Quote:
The Bokaro Mall will be operational in Dec.12 and Quatzal Mall in Aug.13. The Above news which you quoted is published in Telegraph - Bokaro makes room for malls SHASHANK SHEKHAR An upcoming mall in Bokaro. Picture by Pankaj Singh Bokaro, June 18: A massive anti-encroachment drive has been launched in the steel city to make way for malls and multiplexes. The Bokaro Steel Limited (BSL) owns several thousand acres of land here, but a large chunk of it is facing encroachment. The BSL administration, keen on ushering in the mall-plex culture of metros here, has prepared an ambitious blueprint to develop swanky shopping destinations and multiple-screen theatres. To begin with, it has served notices to more than 800 illegal residents in sectors IV, V, VI, IX and XI, asking them to vacate land with immediate effect. Highly placed BSL sources said two plots in Sector IV had been identified for malls. One of the plots has been allotted to a Bihar-based film producer-cum-director, who will also set up a studio. The other has been entrusted to a senior politician who is expected to use his contacts to set up another mall and a 500-seat multiplex. The mall-plex was envisioned a few years ago by present BSL managing director V.K. Srivastav and DIG Anil Palta. But because of a volatile political situation, the anti-encroachment drive could not be started. BSL chief of communications Sanjay Tewary said the city with a population of more than 400,000 needed an entertainment zone, but he refused to divulge more on their plans. “Right now, we are trying to evict illegal residents occupying our land,” he said. Besides the malls, a Vishal Market is coming up at Sector IV near City Centre. The premises of Devi Cinema, which had remained closed for nine years, has also been handed over to Reliance Fresh. Ref : http://www.telegraphindia.com/109061...y_11131301.jsp
|
|
|
|
|
|
|
#22 |
|
Registered User
Join Date: Aug 2011
Posts: 481
Likes (Received): 99
|
Biada to buy 700 acres for new industries
BOKARO: To develop more industries in Bokaro, Giridih and Dhanbad, the Balidih Industrial Area Development Authourity (Biada) is all set to acquire more than 700 acres of lands in these areas. Currently, Biada is suffering from shortage of land which is creating hurdle for new industries.The approval for acquiring lands has been given to Biada by state industry secretary A P Singh, who is also chairman of Biada, in a board meeting with managing director-cum-Bokaro DC Sunil Kumar, secretary Robin Toppo and others. "Witnessing crisis of lands, we have sent a proposal for acquiring more lands for development of Biada. Today, the board headed by Singh has given an in-principal consent for acquiring lands in Bokaro, Chandankyari, Jaridih, Dhanbad and Giridih for industrial growth," said Kumar. Biada, formed in 1974, has played an important role in industrial development of this region. The authority, which has acquired 1470.59 acres, allotted its land to around 486 industries across Dhanbad, Bokaro and Giridih districts. Presently, only around 100 acres of land are left with Biada, which is found by authorities to be very less. Biada area comprises 1234.45 acres in Balidih Industrial Area (BIA), 134.58 acres in Kandra Industrial Area in Dhanbad, 55 acres in Sindri Industrial Area and 46.56 acres in Giridih Industrial Area. Out of them, BIA in Bokaro has shown a rapid growth with 374 industries got its venue here. Kumar added that the board apart from giving consent for acquiring lands has also given approval of Rs 2.97 crore for development of Biada. The project comprises developing of basic amenities, including roads and sewerage.. Ref : http://articles.timesofindia.indiati...ial-area-acres |
|
|
|
|
|
#23 |
|
Registered User
Join Date: Aug 2011
Posts: 481
Likes (Received): 99
|
ArcelorMittal Steel and Power plant
Arcelor team in Bokaro for land
OUR SPECIAL CORRESPONDENT A three-member ArcelorMittal team from Ranchi on Thursday held a closed-door meeting with the deputy commissioner of Bokaro amid speculation that the steel behemoth was desperately trying to thrash out the plaguing land acquisition issue in Kasmar-Petarwar block for its proposed 12MTPA plant and might even be mulling a part of the project in Chas. The company, which had signed an MoU with the Jharkhand government three years ago with a proposed investment of some Rs 45,000 crore, requires over 2,000 acres of land for a 3MTPA unit, besides a captive power plant, in the first phase. However, over the past two years — and despite offering competitive compensation package — it has been able to acquire a paltry two acres in Maoist-hit Kasmar-Petarwar. Apparently to speed up the project, the high-level ArcelorMittal team — led by its Jharkhand general manager P.S. Prasad — has requested deputy commissioner Sunil Kumar to make urgent provision for 1,330 acres of riyati land and 880 acres of government land in Chas, 15km from Bokaro steel city. The proposed site is close to the upcoming Electrosteel Castings Limited plant and even nearer to the proposed Bhushan Steel unit. Speaking to The Telegraph before meeting the deputy commissioner, Prasad said once the plant came up it would provide direct employment to 2,000 people and indirect jobs to several thousand others. On whether ArcelorMittal had aborted the project in Kasmar-Petarwar, he evaded a direct answer and said they would set up the proposed plant, which was shifted from Torpa-Kolebira in Khunti-Gumla to Bokaro, and might divide the steel and power units between Kasmar-Petarwar and another site. He also admitted that they had failed to acquire more than two acres in the Maoist-hit block. Kumar confirmed that the steel giant had submitted a written plea for land in Chas. “ArcelorMittal perhaps wants to establish an integrated steel and power plant there,” he said, adding that the proposal did not mention the Kasmar-Petarwar project.
Ref : http://www.telegraphindia.com/111111...y_14764343.jsp |
|
|
|
|
|
#24 |
|
Registered User
Join Date: Aug 2011
Posts: 481
Likes (Received): 99
|
Monnet Steel
Monnet Ispat acquires 850 acres for Bokaro plant
Navtan Kumar, ET Bureau Sep 17, 2010, 03.07am IST RANCHI: Monnet Ispat & Energy, a Delhi-based company with interests in steel and power, has so far acquired around 850 acres in Bokaro where it is building a 2.5-million-tonne steel plant. It needs about 2,000 acres for the project. Monnet Ispat will invest over Rs 14,000 crore for the project and is also building a 280-mw power plant. Bokaro deputy commissioner Nitin Madan Kulkarni told ET that the villagers agreed to give their land for Rs 4,050 per decimal ( A decimal is one-hundredth of an acre). Another round of meeting is expected to be held soon to finalise the deal. The villagers also sought to know other benefits in terms of employment, health, education and infrastructure. The project has seen steady progress, unlike the situation in Orissa and West Bengal, where slow land acquisition process has delayed the projects of Posco. Monnet Ispat said it has got the consent of villagers of Kumrhi under Chas block, in Bokaro district. Mr Kulkarni said the administration has 220 acres. "Once we get the proposal from the company, we will expedite the process for its transfer. We will also provide assistance to the company in other areas," he said. Besides, 50 acres of forest land is also available, he said. The company also needs 450 acres from Dumrada village, under Chandankiyari block. The company officials distributed agreement forms and hope to finalise the deal soon. |
|
|
|
|
|
#25 |
|
Registered User
Join Date: Aug 2011
Posts: 481
Likes (Received): 99
|
Airport in Bokaro
Jamshedpur, Bokaro to have airports soon; Airports Authority of India signs MoU
PTI Feb 20, 2012, 05.52PM IST NEW DELHI: Steel cities of Jharkhand, Jamshedpur and Bokaro will soon figure on the country's air map as the Airports Authority of India will set up airports there. A Memorandum of Understanding (MoU) was signed by the AAI and the Jharkhand government for establishing airports in both the cities in the presence of AAI Chairman and Jharkhand Chief Minister Arjun Munda. "The operation would start with ATR-72 aircraft initially and later on once the traffic is increased, operation of bigger aircraft would also start from these airports," AAI Chairman V P Agarwal said. The state government would provide land to AAI for developing the airports so that charter and regular flights could start at the earliest. Speaking on the occasion, Munda said the work for survey of land for the airport has already started. "This airport will promote air connectivity and help in promoting economy of the state," he said.Though the city is presently served by a small airport at Sonari, it has been a long standing demand to have a full-fledged airport in Jamshedpur.Sonari airport, which is spread over a 25 acre area, is primarily used for bringing in chartered planes of TATA group. Jamshedpur is a major industrial centre of East India. It houses companies like Tata Steel, Tata Motors, Tata Power, Lafarge Cement, Telcon, BOC Gases, Tata Technologies Limited, Praxair, TCE, TCS, Tinplate and many more. Ref : http://articles.economictimes.indiat...ledged-airport |
|
|
|
|
|
#26 |
|
Registered User
Join Date: Aug 2011
Posts: 481
Likes (Received): 99
|
Glitz Multiplex in City (2013)
Sumant Bhargava of Stargaze Entertainment talks to Aabhas Sharma about the pros and cons of setting up multiplexes in Tier II and III cities.
The multiplex revolution seems to have passed by small-town India — most multiplexes are concentrated in larger metro cities. Recognising the gap between demand and supply of movie halls in small towns, Sumant Bhargava of Stargaze Entertainment, has over the past two years opened multiplexes in towns like Ajmer, Kurukshetra, Dehradun and Bilaspur. “The cities we went to or are planning to go had no multiplexes or at the most one. So we had the first-mover advantage,” says Bhargava, who is an engineer from the Delhi College of Engineering and a graduate of IIM-Lucknow and who worked for a while with Coca Cola, and Satyam Cineplex for over five years before starting his own venture. Bhargava’s multiplexes go by the Glitz brand name. Stargaze offers three differentiated products — Glitz Lounge, Glitz Max and Glitz 3D. “It’s a myth that people don’t want to spend on watching movies in small towns,” Bhargava claims. The average ticket price at Glitz cinemas is around Rs 139. Bhargava believes that the quality of service he provides is at par with bigger players like PVR or BIG Cinemas. The cost of setting up each screen is about Rs 1 crore, according to Bhargava. Food and beverage contributes about 20-30 per cent to Glitz’s revenues while the average expenditure per seat is only about Rs 40. Setting up a multiplex does not require too much capital expenditure as that is taken care of by the mall builder. “The major investments are made by real-estate players. We only manage the soft part of building the multiplex, the auditorium, sound and lights,” he explains. When Bhargava started out with Glitz, he used to pay about Rs 2 lakh a month to a distributor or producer. “Now we can pay them as much as Rs 10 lakh a week,” he says highlighting the growth trajectory in small towns. Bhargava says his biggest challenge has been to find the right manpower in these towns. Being in the movies business, Bhargava naturally watches movies but says candidly that he doesn’t watch more than 30 minutes of it unless it is really good. With commercial real estate on a shaky ground lately, Bhargava admits that the number of malls coming up might go down. He still intends to expand operations to 17 locations and 50 screens in places like Palwal, Bhilai and Bokaro by 2013. “The first-mover advantage has been immense for us and should work for us in the future as well,” he says. Next on his agenda are Yamunanagar, Jaipur, Kota, Raigarh, Bhilai and Bokaro where the next Glitz multiplexes will come up. Ref : http://www.business-standard.com/ind...-mover/458740/ |
|
|
|
|
|
#27 |
|
Registered User
Join Date: Aug 2011
Posts: 481
Likes (Received): 99
|
अंतिम चरण में मेडिकल कॉलेज की प्रक्रिया
May 11, 11:36 pm बताएं बोकारो : मेडिकल अस्पताल में तब्दील होने वाले बोकारो जेनरल अस्पताल की व्यवस्था जिले ही नहीं जिले से बाहर के लोगों के लिए काफी लाभकारी साबित हो रही है। वर्तमान में बीजीएच की कुछ महत्वपूर्ण विभागों की चिकित्सा व्यवस्था व चिकित्सकों का लोहा दूसरे जिले के संस्थान भी मानते हैं। यही वजह है कि हजारीबाग व संताल प्रमंडल के अधिकांश गंभीर मरीजों को इस अस्पताल में रेफर किया जाता है। बीते वर्ष में बीजीएच की ओपीडी में लगभग आठ लाख मरीजों के स्वास्थ्य का जांच किया गया। जो कि किसी भी अस्पताल के लिए एक रिकार्ड है। अस्पताल को मेडिकल कॉलेज में तब्दील करने की प्रक्रिया अंतिम चरण में है। एससीआई के दल ने निरीक्षण कर लिया है। कॉलेज के संचालन के लिए देश के मान्यता प्राप्त संस्थान भारती विद्यापीठ, मणिपाल से बात चल रही है। आने वाले एक दो माह में किस एक के साथ एमओयू भी होने की संभावना है। हृदय व न्यूरो विभाग हर गंभीर मरीज की बचता जान यूं तो बोकारो जेनरल अस्पताल के सभी रोगों के यूनिट बेहतर हैं लेकिन कुछ ऐसे भी हैं जहां हर दिन किसी न किसी गंभीर मरीज की जान की रक्षा यहां के चिकित्सक करते हैं। इनमें ह़ृदय रोग व न्यूरो विभाग काफी महत्वपूर्ण है। इसके अलावा बर्न यूनिट, शिशु यूनिट, कैंसर, नेफ्रोलॉजी की सेवाएं किसी भी अस्पताल से बेहतर है। जांच की उम्दा व्यवस्था बोकारो जेनरल अस्पताल में कई नए उपकरण लगाएं है। एमआरआई, डिजिटल एक्स-रे, हाईटेक यूएसजी मशीन, टीएमटी, इको, हॉलटर के अलावा यहां लेप्रोस्कोपिक सर्जरी की व्यवस्था है। अस्पताल में हृदय रोग मरीजों की सुविधा के लिए प्रबंधन जल्द ही यहां कैथ लैब की व्यवस्था करने जा रहा है। जहां इस रोग से पीड़ित मरीजों का एन्जयोग्राफी किया जाएगा। पेसमेकर के प्रत्यारोपण का कार्य चिकित्सकों द्वारा कई वर्ष पूर्व से ही किया जा रहा है। बोकारो जेनरल अस्पताल वर्ष 2011 एक नजर में प्रति वर्ष 711634 हकदार मरीजों की ओपीडी में जांच प्रति वर्ष 50281 गैर हकदार मरीज की ओपीडी में जांच प्रति वर्ष 42255 हकदार आकस्मिक सेवा प्रति वर्ष 10977 गैर हकदार आकस्मिक सेवा प्रति वर्ष 17715 हकदार मरीजों की भर्ती प्रति वर्ष 21503 गैर हकदार मरीज मरीजों की भर्ती Ref : http://in.jagran.yahoo.com/news/loca...8_9242957.html |
|
|
|
|
|
#28 |
|
Registered User
Join Date: Aug 2011
Posts: 481
Likes (Received): 99
|
500-mw Bokaro plant
SBI to lend Rs 1,400 cr to DVC's 500-mw Bokaro plant
PTI | 10:05 PM,May 17,2012 Mumbai, May 17 (PTI) The country's largest lender State Bank of India today said it has agreed to lend Rs 1,400 crore to Damodar Valley Corporation (DVC) for its upcoming 500-mw thermal plant at Bokaro. "State Bank of India has agreed to lend Rs 1,400 crore to Damodar Valley Corporation (DVC) to part-fund its 500 mw Bokaro thermal power station (A) project," a bank release said here, adding SBI's associate banks will lend Rs 1,000 crore for this purpose. The thermal unit, which is likely to be commissioned next April, will be set up at an estimated cost of Rs 3,500 crore with a debt-equity ratio of 70:30. Referring to contentious coal supply and power purchase agreement, the release said fuel will come from the Central Coalfields and the power generated will be fed to the National Grid. "DVC has signed a power purchase agreement with the Punjab State Electricity Board to supply 200 mw, while the rest will be consumed in Jharkhand," the release said. The power generation from old thermal plants of DVC stands at 2,210 mw and it has commissioned new thermal plants with additional capacity of 3,500 mw so far. The Corporation is expected to make further capacity addition of 1,250 mw during this fiscal. PTI DM BEN ABC Ref : http://ibnlive.in.com/generalnewsfee...t/1000009.html |
|
|
|
|
|
#29 |
|
Registered User
Join Date: Aug 2011
Posts: 481
Likes (Received): 99
|
Garga bridge
गरगा पुल का शीघ्र मिलेगा तोहफा
May 17, 09:50 pm बताएं बोकारो : गरगा नदी पर बन रहे एक और पुल को जनवरी 2013 तक नगरवासियों को सौंप देने की तैयारी जोर-शोर से चल रही है। कुछ माह पूर्व इसके निर्माण में तकनीकी खामी आ गयी थी, जिसके बाद काम की रफ्तार थोड़ी धीमी हो गयी थी। फिलहाल नये पुल के निर्माण की दिशा में एचएससीएल तेजी से कार्य कर रही है। क्या होगा खास नये पुल की लंबाई करीब 100.24 मीटर व चौड़ाई 14.8 मीटर होगी। 10.5 मीटर चौड़ाई पर गाड़ियां चलेंगी। जबकि रोड के दोनों तरफ डेढ़-डेढ़ मीटर का फुटपाथ होगा। नया पुल पुराने पुल से दोगुना चौड़ा होगा। छह पिलर व दो एबॉटमेंट होंगे। नये पुल की कुल लागत 3 करोड़ 58 लाख रुपये है। क्या मिलेगी सुविधा पुल के बन जाने से नगरवासियों को रोज-रोज लगने वाले जाम से निजात मिल जायेगा। पुराने पुल की चौड़ाई काफी कम होने की वजह से प्रतिदिन पुल पर जाम की स्थिति बनी रहती है। इससे लोगों को भारी कठिनाइयों का सामना करना पड़ता है। |
|
|
|
|
|
#30 |
|
Registered User
Join Date: Aug 2011
Posts: 481
Likes (Received): 99
|
Electric Loco-shed
रेल इलेक्ट्रिक लोकोशेड से आएगी खुशहाली
May 17, 09:42 pm बताएं बोकारो : बोकारो इलेक्ट्रिक लोको शेड का निर्माण कार्य पूरा होने के साथ बोकारो रेलवे के इतिहास में एक नया अध्याय जुड़ गया है। नव निर्मित रेलवे लोको शेड का उद्घाटन रेलवे बोर्ड के सदस्य कुलभूषण शुक्रवार को करेंगे। उनके साथ रेलवे महाप्रबंधक एके वर्मा व मुख्य विद्युत अभियंता वीके अग्रवाल, डीआरएम एके हलधर सहित अन्य अधिकारी उपस्थित रहेंगे। चालीस करोड़ की लागत बोकारो इलेक्ट्रिक लोको शेड के निर्माण पर रेलवे ने चालीस करोड़ से अधिक की राशि का व्यय किया है। इस शेड में फिलहाल बीस रेलवे इंजन की मरम्मत का कार्य किया जाएगा। आने वाले एक वर्ष में इसकी क्षमता बढ़कर एक सौ इंजन की हो जाएगी। जिससे कि आद्रा रेल मंडल के अलग-अलग स्टेशनों के अधीन चलने वाले इलेक्ट्रिक इंजन की मरम्मत का काम आसान हो जाएगा। कर्मचारियों की संख्या बढ़ेगी शेड के निर्माण के साथ कर्मचारियों की संख्या में भी इजाफा होगा। पूर्ण रूप से शेड को संचालित करने के लिए लगभग पांच सौ कर्मचारियों को पदस्थापित किया जाएगा। शेड बनने से रेलवे को राजस्व लाभ भी होगा। साथ ही स्थानीय बियाडा सहित आसपास के छोटे उद्योगों को भी समय-समय पर कार्यादेश मिल सकेगा। |
|
|
|
|
|
#31 |
|
Registered User
Join Date: Aug 2011
Posts: 481
Likes (Received): 99
|
ArcelorMittal wants 1330 acre land at Bijulia area in Chas
Sunday, 27 May 2012 ArcelorMittal had shifted its steel project to Petarwar in Bokaro, where the company has made some headway in land acquisition. The company has already purchased a few acres of land and is in the process of giving final shape to the land deeds of many more acres. Ms Mandakini Sood public relations officer of ArcelorMittal said that this is an attempt to hasten the progress of its proposed 12 million tonne Greenfield plant in the state and as soon as the company is in possession of the land, the process of establishment of the unit will be started. Source - Bhaskar News |
|
|
|
|
|
#32 |
|
Registered User
Join Date: Aug 2011
Posts: 481
Likes (Received): 99
|
Bokaro is the new destination: ArcellorMittal wants 1330 acre land in Chas
Bokaro is the new destination: ArcellorMittal wants 1330 acre land in Chas
Source: Bhaskar News | Last Updated 01:27(26/05/12) Share | The company had sought government acquisition of land in Chas block under the Jharkhand Voluntary Land Acquisition Rules 2010. At Petarwar, the company had managed to acquire just 2.3 acres. This is an attempt to hasten the progress of its proposed 12 million tonne greenfield plant in the state. As soon as the company is in possession of the land, the process of establishment of the unit will be started, said Mandakini Sood, Public Relations Officer, ArcellorMittal. However, the company is facing technical difficulties in getting land in Petarwar, said officials. ArcelorMittal had shifted its 12 MTPA project to Petarwar in Bokaro, where the company has made some headway in land acquisition. The company has already purchased a few acres of land and is in the process of giving final shape to the land deeds of many more acres. The steel plant will see an estimated investment of Rs 50,000 cr. Ref : http://daily.bhaskar.com/article/BIH...s-3320742.html |
|
|
|
|
|
#33 |
|
Registered User
Join Date: Aug 2011
Posts: 481
Likes (Received): 99
|
New Electric Loco Shed
Locomotive shed in Bokaro inaugurated
Bokaro 19 May 2012 Member of the Railway Board, Kulbhusan inaugurated Rs 45 crore Electric Locomotive Shed (ELS) constructed near Bokaro railway station on Friday. Speaking on the occasion, Kulbhusan said, People of Jharkhand should not be disappointed because of less number of trains earmarked for the state in the Railway Budget 2012-13. The railways is not indifferent to state and is giving it the same importance like other states, he added. He further said, “It is a fact that the railway is facing funds crunch but despite that the ministry has distributed the budget equally to every state for development of railway in its areas”. The launch of the project is much delayed as it took around 15 years for its infrastructure to get constructed after announcement of the project. The new ELS having maintenance capacity of 100 locomotives is built at a cost of Rs 45 crore with one of the biggest projects of railways in the state. The Railway Board member said the railways had also invested huge budget in Jharkhand. Citing example he said apart from ELS, the work of constructing a third track between Bandamunda-Manoharpur and Adityapur was going on. A new line on the Lohardagga-Ranchi-Tori route is also under construction. Passenger amenities are also enhanced at the stations, he said. (EOIC) |
|
|
|
|
|
#34 |
|
Registered User
Join Date: Aug 2011
Posts: 481
Likes (Received): 99
|
Arcellor Mittal Steel Plant
Arcellor Mittal won't pull the plug on Bokaro steel plant plan
Divy Khare, TNN Aug 2, 2012, 03.16AM IST Tags: BOKARO: The recent remarks of steel baron L N Mittal that he will not invest money in India since things move slow here will not have any effect on its proposed facility in Bokaro. ArcelorMittal's general manager of corporate communication Mandakini Sud cleared doubts on Wednesday confirming that the company would not withdraw its steel plant project from the state. However, she pointed out that inordinate delay in securing land and other statutory clearances had delayed the process of setting up the steel facility in Jharkhand. A team of ArcellorMittal officials, headed by general manager P S Prasad, met Bokaro DC Sunil Kumar and sought to expedite the land verification process so that they could move ahead in acquiring land for the project in Chas block of the district. Kumar has asked the officials to open an office in Bokaro town which would help strengthen the coordination between the government and the company and speed up the work. Sud said, "Mittal has indeed stated that he will not allocate capital in India in the near future. We are not investing capital at present because things aren't moving and the progress on our projects is very slow. This does not mean that we will not be investing in India. We shall do so at an appropriate time." The DC said the administration was providing all the necessary assistance to the company in acquiring land for the steel facility. "It is not that the administration is responsible for the delay. Earlier, the company had showed interest in Kasmar but now they want land in Chas block which caused the delay." Mittal had signed an MoU with the state government in 2005 and since then the company has changed its project sites to several places including Simdega and Khuti to Kasmar block of Bokaro. They now have zeroed in Chas block here. The company officials had submitted a proposal of 1,310.23 acres of land at Bijulia, ChakMohanpur, Dudhari and Gopidih villages in Chas block for verification and land record update - clearance of which is still pending. ArcellorMittal has a plan to set up 3 MT steel factory which will be later upgraded to 12 MT capacity with an investment of Rs 40,000 crore. Ref : http://articles.timesofindia.indiati...ck-steel-plant |
|
|
|
|
|
#35 |
|
Registered User
Join Date: Aug 2011
Posts: 481
Likes (Received): 99
|
बोकारो में ही लगेगा मित्तल का स्टील प्लांट
Aug 03, 12:58 am बताएं बोकारो,निप्र : स्टील निर्माता कंपनी आर्सेलर मित्तल का स्टील प्लांट बोकारो में लगेगा। कंपनी की प्रस्तावित परियोजना स्थल में चास के साथ पेटरवार भी शामिल है। कंपनी भारत में प्रस्तावित निवेश को जारी रखेगी। कंपनी की ब्रांड एवं संचार प्रमुख मंदाकिनी सूद ने स्पष्ट किया है कि स्टील किंग एलएन मित्तल ने कहा है कि आने वाले समय में भारत में निवेश नहीं करने वाले हैं क्योंकि यहां की प्रक्रिया बहुत धीमी चल रही है। लेकिन झारखंड की परियोजना पर इसका कोई प्रभाव नहीं पड़ेगा। उपयुक्त समय आने पर कंपनी जमीन की खरीद के साथ स्टील प्लांट का निर्माण कार्य करेगी। झारखंड सरकार ने सकारात्मक सहयोग का भरोसा दिया है। ---------------------------------- अधिग्रहण के लिए मिले थे अधिकारी : विदित हो कि बीते 30 जुलाई आर्सेलर मित्तल के अधिकारियों ने उपायुक्त सुनील कुमार से मुलाकात कर कंपनी के लिए भू-अधिग्रहण की प्रक्रिया तेज करने का आग्रह किया था। कंपनी के झारखड के महाप्रबंधक पीएस प्रसाद से उपायुक्त ने कंपनी के अधिकारी को बोकारो में कार्यालय खोलने को कहा था ताकि कंपनी व प्रशासन के बीच बेहतर समन्वय स्थापित हो सके। इससे जमीन अधिग्रहण के कार्य में तेजी आएगी। ---------------------------------- चास एवं चंदनकियारी के लिए दिया है प्रस्ताव : चास एवं चंदनकियारी में संयंत्र की स्थापना के लिए कंपनी ने 1330 एकड़ रैयत भूमि, 880 एकड़ सरकारी भूमि की आवश्यकता जतायी है। यहां कंपनी का तीन मिलियन टन का इस्पात संयंत्र लगना है। प्रखंड के बिजुलिया, चकमोहनपुर व गोपीडीह में 1310.23 एकड़ भूमि का अधिग्रहण प्रस्ताव पर चास अंचल अधिकारी ने अपनी रिपोर्ट भी जिले को सौंप दी है। |
|
|
|
|
|
#36 |
|
Registered User
Join Date: Aug 2011
Posts: 481
Likes (Received): 99
|
Bokaro Mall
Near to Completion
|
|
|
|
|
|
#37 |
|
Registered User
Join Date: Aug 2011
Posts: 481
Likes (Received): 99
|
New Airport between Bokaro-Dhanbad
हवाई अड्डे के विस्तारीकरण पर विराम
Aug 19, 10:53 pm बताएं बोकारो : बोकारो हवाई अड्डे को विकसित कर इसके व्यावसायिक इस्तेमाल की भावी योजना पर फिलहाल विराम लग गया है। बोकारो इस्पात के हवाई अड्डे का विस्तार संभव नहीं है। ऐसा बीते माह बोकारो इस्पात ने नगर विमानन सचिव के साथ हुई बैठक में लिखकर दे दिया है कि वर्तमान एयरपोर्ट के रनवे को लंबा नहीं किया जा सकता है। बीएसएल के इन्कार के बाद जिला प्रशासन अब नये स्थल के चयन पर विचार करना शुरु कर चुका है। संभावित स्थल को धनबाद व बोकारो के बीच किया जा सकता है। इसके लिए नये स्तर से प्रयास प्रारंभ किया गया है। चूंकि वर्तमान एयरपोर्ट के विस्तार में बीएसल की जमीन का अतिक्रमण भी एक बड़ी बाधा है। फरवरी माह में हुआ था करार झारखंड सरकार एवं भारतीय हवाई अड्डा प्राधिकरण के साथ हुए समझौते के तहत बोकारो हवाई अड्डा व जमशेदपुर के सोनारी हवाई अड्डा को विस्तारित कर एयर बस 321 के लायक बनाने की योजना थी। करार में यह भी हुआ था कि दोनों शहरों के औद्योगिक विकास को देखते हुए फिलहाल ए 72 स्तर के छोटे विमानों का परिचालन प्रारंभ किया जा सकता है। पर बीएसएल के वर्तमान रुख को देखते हुए प्राधिकारण के साथ हुए समझौते को लागू करना मुश्किल होगा। दो गुणा करना होगा रनवे बोकारो हवाई अड्डे को व्यावसायिक विमानों के लिए इसके रनवे को वर्तमान से दो गुणा करना होगा तब जाकर व्यावसायिक विमान उड़ सकेंगे। वर्तमान में बोकारो हवाई अड्डे के रनवे की लंबाई 5300 फीट है जबकि रांची हवाई अड्डे के रनवे की लंबाई लगभग 9000 फीट। इस मामले में हवाई अड्डा प्राधिकरण ने इसके रन वे का विस्तार लगभग दस हजार फीट करने के साथ सुरक्षित क्षेत्र के विस्तार का प्रस्ताव रखा है। ताकि किसी भी प्रकार का विमान यहां उतारा जा सके। जेट एयरवेज के लिए भी हवाई अड्डे का विस्तार करने पर दुंदीबाद को हटाने की आवश्यकता होगी। |
|
|
|
|
|
#38 |
|
Registered User
Join Date: Aug 2011
Posts: 481
Likes (Received): 99
|
सेक्टर वन में बनेगा थ्री स्टार होटल
Aug 21, 08:35 pm बताएं बोकारो : राष्ट्रीय उच्च पथ के आइबी (निरीक्षण भवन) को विकसित कर इसके व्यावसायिक इस्तेमाल की अनुमति मिलने के बाद अब काम धरातल पर प्रारंभ होने वाला है। निविदा प्राप्त करने वाली कंपनी आइबी की जमीन पर थ्री स्टार होटल खोलेगी। होटल के साथ इस परिसर को व्यावसायिक केन्द्र के रूप में भी परिणत किया जा सकता है। विदित हो कि गत जुलाई माह में राज्य कैबिनेट ने आइबी के विकसित करने के लिए सबसे अधिक बोली लगाने वाले निविदादाता को आवंटित करने का निर्णय लिया था। जिसे सरकार ने निजी हाथों में सात करोड़ में सौंप दिया है। जबकि इसका बेस प्राइस दो करोड़ 72 लाख रुपया था। सितम्बर माह से प्रारंभ होगा काम आइबी का टेंडर प्राप्त कर चुकी रांची की कंपनी इस स्थल पर सितंबर माह से निर्माण कार्य प्रारंभ कर देगी। प्रारंभिक चरण में कंपनी के लोगों ने बोकारो के बाजार का सर्वेक्षण भी किया है। होटल के अलावा कंपनी इसमें व्यवसायिक केंद्र भी बनाएगी। जबकि इसी परिसर में पथ निर्माण विभाग के कार्यालय के लिए अलग से पांच कमरे उपलब्ध कराए जाएंगे। ताकि विभागीय कामकाज में कर्मियों को किसी प्रकार की असुविधा का सामना करना न पड़े। इस आशय का पत्र सरकार की ओर से विभाग को जारी कर दिया गया है। पत्र के आलोक में कार्यपालक अभियंता ने सहायक अभियंता को आदेश देकर परिसर को संबंधित कंपनी को हस्तगत करने को कहा है। |
|
|
|
|
|
#39 |
|
Registered User
Join Date: Aug 2011
Posts: 481
Likes (Received): 99
|
पानी में आत्मनिर्भर बनेगा बीएसएल
Aug 13, 11:04 pm बताएं बोकारो : तेनु डैम के जल स्तर में गिरावट सहित अन्य कारणों से पानी की कमी झेलने वाला बोकारो इस्पात शहर पानी के मामले में आत्मनिर्भर हो जाएगा। नगर से निकलने वाली नालियों के साथ वर्षा का पानी अब नदियों में बहकर बेकार नहीं होगा। बल्कि शुद्धिकरण कर इसे उपयोग लायक लगाया जाएगा। ताकि नगर में पेयजल व प्लांट के उत्पादन के लिए आवश्यक पानी इस संयंत्र से मुहैया कराया जा सके। वर्तमान में पानी हो जाता बेकार वर्तमान में वर्षा के साथ घरेलू उपयोग के बाद पानी को बड़े नाले के माध्यम से गरगा व दामोदर नदी में प्रवाहित कर दिया जाता है। एक आकलन के मुताबिक यह पानी इतना जरूर होता है कि बोकारो इस्पात की सारी जरूरतों को लगभग चार माह तक पूरा किया जा सके। लेकिन यह यूं बेकार हो जाता है। दूसरी ओर बीएसएल को तेनु नहर पर आश्रित रहते हुए प्रत्येक वर्ष करोड़ों रुपए की राशि का व्यय करना होता है। पायलट प्रोजेक्ट के तहत होगा काम योजना को पायलट प्रोजेक्ट के तहत पूरा किया जाएगा। 62 करोड़ की लागत से लगने वाले इस वाटर ट्रीटमेंट प्लांट को सिटी कॉलेज के समीप बनाया जाएगा। इसमें सीवरेज व नाली दोनों के लिए अलग-अलग संयंत्र की स्थापना होगी। जल के शोधन के उपरांत उसे कूलिंग पौंड में संरक्षित किया जाएगा। प्रस्तावित परियोजना को स्थानीय प्रबंधन ने स्वीकृति प्रदान कर आगे की कार्रवाई के लिए सेट को भेज दिया है। |
|
|
|
|
|
#40 |
|
Registered User
Join Date: Aug 2011
Posts: 481
Likes (Received): 99
|
Eylex Multiplex
Under construction Eylex Multiplex (Demolished Devi Cinema)
|
|
|
|
![]() |
| Tags |
| bihar, bokaro, india, jharkhand, steel city |
| Thread Tools | |
| Display Modes | Rate This Thread |
|
|