Old July 11th, 2017, 04:56 PM   #701
tjrgx
Registered User
 
Join Date: Oct 2013
Location: Boston
Posts: 1,036
Likes (Received): 2801

AFP: Thailand approves long-delayed US$5.2 billion rail link to China

http://www.scmp.com/news/asia/southe...ail-link-china

Thailand’s military government on Tuesday approved US$5.2 billion to build the first stretch of a high-speed railway that will ultimately link Bangkok to southern China, a massive joint infrastructure project with Beijing that has been dogged by delays.

The project is part of China’s huge regional infrastructure plan to build a high-speed rail network connecting the southern city of Kunming with Laos, Thailand, Malaysia and Singapore.

Construction has already begun in Laos but the Thai segment of rail has been stymied for years by tussles over financing, loan terms and protective labour regulations in the Southeast Asian kingdom.

The funding approval from Thailand’s cabinet came after junta chief Prayuth Chan-ocha invoked his absolute powers last month to clear a series of legal and technical hurdles standing in the way of the deal.

“The Cabinet has approved phase one of the high speed railway ... from Bangkok to Korat with 179 billion baht (US$5.2 billion) budget for a four-year plan,” said Kobsak Pootrakool from the Prime Minister’s office.

The first stage of the high-speed line will run 250km between Bangkok and the northeastern province of Nakhon Ratchasima, also known as Korat. The plan is to then extend the track to Nong Khai on the border with Laos.

Thailand will cover the construction costs but the vast majority of technical expertise will come from Chinese engineers – something that has disgruntled local firms who were angered by Prayuth’s decision to loosen restrictions placed on foreign engineers.

“Thailand will be responsible for the construction, while China will be responsible for design,” Thai Transport Minister Arkhom Termpittayapaisith said on Tuesday.

The rail deal is one of the biggest foreign investment projects in Thailand in years and is part of Beijing’s “One Belt, One Road” infrastructure drive which aims to revive ancient Silk Road trading routes.

China’s largesse and increased investment presence in Asia comes as rival power the US becomes more isolationist under President Donald Trump.

Thailand’s junta has grown closer to Beijing since its 2014 power grab, shelling out billions on Chinese arms and welcoming investment from the regional superpower.
tjrgx no está en línea   Reply With Quote

Sponsored Links
Old July 12th, 2017, 09:00 AM   #702
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 8,824
Likes (Received): 15558

Ticket prices for Bangkok - Nakhon Ratchasima route are revealed to be as follows:

Bangkok - Ayutthaya : 64 km - 195 baht (5,60 USD)
Bangkok - Saraburi : 110 km - 278 baht (8 USD)
Bangkok - Pak Chong : 174 km - 393 baht (11,30 USD)
Bangkok - Nakhon Ratchasima : 253 km - 535 baht (15,37 USD)

The trip from Bangkok to Nakhon Ratchasima will take 1 hour and 17 minutes.

__________________
-Noblesse Oblige-

Last edited by Codename B; July 12th, 2017 at 09:24 AM.
Codename B no está en línea   Reply With Quote
Old July 12th, 2017, 09:23 AM   #703
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 8,824
Likes (Received): 15558

The Ministry of Transport is speeding up the Bangkok-Nakhon Ratchasima high-speed train project
after getting the green light by the Cabinet


The expected construction is in October this year



Mr. Arkhom Termpittayapaisith Minister of Transport revealed the results of the Cabinet meeting yesterday that the Cabinet meeting has approved the cooperation projects of high-speed railway between Thailand - China for the Bangkok - Nakhon Ratchasima route at 1,790,413 million baht. It is a 100% investment from Thailand and the contract is divided in two project contracts. Contract 1 is for civil construction, accounting for 75% of the value of the contract. Contract 2 consists of 3 contracts, representing 25% of the value of the contract. 2.1 Contract Design 2.2. Civil and Contracts Control. 2.3 Railway Systems and Training Works.

It is expected at the 20th meeting between August 15 -17, 2017 that it will be possible to sign the contract 2.1 with the proposal of the Cabinet for approval and in early September to sign the contract 2.2. After these two contracts are signed, construction will commence on the first 3.5 km stretch, with a budget of 425 million baht in October 2017. The Department of Highways is assigned to carry out the construction, since it will be faster because it is a government agency.

However, in terms of investment budget, the Cabinet has assigned the Ministry of Finance to consider it. The Office of the Budget has proposed to use the loan to carry out the project, which will be foreign loans and domestic money, except for land ownership. This will need to be considered again as appropriate.

source: http://www.innnews.co.th/shownews/show?newscode=796407
__________________
-Noblesse Oblige-

kunming tiger liked this post
Codename B no está en línea   Reply With Quote
Old July 12th, 2017, 12:37 PM   #704
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,548
Likes (Received): 2524

No need for bidding for the First section of Thai - China High Speed train - 3.5 km at 425 Million Baht since Highway Dept is going to do this construction - started in October 2017 only after the 20th meeting
to get the detail design contract signed on 15-17 August 2017 and project consultant contract signed since September 2017. Thai government also ask Chinese government to issue the detailed design for
the second contract within 4 months instead of 8 months so as to call the bidding for the next 11 km

Budget of Year 2017 at 2,648 Million Baht
Budget of Year 2018 at 43,097 Million Baht
Budget of Year 2019 at 62,216 Million Baht
Budget of Year 2020 at 59,702 Million Baht and
Budget of Year 2021 at 12,017 Million Baht

the Opening date will be December 2021 with the ticket prices up to 535 Baht using the rate of 80 Baht + 1.8 Baht per km distance (total 253 km), so the rate will be

Bangsue Central - Ayutthaya at 195 Baht
Bangsue Central - Saraburi at 278 Baht
Bangsue Central - Pak Chong at 393 Baht
Bangsue Central - Nakhon Ratchasima at 535 Baht - travel time 67 minutes

the train will run 90 minute interval with the seat of 600 seats per set (totally 6 sets) - with expected number of daily passengers at 5310 passengers a day in 2021 before going up to 26830 passengers a day in 2051 due to 26 trains which run at 35 minute interval

the economic benefit will be 11.68% for Bangsue Central - Nakhon Ratchasima (6 stations - Bangsue central, Donmueang, Ayutthaya, Saraburi, Pakchong, Nakhon Ratchasima with maintainance
center at Chiang Rak Noy) after major urban development around the station to boost from the current rate of 8.5% but it will be up to 13.52% once it has been extended to Nong Khai with the stations at Ban Phai, Khon Kaen, Udonthani an Nong Khai

However, the section from Kaeng Khoi to Map Ta Phut via Klong 19 bypass will added later

Need land exappropriation for curve correcting to ensure 250 kph max speed (around 10-15%) - 818 Rai on Bangsue section, 1997 Rai for Ban Phachi section - totally 212 million Baht
http://www.thansettakij.com/content/177958
https://www.prachachat.net/property/news-3549

Big Too also insists that we would NOT be at the disadvantage for Thai - China Railway
http://www.thansettakij.com/content/177948
__________________
BKK Mass Transit Expert
Wisarut no está en línea   Reply With Quote
Old July 19th, 2017, 07:18 AM   #705
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,548
Likes (Received): 2524

Testing the first 40-50 Chinese engineers before gaining permission to work in Thai - China High Speed train project
https://www.prachachat.net/property/news-6884

sending 100 Thai - Chinese engineers including those from Highway Dept to work on the first 3.5 km section of Thai - China High Speed railway to work 24 hours a day 7 days a week to get the permanent way of 4 meter high and 12 meter wide done within 3 months after start working in October 2017 and done in December 2017 - and the next on the line is 11 km section from Pak Chong to Klong Khanant Jit
https://www.prachachat.net/property/news-6967

the council of Thai engineers now defining the technology transfer so Thai engineers can deal with High Speed train track and machine maintenance by themselves.
http://www.manager.co.th/Business/Vi...=9600000073165
__________________
BKK Mass Transit Expert
Wisarut no está en línea   Reply With Quote
Old July 20th, 2017, 03:55 PM   #706
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,548
Likes (Received): 2524

Plan for land development on 541.47 rai of land around new Pak Chong station of Thai - China railway - even though it is Treasury Dept land used by Army Ordinance Dept as factories but there are a lot of people in Tha Manao community in Nong Sarai commune, and Phrom Pradit village in Chanthuk commune of Pak Chong district - so compensation for those local people are in need -

Just the new Pak Chong station alone cover 277,461 sq. meter of land (173.4 Rai) - no community while the actual commercialized land will be on 588,900 sq. meter of land (368 Rai) - even though Army men and Treasury Dept have agreed with development scheme but the local people who have to move out are going up against such a plan by showing defiance against the Treasury Dept who are going to evict them out
http://www.springnews.co.th/th/2017/07/71439/

MoT explaining NLA about Thai - China High Speed train phase 1 (Bangsue Central - Nakhon Ratchaisma) - 252.5 km at 179,412 Million Baht - 250 kph max speed with 11 trains a day - travelling time from Bangsue central to Khorat at 67 minutes - NLA men agree but still raising a concern on 2800 Rai of land exappropriation due to the rising protest by those farmers who lease Treasury land around Pak Chong high speed train station - not to mention about 150000 Million Baht track and rolling stock maintenance cost
http://www.bangkokbiznews.com/news/detail/765420
__________________
BKK Mass Transit Expert

Last edited by Wisarut; July 20th, 2017 at 04:06 PM. Reason: Addendum
Wisarut no está en línea   Reply With Quote
Old July 20th, 2017, 09:12 PM   #707
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 8,824
Likes (Received): 15558

=== at grade tracks
=== elevated tracks
=== 5 bridges
=== 4 tunnels



From top to bottom
- Nakhon Ratchasima Station
- Pak Chong Station
- Saraburi Station



https://www.prachachat.net/property/news-8004
__________________
-Noblesse Oblige-

wwc234 liked this post
Codename B no está en línea   Reply With Quote
Old July 20th, 2017, 10:33 PM   #708
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,548
Likes (Received): 2524

Thai - China high speed train
58.5 km at grade
101.1 km elevated track
4.1 km of 5 via ducts
6.3 km of 4 tunnels around Kaeng Khoi
818 rai of land exappropriation at Bang Sue section and 1997 rai of land exappropriation at Ban Phachi section - need to spend 10000 million Baht to remove the pipelines and high power electric lines - and need to get permanent way of 3.5 km at 425 million Baht around Pang Asok - Bundai Mah done first
https://www.prachachat.net/property/news-8004
__________________
BKK Mass Transit Expert

tjrgx liked this post
Wisarut no está en línea   Reply With Quote
Old July 25th, 2017, 06:54 AM   #709
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,548
Likes (Received): 2524

competitors for High Speed trains to Khorat - Bang Pa In - Khorat motorway
https://www.prachachat.net/property/news-9754


Clear point from OTP - no extension from Donmueang to Ayutthaya for the airport link extension to connect Donmueang, Suvannabhum and U-Tapao together since the study on the PPP on airport link extension to connect Donmueang, Suvannabhum and U-Tapao together is almost done and the extension to Ayutthaya would postpone PPP plan for years instead of by the end of 2017. Furthermore, this extension is a duplication with High Speed train to Chiang Mai which is Thai - Japan project - those who want to go to AYutthaya better change the train at Bangsue central instead
https://www.thairath.co.th/content/1014890
https://www.dailynews.co.th/economic/587440
__________________
BKK Mass Transit Expert

Last edited by Wisarut; July 25th, 2017 at 09:52 AM. Reason: Addendum
Wisarut no está en línea   Reply With Quote
Old August 7th, 2017, 03:07 PM   #710
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,548
Likes (Received): 2524

Even more issue on Thai - China Railway - the consultant fee - the cabinet approving the budget of 1649.08 million Baht but Chinese want more - so Thai government is threatening to cancel Thai - China railway if they cannot accept the price
http://www.manager.co.th/Business/Vi...=9600000080082
__________________
BKK Mass Transit Expert
Wisarut no está en línea   Reply With Quote
Old August 9th, 2017, 06:09 AM   #711
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,548
Likes (Received): 2524

The signing ceremony for Thai - China High Speed Railways postponed by a month to early September 2017 according to the latest news
https://www.khaosod.co.th/economics/news_466481

Thai steel makers pressing demands to participate in Thai - China High Speed Railway instead of letting Chinese steel makers to dump their steel products without passing Thai Industrial Standard to feed Thai - China Railway projects
https://www.prachachat.net/economy/news-17344



5 Thai Engineering and Architecture Organizations [Council of Thai Engineers, Council of Thai Architects, Engineering Institute of Thailand, Deans of Engineering Dept Council and Federation of Thai Industries] are Pressing 5 demands to Thai government to ask Chinese government to do the following things as a part pf Technology transfers including

1. Technology transfers on design, construction control on 25 branches in 9 major groups to enable Thai engineering and architects to gain more expertise
2. Technology transfers on railway traffics and railway track, rolling stock and traffic control system maintenance to enable Thai engineers to handle the maintenance by themselves.
3. technology transfer on production to enable to produce modern railway carriages in Thailand (aircon carriages with WIFI system / better power cars and son) by the local Thai companies at least 50%
4. technology transfer on production of spare pare so that the local Thai companies and produce at least 40% of necessary spare parts)
5. Thai Engineering and Architecture Organizations are going to teach and test 400 Chinese engineers and architects so that they can work on station design to meet the real needs of local Thai people - 3 sets will be tested in China and 1 sets will be tested in Thailand

This will be a part of negotiation on 11 August 2017 before the 20th meeting in Thailand on 15-17 August 2017 with 40 Thai representatives from 5 Thai Engineering and Architecture Organizations [Council of Thai Engineers, Council of Thai Architects, Engineering Institute of Thailand, Deans of Engineering Dept Council and Federation of Thai Industries] - which will be considered as the design experts, ready to handle the extension of Thai - China high speed railways (Nakhon Ratchasima - Nong Khai) which Thai engineers and architects will handle such a project while Chinese partners will act as mentors.

Council of Thai Architects is now raising the serious question on city planning along with urban development around stations - it needs to be in line and at the same direction with those High speed train construction
https://www.youtube.com/watch?v=tdVT8YBdoRc
https://www.prachachat.net/property/news-18753
__________________
BKK Mass Transit Expert

Last edited by Wisarut; August 9th, 2017 at 06:56 AM. Reason: Addendum
Wisarut no está en línea   Reply With Quote
Old August 14th, 2017, 05:54 PM   #712
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,548
Likes (Received): 2524

Donmuang - U-Tapao - Rayong High Speed train with 50 year concession as PPP Net cost with commecial developments on 204 rai of Makkasan central along with commercial developments on 10 stations with the investment of 308,000 Million Baht - 30000 million Baht cost overrun due to the demand to enable High Speed train to have Direct access into Suvannabhum Airport and U-Tapao Airport so as to function as the real EEC gateway - EIRR at 12.8% and FIRR at 2.4%

1. the high speed train tracks of 226000 million Baht including
1.1 159000 Million Baht for civil work,
1.2 32000 million Baht for electromechanic works including electrification and signal installation,
1.3 22000 million Baht for EMUs and
1.4 13000 for miscellaneous expenditure
2. investment on Makkasan central at 82000 million Baht including
2.1 major construction at Makkasan central at 55000 million Baht
2.2 25000 million Baht on construction and commercial development
2.3 2000 million Baht for utilities and improving the access to Makkasan Central

Construction started in December 2018 which separated into 2 sections (Phyathai - Donmuang and Lad Krabang - Rayong) with total distance of 260 km and opened in mid 2023 with 169500 passengers a day
10 stations of Donmuang - U-Tapao - Rayong High Speed train are including
1. Donmueang - EOL for both Express train and commuter
2. Bangsue Central
3. Makkasan Central
4. Suvannabhum
5. Chachoengsao
6. Chonburi
7. Sri Racha - now become just like Japanese town
8. Pataya
9. U - Tapao - EOL for express train
10. Rayong - EOL for city line

max speed of 250 kph - it will take 2 hour for city line from Donmuang to Rayong and it will take 1 hour for express train from Donmuang to U-Tapao
City line ticket rate - 13 Baht + 2 x number of travelling km
express line ticket rate - 20 Baht + 1.8 x number of traveling km

Need to dig tunnels in the following 3 sections
1. Rama 6 road to Ranong 1 road due to the fact that this section has to pass Chitladda Royal Station
2. New tunnel to access into Suvannahhum station from Lad Krabang station
3. Khao Chee Jan tunnel to access into U-Tapao airport

2 depots -
1. existing Airport Link Depot at Klong Tan to handle City Line
2. new depot for Express line at Chachoengsao on 400 Rai of land - North of existing Chachoengsao Junction
https://www.prachachat.net/property/news-21905



MoT Minister Akhom along with permanent secretariat and inspector general inspecting the area to construct the first section of Thai - China High Speed train from Klang Dong station to Pang Asok station in Phraya yen commune, Pak Chong district of Nakhon Ratchasima on 13 August 2017
http://www.thansettakij.com/content/194072
__________________
BKK Mass Transit Expert

tjrgx, Jobber liked this post
Wisarut no está en línea   Reply With Quote
Old August 15th, 2017, 03:20 PM   #713
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,548
Likes (Received): 2524

SRT Governor insisting that the Donmuang - U-Tapao - Rayong High Speed train with 50 year concession for as PPP Net cost with commercial developments on 204 rai of Makkasan central along with commercial developments on 10 stations with the investment of 308,000 Million Baht are for easing the financial burden vof the government since Article 6 and Article 9 of Railway Act of BE 2494 has allowed SRT to do so even the Civil and Commercial Code has limited the concession to 30 year but it is expected that Junta and SRT are going to find the way to get around anyway - the bone of contention which are to be solved is the new place to replace Makkasan Factory
http://manager.co.th/Business/ViewNe...=9600000083211


Even after te bargaining that cut down the designing fee from 2014 million Baht to 1706 million Baht while the personnel hiring have been changed from 500 chinese to 50 Chinese + 450 Thailanders which effectively cut from 5140 million Baht to 4000 million Baht but MoF still want to make a cut to 3000 million Baht even though it is still well over the cabinet approved budget of 1648 million Baht - a bone of contention indeed

the consultant fee of Thai - China Railway is another bone of contention since Chinese government insists 3000 Million baht consultant fee is the minimum acceptable price even though Ministry of Finance of Thailand insisting that 1648 million baht is the maximum they can pay to Chinese government
https://www.prachachat.net/property/news-21908
__________________
BKK Mass Transit Expert

Last edited by Wisarut; August 15th, 2017 at 03:32 PM. Reason: Addendum
Wisarut no está en línea   Reply With Quote
Old August 19th, 2017, 01:52 PM   #714
tjrgx
Registered User
 
Join Date: Oct 2013
Location: Boston
Posts: 1,036
Likes (Received): 2801

Construction of first phase of Thailand-China railway project to start in October

http://news.xinhuanet.com/english/20..._136539091.htm

BANGKOK, Aug. 19 (Xinhua) -- China and Thailand are working together to sign two contracts of the first phase of Thailand-China railway project in September to begin the construction work of the first section in October, Chinese Embassy in Bangkok said in a statement Saturday.

According to the statement, the two countries concluded negotiations of the contract of design work of the first phase of Thailand-China railway project and agreed on the price in the supervision contract during the 20th meeting of Joint Committee on Railway Cooperation between Thailand and China.

"It is a new significant progress that the project made after being approved by Thai cabinet and Thailand's National Legislative Assembly," the statement said.

It also mentioned that both sides had been required to accelerate their work to make it possible for the two sides to sign the two contracts in September and to begin the construction work of the first section in October.

The construction of first phase, or the 253 km railway from Bangkok to Nakhon Ratchasima, will start gradually from the first 3.5 km section, the second 11 km section, the third 119 km section and finally the fourth 119 km section.

The railway project will also be further extended from Nakhon Ratchasima to Nong Khai on Thai-Lao border, which is called the second phase.

"The preparation work for the second phase of the project will start soon," the embassy said.

China and Thailand have held meetings of Joint Committee on Railway Cooperation for 20 times over the past two years, the statement said both sides have overcome many difficulties and solved many problems.

Chinese side will be responsible for the design work and supervision, which will incorporate many Thai engineers and architects while the Thais will be responsible for construction work. The project will also use Thai equipments and materials as much as possible.

Once finished, the project will be the first standard gauge high speed railway of the Thailand and the railway, according to the statement, "will improve Thailand's transport system, enforce its role as the transport hub in the region, boost economic growth in the country, especially its northeastern part, contribute to the Eastern Economic Corridor project and benefit other countries along the railway."
tjrgx no está en línea   Reply With Quote
Old August 29th, 2017, 02:24 PM   #715
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,548
Likes (Received): 2524

Public Hearing on High Speed train connecting 3 Airport - a mix of existing Airport link with Airport Link extension and High Speed train on the Eastern region - in Chachoengsao -with a hope to get it done in 2023
10 stations

1. Donmuang
2. Bangsue Central
3. Makkasan Central
4. Suvannabhum
5. Chachoengsao
6. Chonburi
7. Sri Racha - Japanese Town on the Eastern Seaboard
8. Pataya
9. U-Tapao Airport
10. Rayong

Depot at the existing Klong Tan Depot with First CTC control and the new Chachoengsao Depot with second CTC control - with a hope to get daily passengers from Airport city line at 103,920 men a day and Airport Express at 65,630 men a day

https://www.prachachat.net/property/news-30308
__________________
BKK Mass Transit Expert
Wisarut no está en línea   Reply With Quote
Old August 29th, 2017, 08:50 PM   #716
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,548
Likes (Received): 2524

Page for High Speed train that connect 3 Airports (Donmueang - Suvannabhum - U Tapao) ==> http://www.hsr3airports.com/



Route with the total distance of 244 km
1. Existing Suvarnabhumi Airport Rail Link and City Air Terminal (ARL) => 28.7 km
2. Airport Rail Link Extension : Phaya Yhai – Don Mueang (ARLEX) => 21.8 km
3. High Speed Rail : Bangkok (Lad Krabang) - Suvannabhum – Rayong (HSR) => 193.5 km



Suvannabhum Triangle - allowing High Speed train to make direct access to Suvannabhum Airport station



Donmueang Station - at Donmueang station of red line commuter by staggering up - definitely the area at the old Donmueang station has been reserved for High Speed train to Chiang Mai via Phitsanuloke



U-Tapao Triangle to allow the access to U-Tapao international Airport before heading to Rayong

ticket for Airport city line at 13 + (2.0 x travelling distance in km) HSR ticket at 20 + (1.8 x travelling distance in km) opened in 2023


Cabinet approving 3500 Million Baht for consultant fees on Thai - China High Speed train - up from 1,649.08 Million Baht - a compromise rate when the original rate has failed to recognize the cost overrun due to the hike of Chinese consultant fees
https://manager.co.th/Business/ViewN...=9600000088730
__________________
BKK Mass Transit Expert

Munwon, kunming tiger liked this post

Last edited by Wisarut; August 29th, 2017 at 09:16 PM. Reason: Addendum
Wisarut no está en línea   Reply With Quote
Old September 4th, 2017, 12:15 PM   #717
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,548
Likes (Received): 2524

Quote:
Originally Posted by Wisarut View Post
Page for High Speed train that connect 3 Airports (Donmueang - Suvannabhum - U Tapao) ==> http://www.hsr3airports.com/


Route with the total distance of 244 km
1. Existing Suvarnabhumi Airport Rail Link and City Air Terminal (ARL) => 28.7 km
2. Airport Rail Link Extension : Phaya Yhai – Don Mueang (ARLEX) => 21.8 km
3. High Speed Rail : Bangkok (Lad Krabang) - Suvannabhum – Rayong (HSR) => 193.5 km

ticket for Airport city line at 13 + (2.0 x travelling distance in km) HSR ticket at 20 + (1.8 x travelling distance in km) opened in 2023

the actual investment on the Seamless connections between Donmueang - Suvannabhum - U-Tapao airport with airport link extensions and high speed express train => Construction at 220,608 Million Baht and the Land Development around the stations at 82,113 Million Baht - total 302,721 Million Baht - need to be PPP with private sectors though
the expected number of passengers in 2023 are - Donmueang - Suvannabhum 103,920 men a day - Suvannabhum - U-Tapao - Rayong 65,630 men a day - total 169550 men a day - the future goal 362,410 men a day
http://www.thansettakij.com/content/201634
__________________
BKK Mass Transit Expert
Wisarut no está en línea   Reply With Quote
Old September 5th, 2017, 08:07 PM   #718
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 8,824
Likes (Received): 15558

Hopefully construction can then begin next month as scheduled.

------------------------------------------------------------------------

Contracts signed as Thai high speed project progresses
05 Sep 2017



THAILAND: Officials from Thailand and China signed two co-operation contracts for the planned Bangkok – Nakhon Ratchasima high speed railway project on the sidelines of the three-day BRICS Summit in Xiamen, which ended on September 5.

The contracts are worth 5·2bn baht and cover ‘design and supervision’ tasks for the new railway. The planned 1,435 mm gauge high speed line would be designed to Chinese standards for operation at up to 250 km/h, and would cover a 252 km route between the two cities.

The long-delayed project will be financed wholly by Thailand, at a cost estimated to be 179bn baht. But project delivery and railway systems will be covered by Chinese organisations, under the terms of a bilateral agreement. The agreement has proved controversial in Thailand, but the project was approved by the Thai cabinet in July.

Prime Minister Prayuth Chan-o-Cha was invited to participate in the BRICS summit by Chinese President Xi Jinping, having been left off the list of invitees for a high-profile ‘Belt and Road’ infrastructure conference in May. Observers had viewed this as a snub for overt the failure to launch the high speed project.

The Bangkok – Nakhon Ratchasima scheme is the latest iteration of a proposal that would have been Chinese-funded and connected with the railway now being built from China into Laos. However, negotiations on an extension of the trans-Laos railway into Thailand are reported to have collapsed when Chinese officials discovered that the Thai government was pushing ahead with double-tracking the existing metre-gauge railway between Bangkok and the border city of Nong Khai.

http://www.railwaygazette.com/news/h...rogresses.html
__________________
-Noblesse Oblige-

Last edited by Codename B; September 5th, 2017 at 08:34 PM.
Codename B no está en línea   Reply With Quote
Old September 5th, 2017, 08:28 PM   #719
Codename B
Detective
 
Codename B's Avatar
 
Join Date: Feb 2011
Posts: 8,824
Likes (Received): 15558

Bangkok - Rayong HSR

Recent released study of stations location and their design. This line is scheduled to be u/c in 2018.























http://www.hsr3airports.com/wp-conte...56;อ.pdf
__________________
-Noblesse Oblige-

wwc234 liked this post

Last edited by Codename B; September 5th, 2017 at 08:33 PM.
Codename B no está en línea   Reply With Quote
Old September 6th, 2017, 06:33 AM   #720
Wisarut
Registered User
 
Join Date: Oct 2003
Posts: 20,548
Likes (Received): 2524

Contracts signed as Thai high speed project progresses
Railway gazette
05 Sep 2017

Investment in Thailand's extensive metre-gauge main line network has cast doubt on the viability of a long-planned standard gauge railway linking the country to China via Laos.

THAILAND: Officials from Thailand and China signed two co-operation contracts for the planned Bangkok – Nakhon Ratchasima high speed railway project on the sidelines of the three-day BRICS Summit in Xiamen, which ended on September 5.

The contracts are worth 5·2bn baht and cover ‘design and supervision’ tasks for the new railway. The planned 1 435 mm gauge high speed line would be designed to Chinese standards for operation at up to 250 km/h, and would cover a 252 km route between the two cities.

The long-delayed project will be financed wholly by Thailand, at a cost estimated to be 179bn baht. But project delivery and railway systems will be covered by Chinese organisations, under the terms of a bilateral agreement. The agreement has proved controversial in Thailand, but the project was approved by the Thai cabinet in July.

Prime Minister Prayuth Chan-o-Cha was invited to participate in the BRICS summit by Chinese President Xi Jinping, having been left off the list of invitees for a high-profile ‘Belt and Road’ infrastructure conference in May. Observers had viewed this as a snub for overt the failure to launch the high speed project.

The Bangkok – Nakhon Ratchasima scheme is the latest iteration of a proposal that would have been Chinese-funded and connected with the railway now being built from China into Laos. However, negotiations on an extension of the trans-Laos railway into Thailand are reported to have collapsed when Chinese officials discovered that the Thai government was pushing ahead with double-tracking the existing metre-gauge railway between Bangkok and the border city of Nong Khai.

Thai version of this news: Thai government is signing the 5,206.771 Million Baht contract to hire Chinese firms to handle design and consultant for Thai - China High Speed train during the 9th BRICS Xiamen Summit at Xia Men

Here are the contracts in question:
1. Detailed Design Services Agreement at 1,706.771 Million Baht
2. Construction Supervision Consultant Services Agreement at 3,500 Million Baht

During the 9th BRICS Xiamen Summit at Xia Men, MoT Akhom said during the construction of Bangsue Central - Nakhon Ratchasima High Speed train construction, Thai government is going to deal with the study on the extension from Nakhon Ratchasima to Nong Khai to connect with Lao - China Railway
https://mgronline.com/business/detail/9600000091221
http://www.banmuang.co.th/news/economy/89941
__________________
BKK Mass Transit Expert

kunming tiger liked this post
Wisarut no está en línea   Reply With Quote


Reply

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Related topics on SkyscraperCity


All times are GMT +2. The time now is 06:22 AM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2018, vBulletin Solutions Inc.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

tech management by Sysprosium