Old April 28th, 2012, 09:11 AM   #2141
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,248
Likes (Received): 12020

Line 12 - Jardim Romano station

[IMG]http://i46.************/1rukgw.jpg[/IMG]

by Unirod
mopc no está en línea   Reply With Quote

Sponsored Links
Old April 29th, 2012, 01:25 AM   #2142
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,248
Likes (Received): 12020

Line 17 starting to get off the ground - by Lro AC





mopc no está en línea   Reply With Quote
Old April 29th, 2012, 01:53 AM   #2143
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,248
Likes (Received): 12020

Sao Paulo trolleybus, Sao Mateus-Jabaquara BRT



by LroAC
mopc no está en línea   Reply With Quote
Old April 29th, 2012, 02:02 AM   #2144
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,248
Likes (Received): 12020

Barra Funda station (lines 7, 8, 3)



Former Barra Funda station, now used as depot and maneuvering site for CPTM lines 7 and 8.









by Sergio Mazzi
mopc no está en línea   Reply With Quote
Old April 29th, 2012, 04:43 AM   #2145
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,248
Likes (Received): 12020

PRESS RELEASE

April 13, 2012, 10:16 a.m. EDT

Bombardier Inaugurates Advanced Monorail Vehicle Manufacturing Site in Brazil

New site expands local manufacturing capability of sustainable mass transit solutions in the rapidly growing Latin American market



BERLIN, GERMANY, Apr 13, 2012 (MARKETWIRE via COMTEX) -- Bombardier Transportation today inaugurated a new, state-of-the-art monorail vehicle manufacturing facility in Hortolandia - Sao Paulo, Brazil. The new production site represents an investment of $15 million US and is Bombardier's global production centre for Monorails, serving the fast-growing market in Brazil as well as export opportunities in Latin America and around the world. It will generate 250 new jobs directly dedicated to railway vehicle production, including aluminum carbody, bogie and final assembly activities. In addition, approximately 500 indirect jobs will be created based on increased activity in Bombardier's local supplier base. The new investment underlines Bombardier's long-term commitment to Brazil, a market where the company has been active for many years.

The Hortolandia Monorail manufacturing site was built in just 18 months and will start its manufacturing activities immediately. The first carbodies and bogies are already being manufactured there and the first completed monorail cars are expected to exit the assembly line later this year. The new site was designed and built following the most modern industrial standards worldwide and is based on technology transferred from Bombardier's manufacturing and engineering hubs in Kingston, Ontario, Canada; St. Bruno, Quebec, Canada; and Pittsburgh, Pennsylvania, USA.

Andre Navarri, President and Chief Operating Officer, Bombardier Transportation, participated in the inauguration ceremony at the new site. The 100 guests in attendance included the Sao Paulo State Governor, Geraldo Alkmin, the Sao Paulo State Transport Secretary, Jurandir Fernandes, the Prime Minister of Quebec, Jean Charest, the Minister of Economic Development of Quebec, Sam Hamad, and representatives of Sao Paulo Metro and of other railway operators in Brazil, Bombardier suppliers and employees. Mr. Navarri was joined by Andre Guyvarch, President, Brazil, Bombardier Transportation and Serge van Themsche, Vice President EMEA and Brazil, Systems, Bombardier Transportation.

"This new monorail manufacturing site represents the second phase of Bombardier's industrial expansion initiated in 2009 that aims to triple our number of employees in Brazil to 600 people and to quadruple the industrial area in Hortolandia," Navarri said. "Even more important than the new industrial facility is the advanced monorail vehicle we are going to manufacture here - a fine example of our continuous focus on technology development in order to offer interconnected modality of public transport across the globe. One of Bombardier's key strengths is combining this worldwide experience with the local knowledge to deliver the best-fit mobility solution for each city individually."

Navarri added: "The new high capacity BOMBARDIER INNOVIA Monorail 300 system we are building for Sao Paulo is game changing because it offers a transportation capacity similar to a metro, yet the light infrastructure required reduces the construction price and the implementation schedule by up to one half, bringing quality of life benefits to citizens sooner and more cost effectively. We are certain that once service operation starts, it will be acknowledged as one of the best mass transit solutions ever built."

The INNOVIA Monorail 300 system is Bombardier's newest transportation system technology. Cost effective to introduce without requiring major infrastructure or civil works, it offers transport capacity up to 48,000 passengers per hour per direction. Whether transporting visitors to out-of-town destinations, or offering high capacity, frequent services for more densely used inner city routes, the INNOVIA Monorail 300 ensures passengers experience the ultimate in modern ride comfort.

Bombardier's new manufacturing site is set to serve projects in Brazil as well as in the Latin America region. Its first order is the delivery of 54 seven-car INNOVIA Monorail 300 trains (378 cars) for Metro Sao Paulo. To ensure a successful and faster ramp-up of the project, one train (7 cars) will be produced and tested by Bombardier at the Kingston testing facility in Canada. The remaining Monorail cars will be produced at the new site in Brazil.

The site will also result in a broader industrial development of the country due to the production requirements requested by Bombardier of its local suppliers. More than 15 companies have set up or expanded production in Brazil in response to Bombardier's requests. In addition, the most advanced manufacturing techniques will be applied, using lightweight, highly resistant aluminum and composite materials, making Bombardier the first railway company in Brazil to introduce new technologies for aluminum carbody manufacturing.

Answering tomorrow's congestion challenges today

"The fact that this advanced manufacturing facility was completed so fast and smoothly is primarily due to the extraordinary commitment of our staff in Brazil and in North America," said Andre Guyvarch, President, Brazil, Bombardier Transportation. "I would also like to thank Metro Sao Paulo for having selected our advanced system to respond to the city's mobility needs. Our team will do everything to meet expectations and the hopes of Sao Paulo commuters, who want to see the time they spend in traffic every day significantly reduced as soon as possible."

Benefiting more than 500,000 users daily, Bombardier's new INNOVIA Monorail 300 system will reduce journey times from almost two hours down to approximately 50 minutes between the stations Vila Prudente and Cidade Tiradentes on Metro Sao Paulo's Line 2. Bombardier will design, supply and install the 24 km, 17 station system with BOMBARDIER CITYFLO 650 automatic train control.

The first section of the new line, connecting the stations of Vila Prudente and Oratorio is expected to start passenger service at the end of 2013, followed by a second section in 2014. The line will be completed in 2016. Bombardier is a member of a consortium led by the Brazilian civil contractor Queiroz Galvao and also incorporating the construction firm Construtora OAS.

With more than 60 systems in operation in many countries and more than 40 years of experience of managing transit systems, Bombardier is highly proven to deliver turnkey transportation systems anywhere in the world. It provides unrivalled support in maintaining fleet safety, availability, performance and reliability through its global operations and maintenance services network. Bombardier is committed to delivering the highest levels of system performance for the life of the INNOVIA Monorail 300 system in Sao Paulo and anticipates creating further high-skilled employment opportunities in Brazil.

About Bombardier Transportation

Bombardier Transportation, a global leader in rail technology, offers the broadest portfolio in the rail industry and delivers innovative products and services that set new standards in sustainable mobility. BOMBARDIER ECO4 technologies - built on the four cornerstones of energy, efficiency, economy and ecology - conserve energy, protect the environment and help to improve total train performance. Bombardier Transportation is headquartered in Berlin, Germany and has a very diverse customer base with products or services in more than 60 countries. It has an installed base of over 100,000 vehicles worldwide.

About Bombardier

A world-leading manufacturer of innovative transportation solutions, from commercial aircraft and business jets to rail transportation equipment, systems and services, Bombardier Inc. is a global corporation headquartered in Canada. Its revenues for the fiscal year ended December 31, 2011, were $18.3 billion, and its shares are traded on the Toronto Stock Exchange (BBD). Bombardier is listed as an index component to the Dow Jones Sustainability World and North America indexes. News and information are available at www.bombardier.com or follow us on Twitter @Bombardier.
mopc no está en línea   Reply With Quote
Old April 29th, 2012, 05:31 AM   #2146
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,248
Likes (Received): 12020

Line 4 Paulista station already proportionally more overcrowded than Se (formerly most overcrowded station)

Quote:
Originally Posted by Slice Shot View Post
Lotação da Estação Paulista já supera, proporcionalmente, a da Sé
Projetada para 145 mil usuários/dia, parada da Linha 4 recebe 300 mil e está saturada em 100%. Sé comporta 1 milhão, mas recebe 800 mil
26 de abril de 2012 | 22h 30
Notícia

Bruno Ribeiro e Nataly Costa - O Estado de S. Paulo

SÃO PAULO - A Estação Paulista do Metrô completou nesta quinta-feira, 26, sete meses de operação integral da primeira fase da Linha 4-Amarela, entre o Butantã e a Luz, com um feito. A parada conseguiu superar, proporcionalmente, o congestionamento da estação-símbolo da superlotação: a Sé, conexão entre as Linhas 1-Azul e 3-Vermelha. A Paulista recebe diariamente 300 mil passageiros, o dobro da capacidade para o qual foi projetada: 145 mil. Pela Sé passam 800 mil usuários, onde seriam suportados 1 milhão - há momentos de folga.

Hélvio Romero/AE

240 mil passam pelo corredor que liga as estações Paulista e Consolação
A sensação de superlotação na Paulista ocorre principalmente por causa do maior gargalo da Linha 4: o túnel que liga a parada à Estação Consolação, na Linha 2-Verde (Vila Prudente-Vila Madalena). Dados da ViaQuatro, concessionária que administra a Linha 4, mostram que 80% das pessoas que usam a Estação Paulista passam pelo corredor - ou seja, 240 mil por dia.

A ViaQuatro já estuda construir uma nova saída da estação, pela Rua Bela Cintra, para desafogar o túnel.

No "tubo" ou "corredor da morte", como já foi apelidado, há a tecnologia de esteiras rolantes para agilizar o percurso e piso tátil para deficientes. A lotação, porém, é tanta que parte desses recursos se mostrou inútil: as esteiras rolantes são desligadas no horário de pico "por segurança" e por não suportar o fluxo de usuários espremidos na passagem.

As escadas rolantes ficam direcionadas para um só sentido do túnel. O piso tátil também é inutilizado: para tentar organizar o caos no corredor, os funcionários da ViaQuatro instalam fitas divisórias bem em cima do piso para os deficientes.

"Com a operação de uma nova linha, como a 4-Amarela, conhecida como ‘de integração’, porque cruza três linhas da CPTM e três do Metrô, é natural que haja um novo acomodamento da rede e algumas estações fiquem mais carregadas e outras menos", informou o Metrô, por meio de nota.

Para o engenheiro civil Creso de Franco Peixoto, professor da FEI, há um descompasso entre a oferta e a demanda. "Coloca-se a linha para funcionar e meses depois já está saturada. Por quê? Porque a capacidade de construção do metrô em São Paulo é muito menor do que a demanda", disse. "O tamanho do túnel é adequado. O problema é a necessidade de mais linhas."

Medidas paliativas. Enquanto isso, para tentar amenizar o caos, a empresa tem adotado soluções imediatas. Um exemplo é a nova sinalização no piso que pede aos usuários para esperar o desembarque do trem ao lado das portas.

"Quinze segundos é o tempo necessário para cada uma das operações de embarque e desembarque. Quando os passageiros tentam embarcar no mesmo momento do desembarque, essa operação leva cerca de 45 segundos", disse a empresa, em nota.

Link:http://www.estadao.com.br/noticias/c...e,865819,0.htm
mopc no está en línea   Reply With Quote
Old April 29th, 2012, 06:09 AM   #2147
Julio CAF
L3, L11 user
 
Julio CAF's Avatar
 
Join Date: Jul 2010
Location: São Paulo
Posts: 5,132
Likes (Received): 4258

Line 3, Pedro II Station. New's trains, this line that has access to the Corinthians Itaquera station, stadium opening World Cup 2014.


Last edited by Julio CAF; April 29th, 2012 at 06:15 AM.
Julio CAF no está en línea   Reply With Quote
Old April 30th, 2012, 09:29 AM   #2148
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,248
Likes (Received): 12020

Line 3 train near Barra Funda station, by Sergio Mazzi

mopc no está en línea   Reply With Quote
Old April 30th, 2012, 08:56 PM   #2149
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,248
Likes (Received): 12020

Line 8 train near Barra Funda station, Latin American Memorial in the background

mopc no está en línea   Reply With Quote
Old May 1st, 2012, 03:31 AM   #2150
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,248
Likes (Received): 12020

Line 18 Monorail estimated to cost around R$ 4 billion (US$ 2,2 billion)- 20 stations, 19 km, capacity for 270,000 passengers/ day.

Quote:
Originally Posted by FGB_curitiba View Post
Monotrilho Tamanduateí-São Bernardo é orçado em R$ 4 bilhões
Obra terá contrapartida do Governo de São Paulo de mais de 50%, totalizando R$ 2,3 bilhões

O Monotrilho Estação Tamanduateí-São Bernardo, que beneficiará a população do ABC, orçado em R$ 4 bilhões, terá R$ 2,397 bilhões investidos pelo Governo do Estado de São Paulo. O financiamento, cujo projeto foi elaborado pela Secretaria de Planejamento e Desenvolvimento Regional, será de R$ 1,276 bilhão, por meio da Caixa Econômica Federal. A obra também receberá recursos do governo federal, de R$ 400 milhões. "É uma linha importante, são cerca de 20 estações, 19 quilômetros e capacidade para 270 mil passageiros por dia", destacou o governador Geraldo Alckmin.
A Linha 18-Bronze atenderá os polos industriais e de serviços da Região Metropolitana de São Paulo, os municípios de São Caetano do Sul, São Bernardo do Campo e Santo André. A obra ligará importantes polos educacionais, com destaque para o Instituto Mauá de Tecnologia, UNIBAN, Faculdade de Medicina de Santo André, Faculdade de Engenharia Industrial - FEI, Fundação Santo André e a Universidade Municipal de São Caetano do Sul.
O trajeto será de 20 quilômetros, que deverão ser percorridos em 35 minutos. Estão previstas 19 estações. A Linha 18-Bronze terá mais quatro terminais integrados, com o transporte diário de cerca de 400 mil usuários na ligação Tamanduateí.
http://www.planejamento.sp.gov.br/?idd=866&id=19
mopc no está en línea   Reply With Quote
Old May 1st, 2012, 07:44 AM   #2151
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,248
Likes (Received): 12020

Controversy as local inhabitants dispute expropriations to build Monorail Line 17 and others.

mopc no está en línea   Reply With Quote
Old May 2nd, 2012, 12:31 AM   #2152
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,248
Likes (Received): 12020

Line 2 monorail update - video of construction site from Vila Prudente to Vila Uniao stations (8km, about 30% of full line)



Map of Line 2 Monorail:



geographical:

mopc no está en línea   Reply With Quote
Old May 2nd, 2012, 12:33 AM   #2153
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,248
Likes (Received): 12020

Line 4 - digital media CGI plan for stations and trains by Terra

mopc no está en línea   Reply With Quote
Old May 2nd, 2012, 05:30 AM   #2154
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,248
Likes (Received): 12020

Metro (CMSP) maintenance van near line 2 Consolaçao station (Paulista Avenue)



by Marcio Staffa
mopc no está en línea   Reply With Quote
Old May 4th, 2012, 10:42 AM   #2155
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,248
Likes (Received): 12020

Line 3 train near Barra Funda station

mopc no está en línea   Reply With Quote
Old May 4th, 2012, 06:05 PM   #2156
Rodalvesdepaula
Scooter/motorbike lover
 
Rodalvesdepaula's Avatar
 
Join Date: Apr 2008
Location: Sorocaba (SP), Brazil
Posts: 49,605
Likes (Received): 41001

At right, commuter train lines to Jundiaí (60 Km from São Paulo) and Itapevi (37 Km from São Paulo).
__________________

Rodalvesdepaula está en línea ahora   Reply With Quote
Old May 5th, 2012, 01:22 AM   #2157
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,248
Likes (Received): 12020

CPTM line 8 train near Barra Funda station

mopc no está en línea   Reply With Quote
Old May 7th, 2012, 02:12 AM   #2158
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,248
Likes (Received): 12020

Line 9 Vila Olímpia Station overlooking new highrise



by Marcio Staffa
mopc no está en línea   Reply With Quote
Old May 7th, 2012, 07:19 AM   #2159
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,248
Likes (Received): 12020

Line 2 monorail update











Future depot:


mopc no está en línea   Reply With Quote
Old May 7th, 2012, 07:19 AM   #2160
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,248
Likes (Received): 12020

More by Sergio Mazzi



mopc no está en línea   Reply With Quote


Reply

Tags
metro, são paulo, subway, trains

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Related topics on SkyscraperCity


All times are GMT +2. The time now is 12:21 PM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2018, vBulletin Solutions Inc.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

tech management by Sysprosium