Old April 27th, 2014, 02:52 AM   #3141
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,244
Likes (Received): 12002

Quote:
Originally Posted by Jim856796 View Post
The Avenida Jornalista Roberto Marinho is being redeveloped into a controlled-access highway in conjunction with the Line 17 monorail?
No, only the park they will build east of the avenue will be surrounded by a limited-access low-speed parkway.

The Avenue itself will only be improved in its existing part, and then expended eastward as a tunnel.
mopc no está en línea   Reply With Quote

Sponsored Links
Old April 27th, 2014, 04:14 AM   #3142
Jim856796
Registered User
 
Jim856796's Avatar
 
Join Date: Jun 2006
Location: Citizen of the World
Posts: 8,955
Likes (Received): 849

That's odd; in the video, I didn't see any level crossings in the reformed Avenue, just flyovers, frontage roads and pedestrian bridges (aside from the new tunnel). Was that an old plan or something?
__________________
I honestly think all development projects must be sustainable and futureproof.

You support the good projects... and oppose the bad.
Jim856796 no está en línea   Reply With Quote
Old April 27th, 2014, 04:33 AM   #3143
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,244
Likes (Received): 12002

Yes, major intersecting avenues, which today cross Roberto Marinho on level, will have viaducts built to avoid that kind of awkward connection, the avenues will cross Roberto Marinho as viaducts, but they will still have lateral wings to provide access to Roberto Marinho. So that Roberto Marinho will not be 'restricted access' in any way.
mopc no está en línea   Reply With Quote
Old April 27th, 2014, 06:13 AM   #3144
Jim856796
Registered User
 
Jim856796's Avatar
 
Join Date: Jun 2006
Location: Citizen of the World
Posts: 8,955
Likes (Received): 849

"Lateral wings"? I think you mean "slip roads". I think this really is "controlled access"/"expressway".

I think this discussion about the Roberto Marinho Avenue is best reserved for the Brazil Road Infrastructure Thread.
__________________
I honestly think all development projects must be sustainable and futureproof.

You support the good projects... and oppose the bad.
Jim856796 no está en línea   Reply With Quote
Old April 27th, 2014, 06:18 AM   #3145
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,244
Likes (Received): 12002

Most recent map of concrete future plans/under construction as of 2014

http://www.metro.sp.gov.br/pdf/mapa-da-rede-2014.pdf



mopc no está en línea   Reply With Quote
Old April 27th, 2014, 08:43 PM   #3146
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,244
Likes (Received): 12002

Quote:
Originally Posted by Jim856796 View Post
"Lateral wings"? I think you mean "slip roads". I think this really is "controlled access"/"expressway".

I think this discussion about the Roberto Marinho Avenue is best reserved for the Brazil Road Infrastructure Thread.
yes thats roughly it
mopc no está en línea   Reply With Quote
Old April 27th, 2014, 10:11 PM   #3147
Falubaz
Registered User
 
Falubaz's Avatar
 
Join Date: Nov 2004
Location: Zielona Gora, Polska
Posts: 14,799
Likes (Received): 2940

So the white line is gone for good? And became just the extention of the green line.
__________________
Zielona Góra - Ziemia Lubuska

₪₪₪Zielona Góra moim okiem₪₪₪ Zielonogórskie autobusy₪₪₪Port Lotniczy ZIElona Góra₪₪₪ BRT₪₪₪ścieżki rowerowe w ZG
₪₪₪[Świat] „Przebłyski pamięci”₪₪₪Moja Ameryka - nie tylko Stany
Falubaz no está en línea   Reply With Quote
Old April 28th, 2014, 07:14 PM   #3148
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,244
Likes (Received): 12002

Yes but it's the same
mopc no está en línea   Reply With Quote
Old April 30th, 2014, 12:03 PM   #3149
nicoziv
Registered User
 
Join Date: Apr 2014
Location: Paris
Posts: 5
Likes (Received): 1

Hi everyone,

I'm looking for a summary of the Sao Paulo metro projects for the 10 next years. I have understood that there are the following lines under construction:

- Line 4 extension: lenght ? number of stations ? when it will be open ? pphpd expected ? Rolling stock? underground or aerial ?
- Line 5 extension: 10 stations, will open in 2016, pphpd = 14 0000, fully underground. Lenght ?
- Line 17 new monorail 7.7 km 8 stations pphpd = 14 0000 and will open in 2015
- Line 15: new monorail. Lenght ? number of stations ? When will it be open ? pphpd ?
- Line 6: 15.9km 15 stations pphpd = 15 000 will open in 2018. New line or extension ? Underground or aerial ? Rolling stock ?
- Line 2: extension of 14.7 km fully undergroundv 14 stations. When it will be open ? pphpd ?

As you can see a lot of informations are lacking. If you have one of them it could help me a lot.

Thanks !
nicoziv no está en línea   Reply With Quote
Old April 30th, 2014, 03:40 PM   #3150
rafarizzo
Registered User
 
rafarizzo's Avatar
 
Join Date: Sep 2013
Location: São José dos Campos
Posts: 178
Likes (Received): 340

Quote:
Originally Posted by nicoziv View Post
Hi everyone,

I'm looking for a summary of the Sao Paulo metro projects for the 10 next years. I have understood that there are the following lines under construction:

- Line 4 extension: lenght ? number of stations ? when it will be open ? pphpd expected ? Rolling stock? underground or aerial ?
- Line 5 extension: 10 stations, will open in 2016, pphpd = 14 0000, fully underground. Lenght ?
- Line 17 new monorail 7.7 km 8 stations pphpd = 14 0000 and will open in 2015
- Line 15: new monorail. Lenght ? number of stations ? When will it be open ? pphpd ?
- Line 6: 15.9km 15 stations pphpd = 15 000 will open in 2018. New line or extension ? Underground or aerial ? Rolling stock ?
- Line 2: extension of 14.7 km fully undergroundv 14 stations. When it will be open ? pphpd ?

As you can see a lot of informations are lacking. If you have one of them it could help me a lot.

Thanks !
Line 4
-Fradique Coutinho, Oscar Freire, Higienópolis-Mackenzie, São Paulo-Morumbi and Vila Sônia to be open until 2016. Fully underground. 1 million passengers/ day. 12.8km. A few more stations under studies to be added in the west end.

Line 5
19,9km, 771.000 passengers/day

Line 15

26,6km. Two first stations to be opened in a few months, 18 stations by 2017 (?), half million passengers/ day.

Line 6

New line, fully underground.

Line 2

Around 2018. 1 million and 700 thousand passengers/ day
rafarizzo no está en línea   Reply With Quote
Old April 30th, 2014, 04:28 PM   #3151
nicoziv
Registered User
 
Join Date: Apr 2014
Location: Paris
Posts: 5
Likes (Received): 1

Perfect ! Thank you very much.
nicoziv no está en línea   Reply With Quote
Old April 30th, 2014, 04:40 PM   #3152
RafaBRA
RafaBRA
 
RafaBRA's Avatar
 
Join Date: Mar 2013
Location: São Paulo
Posts: 31
Likes (Received): 13

I think line 6 should be extended to the Mooca
RafaBRA no está en línea   Reply With Quote
Old April 30th, 2014, 07:42 PM   #3153
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,244
Likes (Received): 12002

Quote:
Originally Posted by nicoziv View Post
Hi everyone,

I'm looking for a summary of the Sao Paulo metro projects for the 10 next years. I have understood that there are the following lines under construction:

- Line 4 extension: lenght ? number of stations ? when it will be open ? pphpd expected ? Rolling stock? underground or aerial ?
- Line 5 extension: 10 stations, will open in 2016, pphpd = 14 0000, fully underground. Lenght ?
- Line 17 new monorail 7.7 km 8 stations pphpd = 14 0000 and will open in 2015
- Line 15: new monorail. Lenght ? number of stations ? When will it be open ? pphpd ?
- Line 6: 15.9km 15 stations pphpd = 15 000 will open in 2018. New line or extension ? Underground or aerial ? Rolling stock ?
- Line 2: extension of 14.7 km fully undergroundv 14 stations. When it will be open ? pphpd ?

As you can see a lot of informations are lacking. If you have one of them it could help me a lot.

Thanks !
As my signature says, the answers lie all in the first page of the BRAZIL URBAN TRANSPORT COMPILATION thread.

And there is also line 18 monorail, which is in tender, and Line 13, which is under construction.
mopc no está en línea   Reply With Quote
Old May 1st, 2014, 11:01 PM   #3154
Julio CAF
L3, L11 user
 
Julio CAF's Avatar
 
Join Date: Jul 2010
Location: São Paulo
Posts: 5,118
Likes (Received): 4233

And line 9, expanding south more 4.6 km which is under construction. Stations: Mendes and Varginha.
__________________
Lema profissional no ramo do transporte: "País desenvolvido não é onde o pobre pode comprar um carro, é onde o rico usa o transporte público" - Desconhecido.

Last edited by Julio CAF; May 1st, 2014 at 11:10 PM.
Julio CAF no está en línea   Reply With Quote
Old May 1st, 2014, 11:27 PM   #3155
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,244
Likes (Received): 12002

yes all updated info is here
mopc no está en línea   Reply With Quote
Old May 2nd, 2014, 01:37 AM   #3156
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,244
Likes (Received): 12002

Line 9 - train and adjacent freeway

mopc no está en línea   Reply With Quote
Old May 5th, 2014, 01:42 AM   #3157
Yuri S Andrade
Registered User
 
Yuri S Andrade's Avatar
 
Join Date: Sep 2008
Location: São Paulo
Posts: 15,355
Likes (Received): 19419

mopc, have they made available the map of the surroundings of Higienópolis-Mackenzie, like the ones we find in the stations?
Yuri S Andrade no está en línea   Reply With Quote
Old May 5th, 2014, 04:01 AM   #3158
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,244
Likes (Received): 12002

I believe these maps only come out when the station is opened, which will be early next year (2015)
mopc no está en línea   Reply With Quote
Old May 5th, 2014, 04:47 AM   #3159
Yuri S Andrade
Registered User
 
Yuri S Andrade's Avatar
 
Join Date: Sep 2008
Location: São Paulo
Posts: 15,355
Likes (Received): 19419

Do you know exactly where is it? The entrances?
Yuri S Andrade no está en línea   Reply With Quote
Old May 8th, 2014, 06:01 AM   #3160
mopc
Registered User
 
mopc's Avatar
 
Join Date: Jan 2005
Location: Santos Sao Paulo
Posts: 17,244
Likes (Received): 12002

Higienopolis station has been in planning for so long that I don't even known where its blueprints and schemes are any more.

The user Saviano Marcio is the king of diagrams and has posted all of them here for download =

http://www.skyscrapercity.com/showth...#post113504046
mopc no está en línea   Reply With Quote


Reply

Tags
metro, são paulo, subway, trains

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Related topics on SkyscraperCity


All times are GMT +2. The time now is 10:56 AM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2018, vBulletin Solutions Inc.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

tech management by Sysprosium