Old November 7th, 2012, 02:39 AM   #2461
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,244
Likes (Received): 12002

Line 15 Monorail - "to be the most modern in the world"

Quote:
Originally Posted by Dom Drácula View Post
Monotrilho da Zona Leste será "o mais moderno do mundo"

O sistema de transporte deve começar a operar até o fim do ano que vem, com conclusão programada para 2016

Em um dos galpões industriais da empresa de transportes canadense Bombardier, dois esqueletos de “vagão” em processo de montagem estão suspensos sobre estruturas de vigas metálicas. “Não são vagões, são carros. Vagão é para carga”, diz Manuel Gonçalves, diretor geral da fábrica, corrigindo os jornalistas reunidos para conhecer o processo de construção do monotrilho. Daqui a um ano, se tudo correr conforme o cronograma, os “carros” estarão imersos na paisagem da capital paulista, no polêmico projeto do monotrilho da Zona Leste.

Os 378 carros do monotrilho da linha 15 – Prata do metrô virão de mais longe, da cidade de Hortolândia, a 20 minutos de Campinas. O projeto estipula 2016 como o prazo para ligar o bairro Cidade Tiradentes à estação Vila Prudente, da linha 2 – Verde, num total de 24 quilômetros e 17 estações. Mas já no fim do próximo ano, o primeiro trecho deve ser inaugurado, percorrendo os 2,9 quilômetros que separam a estação Vila Prudente da futura parada Oratório.



Para mensurar o impacto desse novo sistema no transporte da cidade, basta imaginar que um ônibus circulando no trecho entre a Avenida Jaguaré, na zona oeste, até a Avenida Paulista, de pouco mais de10 quilômetros, leva em torno de 40 minutos – se o trânsito não estiver muito ruim. Com o mesmo tempo, seria possível percorrer quase toda a extensão do monotrilho, estimada pelo fabricante em 50 minutos. Praticamente o dobro da distância. O ônibus transporta até 34 pessoas sentadas e 54 em pé, um total de 88 passageiros. Já o trem com traços futuristas carregará cerca de 15 passageiros sentados e 128 em pé, num total de 143 passageiros. Por carro.

A estimativa é que o serviço receba 500 mil usuários diariamente, algo como toda a população do Grajaú, bairro mais populoso da capital, somada aos moradores da Vila Mariana. Segundo o diretor de comunicação da Bombardier na América Latina, Luis Ramos, a linha vai ajudar a suprir a carência da região leste por transporte coletivo. “O principal problema das cidades é que houve um grande crescimento da população, mas não da infra-estrutura”, diz.



Para transportar um contingente tão expressivo, é preciso algumas inovações. A Bombardier, que também atua no ramo da aviação, trouxe tecnologia aeronáutica para reduzir o peso dos carros, e assim aumentar o número de usuários transportados. São 15 toneladas de alumínio, estruturadas em forma de colmeia. “É um truque para reduzir espaço e ganhar performance”, explica o diretor Manuel Gonçalves. O motor é de ímã permanente e fica dentro do cubo da roda de borracha, gerando um nível de ruído quase nulo.

A multinacional classifica o sistema como “de alta capacidade”, único no mundo com cara de metrô. Na China, um monotrilho carrega 30 mil pessoas por hora, e no Japão, 25 mil. No Brasil serão 40 mil pessoas por hora. “Um trem com a nossa capacidade é inédito”, explica Luis Ramos, que vê um futuro promissor para a exportação. A fábrica já tem encomendas de 12 carros para a Arábia Saudita, e as cidades de Belo Horizonte, Recife e Rio de Janeiro já demonstraram interesse. A meta para o auge de produção é de um carro pronto a cada dia. Se o monotrilho entregar tudo o que promete, a Zona Leste terá muito mais carros na garagem a partir de 2016. “O que é mais confortável, estar sozinho na sua ‘poltrona’ e ficar duas horas parado no trânsito, ou chegar em 50 minutos?”, pergunta Luis Ramos. Como se fosse preciso responder.



Na vida prática

O trecho completo do monotrilho está estimado em uma viagem de 50 minutos. Se você, assim como eu, opta por viajar na leitura enquanto, fisicamente, viaja pela cidade, talvez consiga ler dois capítulos (algo em torno de 20 páginas) de um livro como a Dança dos Dragões, quinto da série Crônicas de Gelo e Fogo, épico de George R.R. Martin muito comum entre usuários dos transportes públicos. Ou, se prefere ouvir música, talvez seja possível escutar do início ao fim um álbum de sua banda favorita.
mopc está en línea ahora   Reply With Quote

Sponsored Links
Old November 7th, 2012, 08:58 PM   #2462
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,244
Likes (Received): 12002

CPTM Line 8 Cobrasma-Francorail series 5000 train

mopc está en línea ahora   Reply With Quote
Old November 8th, 2012, 02:41 AM   #2463
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,244
Likes (Received): 12002

Line 6 - bidding process to take place early next year.

Quote:
Originally Posted by Green Eyes View Post
Reportagem sobre o andamento da L6:

http://radio.estadao.com.br/audios/a...A3BFD8430E1803

Last edited by mopc; November 8th, 2012 at 03:38 AM.
mopc está en línea ahora   Reply With Quote
Old November 8th, 2012, 03:38 AM   #2464
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,244
Likes (Received): 12002

Links to Line 17 Monorail station schematics

mopc está en línea ahora   Reply With Quote
Old November 8th, 2012, 10:08 AM   #2465
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,244
Likes (Received): 12002

CPTM Line 13 - Line 13 / International Airport Guarulhos Line will only be completed after the 2014 FIFA World Cup. Surprise surprise.

Quote:
Originally Posted by rfavero View Post
Confirmação de algo que era quase uma certeza absoluta.

Linha para Cumbica ficará pronta só depois da Copa

07/11/2012 - Valor Econômico

O trem que vai ligar o aeroporto de Guarulhos a São Paulo não vai ficar pronto para a Copa do Mundo, que será realizada em julho de 2014, de acordo com o presidente da Companhia Paulista de Trens Metropolitanos (CPTM), Mário Manoel Bandeira. De acordo com ele, as obras só começarão em fevereiro de 2013 e levarão de 18 a 24 meses. "O trem não consegue ficar pronto para a Copa, ainda estamos discutindo os detalhes da licitação", afirmou. Ele lembrou que mesmo construída em via elevada a obra é complexa e precisa atravessar o parque linear do Tietê.

O investimento para a construção da linha está estimado em cerca de R$ 1,2 bilhão. A linha, denominada 13-Jade terá 11,5 quilômetros de extensão, vai transportar 120 mil passageiros por dia na primeira fase, que prevê a construção da estação do aeroporto, ampliação da Engenheiro Goulart, na Linha 12-Safira, e a construção da estação Cecap-Guarulhos.

Em entrevista ao Valor, Bandeira lembrou ainda que o governo de São Paulo mantém conversas com a concessionária Aeroporto Internacional de Guarulhos, que está assumindo a administração do aeroporto, para definir o melhor local da estação. "Havia um local reservado entre os terminais 1 e 2. Há documentos que comprovam isso, mas eles dizem que não sabiam do projeto e reservaram o espaço para outra finalidade", afirma.

De acordo com Bandeira, a concessionária reservou espaço próximo ao Terminal 4, que hoje atende apenas a WebJet, e fica dois quilômetros distante dos terminais 1 e 2, que são os mais movimentados e darão acesso ao terminal 3, que está em construção. Para o secretário de Transportes Metropolitanos, Jurandir Fernandes, a concessionária precisa explicar seu projeto. "Não é proposta nossa a construção da estação longe dos principais terminais. Eles é que têm de explicar", afirma. De acordo com ele, o governo de São Paulo pediu licença da concessionária para começar os trabalhos até o fim do mês no local inicialmente previsto para a estação entre os terminais 1 e 2. "Aguardamos a resposta deles", disse, após participar de feira sobre o setor metroferroviário.

A concessionária afirma que colabora com a CPTM para a definição do "local mais adequado" para a construção da futura estação da Linha 13-Jade. Após definição do local, a empresa prevê construir um sistema de mobilidade interna que levará os passageiros da estação aos terminais. De acordo com a empresa, há um sistema de monotrilho em estudo, previsto no plano diretor do aeroporto, com capacidade adequada à demanda projetada pela CPTM. O investimento estimado é de US$ 40 milhões, mas a previsão é que o projeto fique pronto somente em 2016.

Enquanto a CPTM e a concessionária ainda definiram o melhor local para a estação, Bandeira lembra que o projeto da CPTM deixou de prever o trem expresso, como o projeto original. O deslocamento entre o aeroporto e a Estação Engenheiro Goulart, na zona leste paulista, deve demorar cerca de 20 minutos. A previsão inicial do projeto era que esse fosse o tempo até o centro da cidade, que só deve ser alcançado na segunda fase.

O projeto de trem expresso, segundo o secretário Jurandir Fernandes, foi descartado por causa da construção do trem de alta velocidade que vai ligar Campinas, São Paulo e Rio de Janeiro. O trem-bala têm estações previstas no aeroporto de Guarulhos e na região central de São Paulo. O governo federal e paulista assinaram termo de cooperação para estudos conjuntos para definição dos melhores lugares para a estação. "Estudamos a articulação entre o trem-bala e os trens regionais que vão para Jundiaí, ABC e Santos, previstos pelo governo de São Paulo", confirmou ontem o presidente da Empresa de Planejamento e Logística (EPL), Bernardo Figueiredo.

O governo de São Paulo quer que a estação fique na Água Branca, na zona oeste paulistana, onde haveria conexão com a CPTM e com a futura Linha 6-Laranja (Brasilândia-São Joaquim). "Também estudamos a possibilidade de ter mais de uma estação na cidade", afirmou Figueiredo.

Outra linha prometida como legado da Copa, mas que não ficará pronta para o mundial de 2014 é a 17-Ouro, que vai ligar o aeroporto de Congonhas à estação Morumbi, da CPTM. "Não estamos garantindo para a Copa. Trabalhamos para que fique pronto até dezembro de 2014", reafirmou ontem o secretário. Sem novos transportes de massa para o mundial, a ligação dos aeroportos com o centro da cidade e o estádio Itaquerão, na zona leste, será feito por linhas especiais de ônibus. "Em dias de jogos teremos 25 a 30 linhas especiais para levar os torcedores", afirma Fernandes.
mopc está en línea ahora   Reply With Quote
Old November 9th, 2012, 04:42 PM   #2466
Jim856796
Registered User
 
Jim856796's Avatar
 
Join Date: Jun 2006
Location: Citizen of the World
Posts: 8,955
Likes (Received): 849

The Sao Paulo Metro system has lines numbered 1, 2, 3, 4, 5, 6 and 15, 16, 17, 18, 19, and 20. Can there be a reason how the numbers 7 through 14 are skipped?
__________________
I honestly think all development projects must be sustainable and futureproof.

You support the good projects... and oppose the bad.
Jim856796 no está en línea   Reply With Quote
Old November 9th, 2012, 06:01 PM   #2467
Eduardo GJF
Registered User
 
Join Date: Jun 2009
Posts: 7,262
Likes (Received): 3082

Quote:
Originally Posted by Jim856796
The Sao Paulo Metro system has lines numbered 1, 2, 3, 4, 5, 6 and 15, 16, 17, 18, 19, and 20. Can there be a reason how the numbers 7 through 14 are skipped?
Those are CPTM Lines, they belong to the same "system":

07 - Ruby (Luz - Francisco Morato - Jundiaí)
08 - Diamond (Júlio Prestes - Itapevi)
09 - Emerald (Osasco - Grajaú)
10 - Turquoise (Brás - Rio Grande da Serra)
11 - Coral (Luz - Guaianazes - Estudantes)
12 - Sapphire (Brás - Calmon Viana)
Eduardo GJF no está en línea   Reply With Quote
Old November 9th, 2012, 08:22 PM   #2468
malegi
Registered User
 
malegi's Avatar
 
Join Date: Aug 2010
Location: SP
Posts: 13,050
Likes (Received): 4637

Line 13 is the future Guarulhos Airport Line
__________________
Imagine there's no heaven.. (John Lennon)
malegi no está en línea   Reply With Quote
Old November 9th, 2012, 09:04 PM   #2469
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,244
Likes (Received): 12002

Yes, CPTM lines go from 7 through 13, but 14 is undefined as of now.

CPTM lines used to be named with letters, from A to F. In 2008 they changed to numbers following the metro lines (including then-under construction line 4 and planned line 6). Then when the metro started planning more lines in 2009/2010, they had to number them after the CPTM lines. It's a mess. I preferred the former metro= numbers CPTM = letters system.

Before CPTM switched to numbers, some CPTM lines that were planned to be transferred to the Metro Company were provisorily and unnofficially numbered according to the metro system: Line 11 (then Line E - Expresso Leste) was Line 6 and Line 9 (then Line C) was Line 7. That never actually stuck and the plans to transfer these two lines to the Metro Company were abandoned.
mopc está en línea ahora   Reply With Quote
Old November 10th, 2012, 05:41 AM   #2470
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,244
Likes (Received): 12002

New CPTM Alstom 9000 series (foreground) and a CAF 8000 series

mopc está en línea ahora   Reply With Quote
Old November 10th, 2012, 05:52 AM   #2471
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,244
Likes (Received): 12002

Line 15 update





mopc está en línea ahora   Reply With Quote
Old November 11th, 2012, 03:01 AM   #2472
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,244
Likes (Received): 12002

Metro - future metro line plans atract real estate development


Quote:
Originally Posted by ariotz View Post
Até metrô no papel atrai novos empreendimentos em SP

O trem não chegou à estação e, em muitos casos, nem a estação existe. Mas metade dos novos empreendimentos imobiliários perto do metrô de São Paulo marca presença nas cercanias de instalações em obras ou ainda no papel.

Estudo feito pela Lopes, empresa do setor imobiliário, indica que 63% (ou 203) dos 320 empreendimentos que a cidade vai ter nos próximos anos estarão a até 1 km do metrô.

Desses, 102 ficam na região de estações que ainda estão em construção, como a de Moema, no prolongamento da linha amarela, ou que ainda não saíram do papel, como a de Perdizes, na linha laranja, que deve começar a ser construída em 2013.

O Secovi (sindicato da habitação) avalia que é positivo para a cidade incentivar o adensamento de pessoas em áreas onde há ou haverá oferta de transporte público.

"Empreendimentos perto do metrô são uma tendência positiva. Se há problema de mobilidade, é preciso procurar alternativas para resolvê-lo. Uma forma é otimizar o adensamento racional ao longo das linhas que existem. Isso promove retirada de carros das ruas", disse Claudio Bernardes, presidente do Secovi.

O urbanista Kazuo Nakano, do Instituto Pólis (ONG da área de políticas públicas), alerta, porém, que nem sempre empreendimentos representarão bom uso da área urbana.



"Às vezes, um lote com duas casas dá lugar a um prédio com 60 apartamentos, mas, no entorno, várias outras casas saem para dar lugar a comércios e serviços. Isso acaba anulando o resultado positivo."

A comodidade de morar perto do metrô tem custo tanto financeiro como social, já que pode elitizar a região.

"Os imóveis nessas localidades costumam ser de médio e alto padrão e são caros. Comprar terreno nessas regiões envolve alto investimento e os empreendedores vão vender para seguimentos que podem pagar por eles", disse Nakano.

No estudo, não foram levantadas informações a respeito do nível dos imóveis.

Cyro Naufel, diretor de atendimento da Lopes, afirma que o público que tem comprado esses apartamentos é diversificado.

"Morar perto do metrô é demanda de todas as classes sociais hoje, e o traçado das linhas tem atendido tanto ao Itaim, para o executivo ir trabalhar, como o Taboão, onde a pessoa pode morar."

A bancária Adelina Souza comprou apartamento de dois quartos que será próximo à futura estação da Lapa, na zona oeste. "Trabalho no centro e enfrento muito trânsito todos os dias. Quando puder ir de Metrô, vou gastar menos da metade do tempo.

http://www1.folha.uol.com.br/cotidia...os-em-sp.shtml
mopc está en línea ahora   Reply With Quote
Old November 11th, 2012, 03:02 AM   #2473
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,244
Likes (Received): 12002

Line 5 update


Quote:
Originally Posted by RMeier View Post
Hoje consegui fazer algo que planejava há algum tempo: dar uma volta em torno dos canteiros da estação Adolfo Pinheiro e o poço Conde de Itú.

Estava curioso principalmente com o poço, que acompanho diariamente ao voltar do trabalho. De um tempo para cá, os grandes guindastes e perfuratrizes sumiram e deduzi que a escavação já tinha começado. Como a foto mostra abaixo, já escavaram bastante e começaram a concretar um muro paralelo à adutora da Sabesp.

Um funcionário da obra me explicou que o poço terá 44 metros de profundidade e que, depois de pronto o muro, vão escavar do lá de cá da foto. Segundo ele, devem liberar parte da avenida assim que isso ocorrer.

O mais interessante, no entanto, foi a data de início do trabalhos dos shields. Ainda de acordo com ele, os dois "tatuzões" começarão seu trabalho em junho de 2013 e sairão juntos dali mesmo. Não sei se a informação é confiável mas parece coerente com o cronograma. Que acham?

Ah, sim, ele também disse que o túnel que vem da Adolfo está no meio do caminho e que eles (Camargo Correa?) farão a ligação com o que já foi feito pela Constram.

O poço da Conde de Itú no sentido Adolfo Pinheiro


Outra foto no sentido contrário. Essa ferragem é do muro que o funcionário se referiu.


Estação Adolfo Pinheiro






mopc está en línea ahora   Reply With Quote
Old November 11th, 2012, 04:27 AM   #2474
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,244
Likes (Received): 12002

Line 2 pics - Tamanduateí depot, Alto do Ipiranga station, Chácara Klabin station

Quote:
Originally Posted by Lucas 5131 View Post
UM RÁPIDO PASSEIO PELA LINHA 2

Pátio Tamanduatei








mopc está en línea ahora   Reply With Quote
Old November 11th, 2012, 04:29 AM   #2475
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,244
Likes (Received): 12002

Line 4 - Pinheiro station demand doubles in 1 year

Quote:
Originally Posted by Green Eyes View Post
Estação Pinheiros da CPTM vê fluxo dobrar


Com as transferências com o metrô, por meio da linha 4-amarela, o número de passageiros que embarcaram na estação Pinheiros da linha 9-esmeralda da CPTM (Companhia Paulista de Trens Metropolitanos) mais do que dobrou neste ano, se comparado com todo o ano passado.

Até setembro deste ano, 23,9 milhões de passageiros (87.440 por dia) utilizaram a estação. Em todo o ano de 2011, foram 11,6 milhões (31.831 por dia), segundo dados obtidos pela reportagem com a CPTM.


Vinicius Pereira/Folhapress

Escada rolante lotada na estação Pinheiros da CPTM; número de passageiros dobrou em um ano


Se comparado com o ano de 2010, quando a estação recebeu 2,1 milhões (5.762 por dia), o crescimento foi cerca de dez vezes maior.

A ligação gratuita em horário integral com a estação homônima da linha 4-amarela, em outubro de 2011, permitiu uma conexão mais rápida com as regiões das avenidas Paulista e Faria Lima e com as linhas 1-azul, 2-verde e 3-vermelha.

Antes, para chegar à região central, muitos passageiros vindos da zona sul precisavam ir até a estação Presidente Altino, próxima à divisa com Osasco (Grande São Paulo), para fazer uma integração com a linha 8-diamante da CPTM e só então chegar ao metrô, na estação Palmeiras-Barra Funda, da linha 3-vermelha.

Para chegar à Luz, ainda era necessária outra integração, com a linha 7-rubi da CPTM.

A companhia aponta mais uma variável para o boom na estação Pinheiros: a inauguração de novas estações na linha 2 do metrô --Tamanduateí, em agosto de 2010, e Vila Prudente, em setembro de 2011.

No mesmo período, as estações Grajaú e Santo Amaro ganharam 3 milhões e 4 milhões de passageiros, respectivamente. Por outro lado, a estação da Luz perdeu 7,6 milhões de passageiros --queda de 46,02 milhões em 2010 para 38,41 milhões em 2012.


Editoria de Arte/Folhapress

Movimento de passageiros na estação Pinheiros


'LINHA QUE DEU CERTO'

O consultor em transporte Marcos Bicalho diz acreditar que o aumento da demanda na estação Pinheiros se deve "ao sucesso de uma linha que deu certo. As pessoas querem usar, mesmo que tenham que enfrentar a lotação".

É o caso da analista de marketing Angélica Santiago, que diz preferir deixar o carro em casa e ir para o trabalho, próximo à estação Faria Lima, na zona oeste, de trem e metrô. Ela mora na região do Grajaú, na zona sul, e passa pela estação Pinheiros todos os dias.

"Apesar da lotação, não pego trânsito e chego na hora."

Para Bicalho, o aumento da demanda em Pinheiros traduz a necessidade da ampliação do transporte público. "O importante é que tenhamos mais alternativas. O ruim é as pessoas usarem o carro."


http://www1.folha.uol.com.br/cotidia...o-dobrar.shtml
mopc está en línea ahora   Reply With Quote
Old November 11th, 2012, 04:59 AM   #2476
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,244
Likes (Received): 12002

Line 3 pics - a few stations

Quote:
Originally Posted by Lucas 5131 View Post
PASSEIO PELA 3














mopc está en línea ahora   Reply With Quote
Old November 11th, 2012, 05:15 AM   #2477
malegi
Registered User
 
malegi's Avatar
 
Join Date: Aug 2010
Location: SP
Posts: 13,050
Likes (Received): 4637

MOPC, do you have Sé station numbers for the last years ?
__________________
Imagine there's no heaven.. (John Lennon)
malegi no está en línea   Reply With Quote
Old November 11th, 2012, 08:11 PM   #2478
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,244
Likes (Received): 12002

You mean ridership? All I have is what the metro says here.
mopc está en línea ahora   Reply With Quote
Old November 12th, 2012, 09:34 PM   #2479
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,244
Likes (Received): 12002

Official government video update of the 4 lines under construction

Line 5



Line 4



Line 17



Line 15

mopc está en línea ahora   Reply With Quote
Old November 12th, 2012, 09:44 PM   #2480
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,244
Likes (Received): 12002

Line 15 - more pics of construction of first monorail trains at Bombardier's new São Paulo unit

Quote:
Originally Posted by julius vinicius View Post









mopc está en línea ahora   Reply With Quote


Reply

Tags
metro, são paulo, subway, trains

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Related topics on SkyscraperCity


All times are GMT +2. The time now is 06:09 AM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2018, vBulletin Solutions Inc.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

tech management by Sysprosium