search the site
 daily menu » rate the banner | guess the city | one on oneforums map | privacy policy | DMCA | news magazine | posting guidelines

Go Back   SkyscraperCity > Infrastructure and Mobility Forums > Highways & Autobahns

Highways & Autobahns All about automobility



Global Announcement

As a general reminder, please respect others and respect copyrights. Go here to familiarize yourself with our posting policy.


Reply

 
Thread Tools
Old June 10th, 2012, 10:00 PM   #1
european_driver
Registered User
 
european_driver's Avatar
 
Join Date: Sep 2010
Location: Silesia
Posts: 277
Likes (Received): 21

What is cost of built 1 km motorway/expressway in your country?

I wonder how expensive is construction 1 km motorway and expressway road is in your country.
You may write examples of road sections which was build in last years. Please remember write some informations about road standard (motorway or expressway, lanes amount, asphalt or concrete, plain terrain or mountains, tunnels ect.)

Some examples from Poland are below. Prices are very variable. I used rate exchange 4.30 PLN/EUR in the calculations.


S2/S79 south bypass of Warsaw (3 lanes expressway, asphalt, urban terrain) 8.9 km - 29.3 mln EUR/km (126 mln PLN/km)

A1 Pyrzowice - Piekary Sl.(motorway, 2 lanes, asphalt, plain terrain) 16 km - 26 mln EUR/km (113 mln PLN/km)

S69 Bielsko-Biala - Zywiec (2 lanes expressway, mountains but no tunnels, asphalt) 15.6 km - 11.6 mln EUR/km (50 mln PLN/km)

A1 Piątek-Stryków (2 lanes motorway, asphalt, plain terrain) 21 km - 6.3 mln EUR/km (27 mln PLN/km)

S8 Syców - Kępno (2 lanes expressway, asphalt, plain terrain) 15.3 km - 4.9 mln EUR/km (21 mln PLN/km)

A4 Zgorzelec - Krzyżowa (motorway, 2 lanes, concrete, plain terrain) 51.4 km - 4.6 mln EUR/km


Very accurate statistic about roads building costs in Poland created @Maya83 in post http://www.skyscrapercity.com/showpo...99&postcount=7. Prices per 1 kilometr in PLN are in last column of tables ("cena za km")

Last edited by european_driver; June 11th, 2012 at 11:39 AM.
european_driver no está en línea   Reply With Quote

Sponsored Links
Old June 10th, 2012, 10:37 PM   #2
brewerfan386
Registered User
 
brewerfan386's Avatar
 
Join Date: Apr 2009
Location: Cheeseland
Posts: 710
Likes (Received): 153

USA
According to MI DOT
Quote:
A mile of freeway through an urban area costs approximately $39 million, while a mile of freeway through a rural area costs approximately $8 million.
according to the FHWA (2006 Dollars)
Quote:
The cost to construct one lane-mile of a typical 4-lane divided highway can range from $3.1 million to $9.1 million per lane-mile in rural areas depending on terrain type and $4.9 million to $19.5 million in urban areas depending on population size.
However, in urban areas restrictions (high cost of additional right-of-way, major utility relocation, high volume traffic control, evening work restrictions, etc.) may increase the cost per lane-mile. If restrictions exist the cost to construct one lane-mile of a 4-lane divided highway can range from $16.8 million to $74.7 million. The cost of $74.7 million perlane-mile in areas of severe restrictions may not represent the maximum cost per-lanemile and should be used as general guideline only. Individual projects may include extreme conditions warranting a much higher cost. The costs provided are per lane-mile.
To obtain the cost for a section of roadway the cost
would need to be multiplied by the number of lanes on the roadway section.
__________________
[intentionally left blank]
brewerfan386 no está en línea   Reply With Quote
Old June 10th, 2012, 10:39 PM   #3
ChrisZwolle
Road user
 
ChrisZwolle's Avatar
 
Join Date: May 2006
Location: Zwolle
Posts: 41,783
Likes (Received): 16453

The Netherlands has constructed too little mileage in the past 10 years to give a reliable number. The last links are missing links which are generally expensive (€ 50+ million per kilometer often).
ChrisZwolle no está en línea   Reply With Quote
Old June 10th, 2012, 10:53 PM   #4
european_driver
Registered User
 
european_driver's Avatar
 
Join Date: Sep 2010
Location: Silesia
Posts: 277
Likes (Received): 21

Quote:
Originally Posted by brewerfan386 View Post
The cost to construct one lane-mile of a typical 4-lane divided highway can range from $3.1 million to $9.1 million per lane-mile in rural areas depending on terrain type
I shocked by low cost of roads building in USA. What are reasons? Maybe low oil cost in USA which have impact to asphalt cost?
european_driver no está en línea   Reply With Quote
Old June 10th, 2012, 11:21 PM   #5
x-type
con los terroristas
 
x-type's Avatar
 
Join Date: Aug 2005
Location: Bjelovar [HR]
Posts: 13,141
Likes (Received): 3241

in Croatia average is some 8-9 mil. €/km.
__________________
Svaki dan sanjam autobahn...
x-type no está en línea   Reply With Quote
Old June 10th, 2012, 11:31 PM   #6
yamboliya
Registered User
 
yamboliya's Avatar
 
Join Date: Sep 2009
Location: Bulgaria
Posts: 505
Likes (Received): 395

In Bulgaria currently under construction are: Trakiya Hoghway (three stretches) first stretch - constructor is bulgarian company Trace with price 2,217 mln.euro/km , second stretch constructor is greek company Actor with price 1,9 mln.euro/km. , third stretch constructor is bulgarian Holding Roads with price 2,247 mln.euro/km. The other highway under construction in Bulgaria is Maritsa (two stretches) first stretch - constructor is Chimetisti Ravena Italy with price 2.12 mln.euro/km, second stretch price 1,82mln.euro/km. - constructor Holding Roads (all the prices excl VAT).
__________________
"Да използваш като извинение липсата на здрав разум у другите , само по себе си е липса на здрав разум"
yamboliya no está en línea   Reply With Quote
Old June 11th, 2012, 12:19 AM   #7
hofburg
middle lane hogger
 
hofburg's Avatar
 
Join Date: Jun 2009
Location: Nova Gorica
Posts: 3,265
Likes (Received): 461

according to DARS, the average cost from 1994-2008 was 10,4mln € per km.

the lowest was A3 Divaca-Dane (2,3mln €), the highest famous section of A2 with Sentvid tunnel (47,1mln €), highest non-urban was A1 at Trojane pass (25,6mln €).
hofburg no está en línea   Reply With Quote
Old June 11th, 2012, 12:27 AM   #8
Peines
Peter
 
Join Date: Aug 2011
Location: Madrid
Posts: 866
Likes (Received): 94

Spain: from 3,10 to 13,35 million €/km.

P.D.: The price doesn't include commission's for politicians. I should be no more than 5 ~ 10 % of the cost per km.
Peines no está en línea   Reply With Quote
Old June 11th, 2012, 01:10 AM   #9
Verso
Islander
 
Verso's Avatar
 
Join Date: Jun 2006
Location: Ljubljana
Posts: 21,848
Likes (Received): 4415

Quote:
Originally Posted by hofburg View Post
according to DARS, the average cost from 1994-2008 was 10,4mln € per km.

the lowest was A3 Divaca-Dane (2,3mln €), the highest famous section of A2 with Sentvid tunnel (47,1mln €), highest non-urban was A1 at Trojane pass (25,6mln €).
The tunnel itself cost 124m €/km.
Verso no está en línea   Reply With Quote
Old June 11th, 2012, 09:32 AM   #10
Chilio
Небостъргачевград
 
Chilio's Avatar
 
Join Date: May 2009
Location: Sofia
Posts: 12,666
Likes (Received): 8682

Quote:
Originally Posted by yamboliya View Post
In Bulgaria ...
To add some info, the highest price of motorway construction was of A5 Lyulin, which was about 9.7-9.8 mln euros/km.
Most expensive stretch of motorway is still to come in EU-financial period 2014-2020 - LOT3 of A6 Struma from Blagoevgrad to Sandanski, which will include a 13 km tunnel or a sequence of tunnels and viaducts in the Natura2000 protected area of Kresna Gorge, and is expected to cost more than a 1 mlrd euro.
Chilio no está en línea   Reply With Quote
Old June 11th, 2012, 11:35 AM   #11
Cicerón
Espere verde
 
Cicerón's Avatar
 
Join Date: May 2006
Location: En el obscuro jardín del manicomio
Posts: 3,876
Likes (Received): 53

Spain:

Code:
Road costs (average prices):
         Building:
             Conventional road: € 3M/km.
             Motorway: € 4M/km.
             Over/underpasses: € 700/m2. 
         Maintenance (annual cost):
             Secondary road: € 6,000/km.
             Main road: € 9,000/km .
             High-capacity road: € 18,000/km.
             Motorway: € 42,000/km.
         Pothole repair: Between € 35,000/km - € 65,000/km.
         Cleaning: € 45/km

     Information cost:
         Integrated management systems which collect traffic information: from € 40,000 to 140,000.
         Data collection cameras: € 6,000.
         Weather Station: € 32,000.
         Electronic Signpost: € 42,000.
         Laser Radar: € 40,000.

     Signs cost:
         Replacing a demolished sign: € 145 to 300.
         Sign cleaning (removing graffiti): € 45-75.
         For example, the cost of switching signals to 110 km/h which was carried on last year was estimated at € 250,000  (about € 40/sign).

     Accidents cost:
         Emergency equipment mobilization € 772/unit.
         Daily cost of maintaining each mobile Intensive Care Unit: € 3,100.
         Mobilization of a helicopter (for rural areas which are difficult to reach by other means): € 3,642.
         Activate a medical helicopter: € 6,800.
         Fire fighters: € 3,000.
         Subsequent cleaning of the road: € 600.

Source: http://www.tecnocarreteras.es/web/it...seguridad-vial
Cicerón no está en línea   Reply With Quote
Old June 11th, 2012, 08:41 PM   #12
Verso
Islander
 
Verso's Avatar
 
Join Date: Jun 2006
Location: Ljubljana
Posts: 21,848
Likes (Received): 4415

Just 4m €/km? No wonder Spain has loads of motorways.
Verso no está en línea   Reply With Quote
Old June 11th, 2012, 09:19 PM   #13
DanielFigFoz
Registered User
 
DanielFigFoz's Avatar
 
Join Date: Mar 2007
Location: No fixed abode
Posts: 4,403
Likes (Received): 817

Quote:
Originally Posted by european_driver View Post
I shocked by low cost of roads building in USA. What are reasons? Maybe low oil cost in USA which have impact to asphalt cost?
Land is less expensive as well
DanielFigFoz no está en línea   Reply With Quote
Old June 11th, 2012, 09:24 PM   #14
ChrisZwolle
Road user
 
ChrisZwolle's Avatar
 
Join Date: May 2006
Location: Zwolle
Posts: 41,783
Likes (Received): 16453

Land expropriation cost can add significantly to the overall construction cost, especially in semi-urban and urban areas. Land in Europe is generally not as cheap as in the United States. The U.S. density is much lower than in Europe, for instance the low density Dutch province of Drenthe has 190 inhabitants/km˛ while this is only 41 inh/km˛ in Wisconsin and 43 inh/km˛ in Kentucky, to name a few states which are not considered sparsely populated.
ChrisZwolle no está en línea   Reply With Quote
Old June 11th, 2012, 09:32 PM   #15
Galro
Humanity through Urbanity
 
Galro's Avatar
 
Join Date: Aug 2010
Posts: 11,076
Likes (Received): 7544

Norway:

Between 120 and 150 millions Norweigan kroner, or around 16 to 20 million Euros.

Source: http://www.aftenposten.no/nyheter/ir...e#.T9ZGpZKr0gQ
Galro no está en línea   Reply With Quote
Old June 11th, 2012, 10:59 PM   #16
MattiG
Registered User
 
MattiG's Avatar
 
Join Date: Feb 2011
Location: Espoo FI
Posts: 1,566
Likes (Received): 505

Well... It depends...

I depends heavily on the number of exits and bridges, the terrain, the economic situation, winter conditions, and whether it is a urban or rural one. Comparisons across countries is difficult, because planning, land, and bureaucracy cost are allocated differently.

Some samples of recent cases in Finland:

3/E12 Tampere west bypass, open 2009, upgrade 1+1 to 2+2, most exits rebuilt, double bridge over Lake Pyhäjärvi: 21 km, 114 MEUR, 5.4 MEUR/km.

1/E18 Lohja-Muurla, open 2009, 2+2, challenging terrain, 7 twin-tube tunnels total length 5.7 km, 75 bridges, 8 exits, animal fence: 51 km, 330 MEUR, 6.5 MEUR/km. Public Private Partnership model (PPP).

7/E18 Koskenkylä-Kotka, under construction, open 2014. 17 km upgrade 1+1 to 2+2, 34 km new 2+2 motorway. 6 new exits, 68 bridges, one short twin-tube tunnel, telematics, animal fence, some upgrade on current motorway in Kotka. 51 km, 340 MEUR, 6.7 MEUR/km. PPP Model.

51 Espoonlahti-Kirkkonummi, under construction, open 2012, 2+2 replacing the current 1+1 road in the same aligment, new parallel local roads, 3 new exits, major upgrade to one exit. 10 km, 80 MEUR, 8 MEUR/km.

6 Lappeenranta-Imatra, open 2012, 2+2 "almost motorway", with middle barrier, replacing the old 1+1 road in the same alignment. 6 new and 9 upgraded exits, 35 km animal fence, illumination, 22 km noise barriers, somewhat challenging crossing with Saimaa Canal. 48 km, 177 MEUR, 3.7 EUR/km.

100 between 3/E12 and 45, Helsinki, "Ring Zero of Helsinki", open 2009. Replacing existing 1+1 street with 2+2 road, partly 3+3. 4 exits, one twin-tube tunnel under 3/E12, 700 m 25 bridges, crosses two main railways. Construction under heavy traffic: 35,000 vehicles and 1000 trains daily. Full of existing infrastructure. 3.3 km, 100 MEUR, 30 MEUR/km.

Construction cost only, with the exception of case Road 51 where planning cost partly included in the contract.
MattiG no está en línea   Reply With Quote
Old June 12th, 2012, 03:25 AM   #17
brewerfan386
Registered User
 
brewerfan386's Avatar
 
Join Date: Apr 2009
Location: Cheeseland
Posts: 710
Likes (Received): 153

Quote:
Originally Posted by ChrisZwolle View Post
Land expropriation cost can add significantly to the overall construction cost, especially in semi-urban and urban areas. Land in Europe is generally not as cheap as in the United States. The U.S. density is much lower than in Europe, for instance the low density Dutch province of Drenthe has 190 inhabitants/km˛ while this is only 41 inh/km˛ in Wisconsin and 43 inh/km˛ in Kentucky, to name a few states which are not considered sparsely populated.
Exactly, also remember the environmental and especially archeological studies are usually MUCH less rigorous over here. We have different pavement/ roadbed standards and don't use the very, very, expensive porous surfaces common in Europe. In addition, some states also have "right to work" laws which can help keep costs down as well.
__________________
[intentionally left blank]
brewerfan386 no está en línea   Reply With Quote
Old June 13th, 2012, 04:31 PM   #18
Arbenit
Registered User
 
Arbenit's Avatar
 
Join Date: Mar 2010
Posts: 3,720
Likes (Received): 372

In Kosovo there are built (completed) only 38 km of motorways, and under construction 22 more kilometers, that will be completed soon. Price is almost 8 million Euros for 1 km. Terrain is fifty-fifty plain-mountainous with few bridges, no tunnels. In this price are not calculated expropriations needed.


It is very interesting to know why the prices in Bulgaria are much cheaper than in other countries (some 2 million Euro for 1 km). Is the quality of motorways built in Bulgaria not that good, or Bulgarian authorities are honest and there is no corruption, or…
__________________
Don't feed the trolls

Brilliant minds discuss ideas, average minds discuss events, small minds discuss people
Arbenit no está en línea   Reply With Quote
Old June 13th, 2012, 05:27 PM   #19
gogo3o
Bulgaria
 
gogo3o's Avatar
 
Join Date: Feb 2011
Posts: 6,588
Likes (Received): 12132

Many reasons I think: plain terrain, low wages; crisis in the construction sector from 2008 after the real estates bubble; and, last but not the least, clear tender procedures that were introduced by the government in 2009 which gave really competitive offers from 10 to 15 participants for each lot...
__________________
SOFIA | Metro
gogo3o está en línea ahora   Reply With Quote
Old June 13th, 2012, 05:38 PM   #20
g.spinoza
Lord Kelvin
 
g.spinoza's Avatar
 
Join Date: Jul 2010
Location: Torino
Posts: 8,886
Likes (Received): 1743

BreBeMi, the new Brescia-Milan autostrada, is going to cost 38 M€/km. Pedemontana lombarda is going to cost 47 M€/km, but the price is comprehensive of 70 km of local roads.
g.spinoza no está en línea   Reply With Quote


Reply

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Related topics on SkyscraperCity


All times are GMT +2. The time now is 06:35 PM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2017, vBulletin Solutions Inc.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2017 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2017 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu