Square will complete



_______________________________________________________________



APRIL 2014

Non-Specific Dates

- Quays to City Water Taxi route will begin operation
- Ticket gates will be installed at Victoria Station and, as part of the refurbishment; the new mezannine structural work will be complete, and internal restoration will also be complete too
- Consultation for Trafford Center Metrolink Line will begin
- Metrolink's Oldham Town Center route will begin operation
- Redevelopment of Manchester Business School on West Booth Street will begin
- Public realm construction at First St North will begin
- 1 Hardman Street Spinningfields office block will complete construction
- Construction on Gary Neville's Hotel Football at Old Trafford will complete
- Phase 2 of Pendleton's Redevelopment will begin
- Completion of construction of the Multi Storey Car Park at First St


_______________________________________________________________



MAY 2014

- First Transpennine Express set to benefit from 40 new electric trains
- Decked park-and-rides at Whitefield and Radcliffe's Metrolink stations due for completion
- Subway works at Oxford Road station due for completion
- Planning application for Realty Estate's BBC Oxford Road site due to be submitted ( )
- Turkish Airlines will increase number of Manchester routes from 2 per day to 3, using bigger planes on the existing routes
- Drama Hub will open at the Sharp Project in Gorton
- Altrincham Transport Interchange's work due to be completed.
__________________

js1000, Schooner liked this post
VDB está en línea ahora   Reply With Quote
Old November 11th, 2013, 09:59 PM   #170
tomegranate
Registered User
 
Join Date: Apr 2009
Posts: 1,016
Likes (Received): 117

VDB, do you sleep??
__________________

js1000 liked this post
tomegranate está en línea ahora   Reply With Quote
Old November 11th, 2013, 10:17 PM   #171
VDB
Registered User
 
VDB's Avatar
 
Join Date: Jun 2012
Posts: 6,490
Likes (Received): 1971

Quote:
Originally Posted by tomegranate View Post
VDB, do you sleep??
yes yes plenty! Usually 8 hours each night, 7 if I decide to watch Family Guy on BBC3 at 11pm
VDB está en línea ahora   Reply With Quote
Old November 12th, 2013, 12:17 AM   #172
js1000
Registered User
 
js1000's Avatar
 
Join Date: Dec 2011
Location: Mcr / Lon / Sheff
Posts: 2,191
Likes (Received): 547

Some good things to look forward.

Your confident response in regards to Realty's "ongoing developments" (no doubt they would laughably call them!) has assured me greatly.
__________________
The higher the building, the lower the morals
js1000 está en línea ahora   Reply With Quote
Old November 30th, 2013, 10:23 AM   #173
VDB
Registered User
 
VDB's Avatar
 
Join Date: Jun 2012
Posts: 6,490
Likes (Received): 1971

CONSTRUCTION TIMELINE DECEMBER 2013

Exact Dates

- 2nd - Porada, a new Italian restaurant in Whitefield, will open
- 3rd - Decision expected on First takeover of Finglands
- 13th - Lola Lo on Deansgate Locks will open


Non-Exact Dates

- "Almost Tea" (by Yvette Fielding) will open next to Manchester Cathedral
- Construction will begin on Ordsall Curve (?)
- "Dockyard" will open at MediaCityUK
- Network Rail North West Headquarters in Gorton due for completion
- Planning App for One Hardman Square will be submitted
- Construction of City to Quays Ferry Water Taxi landing stages/pontoons will begin.
- All T68 Trams will be withdrawn from the Metrolink network and replaced by the new M5000s.
- Citilabs on Oxford Road will be complete
- Central Park Redevelopment; work set to complete on recladding of frontages
- Queens Road Metrolink station will open
- Steve Pilling; owner of Damson, will be opening "Mr Pilling's Restaurant and Chophouse" at the Courthouse on Deansgate.
- Electric trains will begin running on the Transpennine Express Network
- Work on Victoria station over Christmas will see OHLE poles installed inside the station


VDB está en línea ahora   Reply With Quote
Old December 2nd, 2013, 07:12 PM   #174
VDB
Registered User
 
VDB's Avatar
 
Join Date: Jun 2012
Posts: 6,490
Likes (Received): 1971

CONSTRUCTION TIMELINE 2015

Decided to take a great leap into the unknown; today I'll be looking beyond 2013 & 2014 and casting my magic ball into 2015.

Because it's obviously a relatively long way away, we have a limited number of entries into each month of 2015, but it's still going to be interesting to see what's due to be happening across the city at this time.




JANUARY 2015

- Construction work on 19-storey office tower at 1 Hardman Square Spinningfields due to commence.
- Metrolink Line to Trafford Centre will begin construction
- Vimto Gardens at Chapel Street will complete construction



FEBRUARY 2015

- Work will begin on Ordsall Curve
- All construction work at Victoria Station will be complete



MARCH 2015

- Refurbishment / Reclad work will complete on all of Ancoats' tower blocks
- Hotel Gotham on King St will open
- Completion / Opening of the National Graphene Institute



APRIL 2015

- Construction due to complete on 14-storey Motel One Hotel, Piccadilly
- First St North construction work largely complete by now.



MAY 2015

- Construction will complete on 19-storey hotel at Manchester Business School on West Booth Street



JUNE 2015

- Metrolink 2CC spur between Victoria and temporary terminus at Exchange Square will complete.
- Deansgate-Castlefield Metrolink station redevelopment complete by now
- Indigo Hotel Victoria to complete construction
- 20-storey Axis Tower due to complete construction



JULY 2015

~ NO ENTRIES AS YET ~



AUGUST 2015

- Work will complete on expansion of Etihad Stadium to seat 60,000 people and make it the third largest stadium in the UK
- Salford University; "Gateway" building (7 floors) will complete construction in time for the new school year.




SEPTEMBER 2015

- Peel Park, Salford University Campus will open
- Refurbishment of Plane Court tower in Pendleton will be complete
- Central Retail Park development is set to complete in Ancoats



OCTOBER 2015

- Construction will complete on Holiday Inn on Aytoun Street (former Employment Exchange)
- Public realm work at NOMA due to be complete.




NOVEMBER 2015

- Redevelopment of all Pendleton apartment blocks & towers will be complete.



DECEMBER 2015

- Metrolink line to Trafford Centre will complete construction(?)
- Frequency of Metrolink to Shaw on the ORL and Crumpsall on the BURY will increase. 6 minutes for Shaw, 4 minutes for Crumpsall.
- Number 2 St Peter's Square will complete construction.



VDB está en línea ahora   Reply With Quote
Old December 29th, 2013, 12:39 AM   #175
VDB
Registered User
 
VDB's Avatar
 
Join Date: Jun 2012
Posts: 6,490
Likes (Received): 1971

2014

Seeing as the New Year is upon us, lets look at the New Year from February onwards (the January update will come closer to the end of this month)

As always significant projects are in bold.

FEBRUARY 2014

- Albert Hall Music venue on Peter Street will open
- Gateway House Piccadilly redevelopment scheduled to begin
- Driver training to begin on Todmorden Curve direct Victoria-Burnley rail link
- The Corn Exchange will close for redevelopment to take place, conversion into a casual dining destination
- "Reds True Barbeque" will open a 6,000sqft restaurant in former Livebait unit in Albert Square
- Hotel Indigo Victoria will start construction (Q1 2014)
- Demolition of Aytoun Street Employment Exchange will begin to make way for 8-storey Holiday Inn
- Rochdale Town Centre Metrolink will open
- Demolition of Redfern Annex begins on NOMA site
- Reconstruction of St Peter's Square will begin
- 1 Hardman Square tower will go to committee
-Oldham Town Centre Metrolink will open
- Planning application will be submitted for BBC Oxford Road site
- Smithfield One Apartment block in the NQ will complete construction
- Demolition of Century House and adjacent buildings will begin to accommodate the new 2SPS




MARCH 2014

- 7th - Transavia will start running a weekly flight to Palma from Manchester
- Construction will start on expanding the Etihad Stadium into the UK's third largest (Spring)
- Burnley Manc Road Station will complete construction
- Construction due to begin on 22 storey Axis Tower
- Cycle Hub will open at Victoria station
- Work will start on Hotel Gotham, King Street
- 61,500sqft of office space due to open up at Sevendale House in the Northern Quarter
- Central Reference Library will reopen
- Construction will begin on on new sports pitches on NOMA site
- One St Peter's Square office block due for completion
- Manchester Victoria Metro stop will close temporarily for roof work
- Construction on Midtown-Quays WAXI ferry route landing stages will complete, the service will begin in April




APRIL 2014

- 1st - American Airlines will upgrade the MAN Chicago route with bigger planes
- 1st - Flights to Jeddah will begin, bringing a new First Class lounge to Manchester Airport
- Ticket Gates will be installed at Victoria Station, and the mezannine structural work will be completed. Internal restoration of the station will complete too.
- Quays to Mid-Town WAXI route will start operating
- Consultation for Trafford Metrolink Line will begin
- Redevelopment of Manchester Business School will begin
- Public realm works at First Street North will start construction
- 1 Hardman Street Spinningfields will complete construction
- Phase 2 of the redevelopment of Pendleton will begin
- Le Bistro Pierre restaurant will open in former L'Entrecote restaurant in King Street
- Completion of construction on the MSCP at First Street
- Sports pitches at NOMA site will open
- I+Spinningfields office block will start construction



MAY 2014

- Turkish Airlines will increase Manchester Airport routes; from 2 per day to 3, using bigger planes
- Decked Metrolink Park-and-Rides at Radcliffe and Whitefield will complete construction
- Drama Hub at Sharp Project in Gorton will open
- Subway works at Oxford Road station will complete construction
- Altrincham transit interchange work due to be completed
- Beginning of construction for public realm works at NOMA site in the Redfern St area will start
- Rail timetable changes may mean more services & longer trains on the Transpennine Network





JUNE 2014

- Refurbisment of Plane Court Tower in Pendleton will begin
- Birley Fields student campus will complete construction
- Cibitas will submit plans for 4,000 new homes in Holt Town
- First St North Cultural Facility (HOME) completes construction
- Testing may begin on the Metrolink Airport Line
- 14-storey Melia Hotel will complete construction
- New route by Air Canada will launch between MAN and Toronto
- BBC Oxford Road Car Park will cease being a car park apparently, for development to begin.....




JULY 2014

- 1st - Etihad will increase the size of their Manchester operations
- Nuovo apartment block Gt Ancoats St to complete construction
- Completion of roof at Victoria station




AUGUST 2014

- X1 Chapel Street Manchester 5 fl student accommodation will complete construction
- Vita Student block at 1st Street will be completed
- RNCM refurbishment will complete too

- Public realm at First St North will complete




SEPTEMBER 2014

- 13th - Whitworth Art Gallery will reopen
- New Islington Free School will open
- Hotel Football Old Trafford due for completion
- Normal Metrolink services will resume at Victoria station
- University Technical College at MediaCityUK will open
- Get Me There smartcarding will be available across Metrolink network
- Motel One Piccadilly will complete construction
- Construction complete on National Graphene Institute




OCTOBER 2014

- 29th - American Airlines will begin operating 5 new weekly flights to Miami
- Airport line Metro MAY begin running
- Corn Exchange Redevelopment complete
- New supermarket will begin construction at Central Retail Park
- Redevelopment of Malus Court Tower, Pendleton, to start




NOVEMBER 2014

- Completion of external refurbishment works at Victoria station




DECEMBER 2014

- Gino di Campo's new restaurant "My Pasta Bar" due to open in Manchester
- Electrification of rail line to Liverpool will complete
- Completion of public realm works at Redfern St on the NOMA site
- Rail services between Burnley Manchester Road and Victoria will begin
- Electrification between Castlefield Junction and Victoria will complete
- Redevelopment work at Saltford Tower block in Ancoats complete




Happy New Year.
__________________

iwillo liked this post
VDB está en línea ahora   Reply With Quote
Old December 29th, 2013, 04:12 AM   #176
AJD1984
Registered User
 
AJD1984's Avatar
 
Join Date: Jan 2006
Location: Manchester, UK
Posts: 935
Likes (Received): 122

Good list VDB.

Couple of queries though. When you say complete construction for First Street, do you mean finish completely or topped out? First Street North isn't due for completion till May/June 2015. I expect the public realm will be the last piece of the jigsaw and commence in the March of 2015 or something.

Hotel Indigo is supposedly starting in March.

Andrew
AJD1984 no está en línea   Reply With Quote
Old December 29th, 2013, 11:01 AM   #177
VDB
Registered User
 
VDB's Avatar
 
Join Date: Jun 2012
Posts: 6,490
Likes (Received): 1971

Quote:
Originally Posted by AJD1984 View Post
Good list VDB.

Couple of queries though. When you say complete construction for First Street, do you mean finish completely or topped out? First Street North isn't due for completion till May/June 2015. I expect the public realm will be the last piece of the jigsaw and commence in the March of 2015 or something.

Hotel Indigo is supposedly starting in March.

Andrew

Thanks Andrew

Each individual building on First Street has a different construction completion date, I get all these time-scales from various websites including Ask, etc. I think it must be topped out rather than complete and open to the public, however construction does often take you by surprise! I wouldn't be surprised if they're all completed by September.

Thanks for the info on Indigo too.
VDB está en línea ahora   Reply With Quote
Old December 31st, 2013, 02:18 PM   #178
VDB
Registered User
 
VDB's Avatar
 
Join Date: Jun 2012
Posts: 6,490
Likes (Received): 1971

JANUARY 2014

Happy New Years' Eve Everyone!

Above is the construction timeline for 2014, below is the listings for January;

JANUARY 2014

4th - Nigel Rayment boutique opens on Old Bank Street
6th - Work will begin on the Metrolink second city crossing (2CC)
12th - Victoria Station Metrolink will close temporarily
27th - Travelodge Piccadilly Gardens opens
27th - Oldham Town Center Metrolink will open


- National House offices on Cross Street will complete refurbishment
- Redevelopment of Royal Northern College of Music will begin
- Construction will begin on Greengate One (31 & 21 story apartment blocks)
- New concept Argos will open at Manchester Fort.
- Installation of the new ETFE roof will begin at Victoria (!!!)
- Work will begin on extending the Etihad Stadium to seat 60,000 people, making it the third largest stadium in the UK
- Phase 1 of Pendleton redevelopment will finish



Happy New Year - looks like January's going to be a good one - it'll see the largest number of "Significant" projects ever on this list. Significant being construction starts & finishes, I think it's fair to say that we're in for another year of growth in the construction industry here in Manchester.
__________________

Schooner liked this post
VDB está en línea ahora   Reply With Quote
Old January 1st, 2014, 08:53 PM   #179
VDB
Registered User
 
VDB's Avatar
 
Join Date: Jun 2012
Posts: 6,490
Likes (Received): 1971

Me again.

As mentioned above, January 2014 saw the largest number of "BOLD HIGHLIGHTED SIGNIFICANT PROJECTS" ever on the construction timeline, that is, since February 2012.

Listings I choose to highlight as 'Significant' are nearly always those to do with Construction. For instance, if construction begins on something or completes on something, it'll be listed as 'Significant'. Everything else is new shops opening or restaurants opening (unless of course, the new shops opening are big department stores or new-build retail units, I won't list them).

Construction indices, as I'm sure you all know, have for a long time been representative of a given economy.

Therefore it's my pleasure to interpret January 2014's relatively high number of significant bold-highlighted projects as a sign that 2014 will be a very good year - economically - for Manchester (touch wood).

Here's the graph with all the ups-and-downs.





This figure does not appear to be anomalous either. February too is already shaping up to be a good month, there are so far 7 significant bold-highlighted entries. This could increase through January. As you can see from the graph, it's only since August 2013 that the numbers started going above 6, and we've only had two 7s since then. The higher numbers appear to be becoming more and more common, and the troughs we experience are in fact highs when compared to the numbers of significant entries throughout 2012.


"But VDB, could it not be that you're becoming more 'laxed about what you count as 'Signifcant'"?

No. Because up until last year, I didn't record 'significant' projects. I merely went back in time last Summer and reviewed all the entries from since Feb 2012, marking what I saw as significant there and then. Also, the criteria for projects to be marked as significant are pretty simple; construction-related or not.


So have a Happy New Year - I'm sure it'll be a busy one on the forums.

*Touchwood*.
VDB está en línea ahora   Reply With Quote
Old January 31st, 2014, 07:07 PM   #180
VDB
Registered User
 
VDB's Avatar
 
Join Date: Jun 2012
Posts: 6,490
Likes (Received): 1971

CONSTRUCTION TIMELINE FEBRUARY 2014

As usual, significant projects (construction, demolition, completion) is in bold.

EXACT DATES

- 1st - Footlocker will reopen on Market Street after refurbishment
- 3rd - Altrincham Interchange; new footbridge will start construction
- 3rd - Rochdale Town Centre's new free bus service will start
- 9th - Transfer of Finglands bus routes in Gtr Manchester to First


NON-EXACT DATES

- Hamleys in the TC will expand
- Gateway House Redevelopment scheduled to begin (hm)
- Albert Hall Music Venue on Peter Street will open
- Corn Exchange will close for redevelopment into casual dining destination
- £400,000 refurbishment of 81 Fountain Street will begin
- Demolition will begin on the former Employment Exchange on Aytoun Street ahead of construction on the Holiday Inn
- Driver training will begin on Todmorden Curve with direct services between Victoria and Burnley
- Rochdale Town Centre Metrolink will open
- Red's True Barbeque will open a 6,000sqft restaurant in Albert Square, creating 85 jobs
- Smithfield One in the NQ will top out
- Demolition of Redfern Annex will begin at NOMA
- Reconstruction of St Peter's Square will begin
- Number One Spinningfields office tower due to gain planning approval
- A planning application will be submitted by Realty (haha) for the redevelopment of the BBC Oxford Road site
- Demolition work on Century House and adjacent buildings will begin in order to build Number 2 St Peter's Square
- Fire Hit TV will begin broadcasting local Manchester news on Freeview Ch60
- BBC Radio 6 will launch its first ever festival at Victoria Warehouse, Trafford.



______________________________________________________________

Record number of entries this month, representing our emergence from the recession. Should be an exciting one.
__________________

boyaloud liked this post
VDB está en línea ahora   Reply With Quote


Reply

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT +2. The time now is 01:01 AM.


Powered by vBulletin® Version 3.8.8 Beta 1
Copyright ©2000 - 2014, vBulletin Solutions, Inc.
Feedback Buttons provided by Advanced Post Thanks / Like v3.2.5 (Pro) - vBulletin Mods & Addons Copyright © 2014 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2014 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu