|
|
| daily menu » rate the banner | guess the city | one on one |
|
|
#241 |
|
Registered User
Join Date: Aug 2011
Posts: 130
Likes (Received): 1
|
Does anyone know when Ordsall Lane to Victoria is being electrified because none of the comments or articles on the scheme seem to say when this bit is being done. NR say as part of the Victoria works that electrification works at Victoria starts winter this year but I don't think that is now correct.
|
|
|
|
|
|
#242 | |
|
Engineer
Join Date: Sep 2010
Location: Manchester
Posts: 712
Likes (Received): 39
|
Quote:
As far as I know, wires to Vic is phase 1 of NWEP, e.g. now. That said, if Hub is messing with Deal Street I can understand why they aren't diving in.
__________________
Railway Engineer for Hire No job too small. Free quotations. Has own shovel.
|
|
|
|
|
|
|
#243 | |
|
Registered User
Join Date: Aug 2011
Posts: 130
Likes (Received): 1
|
Quote:
It was my understanding that it was in phase one and would be starting about now. If as you suggest it may be delayed because of Deal street and things connected to the chord and possibly what to do about Platforms at central then I can understand it particularly as it does not look as though the delay will hold up much because at present there appears to be is no stock(319s) to operate it from 2014. |
|
|
|
|
|
|
#244 |
|
heard it here second . .
Join Date: Sep 2009
Location: Droylsden
Posts: 2,205
Likes (Received): 1220
|
I’m sure there’s a thread specifically for the Electrification project, but blowed if I can find it again, so I’ll post these pics here.
They are of the first road bridge West out of Preston to be raised on the Blackpool line (junction Ashton Street/Wellfield Road). It’s just beside a famous landmark, St Walburge’s Church.
__________________
Nostalgia for an age yet to come . . . (Pete Shelley - it's a buzz, cock) Last edited by Johnny de Rivative; December 9th, 2012 at 11:21 PM. |
|
|
|
|
|
#245 |
|
Engineer
Join Date: Sep 2010
Location: Manchester
Posts: 712
Likes (Received): 39
|
Nice pics JDR, but that's North West Electification Phase 3 ...
__________________
Railway Engineer for Hire No job too small. Free quotations. Has own shovel.
|
|
|
|
|
|
#246 |
|
heard it here second . .
Join Date: Sep 2009
Location: Droylsden
Posts: 2,205
Likes (Received): 1220
|
Cheers Joseph - now I found the correct place.
__________________
Nostalgia for an age yet to come . . . (Pete Shelley - it's a buzz, cock) Last edited by Johnny de Rivative; December 11th, 2012 at 09:46 PM. |
|
|
|
|
|
#247 |
|
Registered User
Join Date: Jan 2013
Posts: 1
Likes (Received): 0
|
progress
north-west sparks reports that catenary wires are up near castlefied junction
http://nw-sparks.blogspot.co.uk/ |
|
|
|
|
|
#248 | |
|
Registered User
Join Date: Jun 2008
Location: Manchester
Posts: 2,535
Likes (Received): 34
|
Quote:
|
|
|
|
|
|
|
#249 | |
|
Chris W
Join Date: Oct 2011
Posts: 303
Likes (Received): 11
|
Quote:
http://www.skyscrapercity.com/showthread.php?t=1265187 Sometimes overlapping subjects on here - you'll find your way round eventually like I did. ![]() Cheers CW |
|
|
|
|
|
|
#250 | |
|
Engineer
Join Date: Sep 2010
Location: Manchester
Posts: 712
Likes (Received): 39
|
Welcome all those from the Metrolink Fantasy thread. Comment has been made about keeping Heavy Rail fantasy over here, so that is what I shall do.
Assuming that:
__________________
Railway Engineer for Hire No job too small. Free quotations. Has own shovel.
|
|
|
|
|
|
|
#251 | |
|
Registered User
Join Date: Nov 2012
Posts: 51
Likes (Received): 9
|
Quote:
|
|
|
|
|
|
|
#252 |
|
Engineer
Join Date: Sep 2010
Location: Manchester
Posts: 712
Likes (Received): 39
|
No, I rather thought it would be one long level crossing, with cyclists motivated by 90mph electric trains bearing down on them. SusTrans is very aptly named, in my (dim) view.
__________________
Railway Engineer for Hire No job too small. Free quotations. Has own shovel.
|
|
|
|
|
|
#253 |
|
Registered User
Join Date: Jun 2009
Location: Timperley
Posts: 550
Likes (Received): 36
|
|
|
|
|
|
|
#254 | |
|
Registered User
Join Date: Mar 2012
Posts: 170
Likes (Received): 34
|
Quote:
![]() I think the serious omissions include: - Electrification of the CLC line from Trafford Park to Allerton via Warrington Central, of Hazel Grove to Buxton, of the Hope Valley line and of Hyde to New Mills (assuming Ashburys to Marple via Bredbury included in tram-trainification) - Infill electrification of Buxton to Great Rocks and Hindley, of Hazel Grove to Northenden via Cheadle Heath, and of Guide Bridge to Heaton Norris via Denton (to enable the aggregate traffic to be electrically hauled) - Reopening and electrification of East Didsbury to Cheadle Heath (rebuilding the Mersey bridge at Heaton Mersey of course), plus redoubling of Cheadle Heath to Hazel Grove (to enable tram-trains to access Cheadle Heath, Hazel Grove and Chinley, with weekend excursions into the Peak District) - Reopening Timperley to Glazebrook via Partington (electrified, naturally, and a few repairs needed to the rusty bridge over the Ship Canal) as part of a trans-Pennine freight route from Liverpool. I'll leave Woodhead reopening for Ashtonian to advocate!
|
|
|
|
|
|
|
#255 | |
|
Xenophon philosopher
Join Date: Jun 2011
Location: The poshest bit of Cheshire (better than Alderley Edge or Wilmslow).
Posts: 108
Likes (Received): 22
|
Being a fantasy thread, the reopening of the following:-
The Fallowfield Loop Line The Bury to Holcombe Brook Line The Clitheoroe to Hellifield Line The Accrington to Bury Line The Rochdale to Bacup Line Apologies if any have already been mentioned.
__________________
A cynic is a man who, when he smells flowers, looks around for a coffin. Sent from my stone monolith using cuneiform and runic symbols.
|
|
|
|
|
|
|
#256 | |
|
Registered User
Join Date: Dec 2011
Posts: 1,337
Likes (Received): 120
|
Talking of Woodhead and fantasies, the Woodhead group make me laugh with their request.
![]() Quote:
__________________
The higher the building, the lower the morals |
|
|
|
|
|
|
#257 |
|
Registered User
Join Date: Apr 2004
Posts: 2,997
Likes (Received): 24
|
They're for real, js1000.
There's a tunnel already there. The Midland Main line is to be electrified all the way from London to Sheffield. Reopening the Woodhead tunnel and electrifying it would connect the North West with the East Midlands with fairly fast trains. Running trains from Manchester to London through the Woodhead tunnel is a perfectly sensible solution for increasing capacity. It's joined up thinking. Why it hasn't been on the cards for years I don't know. |
|
|
|
|
|
#258 |
|
Registered User
Join Date: Jun 2009
Location: Timperley
Posts: 550
Likes (Received): 36
|
The Woodhead route is hardly handy for the Liverpool/Preston/Glasgow extensions though.
|
|
|
|
|
|
#259 |
|
Portsmouths Finest, Maybe
Join Date: Feb 2005
Location: Portsmouth
Posts: 14,123
Likes (Received): 217
|
Re-opening the Monsal Train would be great, but a shame (in an odd way). I have pretty much walked the length of the Buxton-Bakewell section. The little cottages at the railway triangle outside of Buxton (google maps link) served as my holiday home for two summers. Those viaducts criss-crossing the A6 are some of the most epic bits of iron viaduct in the country IMHO. There are loads along the line.
Oddly, it was not Beeching'd, instead being closed by Labour/Barbara Castle. It's a stupid situation really, such a small section of the line to be closed. It's safeguarded, but did and could again provide Manchester a direct link to the Midland Mainline...
__________________
Official Skyscrapercity 'Support the Shard at London Bridge' Facebook Group! Ill-Tonkso.co.uk - My Portfolio Website Last edited by ill tonkso; March 28th, 2013 at 11:01 AM. |
|
|
|
|
|
#260 |
|
Registered User
Join Date: Feb 2013
Location: Manchester
Posts: 101
|
But none of this has anything to do with the Northern Hub. Shouldn't it be in its own thread?
|
|
|
|
![]() |
| Thread Tools | |
| Display Modes | |
|
|