Old May 26th, 2006, 07:48 AM   #21
ariesg18
Bombay Addict
 
Join Date: May 2006
Posts: 4
Likes (Received): 0

Hi - I'm a blogger and have posted on the metro here (http://doesmumbaimatter.blogspot.com...ive-start.html)
I'm new to skyscrapercity and totally lost on how to post, participate, etc. Yet, I find this forum awesome and full of insights. Btw - can I pick up that map of the Versova-Ghatkopar link posted by "magestom" ? Its very helpful. Thanks a lot.
ariesg18 no está en línea   Reply With Quote

Sponsored Links
Old June 2nd, 2006, 06:57 PM   #22
kronik
Registered User
 
kronik's Avatar
 
Join Date: Aug 2004
Location: DED, PHL, MUM
Posts: 4,411
Likes (Received): 26

The company that will build the Mumbai Metro has been formed. It'll be called Mumbai Metro - I.

In India, the Government is still loathe to let the private sector build major projects, so they have come up with what is called the Public Private partnership, in which they form specific companies for that particular project with stakes by both the private company and the government. That is true for the Mumbai/Delhi airports, and that'll be true for the Mumbai and Bangalore Metro.

SPV for Mumbai metro rail project formed

Quote:
The special purpose vehicle (SPV) for the construction of the first line of metro rail between Ghatkopar and Versova has been formed, and it will be called Mumbai Metro-I.

The state government will acquire 26 per cent stake in the Reliance Energy-led SPV through Mumbai Metropolitan Region Development Authority (MMRDA). Total project cost is estimated at around Rs 2,356 crore with viability gap funding (VGF) component of Rs 650 crore.

A five-year timeframe has been fixed for the completion of the project, which will be implemented on a BOOT (build-operate-own-and-transfer) basis. After 35 years, it will be transferred back to the Maharashtra government.

It was also decided that the state government would approach the central government for financing the VGF to the extent possible under its National Urban Renewal Programme and the rest would be financed by the state government.

Besides, it was decided that the state government would acquire the required private land for the construction of the Versova-Andheri-Ghatkopar route and the compensation for the same would be paid by the authority.

Once completed, this 11-km metro line is expected to reduce travelling time between Ghatkopar and Versova from the current 70 minutes to around 20 minutes, and tickets of the metro will cost one-and-a half time the fare charged by a BEST bus.
kronik no está en línea   Reply With Quote
Old June 3rd, 2006, 02:41 AM   #23
Toronto06
New Yorker in TO
 
Join Date: Jun 2006
Location: T-Dot / NYC
Posts: 328
Likes (Received): 5

you mean indias biggest city didnt have a subway system?

..................................
__________________
The mods deleted my big annoying signature.
Toronto06 no está en línea   Reply With Quote
Old June 3rd, 2006, 04:35 AM   #24
centralized pandemonium
Satyameva Jayate
 
centralized pandemonium's Avatar
 
Join Date: Aug 2004
Location: Can-duh-a
Posts: 2,856
Likes (Received): 13

It has a suburban rail system that carries 6 million people a day with metro like frequencies. Read post 10.
__________________
Give a man a fish and he eats for a day. Teach a man to fish and he gets drunk and sunburned every weekend.

www.ironaddicts.com
centralized pandemonium no está en línea   Reply With Quote
Old June 15th, 2006, 10:07 PM   #25
kronik
Registered User
 
kronik's Avatar
 
Join Date: Aug 2004
Location: DED, PHL, MUM
Posts: 4,411
Likes (Received): 26

Hey all, some updates on the Mumbai Metro.

Two of Mumbai's biggest projects right now are the upgradation of the Mumbai International Airport and the Mumbai Metro. Both have finally cleared the red tape and are moving along.

MIAL eyes pact with R-ADAG for metro link

Quote:
Mumbai International Airport Pvt Ltd (MIAL) is in talks with a consortium led by Reliance - Anil Dhirubhai Ambani Group, which has bagged the contract for Mumbai metro project, to provide direct rail link to the new airport terminal.

"A direct access from the metro is an option and we are exploring it. We are in talks with Mass Rapid Transit Project (MRTP) for providing a direct access to the airport terminal from the proposed metro rail project," MIAL managing director G V Sanjay Reddy told reporters here today.

The original plan of mumbai metro does not envisage connectivity to the city airport. However, GVK suggested a separate link to the airport be provided from Saki Naka and an elevator be constructed so that passengers are able to access the terminal building.

The first corridor will be completed within three years by a special purpose vehicle (SPV) formed by Mumbai Metro-I consortium.

The GVK-South African Airport consortium, which bagged the Mumbai airport modernisation programme, is also planning to build a six to eight lane parallel access way from the Western Express Highway to provide another direct access to the airport.
----------------------------------------------------------

also.........

kronik no está en línea   Reply With Quote
Old June 21st, 2006, 09:15 PM   #26
kronik
Registered User
 
kronik's Avatar
 
Join Date: Aug 2004
Location: DED, PHL, MUM
Posts: 4,411
Likes (Received): 26

Hey all,

The Prime Minister of India laid the foundation stone for the construction of the phirst phase of the Mumbai Metro on June 21st.

Mumbai Metro: PM lays foundation stone

Quote:
Prime Minister Manmohan Singh on Wednesday led the foundation of Rs 19,500-crore (Rs 195 billion) Metro Rail Project, which authorities hope will help ease traffic flow within the metropolis.

The ceremony, held at Vikhroli in Northeast Mumbai, signals the start of Phase I of the Mass rapid Transit System. The launching of the project is seen as a step towards making Mumbai a world class financial hub.

Singh was accompanied by Maharashtra Governor S M Krishna, Chief Minister Vilasrao Deshmukh, Reliance Anil Dhirubhai Ambani Group Chairman Anil Ambani and Mumbai Metropolitan Commissioner T Chandrashekhar at the ceremony.

The first corridor in Phase I, the 11.7 km Versova-Andheri-Ghatkopar stretch, one of Mumbai's most congested stretches, is expected to service close to 60,000 commuters per hour on its completion by 2009.

French company Connex, which has undertaken several similar mass rapid transports systems worldwide, including in in Melbourne, Boston and in Germany, is the operational partner of the consortium.

The phase one of the metro project also includes the 38 km Colaba-Mahim-Charkop corridor and 14 km Bandra-Kurla-Mankhurd corridor. The 63 km-long three line would be built at an estimated cost of Rs 12,777 crores (Rs 127.77 billion) and expected to be completed by 2010-2011.

The metropolitan authority would hold 26 per cent equity in the SPV for which a provision of Rs 134 crore (Rs 1.34 billion) has been made. The project is on build-own-operate and transfer basis for 35 years, of which five years are for construction.

The Mumbai Metro Rail would be 146.5 km long and is estimated to cost Rs 19,500 crore (Rs 195 billion). There are nine lines, of which 32.5 km would be underground and 114 km on elevated rails. The first phase is expected to be fully functional by 2011, the second by 2016 and the final phase by 2021.
kronik no está en línea   Reply With Quote
Old June 22nd, 2006, 08:31 AM   #27
ariesg18
Bombay Addict
 
Join Date: May 2006
Posts: 4
Likes (Received): 0

Metro v/s Skybus

Hi All - I've got this query on my blog, which in fact is also an issue raised by environmentalists in the past. Isn't the overhead/elevated rail an obsolete technology and wasn't the skybus a better, cheaper and quicker option than the Metro Rail ? I'd appreciate your response. Thank you.
ariesg18 no está en línea   Reply With Quote
Old June 22nd, 2006, 09:43 AM   #28
Tintin27
Registered User
 
Join Date: Feb 2005
Posts: 485
Likes (Received): 56

Quote:
Originally Posted by ariesg18
Hi All - I've got this query on my blog, which in fact is also an issue raised by environmentalists in the past. Isn't the overhead/elevated rail an obsolete technology and wasn't the skybus a better, cheaper and quicker option than the Metro Rail ? I'd appreciate your response. Thank you.
SKybus is cheaper and quicker to implement compared to conventional metro but in a city like mumbai which is huge, skybus, can act as feeder routes to the metro rail rather than work like a metro due to lower passenger capacity compared to metro. I dont think there should be any Metro vs Skybus debate coz for a city to have a world class public transport system, we need both and they should complement each other. Like, The proposed metro route from Versova to Ghatkophar has a station airport road. There can be sky bus connecting that station with the airport and its terminals. Skybus can be used as a feeder route in Navimumbai, say connecting VAshi with other nodes of navi mumbai or Skybus routes in Thane city area connecting with Thane Railway station... I believe in a city like mumbai, there is scope for both technology...Integration of all modes of transports is the way to go forward in providing a world class transportation system.
Tintin27 no está en línea   Reply With Quote
Old June 23rd, 2006, 12:12 PM   #29
ariesg18
Bombay Addict
 
Join Date: May 2006
Posts: 4
Likes (Received): 0

Tintin - thanks a lot for that reply. Is there a technical aspect to this as well ? As in (purely in the theoritical realm) can a skybus project be used for the size and scale of the Metro in its full form (i.e. 146km with VAG, Col-Chark, BKC-Kanjur Marg, P'devi-Sewri, etc.?)
ariesg18 no está en línea   Reply With Quote
Old July 12th, 2006, 08:40 PM   #30
kashyap3
Right Wing-ed
 
Join Date: Jul 2006
Location: Batcave
Posts: 310
Likes (Received): 0

lets hope this metro will alleviate the pressure on the local train system and will function during extreme monsoon weather

why not expand these lines into thane district, paralleling the central line of the local train system
kashyap3 no está en línea   Reply With Quote
Old August 24th, 2012, 11:32 PM   #31
infra desperados
Registered User
 
infra desperados's Avatar
 
Join Date: May 2012
Location: Chandigarh/Mohali
Posts: 471
Likes (Received): 519

MUMBAI | Metro

MUMBAI METRO

The Mumbai metro is a rapid transit system being developed by both the PPP (Public-Private Partnership) and EPC models. Line 1 and Line 2 are being developed with Reliance as the consortium head while Line 3 is going to be developed by an implementation agency called MMRC whose role is similar to the DMRC in the Delhi Metro project.


Phase I
Code:
Line #                Route          Length(Kms) Stations   Special Purpose Vehicle 
Line 1 Versova - Andheri - Ghatkopar   11.4         12      Mumbai Metro One  Pvt. Ltd.
Line 2 Charkop - Bandra - Mankhurd     32           27      Mumbai Metro Transport Pvt. Ltd.
Line 3 SEEPZ - BKC - Colaba            33           25      Mumbai Metro Rail Corporation


Official Website of Line 1

Line 1 Versova-Andheri-Ghatkopar - 11.4 Kms - Under Construction


1) GENERAL

o Journey time: 21 minutes
o Frequency: 3.5 minutes, going down to 3 minutes during peak hours
o Fares # (2003-2004 level)
+ Rs. 6 upto 3 Kms.
+ Rs. 8 between 3 Kms.to 8 Kms.
+ Rs. 10 beyond 8 Kms.

# Fares indicated are for 2003-2004 level and shall be revised @ 11% every fourth year (rounded off to the nearest rupee). Fares shall be fixed by Government of Maharashtra, through a notification.

2 ) ALIGNMENT

* The Proposed Versova-Andheri-Ghatkopar Metro corridor will be 11.40 Km long double line on elevated viaduct with Standard Gauge (1435 mm)
* The proposed alignment starts at Versova, runs along the JP Road, crosses the SV Road and Western Railway tracks to the North of existing Andheri Suburban Railway Station
* The alignment travels on the MV Road ( Andheri-Kurla Road). It crosses the Western Express Highway (WEH) above the existing flyover and reaches Sakinaka
* From Sakinaka the alignment travels along the Andheri-Ghatkopar link Road upto Asalpha
* After Asalpha, the alignment crosses the Kadam Road and runs through Golibar Road upto LBS Marg after taking almost 90 degrees turn behind the Sarvodaya Hospital
* From the LBS Marg the alignment passes along the Heera Chand Desai Road upto Ghatkopar proposed Metro Station near the Ghatkopar Suburban Railway Station
* The take off point for Car depot is located near proposed DN Nagar Metro Station

3) CIVIL

* Elevated Viaduct with PSC Segmental construction
* Car Depot at DN Nagar
* Ballastless track
* Operational Control Centre (OCC), Metro Head Office and maintenance depots in the Car Depot premises
* There are twelve stations on the route. They are - Versova, D.N. Nagar, Azad Nagar, Andheri, Western Express Highway (WEH), Chakala, Airport Road, Marol Naka, Saki Naka, Subhash Nagar, Asalpha Road, Ghatkopar

4 ) ROLLING STOCK - provided by CSR Nanjing Puzhen Rolling Stock Co. from China

Render:


Actual Train:

INTERIORS


The first rake arrived at the GTI port in Mumbai in March 2010:



Line 1 Station Designs:


WEH Station


Versova Station



Line 2 Charkop - Bandra - Mankhurd - 32 Kms - Approved




Line 3 SEEPZ - BKC - Colaba/Cuffe Parade - 33 Kms - Planning stage


Phase 1


Master Plan

BY-IndiansUnite.
__________________

n20 liked this post

Last edited by infra desperados; August 25th, 2012 at 12:40 AM.
infra desperados no está en línea   Reply With Quote
Old August 24th, 2012, 11:33 PM   #32
infra desperados
Registered User
 
infra desperados's Avatar
 
Join Date: May 2012
Location: Chandigarh/Mohali
Posts: 471
Likes (Received): 519

SOME OLD PICS FROM YEAR 2010
Quote:
Originally Posted by IndiansUnite View Post
April 12 - WEH station
Copyright Lonely Wandrer


Quote:
Originally Posted by fuwad View Post
Mumbai Metro Update - JP Road Andheri West.







infra desperados no está en línea   Reply With Quote
Old August 24th, 2012, 11:35 PM   #33
infra desperados
Registered User
 
infra desperados's Avatar
 
Join Date: May 2012
Location: Chandigarh/Mohali
Posts: 471
Likes (Received): 519

SOME PICS FROM YEAR 2011
[QUOTE=vadditwice;79956586]Update :

WR Tracks


Uploaded with ImageShack.us



Uploaded with ImageShack.us

Andheri Station



Uploaded with ImageShack.us

Not Andheri Station



Uploaded with ImageShack.us

WEH Suspension



Uploaded with ImageShack.us


Quote:
Originally Posted by fuwad View Post
DN Nagar Depot to Four Bunglow Jn.




Line going into the depot....

infra desperados no está en línea   Reply With Quote
Old August 24th, 2012, 11:36 PM   #34
infra desperados
Registered User
 
infra desperados's Avatar
 
Join Date: May 2012
Location: Chandigarh/Mohali
Posts: 471
Likes (Received): 519

PICS FROM YEAR 2012

Uploaded with ImageShack.us[/QUOTE]






27 JULY 2012
Quote:
Originally Posted by vadditwice View Post


Uploaded with ImageShack.us



Uploaded with ImageShack.us



Uploaded with ImageShack.us



Uploaded with ImageShack.us



Uploaded with ImageShack.us
[IMG]http://i47.************/2qi8rcw.jpg[/IMG]
[IMG]http://i49.************/zn8rx0.jpg[/IMG]
[IMG]http://i46.************/211j76g.jpg[/IMG]
image hosted on flickr

image hosted on flickr
infra desperados no está en línea   Reply With Quote
Old August 24th, 2012, 11:43 PM   #35
infra desperados
Registered User
 
infra desperados's Avatar
 
Join Date: May 2012
Location: Chandigarh/Mohali
Posts: 471
Likes (Received): 519

AS PER NOW AUG 2012, THE LINE 1 OF PHASE 1 IS ALMOST READY,TRIALS OF ROLLING STOCKS ARE ONGOING AND FIRST LINE IS SET TO OPERATIONAL BY 2013.
CC-FUWAD


TEST TRIALS, METRO ON TRACK. 14th august 2012
cc-fuwad



__________________

n20 liked this post
infra desperados no está en línea   Reply With Quote
Old August 28th, 2012, 10:15 AM   #36
Abinash89
Registered User
 
Abinash89's Avatar
 
Join Date: Mar 2012
Location: bhubaneswar
Posts: 1,185
Likes (Received): 598

X-posting from SSCI
__________________
Abinash
Abinash89 no está en línea   Reply With Quote
Old February 24th, 2013, 08:02 AM   #37
n20
Vicarious Urbanizer
 
n20's Avatar
 
Join Date: Oct 2012
Posts: 2,206

Metro Rail Depot U/C, photos as of October, 2012:

Quote:
Originally Posted by Coolguyz View Post
[IMG]
picture hosting[/IMG]
Quote:
Originally Posted by Coolguyz View Post
n20 no está en línea   Reply With Quote
Old February 24th, 2013, 08:09 AM   #38
n20
Vicarious Urbanizer
 
n20's Avatar
 
Join Date: Oct 2012
Posts: 2,206

The crucial Metro bridge being built over the Western Express Highway in Mumbai's western suburbs; picture as of November, 2012:

Quote:
Originally Posted by deekshith View Post
"Construction of Mumbai Metro One Bridge over Western Express Highway"
As on Nov 2012.

image hosted on flickr

_MG_4726 by ramnath bhat, on Flickr
n20 no está en línea   Reply With Quote
Old February 24th, 2013, 08:21 AM   #39
n20
Vicarious Urbanizer
 
n20's Avatar
 
Join Date: Oct 2012
Posts: 2,206

Line# 3 of the Mumbai Metro: soil testing was well underway in November 2012, as reported in the Mumbai sub-forum.
n20 no está en línea   Reply With Quote
Old February 24th, 2013, 08:24 AM   #40
n20
Vicarious Urbanizer
 
n20's Avatar
 
Join Date: Oct 2012
Posts: 2,206

Roof work U/C on the Western Express Highway (WEH) Metro station (December 2012):

Quote:
Originally Posted by IndiansUnite View Post
Roof work:





n20 no está en línea   Reply With Quote


Reply

Tags
mumbai

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Related topics on SkyscraperCity


All times are GMT +2. The time now is 06:00 AM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2018, vBulletin Solutions Inc.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

tech management by Sysprosium