daily menu » rate the banner | guess the city | one on oneforums map | privacy policy | DMCA | news magazine | posting guidelines

Go Back   SkyscraperCity > Infrastructure and Mobility Forums > Subways and Urban Transport

Subways and Urban Transport Metros, subways, light rail, trams, buses and other local transport systems

Global Announcement

As a general reminder, please respect others and respect copyrights. Go here to familiarize yourself with our posting policy.


Thread Tools
Old September 30th, 2013, 02:00 PM   #1
Join Date: Apr 2013
Location: Outside the box laughing at those inside!
Posts: 4,451
Likes (Received): 5017



Status - Approved, Construction will begin soon

Corridor 1 (west-east): Airport to Narengi via Jalukbari, Bharalumukh, Fancy Bazar, Chandmari and Noonmati

Corridor 2 (center-south east): Paltan Bazar to Khanapara via, Ulubari, Bhagagarh, Ganeshguri and Dispur

64.50 km and 56.30 km will be covered in the first and second phase respectively, while in the third phase 75.50 km will be covered.


To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts.
Pals_RGB no está en línea   Reply With Quote

Sponsored Links


Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Related topics on SkyscraperCity

All times are GMT +2. The time now is 02:38 PM.

Powered by vBulletin® Version 3.8.8 Beta 1
Copyright ©2000 - 2015, vBulletin Solutions, Inc.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2015 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2015 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu