Old December 27th, 2013, 03:11 PM   #1
MichiH
Registered User
 
Join Date: Jan 2013
Location: Lower Franconia
Posts: 4,406
Likes (Received): 2082

New motorway projects (see new thread!)

The list should contain all under construction new motorway and expressway sections which have been opened for traffic since 1st January 2014. The list is frequently updated.
It's currently not comprising all countries of the world which depends on many reasons like incomplete data or different road standards.
If you want to add your country's project list, please post all required and known information within the country's thread. Please refer to the legend for required standards.

History:

Summary of 2014 openings (by country/by date/km per country)

Legend:

<Numbering>: <section from ... to ...> <Length> km (<start of construction> to <estimated opening>/<actual opening>) [optionally: <comment>] - project pagemap
c/w = carriageway, i/c = interchange, AS/AD/AK = interchange (German version)

The definition of motorway and expressway status is country-specific. The subsequent definition describes the pre-conditions which must be fulfilled to add new projects:

New motorways and expressways are projects which are currently under construction or have been opened since 1st January 2014.
The pre-conditions to be added to the list are based on the Convention on road traffic done at Vienna on 8th November 1968. The future road:
- must feature 2 carriageways with each 2 lanes
- must be grade-separated
- should be access-controlled
- does not have U turns to travel in reverse
It doesn't matter if the future road will feature hard shoulders.
A median is not mandatory but there must be a fixed barrier between the carriageways, for instance guard railing.
If a 2nd carriageway is planned but not yet u/c, the project is added if the other pre-conditions - except barrier - are already fulfilled.
Projects which were under construction but are suspended now, are added too, if the completion is still planned by the countries demand plan.
In addition, roads will be added which will be rededicated to motorway or expressway status of the respective country.
Widening projects are not included.
The opening date does not refer to the completion of the works but to the official opening of the road.

All information without engagement

*** The author gladly takes notes for completion / correction ***
*** Please post regular updates only in the respective country thread of the project. Thank you. ***



List of new motorway or expressway sections with actual or expected opening dates:

Albania

2014 opening:
A3: Mushqeta – Elbasan ~14km (April 2011 to 31st July 2014) – ? – map
SH4: Kavaje – Rrogozhine ~20km (2010 to August 2014) – ? – map

2016 opening:

A3: Tirana – Mushqeta ~17km (April 2011 to Spring 2016) – ? – map
A4: Mbrostar Ura – Levan 22km (2013 to 2016) – ? – map


Algeria

2014 opening:
A1: Boughalboune – El Harrouche 16km (2007 to 27th January 2014) – projectmap
A1: El Harrouche – El Ghadir 7km (2007 to 10th April 2014) – projectmap

2015 opening:

?: Chiffa – Berrouaghia 125km (Mid 2012 to 2015/16) – projectmap

Unknown opening date:

A1: Zighoud Youcef – Boughalboune 8km (2007 to ?) – projectmap
A1: Drean/Ain Allam – Raml Souk ?km (2007 to ?) [contract canceled]projectmap
?: Batna – Khenchela 102km (November 2014 to ?) – ? – map

The list is incomplete. Please help to complete!


Argentina (map)

2014 opening:
Autopista Illia: Buenos Aires-Avenida La Pampa – Buenos Aires-Avenida Presidente Sarmiento 3.3km (Early 2010 to 3rd June 2014) [2nd c/w] – ? – map
RP314: Tafi Viejo – Tucuman-Avenida Francisco de Aguirre 5.5km (Mid 2012 to 26th September 2014) – ? – map

2017 opening:

RN8: Pergamino-West – Pergamino-East 20.3km (2013 to 2017) – ? – map

2018 opening:

RN22: Cipolletti – Enrique Godoy 78.2km (November 2011 to November 2018) – ? – map

Unknown opening date:

Autopista Presidente Peron: Mariano Acosta – Guernica ~55km (February 2011 to ?) – ? – map
RN7: San Andres de Giles-East – Lujan-West 23.9km (2012 to ?) – ? – map
RN8: west of Solis – Fatima-West 32.6km (2012 to ?) – ? – map
RN9: Yala – west of Jujuy 12.9km (2011 to ?) – ? – map
RN5: Jauregui – Lujan-East 10.6km (2005 to suspended) – ? – map


Austria

2014 opening:
S10: Freistadt-North – Freistadt-South 5.9km (Summer 2011 to 16th November 2014) – projectmap

2015 opening:

A9: Bosrucktunnel 7.3km (2007 to 19th October 2015) [2nd c/w] – projectmap
S36: west of Sankt Georgen – east of Sankt Georgen ~1.5km (April 2013 to 1st December 2015) – projectmap
S10: Freistadt-South – Unterweitersbach 13.6km (Spring 2012 to 20th December 2015) – projectmap

2017 opening:

A5: Poysbrunn – Schrick 25km (April 2015 to 2017) – projectmap

2018 opening:

A9: Tunnelkette Klaus 8km (September 2013 to Late 2018) [2nd c/w] – projectmap

2019 opening:

A9: Gleinalmtunnel 8.3km (September 2013 to 2019) [2nd c/w] – projectmap

2021 opening:

S7: Riegersdorf (A2) – Dobersdorf 14.8km (May 2015 to 2021) – projectmap

2023 opening:

A11: north of Karawanks tunnel – AT/SLO border 4.9km (September 2015 to Summer 2023) [2nd c/w] – projectmap


Belarus

2014 opening:
M6: Dubraulyany – Plianty 8km (2011 to 2014) – ?– map

2015 opening:

MKAD2: Haroski (P28) – Ostroshitskij Gorodok (M3) 28km (Early 2014 to 6th October 2015) – ? – map
MKAD2: Rakaw (M6) – Haroski (P28) 18km (Early 2014 to Late 2015) – ? – map

2017 opening:

MKAD2: Boroviki (M1) – Rakaw (M6) 42km (2014 to November 2017) – ? – map

The list is incomplete. Please help to complete!


Belgium

A11: Brugge (N31) – Westkapelle 12km (March 2014 to Late 2017) – projectmap


Bosnia and Herzegovina (map and summary)

2014 opening:
A1: Josanica – Butila 5.7km (October 2007 to 26th June 2014) – projectmap
A1: Butila – Vlakovo 3.9km (July 2013 to 26th June 2014) – projectmap
A1: Drivusa – Biljesevo 6.5km (August 2010 to 25th August 2014) – projectmap
A1: Zvirovici – Medugorje 9.1km (October 2010 to 17th September 2014) – projectmap
A1: Vlakovo – Lepenica 10.2km (January 2013 to 7th October 2014) – projectmap
A1: Lepenica – Tarcin 10.1km (June 2012 to 7th October 2014) – projectmap

2015 opening:

?: Butila (A1) – Brijesce 3.5km (October 2010 to 16th November 2015) – projectmap

2016 opening:

?: Prnjavor – Johovac 36.6km (May 2013 to Summer 2016) – projectmap

2017 opening:

A1: Klopce – Drivusa 2.5km (October 2014 to April 2017) – projectmap
?: Mahovljani – Prnjavor 35.3km (October 2014 to October 2017) – projectmap
A1: Svilaj – Odzak 11.0km (November 2013 to Late 2017) – projectmap
A1: Donja Gracanica – Drivusa 8.3km (October 2014 to >= 2017) [only southern part u/c]projectmap


Bulgaria

2014 opening:
A4: Generalovo – Kapitan Andreevo 5.4km (November 2011 to 14th August 2014) – ? – map

2015 opening:

A4: Dimitrovgrad – Harmanli 31.5km (July 2011 to 28th May 2015) – projectmap
A4: Kapitan Petko Voyvoda – east of Svilengrad 8.9km (Spring 2011 to 7th June 2015) [2nd c/w] – ? – map
A3: Marino pole – Kulata 3.2km (April 2012 to 16th July 2015) [1st c/w] – projectmap
A3: Marino pole – Kulata 3.2km (April 2012 to 31st July 2015) [2nd c/w] – projectmap
A3: south of Sandanski – Marino pole 11.5km (April 2012 to 31st July 2015) – projectmap
A2: Panayot Volovo – Belokopitovo 4.9km (August 2013 to 3rd August 2015) – ? – map
A3: Dupnitsa – Blagoevgrad ~40km (July 2013 to 22nd October 2015) – projectmap
II18: Kakach river – Lyulin (A6) 3.0km (September 2012 to 22nd October 2015) – projectmap
A4: Chirpan – Dimitrovgrad 33.8km (October 2011 to 29th October 2015) – projectmap
I1: Montana bypass 12.5km (September 2013 to Late 2015) – projectmap

2016 opening:

II18: Trebich (SNST) – Kakach river 5.5km (October 2015 to August 2016) – ? – map
SNST: Trebich (II18) – Sofia-East (A2) 16.5km (February 2015 to 2016) – projectmap


Canada

2014 opening:
QC-A85: Cabano – Notre-Dame-du-Lac 6.0km (2012 to 10th September 2014) – projectmap
QC-A85: Degelis – QC/NB border 8.5km (2012 to 10th September 2014) – projectmap
ON-404: Keswick-Ravenshoe Road – Newmarket-Green Lane 12.7km (2010 to 17th September 2014) – ? – map
QC-A35: Saint Jean sur Richelieu-South – Saint Sebastien (QC-133) 24.5km (2011 to 8th October 2014) – projectmap
QC-A73: South of Vallee-Jonction – Saint-Joseph-de-Beauce 4.2km (August 2012 to 8th October 2014) [2nd c/w] – ? – map
QC-A5: Wakefield – Wakefield (QC-A105) 6.5km (2010 to 10th October 2014) – projectmap
NB-2: QC/NB border – north of Saint-Jacques 2.8km (2010 to 5th November 2014) – ? – map
QC-A410: Sherbrooke-Rue Dunant – Sherbrooke-Rue Belvedere Sud ~3km (2012 to 21st November 2014) – projectmap

2015 opening:

ON-401: Windsor-Lamelle Street – Windsor-Howard Avenue ~8km (August 2011 to 29th June 2015) – projectmap
ON-400: Murdock River Road (ON-637) – north of Alban 9km (Summer 2012 to 11th September 2015) – projectmap
QC-A73: Sainte-Marie – Vallee-Jonction 11km (2014 to 23rd October 2015) [2nd c/w] – projectmap
QC-A410: Sherbrooke-Rue Belvedere Sud – Lennoxville (QC-143) 2.7km (2012 to 29th October 2015) – projectmap
ON-401: Windsor-Ojibway – Windsor-Lamelle Street ~3km (August 2011 to Late November 2015) – projectmap
QC-A73: Notre-Dame-des-Pins – Saint-Georges-North 5.4km (July 2012 to 11th November 2015) – ? – map
QC-A85: Note-Dame-du-Lac – Lac Martin 7.5km (2012 to Fall 2015) – projectmap
ON-407: Pickering-Brock Road – Oshawa-Harmony Road 22km (2013 to December 2015) – projectmap
ON-412: Whitby (ON-407) – Whitby (ON-401) 10km (2013 to December 2015) – projectmap

2016 opening:

ON-400: north of Alban – north of French River (ON-607) 11km (Summer 2012 to Summer 2016) – projectmap
AB-216: Edmonton-Manning Drive (AB-215) – Edmonton-Yellowhead Highway (16) 8.5km (July 2012 to October 2016) – projectmap
QC-A73: Beauceville – Notre-Dame-des-Pins 8.0km (April 2015 to Fall 2016) – ? – map
ON-417: Arnprior-Scheel Drive – Arnprior-Campbell Drive 5.3km (2014 to 2016) – ? – map

2017 opening:

QC-A70: Saguenay-Boulevard du Royaume – Saguenay-Chemin de la Grande-Anse 7.6km (April 2013 to Fall 2017) – projectmap


Croatia

2014 opening:
D1: Split-Dracevac – Klis (near Klis Kosa) 3km (? to 23rd June 2014) [2nd c/w] – ? – map
D2: Osijek (A5) – Osijek (Z4085) 7.5km (September 2011 to 28th November 2014) [2nd c/w] – ? – map
D1: Split-Dracevac – Klis (near Ozrna) 1.5km (? to 30th November 2014) [2nd c/w] – ? – map

2015 opening:

A5: Sredanci (A3) – Zoljani 3.2km (September 2011 to 2nd March 2015) – ? – map
A11: Busevec – Lekenik 11.2km (April 2010 to 22nd April 2015) – ? – map
A11: Jakusevec (A3) – Velika Gorica 8.5km (April 2006 to 3rd November 2015) – ? – map
D2: Osijek (Z4085) – Osijek (Z4091) 4.6km (September 2011 to 5th November 2015) [2nd c/w] – ? – map

2016 opening:

D10: Gradec – Krizevci 11.5km (? to 2016) – ? – map
D12: Vrbovec (A12) – Farkasevac 10.5km (? to 2016) – ? – map

2017 opening:

A5: north of Drava bridge – Osijek ~6km (July 2011 to >= April 2017) – ? – map


Cyprus

No new motorway or expressway currently u/c


Czech Republic

2014 opening:
I44: Zvole – Vlachov 2.9km (April 2009 to 31st July 2014) – projectmap
I35: Lesna – Priluky 1.7km (November 2009 to 8th September 2014) – projectmap

2015 opening:

MO: Prague-Malovanka – Prague-Troja 5.5km (2007 to 19th September 2015) – projectmap
I11: Mokre Lazce – Ostrava-Krasne Pole 9.8km (January 2009 to 13th October 2015) – projectmap
R6: Bosov – Lubenec 4.1km (May 2010 to 10th November 2015) – projectmap

2016 opening:

D8: Rehlovice – Bilinka 12.4km (November 2007 to Late 2016) – projectmap

2017 opening:

R4: Pribram/Skalka – Haje 4.8km (April 2015 to January 2017) – projectmap
D11: Praskacka – Hradek Kralove ~4km (July 2014 to August 2017) – projectmap
I11: Ostrava-Krasne Pole – Ostrava-Poruba 6.7km (November 2012 to August 2017) – projectmap
I11: Nebory – Oldrichovice 4.9km (August 2014 to September 2017) – projectmap
I35: Priluky – Mstenovice 0.7km (November 2009 to November 2017) – projectmap

2018 opening:

I11: Oldrichovice – south of Bystrice 6.2km (August 2014 to February 2018) – projectmap
D3: Veseli nad Luznici – Bosilec 5.1km (April 2015 to March 2018) – projectmap
D3: Borek – Usilne ~2.5km (April 2015 to March 2018) – projectmap
D1: Prerov-North (R55) – Lipnik nad Becvou (R35) 14.3km (July 2015 to July 2018) – projectmap
D3: Bosilec – Sevetin 8.1km (September 2015 to September 2018) – projectmap


Denmark

2014 opening:
PR18: Brande-North – Brande-South 7km (2012 to 27th May 2014) [2nd c/w] – projectmap
PR15: Harup – Lasby 11.7km (2010 to 1st December 2014) – projectmap

2015 opening:

PR17: Traervej – Ballerup 5km (Fall 2012 to 13th July 2015) – projectmap

2016 opening:

PR15: Funder – Harup 17.5km (2010 to Fall 2016) – projectmap

2017 opening:

502: Tjorring – Herning-Snejbjerg 10km (February 2015 to Early 2017) – projectmap

2018 opening:

PR18: Holstebro-North – Tjorring 40km (May 2015 to Late 2018) – projectmap


Equatorial Guinea

?: Bata – Bolondo ?km (2012 to February 2016) – ? – map


Estonia

No new motorway or expressway currently u/c


Finland

2014 opening:
Vt7: Pyhtää – Kotko-West 14km (November 2011 to 12th August 2014) – projectmap
Vt7: Loviisa – Ahvenkoski 15km (November 2011 to 1st September 2014) – projectmap
Vt5: Vuorela – Palvaranta 5km (October 2009 to September 2014) – projectmap
Vt7: Hamina-Lankamalmi – Hamina-East 15.7km (Early 2012 to 17th December 2014) – projectmap

2016 opening:

Vt8: Masku – Raisio ?km (February 2014 to Late 2016) – ? – map

2018 opening:

Vt7: Hamina-East – Vaalimaan 32km (June 2015 to Spring 2018) – projectmap


France

2014 opening:
D222: Tregueux-Le Creach – Tregueux-La Croix Gibat 2km (? to 27th January 2014) – projectmap
A50: Tunnel de Toulon 3.2km (September 2007 to 19th March 2014) [2nd c/w] – ? – map
N7: Saint-Prix – Saint-Martin-Estreaux 9.5km (2007 to 19th March 2014) – ? – map
N249: Montourneau – Bressuire-West 11km (April 2012 to 3rd October 2014) – ? – map
N88: Albi-Le Lude – Albi-Stadium 1.5km (? to 15th October 2014) [2nd c/w] – projectmap
N7: Moiry – Maison-Rouge 3.5km (? to 30th October 2014) – ? – map
N249: Cholet (D160) – Cholet (A87) 3.3km (March 2011 to 4th December 2014) [2nd c/w] – ? – map
D924: West of Ecouche – Argentan-West (A88) ~7km (2011 to 12th December 2014) – ? – map

2015 opening:

A719: Gannat-East – Vichy 13.8km (August 2011 to 12th January 2015) – projectmap
A89: Brive-North – Saint-Germain-les-Vergnes 4km (? to 7th February 2015) [2nd c/w] – ? – map
A150: Yvetot – Barentin 18km (March 2013 to 9th February 2015) – projectmap
N88: Albi-Stadium – north of Albi-Caussels 2.3km (? to 20th February 2015) [2nd c/w] – projectmap
N88: La Baraque St-Jean – La Mothe 13.7km (December 2010 to 2nd July 2015) – projectmap
A466: Quincieux (A46) – Les Cheres (A6) 4km (? to 4th July 2015) – projectmap
D177: Guignen – Le Tertre ~2km (? to 22nd July 2015) – ? – map
N79: Bresnay – Chemilly 6.3km (? to December 2015) [2nd c/w] – projectmap

2016 opening:

A507: Frais Vallon – Marseille-East (A50) 5.2km (1993 to 2016) – projectmap
N27: Arques-la-Bataille – Manehouville 7.7km (July 2012 to Late 2016) – ? – map
D222: Tregueux-La Croix Gibat – Tregueux-Perray (N12) 2.5km (? to Late 2016) – projectmap
N141: La Vigerie – Saint-Yrieix 5.5km (? to Late 2016) – ? – map
D177: Le Tertre – Loheac ~6km (? to Late 2016) – ? – map
D177: Pipriac – Courbouton ~4.5km (? to Late 2016) – ? – map

2017 opening:

D177: Renac – Sainte-Marie 2.0km (? to 2017) – ? – map
A304: Rocroi – Charleroi-Mezieres (A34) 31km (July 2011 to 2017) – projectmap
A9: Saint-Jean-de-Vedas – Saint Aunes ~12km (October 2014 to Late 2017) [existing A9 will be renumbered to A709]projectmap
N88: Malpas – Brive-Charensac-West 8.7km (Spring 2010 to Late 2017) – projectmap

2018 opening:

A89: east of Lentilly – Limonest (A6) 5.5km (Mid 2015 to Early 2018) – projectmap
N1: La Possession-North – Saint-Denis-West 12.5km (December 2013 to 2018) – projectmap
N10: Reignac – Chevanceaux 11.3km (2014 to 2018) – projectmap
N88: La Mothe – Les Molinieres 14.3km (September 2014 to 2018) – projectmap

The list is incomplete. Please help to complete!


Germany (map)

2014 opening:
A30: AS Bad Oeynhausen-North – AS Dehme 1.6km (September 2008 to 12th March 2014) – projectmap
A524: west of AK Duisburg-South – west of AS Duisburg-Rahm 1.9km (February 2010 to Early July 2014) – ? – map
A44: AS Hessisch Lichtenau-West – AS Hessisch Lichtenau-Center 2.2km (April 2008 to 24th July 2014) – projectmap
B243: AS Bad Lauterberg – AS Bad Sachsa 8.6km (October 2008 to 5th September 2014) – projectmap
A66: AS Neuhof-South – AS Neuhof-North 3.7km (October 2005 to 13th September 2014) – projectmap
A4: AS Düren – AS Kerpen 12.9km (September 2008 to 17th September 2014) [direction Cologne]projectmap
A4: AS Düren – AS Kerpen 12.9km (September 2008 to 20th September 2014) [direction Aachen; discontinuation: 12.8km]projectmap
A281: AS Bremen-Seehausen – AS Bremen-Strom 4.1km (April 2009 to 29th September 2014) – projectmap
A62: south of AS Weselberg – Schwarzbach viaduct 3.6km (September 2013 to Late September 2014) [2nd c/w] – ? – map
A14: AS Colbitz – AS Wolmirstedt 5.7km (November 2011 to 29th October 2014) – ? – map
A4: AS Magdala – AS Jena-Göschwitz 11.8km (May 2007 to 30th October 2014) [direction Erfurt]projectmap
A4: AS Magdala – AS Jena-Göschwitz 11.8km (May 2007 to 18th November 2014) [direction Dresden; discontinuation: 12.6km]projectmap
A26: AS Horneburg – AS Jork 4.6km (Summer 2006 to 28th November 2014) [direction Stade]projectmap
A21: south of Nettelsee – Stolpe 2km (February 2012 to 2nd December 2014) – projectmap
B2: AS Roth-Otto-Lilienthal-Kaserne – south of Untersteinbach 3.3km (October 2012 to 5th December 2014) – projectmap
B50: AK Wittlich – AS Platten 5.4km (May 2003 to 15th December 2014) – projectmap

2015 opening:

A448: rededication AD Bochum-West – AS Bochum-South 5.0km (Mid 2015) – projectmap
A26: AS Horneburg – AS Jork 4.6km (Summer 2006 to 17th July 2015) [direction Hamburg]projectmap
A71: Etzleben – AS Sömmerda-East 11.4km (June 2010 to 3rd September 2015) – projectmap
A23: AS Itzehoe-Center – south of Stör bridge 2.5km (January 2007 to 26th October 2015) – projectmap
B10: Walmersbach – AS Hinterweidenthal 2.5km (June 2010 to 30th October 2015) – projectmap
A14: AK Schwerin – AS Grabow 14.4km (November 2012 to 21st December 2015) – ? – map
A14: AS Groß Warnow – AS Karstädt 10.8km (October 2013 to Late December 2015) – projectmap

2016 opening:

A23: south of Stör bridge – AS Itzehoe-South 2.0km (2010 to 30th June 2016) – projectmap
B535: AS Mannheim-Friedrichsfeld – AS Schwetzingen-Center 1.9km (December 2010 to Mid 2016) [2nd c/w] – projectmap
B33: AS Offenburg-Zunsweier – AS Gengenbach-North 2.8km (October 2010 to September 2016) – ? – map
A448: AS Altenbochum (East) – AK Bochum/Witten 1.4km (October 2012 to Late 2016) – projectmap
A661: AS Frankfurt-Friedberger Landstraße – AS Frankfurt-East 2.2km (November 2007 to Late 2016) [2nd c/w] – projectmap
A33: AS Halle-Künsebeck – AS Bielefeld-Center 7.9km (September 2009 to Late 2016) – projectmap

2017 opening:

B266: AS Bad Neuenahr (A573) – AS Bad Neuenahr-East 1.8km (February 2009 to Mid 2017) – projectmap
A44: AS Heiligenhaus – AS Heiligenhaus-Hetterscheidt 4.9km (April 2010 to Mid 2017) – projectmap
A30: AS Gohfeld – AS Bad Oeynhausen-North 5.3km (September 2008 to 2017) [discontinuation: 1.4km]projectmap
A30: AS Dehme – AS Bad Oeynhausen-East 1.9km (September 2008 to 2017) – projectmap
A44: AS Hessisch Lichtenau-East – Hasselbach 4.3km (September 2010 to 2017) – projectmap
A44: Hasselbach – AS Waldkappel 6.1km (March 2011 to 2017) – projectmap
A44: west of AK Jackerath – AK Holz 10.2km (May 2012 to 2017) [discontinuation: 2.2km]projectmap
A72: AS Borna-North – AS Rötha 9.5km (July 2013 to 2017) – projectmap
B85: Piendling – Untertraubenbach 3.2km (March 2014 to October 2017) – projectmap
A8: AS Merzig-Wellingen – AS Merzig-Schwemlingen 3.5km (April 2015 to November 2017) [2nd c/w] – projectmap
A14: AS Grabow – AS Groß Warnow 11.5km (June 2015 to Late 2017) – ? – map
B49: Solms – AS Oberbiel-East 3.2km (May 2010 to Late 2017) [~300m/~1000m in service since 2014/15]projectmap
B33: Waldsiedlung – AS Reichenau 0.9km (June 2014 to Late 2017) – ? – map

2018 opening:

B33: AS Offenburg-Elgersweier (B3) – AS Offenburg-Zunsweier 2.4km (October 2010 to Early 2018) – ? – map
A21: north of AS Nettelsee – south of Nettelsee 2.1km (February 2012 to Mid 2018) – projectmap
A448: rededication AS Bochum-South – AS Altenbochum (West) 1.8km (Mid 2018) – projectmap
A448: AS Altenbochum (West) – AS Altenbochum (East) 1.9km (October 2012 to Mid 2018) – projectmap
A46: AS Bestwig – AS Nuttlar 5.6km (September 2009 to 2018) – ? – map
B50: AS Platten – Longkamp 19.9km (July 2009 to 2018) – projectmap
B10: AS Hinterweidenthal – east of Hinterweidenthal 1.3km (September 2013 to 2018) – projectmap
B49: Landfill site Beselich – Beselich/Merenberg 3.4km (May 2011 to 2018) – projectmap
A33: AS Halle – Halle-Künsebeck 4.0km (December 2012 to 2018) – projectmap
B29: east of Böbingen – west of Essingen 6.9km (July 2015 to 2018) – projectmap
B30: AS Ravensburg-Süd – AS Karrer 3.4km (July 2013 to 2018) – projectmap
B300: AS Dasing (A8) – AS Aichach-West ~4km (October 2014 to 2018) – projectmap
B51: AS Münster-Warendorfer Straße (B481) – AS Münster-Wolbecker Straße 2.7km (June 2015 to Late 2018) – projectmap
B101: AS Thyrow – AS Trebbin-North 5.0km (May 2015 to Late 2018) – projectmap

2019 opening:

B85: AS Neubäu-West – AS Neubäu-East 4.0km (November 2015 to Mid 2019) [1st c/w] – projectmap
A44: AS Helsa-East – AS Hessisch Lichtenau-West 6.1km (May 2010 to 2019) – projectmap
A33: AS Borgholzhausen – AS Halle 8.6km (December 2012 to 2019) – projectmap
B15n: AS Ergoldsbach – AS Essenbach (A92) 9.0km (August 2013 to 2019) – projectmap
A94: AS Pastetten – AS Dorfen 17.4km (April 2012 to Late 2019) – projectmap
A94: AS Dorfen – AS Heldenstein 14.9km (July 2013 to Late 2019) – projectmap
B51: north of Belm – AS Belm (A33) 4.5km (February 2015 to Late 2019) – projectmap
A33: AS Belm (B51) – south of AS Osnabrück-Schinkel 2.2km (February 2015 to Late 2019) – projectmap

2020 opening:

A49: AS Neuental – AS Schwalmstadt 11.8km (March 2011 to 2020) – projectmap
A98: AD Hochrhein – AS Rheinfelden-Karsau 2.5km (March 2009 to Late 2020) – projectmap
B31: Immenstaad – Friedrichshafen/Waggershausen 7.1km (November 2014 to Late 2020) – projectmap

2021 opening:

A26: AS Jork – AS Buxtehude 4.5km (Summer 2006 to 2021) – projectmap
A26: AS Buxtehude – AS Neu Wulmstorf 4.1km (September 2013 to 2021) – projectmap
B2: AS Oberau-North – AS Oberau-South 4.2km (September 2015 to Late 2021) – projectmap

2022 opening:

A100: AD Neukölln – AS Am Treptower Park 3.2km (May 2013 to 2022) – projectmap


Greece

2015 opening:
A1: Roditsa – Anthili (A3) 4km (2006 to 16th February 2015) – ? – map
A1: Raches – Agia Marina 19.2km (2007 to 16th March 2015) [direction Lamia] – ? – map
A1: Raches – Agia Marina 19.2km (2007 to 19th March 2015) [direction Larissa] – ? – map
A29: Krystalopigi – Koromilia 15km (2012 to 2015) – projectmap

2016 opening:

A1: Skotina – Aegani 10km (2008 to October 2016) – projectmap
A1: Pyrgetos – Evangelismos 14km (2008 to October 2016) – projectmap
A3: Trikala – Xuniada ~90km (2008 to 2016) – projectmap
A25: Kato Christos – Strymoniko ~21km (? to 2016) – projectmap
A25: Neo Petritsi – Kamaroto ~10km (? to 2016) – projectmap
A27: Niki – Florina 14.5km (2011 to 2016) – projectmap
A52: Aktio – Loutraki 35km (2009 to 2016) – ? – map
A52: Loutraki – Ambraktia (A5) 13km (2009 to 2016) – ? – map
A3: Panagia (A2) – Trikala ~50km (2008 to > 2016) – projectmap
A3: Xuniada – Anthili (A1) ~35km (2008 to > 2016) – projectmap

2017 opening:

A5: Kefalovryso – Antirrio 43km (2008 to 2017) – projectmap
A5: Sellades – Kouvaras 53km (2008 to 2017) – projectmap
A5: Ioannina (A2) – Filippiada 50km (2008 to 2017) – projectmap
A8: Patra-Rio (A5/A9) – Korinthos (A7) 120km (2008 to 2017) – projectmap

Unknown opening date:

A5: Patra-Mintilogli – Pyrgos 75km (2008 to suspended) – projectmap
A7: Thouria – Kalamata-East 11km (? to suspended) – ? – map
A71: Leuktro (A7) – Sparti 46km (? to suspended) – projectmap


Hungary


2014 opening:

M86: Szombathely – Vat 9.2km (September 2009 to 28th June 2014) – ? – map
M3: Vaja/Mateszalka – Vasarosnameny 11.9km (May 2013 to 10th October 2014) – projectmap

2015 opening:

M85: Kony – Enese 2.3km (June 2013 to 16th June 2015) – ? – map
M85: Rabapatona – Györ (M1) 6.8km (June 2013 to 16th June 2015) – ? – map
M43: Mako – HU/RO border (Nagylak) 23.1km (October 2012 to 11th July 2015) – projectmap
M60: Keszü – Pecs 1.8km (January 2014 to 31st July 2015) [1st c/w] – projectmap
M85: Csorna-East (M86) – Kony 5.8km (June 2013 to 9th September 2015) – ? – map
M86: Szilsarkany – north of Csorna-East (M85) 9.3km (June 2013 to 9th September 2015) – ? – map
M86: north of Csorna-East (M85) – north of Csorna 1.1km (June 2013 to 9th September 2015) [1st c/w] – ? – map
M86: Szeleste – Hegyfalu 7.5km (October 2013 to 18th September 2015) – ? – map

2016 opening:

M86: Hegyfalu – Szilsarkany 33.4km (October 2013 to Summer 2016) – ? – map

Unknown opening date:

M4: Abony – Törökszentmiklos 28.9km (October 2013 to suspended) – projectmap


Iceland

No new motorway or expressway currently u/c


Ireland

2015 opening:
M11: Rathnew – Arklow-North 16.5km (June 2013 to 13th July 2015) – projectmap

2017 opening:

N17: Tuam-North – Tuam-West 4.2km (May 2014 to Summer 2017) – projectmap

2018 opening:

M17: Tuam-West – Rathmorrisy (M6) 25.5km (May 2014 to February 2018) – projectmap
M18: Rathmorrisy (M6) – Gort 27.7km (May 2014 to February 2018) – projectmap
M11: Clough – Enniscorthy-South 27km (October 2015 to 2018) – projectmap


Italy

2014 opening:
SS727: Forli (A14) – Forli-Zona Industriale 4.4km (June 2012 to 26th June 2014) – projectmap
A31: Albettone/Barbarano – Agugliaro 6.6km (September 2005 to 1st July 2014) – projectmap
A35: Melzo (A58) – Brescia 62km (Summer 2009 to 23rd July 2014) – projectmap
A58: Pozzuolo Martesana (SP103) – Comazzo 7km (June 2012 to 23rd July 2014) – projectmap
SP14 Milan: Segrate – Vignate 6.7km (2010 to 23rd July 2014) – projectmap
SP14 Milan: Vignate – Liscate (A58) 5.2km (2010 to 23rd July 2014) – projectmap
SP103 Milan: Pioltello - Pozzuolo Martesana (A58) 6.8km (2008 to 23rd July 2014) – projectmap
SS106: Nova Siri Scalo bypass 5km (September 2011 to 5th November 2014) – projectmap
A31: Santa Margherita d'Adige – Badia Polesine (SS434) 18km (September 2005 to 15th December 2014) – projectmap

2015 opening:

SS77: Colfiorito – Bavareto 9km (November 2009 to 16th January 2015) – projectmap
A60: Azzate Buguggiate (A8) – Ponte di Vedano (SS712) 4.5km (2010 to 25th January 2015) – projectmap
A36: Cassano Magnago (A8) – Lomazzo (A9) 15km (February 2010 to 26th January 2015) – projectmap
Strada a Mare Guido Rossa: Genoa-Cornigliano – Genoa-Sampierdarena 1.6km (February 2011 to 7th February 2015) – ? – map
A31: Noventa Vicentina – Santa Margherita d'Adige 7km (September 2005 to 23rd March 2015) – projectmap
A52: Fiera di Milano (A8) – Novate Milanese ~2km (April 2014 to 27th April 2015) – projectmap
A58: Ornate (A4) – Pozzuolo Martesana (SP103) 9km (2012 to 16th May 2015) – projectmap
A58: Comazzo – Cerro al Lambro (A1) 17km (2012 to 16th May 2015) – projectmap
A59: Grandate (A9) – Albate 3km (2010 to 23rd May 2015) – projectmap
SP415 Lodi: Spino d'Adda – Dovera 6.5km (July 2013 to 22nd June 2015) – projectmap
SS106: Roccella Jonica-Canne – Gioiosa-East 8km (May 2013 to 9th July 2015) – projectmap
SS106: Gioiosa-East – Gioiosa Jonica 4km (September 2011 to 9th July 2015) – projectmap
A12: south of Mignone bridge – Civitavecchia-Aurelia 4km (October 2011 to 17th July 2015) – projectmap
A12: Tarquinia-Tuscania-Viterbo – south of Mignone bridge 10.5km (October 2011 to 31st July 2015) – projectmap
A31: Agugliaro – Noventa Vicentina 6km (September 2005 to 31st August 2015) – projectmap
A36: Lomazzo (A9) – Lentate sul Seveso (SS35) 7.5km (October 2012 to 5th November 2015) – projectmap
A1var: La Quercia – Aglio 37km (2004 to 15th December 2015) – projectmap
A1var: Aglio – Barberino 6km (2004 to 15th December 2015) [2nd c/w] – projectmap
SS534: Spezzano Albanese-Terme – Sibari Marina 14km (November 2013 to 24th December 2015) [2nd c/w] – projectmap
SS199: west of Olbia-South (SS131DCN) – Olbia-Airport 2.5km (June 2012 to December 2015) – projectmap
SS640: Agrigento – Canicatti 8km (March 2009 to 2015) – projectmap

2016 opening:

SS597: Codrongianos (SS131) – Ploaghe 2.4km (September 2013 to January 2016) – projectmap
SP1 BT: Andria-North-East – Trani-North (SS16bis) 7.5km (January 2014 to January 2016) – ? – map
Pedemontana Veneta: Thiene (A31) – Breganze 5.7km (November 2011 to Early 2016) – projectmap
SS96 Barese: Altamura – Mellitto 10km (December 2013 to March 2016) – ? – map
SS597: Monti/Telti – Enas 7.2km (December 2013 to March 2016) – projectmap
SS223: Monticiano – Civitella Paganico 11km (2013 to Spring 2016) – projectmap
SS597: Ploaghe – Ardara 9.4km (September 2013 to June 2016) – projectmap
SS597: Enas – west of Olbia-South (SS131DCN) 8.4km (December 2013 to June 2016) – projectmap
SS640: Cannemaschi – Caltanissetta (A19) 34km (April 2012 to July 2016) – projectmap
SR8: Talsano-North – Pulsano-East 11km (August 2014 to August 2016) – ? – map
SS77: Foligno (SS3) – Colfiorito 19km (November 2009 to 2016) – projectmap
SS77: Bavareto – Pontelatrave 8km (November 2009 to 2016) – projectmap
SS96 Barese: Mellitto – Toritto 5.4km (March 2010 to 2016) – ? – map
SS318: Casacastalda – Valfabbrica 6.8km (< 2007 to 2016) [~4km 1st c/w only] – projectmap
SS318: Valfabbrica – Pianello 8.5km (2009 to 2016) – projectmap
Pedemontana Veneta: Montecchio Maggiore (A4) – Montecchio Maggiore (SR11) 1.2km (October 2014 to 2016) – projectmap

2017 opening:

SS597: Monti-West – Monti/Telti 6.4km (February 2015 to February 2017) – projectmap
SS597: Martis (SS132) – west of Oschiri 11.9km (August 2014 to March 2017) – projectmap
SS675: Monte Romano-East – Cinelli 6.4km (July 2015 to August 2017) – projectmap
SS76: Albacina – Serra San Quirico 11km (Early 2009 to 2017) [2nd c/w] – projectmap
SS76: Fossato di Vico – Cancelli di Fabriano 7km (Early 2009 to 2017) – projectmap
A18: Rosolini – Modica 19km (June 2014 to December 2017) – projectmap
SS96 Barese: Toritto – Modungo/Bitetto 9km (December 2013 to December 2017) – ? – map

2018 opening:

SS597: Berchidda – Monti-West 9.4km (June 2014 to June 2018) – projectmap
Pedemontana Veneta: Montecchio Maggiore-North – Thiene (A31) 22km (October 2014 to 2018) – projectmap
Pedemontana Veneta: Breganze – Marostica 9km (October 2014 to 2018) – projectmap
Pedemontana Veneta: Marostica – Rosa (SS47) 8.5km (February 2013 to 2018) – projectmap
Pedemontana Veneta: Rosa (SS47) – Mussolente/Loria 5km (October 2014 to 2018) – projectmap

Unknown opening date:

SS16: Maglie – Otranto 14.1km (June 2013 to ?) – ? – map

The list is incomplete. Please help to complete!


Kosovo

2015 opening:
?: Prishtina (R6/R7) – Prishtina-South (M2) 3km (October 2014 to 25th October 2015) – ? – map
M9: Gllareve – Gjergjice 10km (June 2014 to Late 2015) – ? – map

2017 opening:

R6: Prishtina (R7) – RKS/MK border (Hani i Elezit) 55km (October 2014 to Late 2017) – ? – map


Latvia

A12: Ludza – Nirza 17.8km (2008 to 1st October 2014) [1st c/w] – projectmap


Lithuania

2017 opening:
A2: Pasilaiciai – Pilaite 5.4km (July 2015 to March 2017) – ? – map
A5: Mauruciai – Garliava 6.1km (September 2015 to 2017) [1st c/w]– ? – map


Luxembourg

2015 opening:
A7: Lorentzweiler – Waldhaff 8.5km (2003 to 23rd September 2015) – projectmap

2016 opening:

A13: west of Hellange – east of Hellange 1.4km (October 2014 to Spring 2016) – projectmap


Macedonia (map)

2016 opening:
A1: Demir Kapija – Smokvica 28.2km (2012 to 2016) – projectmap

2018 opening:

A2: Kichevo – Ohrid 56km (May 2014 to Early 2018) – projectmap
A4: Miladinovci (A1) – Stip 47km (February 2014 to 2018) – projectmap


Morocco

2014 opening:
A8: Khouribga – Beni Mellal 95km (April 2010 to 17th May 2014) – ? – map
?: Casablanca-Route d'Azemmour – Casablanca-Lissafa (A5) 8km (? to 1st October 2014) – ? – map

2015 opening:

A8: Berrechid (A7) – Khouribga 75km (April 2010 to 16th July 2015) – ? – map
A3: Rabat-East (A1/A2) – Sale El Jadida 5.1km (2010 to Late 2015) – ? – map
A3: Sale El Jadida – Skhirat (A3) 36.0km (2010 to Late 2015) – ? – map

2016 opening:

A5: El Jadida – Safi 143km (April 2013 to Early 2016) – ? – map


Moldova

No new motorway or expressway currently u/c


Montenegro

A1: Matesevo – Podgorica-North (M2) 41.0km (May 2015 to May 2019) – projectmap


The Netherlands

2014 opening:
N33: Assen (A28) – Gieten 14km (February 2013 to 12th May 2014) [2nd c/w] – projectmap
N33: Gieten – Veendam-South 12km (February 2013 to 26th May 2014) [2nd c/w] – projectmap
N33: Veendam-South – Zuitbroek (A7) 11km (February 2013 to 7th July 2014) [2nd c/w] – projectmap
N31: Leeumwarden-South (A32) – Leeumwarden-Drachtsterweg 2.5km (Late 2010 to 16th September 2014) [2nd c/w] – ? – map
A4: Dinteloord – Tholen 14km (2011 to 24th November 2014) – projectmap
N31: Marssum (A31) – Leeumwarden-South (A32) 8km (Late 2010 to 18th December 2014) – ? – map

2015 opening:

N62: Hoogedijk (N61) – Terneuzen-South (Sluiskil Tunnel) 4.8km (November 2011 to 23rd May 2015) – projectmap
N261: Waalwijk (A59) – Tilburg-North 7km (September 2012 to Mid 2015) – ? – map
N356: Broeksterwald – De Westereen 2.8km (December 2012 to 17th August 2015) – projectmap
N381: Wijnjewoude – Donkerbroek 5.5km (May 2014 to 14th September 2015) – ? – map
N356: Dokkum-South – Broeksterwald 4km (December 2012 to 28th September 2015) – projectmap
A15: rededication Oostvoorne – Rozenburg 15km (31st October 2015) – ? – map
A4: Delft – Schiedam-North 7km (April 2012 to 18th December 2015) – projectmap
N381: Drachten (A7) – Wijnjewoude 5.0km (May 2014 to December 2015) – ? – map

2016 opening:

N62: Heinkenszand (A58) – 's-Heerenhoek (N254) 5.3km (August 2014 to 2016) – projectmap
N356: De Westereen – Burgum 8km (June 2014 to 2016) – projectmap
A2: Maastricht-Kruisdonk – Maastricht-Europaplein 3km (2010 to Late 2016) – projectmap

2017 opening:

A9: Badhoevedorp – Raasdorp 4km (December 2013 to 2017) [discontinuation: 4km]projectmap
N279: 's-Hertogenbosch (A2) – Veghel (A50) 13km (February 2015 to November 2017) – ? – map
N31: Midlum – south of Harlingen 3km (December 2014 to Late 2017) – projectmap


Norway

2014 opening:
E18: Langaker – Gulli 24km (Fall 2010 to 4th July 2014) [2nd c/w] – projectmap
E18: Momarken – Melleby 7.7km (2012 to 1st October 2014) – ? – map
E6: Skaberud – Labdalen 8km (2012 to 24th November 2014) – projectmap
E6: Langset – Minnesund 2km (2012 to 27th November 2014) – projectmap
E16: Slomarka – Kongsvinger 16.5km (2011 to 27th November 2014) – projectmap
E6: Labdalen – Korslund 9km (2012 to 13th December 2014) – projectmap

2015 opening:

E6: Korslund – Langset 3.8km (2012 to 25th June 2015) – projectmap
Fv557: Liavatnet – Sandeide 4.2km (April 2011 to 12th November 2015) – projectmap

2016 opening:

E18: Retvet – Knapstad 6.2km (2013 to 2016) – projectmap
Rv4: Lunner/Gran – Jaren 9.3km (2013 to 2016) – projectmap

2017 opening:

E39: Sandved – Hove 1.5km (February 2015 to June 2017) [2nd c/w] – projectmap
E18: Sky – Bommestad 7km (2013 to 2017) – projectmap

2019 opening:

E39: Tasta – Schancheholen 4.5km (April 2014 to 2019) – projectmap
Rv13: Madlaveien (E39) – Hundvag 5.7km (May 2014 to 2019) – projectmap

2020 opening:

E16: Voyenenga – Sandvika (E18) 3.5km (February 2015 to 2020) – projectmap

2022 opening:

E39: Nordas/Soras (Fv580) – Ulven 16.2km (September 2015 to 2022) – projectmap
Fv580: Flyplassvegen – Nordas/Soras (E39) 2km (September 2015 to 2022) – projectmap


Pakistan

2014 opening:
E2: Bakhshi Pull-Charsadda Road – Budai Village (N5) 7.6km (February 2010 to September 2014) – ? – map

2015 opening:

M4: Faisalabad – Gojra 58km (August 2009 to 16th March 2015) – ? – map
M4: Khanewal – Multan 54km (August 2009 to November 2015) – ? – map

2017 opening:

M9: Hyderabad – Karachi 136km (March 2015 to September 2017) – ? – map

Unknown opening date:

E2: Garhi Ameer Khan-Warsak Road – Bakhshi Pull-Charsadda Road 11.6km (December 2014 to ?) – ? – map
E35: Hassan Abdal (M1) – Jharee Kas 40km (November 2014 to ?) – ? – map
E35: Jharee Kas – Sarai Saleh 19km (November 2014 to ?) – ? – map


Poland (map, summary and outlook)

2014 opening:
S8: Roza (S14) – Rzgow 16.4km (October 2011 to 11th April 2014) – projectmap
S14: Dobron – Roza (S8) 4.4km (October 2011 to 11th April 2014) – projectmap
A1: Wloclawek-West – Kowal 19.7km (June 2010 to 30th April 2014) – projectmap
S3: Gorzow Wielkopolski-South − Skwierzyna-West 18.5km (July 2011 to 15th May 2014) – projectmap
S3: Skwierzyna-West − Miedzyrzecz-North 18.1km (July 2011 to 15th May 2014) – projectmap
A1: Swierklany – Mszana 7.3km (November 2007 to 23rd May 2014) – projectmap
DK1: Tychy-Wartoglowiec (DK86) – Tychy-Cielmice 6.4km (September 2011 to 1st August 2014) – projectmap
S8: Lask – Roza (S14) 7.4km (October 2011 to 8th August 2014) – projectmap
DW902: Zabrze/Gliwice-Sosnica – Zabrze-Guido 2.7km (May 2012 to 8th August 2014) – projectmap
S5: Rydzyna – Korzensko 28.1km (August 2010 to 15th September 2014) – projectmap
S17: Jastkow – Lublin-Slawinek (S19) 7.7km (June 2011 to 25th September 2014) – projectmap
DK19: Lublin-Slawinek (S17/S19) – Lublin-Slawin 5.5km (August 2012 to 25th September 2014) – projectmap
S17: Lublin-Rudnik (S19) – Lublin-Felin 13.8km (December 2011 to 15th October 2014) – projectmap
DK55: Grudziadz-Poludniowa – Grudziadz-Konstytucji 3 Maja 1.2km (September 2013 to 27th October 2014) – projectmap
DK8: Bialystok-Szosa Elcka – Bialystok-Produkcyjna 1.4km (May 2013 to 28th October 2014) – projectmap
S8: Wielun– Zloczew 19.0km (January 2012 to 29th October 2014) – projectmap
S8: Zloczew – Sieradz-South 19.9km (January 2012 to 29th October 2014) – projectmap
A4: Tarnow-North – Debica-East 34.9km (July 2010 to 30th October 2014) – projectmap
S17: Lublin-Slawinek (S19) – Lublin-Rudnik (S19) 10.2km (December 2011 to 31st October 2014) – projectmap
DW902: Gliwice-Kujawska – Zabrze/Gliwice-Sosnica 3.0km (July 2012 to 5th November 2014) – projectmap
S69: Bielsko-Biala-Mikuszowice – Buczkowice 6.3km (August 2010 to 6th November 2014) – projectmap
S61: Suwalki-South – Raczki 12.2km (December 2012 to 6th November 2014) – projectmap
S8: Sieradz-South – Lask 35.0km (January 2012 to 29th November 2014) – projectmap
S11: Poznan-Rokietnica – Poznan-Tarnowo Podgorne 6.6km (April 2013 to 19th December 2014) – projectmap

2015 opening:

S8: Warsaw-Janki (DK7) – Opacz (S2) 6.3km (March 2014 to 17th July 2015) – projectmap
S69: Buczkowice – Zywiec-Sola 9.5km (August 2010 to 24th July 2015) – projectmap
DK7: Warsaw-Janki (S8) – Sekocin Stary 2.0km (September 2014 to 17th September 2015) – projectmap
S8: rededication Warsaw-Powazkowska – Warsaw-Modlinska 4.6km (20th September 2015) – projectmap
S61: Szczuczyn-North – north of Szczuczyn-West 3.7km (August 2012 to 13th November 2015) [1st c/w] – projectmap
S61: north of Szczuczyn-West – south of Szczuczyn-West 1.5km (August 2012 to 13th November 2015) – projectmap
S61: south of Szczuczyn-West – Koniecki Male 2.9km (August 2012 to 13th November 2015) [1st c/w] – projectmap
S8: Paszkow – Warsaw-Janki (DK7) 3.8km (March 2014 to December 2015) – projectmap
DK7: Sekocin Stary – Sekocin Las 1.1km (September 2014 to December 2015) – projectmap

2016 opening:

DW902: Gliwice-Jezioranskiego – Gliwice-Kujawska 5.4km (December 2012 to Early 2016) – projectmap
DK89: Gdansk-Letnica – Gdansk-Przerobka 2.4km (October 2011 to April 2016) – projectmap
A4: Rzeszow-East – Jaroslaw-West 41.2km (September 2010 to May 2016) – projectmap
A1: Lodz-North (A2) – Tuszyn 40.6km (March 2013 to August 2016) – projectmap
S8: Rzgow – Lodz-South (A1) 5.1km (October 2011 to August 2016) [opening with A1]projectmap
S19: Lublin-Slawinek (S17) – Lublin-Weglin 10.8km (November 2014 to November 2016) – projectmap
S8: Zambrow-East – Mezenin 15.4km (August 2014 to December 2016) – projectmap

2017 opening:

S7: Radom-South – Skarzysko-Kamienna-North 22.0km (July 2014 to April 2017) – projectmap
S3: Gorzow Wielkopolski-North – Gorzow Wielkopolski-South 11.7km (October 2014 to April 2017) [2nd c/w] – projectmap
S7: Milomlyn-North – Milomlyn-South 2.6km (November 2014 to April 2017) [2nd c/w] – projectmap
S7: Milomlyn-South – Ostroda-North 6.9km (November 2014 to April 2017) – projectmap
S7: Nidzica-North – Napierki 22.7km (March 2015 to May 2017) – project (2) – map
S7: Jedrzejow-East – Moczydlo 19.9km (October 2014 to May 2017) – projectmap
S51: Olsztyn-South – Olsztynek-East 13.3km (March 2015 to May 2017) – projectmap
S19: Sokolow Malopolski-North – north of Sokolow Malopolski-East 1.7km (July 2015 to June 2017) [1st c/w] – projectmap
S19: north of Sokolow Malopolski-East – south of Sokolow Malopolski-East 1.3km (July 2015 to June 2017) – projectmap
S19: south of Sokolow Malopolski-East – Stobierna 8.9km (July 2015 to June 2017) [1st c/w] – projectmap
S19: near Stobierna 0.8km (July 2015 to June 2017) – projectmap
S3: Miedzyrzecz-North – Miedzyrzecz-South 6.4km (November 2014 to June 2017) [2nd c/w] – projectmap
S7: Ostroda-South (DK16) – Olsztynek-West (S51) 20.1km (April 2015 to June 2017) – projectmap
S7: Krakow-Nowa Huta – Krakow-Przewoz 4.5km (August 2014 to July 2017) – projectmap
S5: Mieleszyn – Gniezno-South 18.3km (December 2014 to July 2017) – projectmap
S8: Marki – Drewnica (S17) 2.6km (February 2015 to July 2017) – projectmap
S8: Prosienica – Zambrow-West 14.9km (March 2015 to July 2017) – projectmap
S8: Mezenin – Jezewo 14.3km (March 2015 to July 2017) – projectmap
S11: Ostrow Wielkopolski-East – Ostrow Wielkopolski-South 12.8km (January 2015 to July 2017) – projectmap
S11: Mieszkow – Jarocin 7.5km (February 2015 to August 2017) – projectmap
S3: Sulechow – north of Oder bridge Cigacice 3.1km (April 2015 to August 2017) [2nd c/w] – projectmap
S3: south of Oder bridge Cigacice – north of Zielona Gora-North 9.6km (April 2015 to August 2017) [2nd c/w] – projectmap
S3: south of Zielona Gora-South – Niedoradz 8.0km (April 2015 to August 2017) [2nd c/w] – projectmap
S19: Swilcza – Rzeszow-South 6.3km (May 2015 to August 2017) – projectmap
S7: Ostroda North – Ostroda South (DK16) 9.7km (June 2015 to August 2017) – projectmap
S5: Ornowo – Ostroda South (S7) 8.7km (June 2015 to August 2017) – projectmap
S7: Kielce-South – Jedrzejow-North 21.5km (June 2015 to October 2017) – projectmap
S5: Korzensko – Kroscina 15.0km (September 2014 to October 2017) – projectmap
S5: Poznan-West (A2) – Mosina 16.0km (August 2015 to November 2017) – ? – map
DK15: Latkowo – Markowice 18.9km (April 2015 to November 2017) – projectmap
S5: Kroscina – Marcinowo 13.8km (November 2014 to December 2017) – projectmap
S5: Marcinowo – Wroclaw-North (A8) 19.3km (November 2014 to December 2017) – projectmap
DK20: Koscierzyna bypass 10.9km (October 2015 to December 2017) [1st c/w] – projectmap

2018 opening:

S3: south of Zielona Gora-North – north of Zielona Gora-South 2.8km (October 2015 to May 2018) [2nd c/w] – projectmap
S3: Nowa Sol-South – Gaworzyce 16.4km (August 2015 to June 2018) – projectmap
S3: Gaworzyce – Polkowice-North 16.9km (July 2015 to June 2018) – projectmap
S3: Polkowice-North – Lubin-North 14.4km (October 2015 to June 2018) – projectmap
S3: Lubin-North – Lubin-South 11.3km (September 2015 to June 2018) – projectmap
S3: Lubin-South – Legnica-South (A4) 22.6km (July 2015 to June 2018) – projectmap
S7: Zulawy-West – west of Nowy Dwor Gdanski 18.9km (October 2015 to October 2018) – ? – map
S7: south of Nowy Dwor Gdanski – Elblag-South 20.0km (October 2015 to October 2018) – ? – map
A1: Wozniki – Pyrzowice (S1) 15.2km (September 2015 to November 2018) – ? – map

2019 opening:

S3: north of Oder bridge Cigacice – south of Oder bridge Cigacice 0.6km (April 2015 to August 2019) [2nd c/w] – projectmap


Portugal

2014 opening:
A13: Coimbra – Almalagues 7km (April 2012 to 25th April 2014) – ? – map
A16: Brandoa (A36) – Pontinha 0.8km (January 2009 to 21st November 2014) – ? – map

2015 opening:

N125: Faro-North – Rio Seco 2.5km (2009 to 17th August 2015) – projectmap

2016 opening:

A26-1: Santo Andre – Sines (A26) 10.8km (September 2010 to January 2016) – ? – map
A26: Santiago do Cacem-West – Roncao 15.8km (September 2010 to January 2016) [2nd c/w] – ? – map
A26: Azinheira (IC1) – Santa Margarida do Sado 7km (September 2010 to January 2016) – ? – map
A4: Padronelo – Vila Real 25.4km (June 2009 to March 2016) – ? – map
IP2: Evora-North (A6) – Evora-South 12km (2011 to 2016) – ? – map

Unknown opening date:

A26: Roncao – Azinheira (IC1) 23km (September 2010 to suspended) – ? – map
A26: Santa Margarida do Sado – Figueira dos Cavaleiros 12km (September 2010 to suspended) – ? – map
A26: Figueira dos Cavaleiros – Sao Brissos 26.5km (September 2010 to suspended) – ? – map


Romania (map and summary; summary)

2014 opening:
A1: Cunta – Saliste 22.1km (2011 to 14th November 2014) – projectmap
A1: Nadlac – Pecica 27km (October 2011 to 19th December 2014) – ? – map

2015 opening:

A1: HU/RO border (Nadlac) – Nadlac 2.5km (October 2011 to 11th July 2015) – ? – map
A1: Pecica – Arad-West 10.5km (October 2011 to 11th July 2015) – projectmap
A1: Timisoara-East – Balint (A6) 35.6km (2011 to Late 2015) – ? – map

2016 opening:

A10: Turda (A3) – Decea 16.8km (July 2014 to March 2016) – ? – map
A10: Decea – Aiud 8.5km (July 2014 to March 2016) – ? – map
A1: Dumbrava – Margina 15km (2013 to May 2016) – projectmap
A1: Dobra – Ilia 10km (2013 to May 2016) – ? – map
A1: Ilia – Soimus 22.1km (2013 to May 2016) – ? – map
A3: Nadaselu – Gilau 8.7km (July 2014 to 2016) – ? – map
A10: Aiud – Alba Iulia-North 28.7km (July 2014 to October 2016) – ? – map
A10: Alba Iulia-North – Sebes (A1) 16.0km (Spring 2015 to October 2016) – ? – map

2017 opening:

A3: Bucharest-Gherghitei Street – Bucharest Ring Road 6.5km (April 2012 to 2017) [contract canceled] – ? – map
A1: Margina – Dobra 25km (2013 to 2017/18) – ? – map

Unknown opening date:

A3: Bors – Suplacu de Barcau 60.1km (2004 to suspended) – projectmap


Russia

2014 opening:
A180: Ust Luga Seaport – Kotelskiy-South 24km (? to 4th October 2014) – ? – map
M5: Bronnitsy-West (A107) – Starnikovo 12.1km (March 2013 to 15th October 2014) – ? – map
M7: Kushnarenkovo-West – Kushnarenkovo-South 11km (? to 16th October 2014) – ? – map
A229: Zaozerye – Kurgan 17km (? to 8th November 2014) – ? – map
M11: Bologoye – Torzhok-North 76km (Early 2012 to 28th November 2014) – projectmap
M11: Solnechnogorsk – Bibliotetschny prospekt (MKAD) 43.1km (September 2011 to 23rd December 2014) – projectmap

2015 opening:

P268: Azov-South – Koysug-West 20km (? to 26th August 2015) – ? – map
A121: Sosnovo – Steklyannyy 22.8km (? to 11th September 2015) – ? – map
M5: Travniki – west of Timiryazevskiy 11km (Summer 2012 to 5th October 2015) – ? – map
P242: Lobanovo – Koyanovo 6.8km (Late 2012 to 2015) – projectmap

2016 opening:

M4: Voronezh – Rogachevka 29km (April 2014 to 2016) – ? – map
M7: Vyazovka – Sheloksha 14.7km (2008/09 to 2016) – ? – map
ZSD: Saint Petersburg-Staraya Derevnya – Saint Petersburg-Petrolesport 11.7km (March 2013 to 2016) – projectmap

2018 opening:

M10: Ogonki – Beloostrov 18km (December 2014 to May 2018) – ? – map
M11: St Petersburg-Pulkovo (A118) – Veliky Novgorod 141km (June 2015 to 2018) – projectmap
M11: Veliky Novgorod – Bologoye 209km (Early 2014 to 2018) – projectmap
CKAD: Chirikovo (A130) – Belye Stolby (M4) 49.5km (August 2014 to 2018) – projectmap
P23: Zaytsevo – Bolshiye Kolpany 23km (Spring 2014 to 2018) – ? – map

2019 opening:

A121: Losevo – Sosnovo 17km (2015 to 2019) – ? – map

Unknown opening date:

A180: Kotelskiy-South – Alekseevka 16km (? to ?) – ? – map

The list is incomplete. Please help to complete!


Serbia

2014 opening:
A1: Batajnica i/c 2.6km (< 2006 to 29th November 2014) [2nd c/w] – projectmap

2015 opening:

A1: Vladicin han – Prevalac 10.1km (April 2012 to 30th November 2015) – projectmap
A1: Prevalac – Donji Neradovac 16.2km (April 2012 to 30th November 2015) – projectmap
A1: Dobanovci – west of Ostruznica bridge 10.1km (May 2014 to Fall 2015) [2nd c/w] – projectmap
A2: Ljig – Boljkovci 10.7km (2012 to Late 2015) [1st c/w] – projectmap
A2: Boljkovci – Takovo 12.6km (2012 to Late 2015) [1st c/w] – projectmap
A2: Takovo – Preljina 17.1km (2012 to Late 2015) [1st c/w] – projectmap
A4: Crvena Reka – Ciflik 12.7km (October 2011 to Late December 2015) – projectmap

2016 opening:

A1: Grabovnica – Grdelica 5.6km (June 2012 to May 2016) – projectmap
A4: Pirot-East – Dimitrovgrad-West 14.3km (2010 to June 2016) – projectmap
A2: Ljig – Boljkovci 10.7km (2012 to August 2016) [2nd c/w] – projectmap
A2: Boljkovci – Takovo 12.6km (2012 to August 2016) [2nd c/w] – projectmap
A2: Takovo – Preljina 17.1km (2012 to August 2016) [2nd c/w] – projectmap
A1: Grdelica – Caricina dolina 11.8km (September 2013 to September 2016) [2nd c/w] – projectmap
A4: Prosek – Crvena Reka 22.5km (March 2012 to December 2016) – projectmap
A4: Ciflik – Stanicenje 12.1km (June 2013 to December 2016) – projectmap
A4: Stanicenje – Pirot-East 16.7km (June 2013 to December 2016) – projectmap
A4: Dimitrovgrad-West – Gradinje 8.6km (2010 to >= 2016) [contract canceled]projectmap

2017 opening:

A1: Caricina dolina – Vladicin han 14.3km (September 2013 to April 2017) – projectmap
A2: Obrenovac – Ub 26.2km (August 2014 to Mid 2017) – projectmap
A2: Ub – Lajkovac 12.5km (Mid 2010 to Mid 2017) [completed November 2014; to be opened with neighboring section]projectmap
A2: Lajkovac – Ljig 24.0km (August 2014 to Mid 2017) – projectmap

Unknown opening date:

M24: Badnjevac – Gradac 3.0km (Late 2011 to ?) – ? – map
M24: Gradac – Batocina 3.7km (July 2012 to ?) – ? – map
M24: Botunje – Badnjevac 3.5km (May 2013 to ?) – ? – map


Slovakia (map)

2014 opening:
R2: Lovcica – north of Lovca 4.2km (November 2012 to 15th December 2014) [1st c/w] – projectmap
R2: north of Lovca – Lovca (R1) 1.6km (November 2012 to 15th December 2014) – projectmap

2015 opening:

D1: Dubna Skala – Turany 16.2km (December 2011 to 10th July 2015) – projectmap
R3: Martin (D1) – Martin 1.7km (December 2011 to 10th July 2015) – projectmap
D1: Janovce – Levoca 9.0km (June 2011 to 20th October 2015) – projectmap
R2: Pstrusa – Krivan 10.4km (November 2013 to 10th November 2015) – projectmap
D1: Levoca – Jablonov 9.5km (June 2012 to November 2015) – projectmap
D1: Fricovce – Svinia 11.2km (December 2011 to December 2015) – projectmap

2016 opening:

R2: Ruskovce – Pravotice 9.6km (January 2014 to May 2016) [1st c/w] – projectmap
R2: Zvolen-East – Pstrusa 7.8km (September 2014 to July 2016) – projectmap
D3: Svrcinovec (R5) – Skalite-West 12.3km (October 2013 to October 2016) [1st c/w] – projectmap
D3: Skalite-West – Skalite-East 3.0km (November 1997 to October 2016) [1st c/w] – projectmap

2017 opening:

D1: Hubova – Ivachnova 15.3km (February 2014 to May 2017) – projectmap
D3: Zilina-Strazov – Zilina-Brodno 4.3km (June 2014 to June 2017) – projectmap

2018 opening:

D1: Hricovske Podhradie – Lietavska Lucka 11.3km (February 2014 to January 2018) – projectmap

2019 opening:

D1: Lietavska Lucka – Dubna Skala 13.5km (June 2014 to December 2019) – projectmap


Slovenia

2015 opening:
H6: Izola – Semedela 5.2km (September 2010 to 5th June 2015) – projectmap

2017 opening:

A4: Ptuj – Podlehnik 7.3km (July 2015 to November 2017) – projectmap


Spain (map)

2014 opening:
A8: Carreira – Mondonedo 16.8km (? to 3rd February 2014) – ? – map
A7: El Puntalon (GR16) – Carchuna 6.1km (? to 29th March 2014) – ? – map
GR16: Port of Motril – El Puntalon (A7) 2km (? to 29th March 2014) – ? – map
A38: Cales i Talaies – Benidorm 6.2km (? to 10th April 2014) [2nd c/w] – ? – map
C13: Termens-South – Vilanova de la Barca-South ~5km (? to 16th April 2014) – ? – map
A23: Congosto de Isuela – Nueno 3km (2012 to 18th June 2014) [1st c/w] – ? – map
A7: Taramay – Guadalfeo 10.1km (? to 26th June 2014) – ? – map
A12: Hervias – Hormilla 11.4km (? to 9th July 2014) – projectmap
AS17: Tiriana Buenavista – Rianu (AS117) 8.0km (March 2009 to 11th July 2014) – ? – map
A23: Sabinanigo-East – Sabinanigo-South 3km (< 2009 to 14th July 2014) – ? – map
VA30: Cabezon de Pisuerga (A62) – La Cisterniga (VA11) 13.1km (? to 22nd July 2014) – ? – map
A23: Congosto de Isuela – Nueno 3km (2012 to 30th July 2014) [2nd c/w] – ? – map
A8: Pendueles – La Franca 7.8km (? to 7th August 2014) – ? – map
A8: San Vitores – Solares 2.5km (? to 7th August 2014) – ? – map
A23: Alto de Monrepos – Arguis 3.2km (2012 to 10th October 2014) – ? – map
M509: Villanueva del Pardillo – Majadahonda (M50) 5.1km (? to 15th December 2014) – ? – map
LO20: El Junquillo – Recajo 4km (? to 18th December 2014) [1st c/w] – ? – map
A2: Sils – Caldes de Malavella 6.7km (2009 to 22nd December 2014) – ? – map
A7: Castillo de Banos – Albunol 14.8km (? to 23rd December 2014) – ? – map
A8: La Franca – Unquera 4.5km (? to 30th December 2014) – ? – map

2015 opening:

AG51: Salvatera de Mino (AG55) – PLISAN 4.5km (2011 to 7th/8th February 2015) [southern part (2.5km) closed until PLISAN opening] – ? – map
LO20: El Junquillo – Recajo 4km (? to 17th February 2015) [2nd c/w] – ? – map
AC14: As Lonzas – A Zapateira 4.2km (2011 to 14th March 2015) – projectmap
EX-A1: Coria-West – Coria-East 5km (2009 to 20th March 2015) – projectmap
EL20: Elche-Nou Altabix – Elche-El Travalo 1.5km (2007 to 22nd March 2015) – projectmap
GI632: Antzuola – Zumarraga 2.6km (2010 to 25th March 2015) – ? – map
A7: La Gorgoracha (A44) – El Puntalon 6.5km (? to 30th March 2015) – ? – map
A12: El Espino (LO20) – Los Corrales 2.6km (? to 30th March 2015) – projectmap
A15: Radona – Huertas de Sincona ~10km (? to 30th March 2015) – ? – map
A44: Calicasas – Albolote (A92) 4.8km (2006 to 30th March 2015) – projectmap
A44: Albolote (A92) – Atarfe (N432) 3km (2007 to 30th March 2015) – projectmap
A54: Guntin-North – Nadela (A6) 23.3km (? to 30th March 2015) – ? – map
A11: Castrillo de la Vega – Fresnillo de las Duenas 13.7km (? to 31st March 2015) – ? – map
A66: Castrogonzalo (A6) – Zamora-North 49.0km (August 2013 to 12th May 2015) – ? – map
Ma30: Cas Capita – Son Ferriol 3.5km (July 2013 to 20th May 2015) – ? – map
A491: Rota (A2078) – El Puerto de Santa Maria-West 9km (2013 to 29th June 2015) – ? – map
A334: Albox – Arboleas 8.7km (2007 to 3rd July 2015) – projectmap
BU30: Quintanaduenas – Villatoro (A73) ~3km (? to 9th July 2015) – ? – map
BU30: Villatoro (A73) – Villimar ~2km (? to 9th July 2015) [2nd c/w] – ? – map
A15: Huertas de Sincona – Medinaceli (A2) ~2km (? to 29th July 2015) – ? – map
LU12: Lugo-Torron – Vilamoure 3.6km (? to 17th September 2015) – ? – map
A21: west of Sigües – Sigües (A-1601) 3.5km (? to 23rd September 2015) – ? – map
CA35: Cadiz – Barrio Río San Pedro (CA36) 4.8km (? to 24th September 2015) – ? – map
A316: Torrequebradilla – Puente del Obispo-South 6.7km (? to 25th September 2015) – projectmap
A316: Baeza-West – Ubeda-West (A316R) 6.8km (? to 25th September 2015) – projectmap
A32: Linares-West – Ibros 11.3km (2007 to 2nd October 2015) – ? – map
A7: Carchuna – Castell de Ferro 10.1km (? to 7th October 2015) – ? – map
A27: Valls-South – Morell 9.5km (? to 13th October 2015) – ? – map
A316: west of Mancha Real – north of Mancha Real 8.5km (? to 16th October 2015) – projectmap
A54: Palas-West – Guntin-North 14.9km (? to 20th October 2015) – ? – map
A8: Torrelavega – San Vitores 25.5km (? to 24th October 2015) – ? – map
A8009: San Jose de la Rinconada-West – San Jose de la Rinconada-South 1.5km (? to Late November 2015) – projectmap
A27: Valls-North – Valls-South 5.0km (? to December 2015) – ? – map
A316: Puente del Obispo-South - Puente del Obispo-North 5.8km (? to December 2015) – projectmap
A316: Puente del Obispo-North – Baeza-West 4.5km (? to December 2015) – projectmap
AC15: A Coruna Outer Port – Pastoriza (AG55) ~5km (< 2011 to December 2015) – ? – map
FV2: Matas Blancas – El Salmo 14.3km (? to Late 2015) – ? – map
A2-AP7: Castellbisbal (A2) – Castellbisbal (AP7) 1km (2007 to >= 2015) – projectmap
A33: La Font de la Figuera (A35) – Caudete (A31) 12.5km (? to >= 2015) – ? – map

2016 opening:

B25: Cornellà (A2) – Sant Boi de Llobregat (C32) 2km (2009 to June 2016) – projectmap
A14: Alguaire – Lleida (A2) ~8km (? to October 2016) – ? – map
AG55: Baio – Carballo-South 27km (2011 to October 2016) – ? – map
A2: Macanet de la Selva (C35) – Sils 2.7km (December 2014 to 2016) – ? – map
A23: Caldearenas – Alto de Monrepos ~5km (< 2009 to 2016) – ? – map
AG55: Berdoias – Baio 17km (2011 to 2016) – ? – map
BU30: Villalbilla de Burgos (A231) – Quintanaduenas ~8km (? to 2016) – ? – map
N636: Gerediaga – Elorrio 6.4km (2012 to 2016) – ? – map
A33: Jumilla – Yecla 23.4km (December 2014 to >= 2016) – ? – map

2017 opening:

A11: Fresnillo de las Duenas – El Burgo de Osma-West 44km (2009/10 to 2017) – ? – map
A11: El Burgo de Osma-East – La Mallona 33km (2009/10 to 2017) – ? – map
A54: Lavacolla – Arzua-West 18.5km (? to 2017) – ? – map
B24: Vallirana-West – Vallirana-East 2.1km (2005 to 2017) – projectmap
GI632: Bergara – Antzuola 4.6km (2010 to 2017) [contract canceled] – ? – map
SE40: Espartinas (A49) – Almensilla ~7km (? to 2017) – ? – map
SE40: Almensilla – Coria del Rio ~7km (? to 2017) – ? – map
SE40: El Copero – Carretera de la Isla (A4) ~2km (? to Late 2017) – ? – map
SE40: Carretera de la Isla (A4) – Torrequinto (A376) 8.1km (? to Late 2017) – ? – map
AG??: Domaio – Domaio (AP9) 3.3km (October 2015 to Late 2017) [2nd c/w] – ? – map
A38: Cullera – Favara (AP-7) 10km (? to >= 2017) – ? – map
A21: Santa Cilia – Jaca-West 9.0km (? to > 2017) – ? – map
A60: Puente Villarente – Santas Martas-South 20km (? to > 2017) – ? – map

2018 opening:

A44: Atarfe (N432) – Santa Fe (A92G) 3km (2007 to <= 2018) – projectmap
B21: L´Hospitalet (B10/C31) – Harbor Barcelona 3.5km (December 2014 to March 2018) – ? – map
A32: west of Ubeda – east of Torreperogil 16.3km (? to 2018) – ? – map
A57: A Ermida – Vilaboa 6.5km (October 2015 to 2018/19) – ? – map

2020 opening:

RM1: Beniajan – Zenata 7km (March 2015 to 2020) – ? – map

Unknown opening date:

AG42: Tui-South (AP9) – Tomino 4km (2011 to ?) – ? – map
B40: Olesa de Montserrat – Viladecavalls (C16) 6km (2007 to ?) – projectmap
A21: Puente la Reina de Jaca – Santa Cilia 7.2km (? to suspended) – ? – map
A23: Lanave – Caldearenas 14.4km (< 2009 to suspended) – ? – map
A23: Arguis – Congosto de Isuela 3km (? to suspended) [2nd c/w] – ? – map
A27: Montblanc-East – Valls-North 7.3km (2008 to suspended) – projectmap
A32: Torreperogil – Villacarrillo 15km (? to suspended) – ? – map
A32: Villacarrillo – Villanueva del Arzobispo 19km (? to suspended) – ? – map
A44: Santa Fe (A92G) – Las Gabias (A338) 8.7km (2009 to suspended) – projectmap
A56: A Barrela-North (Estivada) – As Lamas (OU901) 8.8km (2008 to suspended) – projectmap
A63: Salas-East – Cornellana 7.3km (? to suspended) – ? – map
A63: Cornellana – Doriga 2.4km (? to suspended) – ? – map
A1051: El Parador de las Hortichuelas-South – Cortijos de Marin 8km (2011 to suspended) – ? – map
GR43: Pinos Puente – Atarfe (A44) 9.7km (? to suspended) – projectmap
SE40: Coria del Rio – El Copero ~3.5km (? to suspended) – ? – map

The list is incomplete. Please help to complete!


Sri Lanka

2014 opening:
E02: Kaduwela – Kottawa (E01) 11.0km (2009 to 8th March 2014) – projectmap
E01: Galle – Matara 35km (2012 to 15th March 2014) – projectmap

2015 opening:

E02: Kadawatha (E04) – Kaduwela 8.9km (February 2012 to 17th September 2015) – projectmap

2018 opening:

E04: Kadawatha (E02) – Mirigama 32.5km (August 2015 to 2018) – projectmap
E01: Matara – Hambantota-Airport 25km (July 2015 to Late 2018) – projectmap


Sweden (summary)

2014 opening:
E22: Rolsberga – Fogdarp 4.7km (June 2012 to 26th May 2014) – projectmap
E18: Hällamotet – Abylund 10km (2012 to 22nd September 2014) [2nd c/w] – projectmap
E22: Pukavik – Mörrum-West 4km (December 2011 to 16th October 2014) – projectmap
E4: Skönsmons – Myre 16km (2010 to 16th November 2014) – projectmap
E22: Listerlandet – Pukavik 11km (December 2011 to 25th November 2014) – projectmap
E20: Northern link Stockholm 4km (2007 to 30th November 2014) – projectmap
E4: Sundsvall-Gärdedalen – Skönsmons 3km (2010 to 18th December 2014) – projectmap

2015 opening:

E6: Tanumshede – Palen 7km (2013 to 6th July 2015) – projectmap
R40: Dallebo – Hester 17km (2012 to 17th October 2015) – projectmap

2017 opening:

?: Gothenburg-Ringön (E6) – Gothenburg-Slakthuset (E45) 1km (2013 to Fall 2017) – projectmap

2018 opening:

E22: Kalmar-Smedby/Rinkabyholm – Kalmar-Rinkabyholm-North 1.4km (October 2015 to June 2018) – projectmap

2025 opening:

E4: Sollentuna – Kungens Kurva 21km (January 2015 to 2025) – projectmap


Switzerland

2014 opening:
A5: Neuchatel Serrieres North – Neuchatel Serrieres South 1.7km (April 2008 to 10th March 2014) – projectmap
A16: Bure – Porrentruy-East 8.8km (2007 to 21st August 2014) [1st c/w] – projectmap

2016 opening:

A16: Delemont-East – Choindez ?km (? to Late 2016) [1st c/w] – projectmap
A16: Court – Loveresse ?km (? to Late 2016) [1st c/w] – projectmap

2017 opening:

A5: Biel-Port – Biel-East 4.9km (December 2007 to 2017) – projectmap
A9: Leuk/Susten-East – Steg/Gampel-West ~10km (2004 to 2017) – projectmap

2018 opening:

A9: Visp-South – Visp-East ~5km (? to 2018) – projectmap

2019 opening:

A9: Visp-West – Visp-South ~4km (? to Late 2019) [2nd c/w] – projectmap

2020 opening:

A9: Steg/Gampel-West – Steg/Gampel-East ~1.5km (? to >= 2020) – projectmap


Turkey

No accurate data available (see here). Please help to complete!


Ukraine

M29: Marianivka – Pidhorodne (M04) 12km (? to suspended) – ? – map


United Kingdom

2014 opening:
A11: west of Elvedon – Thetford ~5km (January 2013 to 28th April 2014) – projectmap
A11: Mildenhall – west of Elvedon ~10km (January 2013 to 12th December 2014) – projectmap

2015 opening:

NI-A8: south of Ballynure (A57) – north of Ballynure 3.4km (August 2012 to 9th February 2015) – projectmap
NI-A8: Coleman's Corner – south of Ballynure (A57) 3.7km (August 2012 to 29th May 2015) – projectmap
NI-A8: north of Ballynure – Millbrook (A36) 7.3km (August 2012 to 29th May 2015) – projectmap
A453: Kegworth (M1) – Clifton 8.8km (January 2013 to 20th July 2015) – projectmap
A465: Tredegar – Brynmawr 7.8km (January 2012 to 28th July 2015) – projectmap

2016 opening:

M90: Queensferry Crossing 4km (September 2011 to 2016) – projectmap
A556: Bowdon (M56) – Over Tabley (M6) 7.5km (November 2014 to Late 2016) – projectmap

2017 opening:

A90: Tipperty – Blackdog 12.0km (February 2015 to Spring 2017) – projectmap
A21: Tonbridge – Pembury 2.7km (January 2015 to Spring 2017) – projectmap
A1(M): Barton – Leeming 19.3km (February 2014 to Mid 2017) – projectmap
M8: Baillieston – Newhouse 9.7km (2014 to 2017) – projectmap
A465: Brynmawr – Gilwern 8.1km (December 2014 to 2017) – projectmap
A533: Widnes (A562) – Astmoor (A558) 4.8km (May 2014 to Fall 2017) – projectmap
A90: Blackdog – Kingswells-North 16.1km (February 2015 to Late 2017) – projectmap
A90: Kingswells-North – Cleanhill 12.2km (February 2015 to Late 2017) – projectmap
A90: Cleanhill – Stonehaven 11.5km (February 2015 to Late 2017) – projectmap
A956: Cleanhill – Cove Bay 6.5km (February 2015 to Late 2017) – projectmap


Edit list:

> click <.
__________________

nbcee, violinivo, arnau_Vic, roata, JackFrost and 50 others liked this post

Last edited by MichiH; November 14th, 2015 at 05:04 PM. Reason: See edit list at the end of the post
MichiH no está en línea  

Sponsored Links
Old December 27th, 2013, 04:07 PM   #2
Kemo
Registered User
 
Join Date: Jan 2012
Location: Segiet
Posts: 10,727
Likes (Received): 18762

Summary of 2014 motorway openings:
Sorted by length

Legend:
Full profile + 2nd carriageway + 1st carriageway = Total length

Europe

Poland
306 + 0 + 0 = 306 km

Russia
173.2 + 0 + 0 = 173.2 km

Spain
123.1 + 6.2 + 4 = 133.3 km

Italy
114.9 + 0 + 0 = 114.9 km

Germany
63.2 + 3.6 + 4.6 = 71.4 km

Norway
43.2 + 24 + 0 = 67.2 km

The Netherlands
22 + 39.5 + 0 = 61.5 km

Sweden
42.7 + 10 + 0 = 52.7 km

Finland
49.7 + 0 + 0 = 49.7 km

Romania
49.1 + 0 + 0 = 49.1 km

Bosnia and Herzegovina
45.5 + 0 + 0 = 45.5 km

France
33 + 6.5 + 0 = 39.5 km

Albania
34 + 0 + 0 = 34 km

Hungary
21.1 + 0 + 0 = 21.1 km

Denmark
11.7 + 7 + 0 = 18.7 km

Latvia
0 + 0 + 17.8 = 17.8 km

United Kingdom
15 + 0 + 0 = 15 km

Croatia
0 + 12 + 0 = 12 km

Switzerland
1.7 + 0 + 7.7 = 9.4 km

Belarus
8 + 0 + 0 = 8 km

Portugal
7.8 + 0 + 0 = 7.8 km

Austria
5.9 + 0 + 0 = 5.9 km

Slovakia
1.6 + 0 + 4.2 = 5.8 km

Bulgaria
5.4 + 0 + 0 = 5.4 km

Czech Republic
4.6 + 0 + 0 = 4.6 km

Serbia
0 + 2.6 + 0 = 2.6 km


Other Contintents

China
7450 km

USA
Probably also many km

Morocco
103 + 0 + 0 = 103 km

Canada
64 + 4,2 + 0 = 68.2 km

Sri Lanka
66 + 0 + 0 = 46 km

Algeria
23 + 0 + 0 = 23 km

Pakistan
7.6 + 0 + 0 = 7.6 km

Last edited by Kemo; February 21st, 2015 at 04:11 PM.
Kemo no está en línea  
Old December 27th, 2013, 04:43 PM   #3
MichiH
Registered User
 
Join Date: Jan 2013
Location: Lower Franconia
Posts: 4,406
Likes (Received): 2082

Edit list:
January 5th, 2014: entirely revised (expressways added; Cyprus, Denmark, Greece, Iceland, Kosovo, Moldova, Norway, Sweden and UK added); Bulgaria, Estonia, Lithuania, Poland and Romania modified
January 6th, 2014: Sweden summary link added; R2.sk modified; A2.bg modified
January 8th, 2014: A3.bg modified
January 12th, 2014: Belarus, Ireland, Latvia, Macedonia and Montenegro added; A4.rs added
January 18th, 2014: Albania, France and Portugal added; A9.at, S36.at, A3.bg, A4.bg, I1.bg, A448.de, A1.pl, A1.rs, M24.rs and H6.si modified
January 19th, 2014: Italy added; E18.no, A4.pt, A13.pt, A26.pt and A26-1.pt modified
January 26th, 2014: Finland and Spain added; A1.ba, B2.de and A1.gr modified
February 2nd, 2014: A5.hr, A35.it, M8.uk modified; E6.fi removed; D222.fr added; Hungary sorted
February 3rd, 2014: PR-18.dk added; AS17.es added; A8.es, A23.es and A33.es modified
February 9th, 2014: 8.fi added; PR-15.dk, 7.fi, A1.pl, A4.pl, S5.pl, S8.pl, S14.pl, S61.pl and S69.pl modified
February 16th, 2014: A1(M).uk added; M43.hu, S5.pl, S14.pl, S69.pl and D1.sk modified
February 23rd, 2014: A2.mk and m4.mk added; A4.bg and D1.sk modified
March 2nd, 2014: A50.fr, A89.fr, A719.fr and B85.de added; A30.de, A44.de, A98.de, A4.mk, S11.pl, A1.ro, A1.rs and A7.es modified; Sweden sorted
March 23rd, 2014: A11.be, II18.bg, D2.hr and N7.fr added; A50.fr, A30.de, A7.gr, A25.gr, A27.gr, A29.gr, A52.gr, A71.gr, A1.pl, S5.pl, S8.pl, S14.pl, S61.pl, S69.pl and A5.ch modified
March 30th, 2014: A3.al, A4.bg, A524.de, A9/A5.gr, A31.it, A36.it and A7.es modified
April 6th, 2014: A11.hr, D2.hr, S77.it, SS640.it, A1.ro, A2.rs, A4.rs and M24.rs modified
April 13th, 2014: SH.al, A52.it, Pedemontana Veneta.it, S8.pl , A38.es added; A4.al, A1.ba, ?.ba, A1.pl, S8.pl, S11.pl, S14.pl modified; Srpska moved to Bosnia and Herzegovina
April 20th, 2014: S8.pl and CE13.es added; S8.pl, S11.pl, S61.pl, A4.pt and A13.pt modified
April 27th, 2014: IP2.pt added; A1.ba, D8.cz, M3.hu, M86.hu, SS76.it, A13.pt, A26.pt, A11.es, A21.es, A23.es, A32.es, A63.es and SE40.es modified
May 4th, 2014: SS318.it and A465.uk added; A66.de, SS318.it, SS106.it, SP14 Milan.it, SP103 Milan.it, SP415 Lodi.it, A1.pl, S3.pl, S17.pl, D1.sk, A2.es and C13.es modified
May 11th, 2014: M17.ie, M18.ie, N381.nl and B30.es added; A3.bg, P18.dk, A5.gr and E22.se modified
May 18th, 2014: N33.nl and AC15.es added; A33.de, A71.de, A661.de, A35.it (A59.it/A60.it), S3.pl and A23.es modified
May 25th, 2014: N31.nl, N261.nl and N356.nl added; A35.it, A1.pl, S8.pl, S17.pl, A1.rs and A4.rs modified
June 1st, 2014: N33.nl, E39.no, Rv13.no, A3.ro, A1.rs and D3.sk added; PR18.dk, A4.nl, N33.nl, A26.pt, A26-1.pt, D1.sk, A23.es and E22.se modified
June 8th, 2014: A18.it added; A1.ba, B50.de, A58.it, E6.no, S8.pl, S69.pl, A1.rs and A8.es modified
June 14th, 2014: Algeria, Canada, Equatorial Guinea, Morocco, Pakistan and Sri Lanka added; A1.dz, ON400.ca, ON401.ca, ON404.ca, ON407.ca, ON407-WDL.ca, ?.gq, ?.ma, A4.ma, A5.ma, E16.no, E2.pk, M4.pk, M8.pk, E01.lk and E02.lk added; B535.de, M60.hu, A31.it, A59.it, A60.it, A12.lv, S8.pl, S17.pl and A23.es modified
June 29th, 2014: Russia and Turkey added; D1.hr, B33.de, N356.nl, M11.ru, ZSD.ru and D1.sk added; A1.ba, A4.bg, A11.hr, A281.de, M86.hu, SS76.it, SS318.it, E18.no, S8.pl, S17.pl, A1.rs, A2.rs, A7.es, A11.es, A23.es and E20.se modified
July 6th, 2014: SS727.it and R6.ko added; A9.at, PR15.dk, A31.it, N33.nl, E18.no, A1.rs, A4.rs, D1.sk, A12.es and A16.ch modified
July 13th, 2014: AB216.ca, QC-A5.ca, QC-A35.ca, QC-A85.ca, QC-A410.ca, DW902.pl, DK19.pl and DK89.pl added; A26.de, A35.it, A58.it, N33.nl, A4.pl, S8.pl, S17.pl, S69.pl, A12.es, AS17.es and GI632.es modified
July 20th, 2014: A30.de, A44.de, M43.hu, S8.pl and A23.es modified
July 26th, 2014: D11.cz, A4.de, S7.pl and VA30.es added; A5.hr, A4.de, A44.de, A524.de, A1.gr, A35.it, A58.it, SP14.it, S8.pl and A27.es modified
August 3rd, 2014: A3.al and ?.dz added; A3.al, S10.at, A1.ba, II18.bg, A4.bg, A11.hr, A62.de, A281.de, B243.de, S5.pl, S11.pl, S17.pl, S61.pl and A23.es modified
August 10th, 2014: A2.nl, S7.pl, S8.pl, DK1.pl, A3.ro, A10.ro and A8.es added; A1.ba, A4.bg, A4.de, A71.de, B49.de, SS106.it, A1.pl, A4.pl, S8.pl, S11.pl, S61.pl, DW902.pl, A1.ro, A3.ro, A2.rs and A8.es modified
August 17th, 2014: A1.ba, A3.bg, A4.bg, 7.fi, A4.de and S61.pl modified
August 24th, 2014: SS96 Barese.it added; A1.ba, A5.hr, A4.de and A16.ch modified
August 31st, 2014: CKAD.ru added; A1.ba, A62.de, B50.de, A1.ro and A8.es modified
September 6th, 2014: S5.pl added; A1.ba, 7.fi, A14.de, A62.de, B243.de, B266.de, A36.it, S11.pl, S17.pl, DK19.pl, DW902.pl and E18.se modified
September 14th, 2014: QC-A85.ca and R2.sk added; A1.ba, ON-404.ca and A66.de modified
September 20th, 2014: ON-417.ca, N31.nl and E4.se added; A1.dz, A1.ba, ON-404.ca, A11.hr, A4.de, A14.de, B50.de, A12.lv, A4.pl, S3.pl, S5.pl, S7.pl, S8.pl, S17.pl, S69.pl, DK19.pl, A1.rs, A4.rs, D1.sk and SE40.es modified
September 26th, 2014: S10.at, A59.it, A60.it, SS640.it, S17.pl, DK19.pl, A1.ro, and E18.se modified
October 5th, 2014: Vt5.fi, ?.ma, E18.no, S3.pl and DK7.pl added; A1.ba, A4.bg, A281.de, M3.hu, A12.lv, A4.pl, S8.pl, S17.pl and A2.rs modified
October 12th, 2014: ?.ba, QC-A73.ca and N249.fr added; A1.ba, QC-A5.ca, QC-A35.ca, M3.hu, E18.no, A1.pl, A4.pl, S8.pl and A23.es modified
October 19th, 2014: A33.de, N62.nl, S7.pl, M5.ru, M7.ru, P242.ru, A27.es, A44.es, A56.es, A334.es, A316.es, A1051.es, A8009.es, AC14.es, AG42.es, AG51.es, AG55.es, B40.es, B24.es, EL20.es, EX-A1.es, GR43.es and E22.se added; A33.de, A62.de, B33.de, S8.pl, S17.pl, M11.ru and E22.se modified
October 26th, 2014: A4.de, B300.de, A121.ru, A180.ru and AG55.es added; PR15.dk, A4.de, B33.de, Pedemontana Veneta.it, A7.lu, N31.nl, S17.pl, R2.sk and AG55.es modified
November 9th, 2014: NB-2.ca, I11.cz, I35.cz, I44.cz, A9.fr, N7.fr, S7.pl, S19.pl, M4.ru, M5.ru, M7.ru, A229.ru and Gr16.es added; A3.al, A4.al, SH4.al, A3.bg, QC-A85.ca, D8.cz, D11.cz, R6.cz, A4.de, A14.de, A26.de, A36.it, A59.it, A60.it, SS106.it, A4.pl, S8.pl, S17.pl, S61.pl, S69.pl, DW902.pl, A1.rs, A4.rs and A7.es modified
November 10th, 2014: D2.hr, M4.pk and A15.es added; A5.hr, D2.hr, A31.it, SS77.it, SS96 Barese.it, SS106.it, SS318.it, E6.no, E16.no, M4.pk, S7.pl, S8.pl, S61.pl, R2.sk and A15.es modified
November 15th, 2014: ?.dz and A1.ba added; M8.pk and E2.pk removed; S10.at, ?.ba, A7.gr, A25.gr, A27.gr, A52.gr, A71.gr, M4.pk, A26.pt, A26-1.pt and A1.ro modified
November 23rd, 2014: QC-A410.ca, E6.no, S3.pl and A16.pt added; QC-A410.ca, A9.fr, A4.de, B2.de, B50.de, B174.de, A1.gr, A36.it, SS318.it, E6.no, A4.pt, M24.rs, D1.sk, AG55.es and E4.se modified
November 30th, 2014: Vt7.fi, B31.de, SS16.it, SR8.it, E2.pk, E35.pk, S5.pl and S8.pl added; A524.de removed; A3.bg, ON-401.ca, D1.hr, D2.hr, Vt7.fi, A26.de, A44.de, A524.de, B50.de, B174.de, A36.it, SS77.it, SS640.it, A4.nl, E6.no, E16.no, S8.pl, M11.ru, A1.rs, A2.rs, E20.se, E22.se and M8.uk modified
December 13th, 2014: N249.fr, D924.fr, A21.de, A31.it, N31.nl, S5.pl, A1.ro, M10.ru and B21.es added; B174.de removed; A9.at, A4.bg, II18.bg, D1.hr, PR15.dk, A21.de, B2.de, M43.hu, A31.it, E6.no, S7.pl, S11.pl, A2.rs and R2.sk modified
December 21st, 2014: A10.ro, R2.sk, LO20.es, A33.es and A9.ch added; Vt7.fi removed; A5.hr, A11.hr, D10.hr, D12.hr, Vt7.fi, A49.de, B50.de, A1.gr, A31.it, N31.nl, M4.pk, S11.pl, DK89.pl, A1.ro, R2.sk, A2.es, A12.es, M509.es, E4.se and A9.ch modified
December 22nd, 2014: A2.es added; A33.es removed; A2.es, A7.es, A8.es, A15.es, A33.es and A38.es modified
December 26th, 2014: Number of carriageway notification removed; A32.es added; M6.by, A719.fr, M11.ru, A1.rs, A7.es, A8.es, A23.es and A32.es modified
December 30th, 2014: M9.ko added; I1.bg, SS77.it, R6.ko, A1.ro, A8.es and B24.es modified
January 3rd, 2015: E04.lk and E4.se added; SS106.it and E02.lk modified
January 11th, 2015: NI-A8.uk, A11.uk, A21.uk, A90.uk, A453.uk, A465.uk, A533.uk, A556.uk and A956.uk added; A719.fr and A1.gr modified
January 17th, 2015: A2-AP7.es, A16?.es and FV2.es added; A3.bg, A150.fr, B535.de, A36.it, A52.it, A58.it, A59.it, A60.it, SS77.it, SS106.it, SS534.it and Pedemontana Veneta.it modified
January 24th, 2015: E02.lk and E04.lk removed; A31.it, A36.it, A59.it, A60.it and E02.lk modified
January 26th, 2015: A36.it, A59.it and A60.it modified
February 1st, 2015: S8.pl and S11.pl added; A4.bg, I1.bg, A150.fr, A1.gr, A5.ma, S8.pl, DK7.pl, LO20.es and A9.ch modified
February 8th, 2015: S51.pl added; A89.fr and A150.fr modified
February 14th, 2015: MKAD2.by, A33.de, B51.de, N279.nl and S11.pl added; A150.fr, A1.gr, S5.pl, S8.pl and AG51.es modified
February 21st, 2015: SNST.bg, E39.no A66.es and GI632.es added; D8.cz, A26.de, B33.de, A58.it, M4.pk, H6.si, A66.es, GI632.es, LO20.es and B40.es modified
February 22nd, 2015: A466.fr, A507.fr, A62.de, B49.de and B535.de modified
February 28th, 2015: N27.fr, N88.fr and D222.fr added; PR15.dk, PR17.dk and E6.se modified
March 8th, 2015: N17.ie, ?.se and A21.uk added; II18.bg, A5.hr, A3.gr, A5.gr, A7.gr, A8.gr, A25.gr, A27.gr, A52.gr, A71.gr, M17.ie, M18.ie, S7.pl, S8.pl, S11.pl, DW902.pl, A7.es and A11.es modified
March 15th, 2015: N10.fr, N79.fr, N141.fr, A1.gr and BU30.es added; N88.fr, A1.gr, A31.it, Pedemontana Veneta.it, M4.pk, BU30.es, A11.es, A44.es and AC14.es modified
March 16th, 2015: A13.lu and A44.es added; A3.al, A11.hr, A1.gr, A7.lu, A3.ma, A4.ma, M4.pk, S7.pl, S11.pl, S19.pl, S51.pl, A8.es, A44.es, A334.es and GI632.es modified
March 22nd, 2015: PR18.dk and M29.ua added; ?.ba, N79.fr, A1.gr, M43.hu, A31.it, A1.ro and EX-A1.es modified
March 23rd, 2015: 502.dk, A1.gr, M9.pk, S7.pl and RM1.es added; PR18.dk, A1.gr, A31.it, A12.es, A15.es and EL20.es modified
March 29th, 2015: Pedemontana Veneta.it added; A31.it, Pedemontana Veneta.it, IP2.pt, A7.es, A12.es, A15.es and GI632.es modified
March 31st, 2015: A2.rs added; A54.es removed; ?.ba, A11.hr, A2.rs, A7.es, A11.es, A12.es, A15.es, A44.es and A54.es modified
April 4th, 2015: R4.cz and A26.pt added; I11.cz, SS77.it, A7.lu, A26.pt, A26-1.pt, IP2.pt and E02.lk modified
April 12th, 2015: D3.cz, S3.pl and S8.pl added; A5.gr, A7.gr, A29.gr, A71.gr, M4.hu, A2.mk, S5.pl, A3.ro and A4.rs modified
April 14th, 2015: A5.at, N1.fr and NI-A8.uk added; A8.gr, E6.no, D1.sk, R2.sk and NI-A8.uk modified
April 19th, 2015: A8.de added; A9.fr, N88.fr, B266.de, A59.it, A3.ro, A10.ro, E6.no and NI-A8.uk modified
April 26th, 2015: S7.pl and DK15.pl added; A4.bg, A11.hr, D2.hr, D10.hr, D12.hr, A44.de and H6.si modified
May 1st, 2015: M11.ru added; A1.ba, AB-216.ca, ON-400.ca, ON-407.ca, ON-412.ca, QC-A35.ca, QC-A410.ca, M11.ru, A1.rs, H6.si and E02.lk modified
May 14th, 2015: SS199.it and SS597.it added; A66.es removed; II18.bg, A3.bg, A4.bg, D8.cz, A1.gr, A5.gr, A8.gr, M85.hu, M86.hu, A59.it, SS223.it, A66.es and NI-A8.uk modified
May 25th, 2015: S7.at, A1.ba, S19.pl, A1.ro, P23.ru and Ma30.es added; A52.it, A58.it, A59.it, N62.nl, A1.ro, A1.rs and A38.es modified
May 31st, 2015: B101.de and E16.no added; A3.bg, A4.bg, M17.ie, M18.ie, E6.no A2.es, A14.es, A21.es, A44.es, A54.es, A334.es, AC15.es, LU12.es and E02.lk modified
June 4th, 2015: A2.bg, A3.bg, A4.bg, I1.bg, II18.bg, A36.it, SS199.it, SS597.it, A10.ro, D1.sk, E02.lk and NI-A8.uk modified
June 7th, 2015: A3.al, A4.al, A1.ba, A4.bg, A71.de, A1.rs, H6.si and A11.es modified
June 14th, 2015: R3.sk added; A38.es removed; A4.bg, PR17.dk, A304.fr, A14.de, A21.de, A23.de, A33.de, A98.de, A661.de, B30.de, B31.de, B535.de, S8.pl and A1.rs modified
June 20th, 2015: M85.hu, A1.me, S7.pl and DK16.pl added; N88.fr, A98.de, M60.hu, M85.hu, S8.pl, DK7.pl, E02.lk and A465.uk modified
June 28th, 2015: ON-401.ca, A14.de, A448.de, and B51.de added; S10.at, ON-401.ca, N88.fr, A14.de, A448.de, A31.it, SS96 Barese.it, SS106.it, SP415 Lodi.it, E6.no, S8.pl, A1.ro, D1.sk, R3.sk, A90.uk and A956.uk modified
July 17th, 2015: D1.cz, A12.it, Strada a Mare Guido Rossa.it, S19.pl, M11.ru, A491.es and E01.lk added; A2.bg, A3.bg, ON-401.ca, QC-A85.ca, PR17.dk, A466.fr, N88.fr, A26.de, A71.de, A29.gr, M43.hu, M11.ie, N17.ie, A12.it, SS106.it, SS640.it, A8.ma, S7.pl, DK15.pl, A1.ro, M11.ru, D1.sk, D3.sk, A334.es, BU30.es and E6.se modified
July 22nd, 2015: SS675.it and S3.pl added; QC-A85.ca removed; A26.de, S8.pl and A453.uk modified
August 2nd, 2015: D177.fr, A94.de, B29.de, A2.lt, S5.pl and P268.ru added; A2.bg, A3.bg, A21.de, A23.de, A44.de, A71.de, B15n.de, B266.de, M60.hu, A12.it, A31.it, N261.nl, A1.pl, S5.pl, S7.pl, S8.pl, S69.pl, DK89.pl, A4.rs, A15.es, E02.lk and A465.uk modified
August 20th, 2015: SP1 BT.it, N356.nl, S3.pl, A4.si and E04.lk added; A2.bg, I11.cz, A30.de, A71.de, A31.it, A2.lt, N356.nl, S7.pl, P268.ru and A2.rs modified
September 19th, 2015: A11.at, ON400.ca, Vt7.fi, B2.de, B33.de, M86.hu, A5.lt, E39.no, Fv580.no, A1.pl, DK7.pl, DK8.pl, DK55.pl, N125.pt and A121.ru added; A4.bg, ON-400.ca, D8.cz, N79.fr, A14.de, A71.de, B33.de, M85.hu, M86.hu, A1var.it, A31.it, A36.it, SS77.it, SS96 Barese.it, SS199.it, SS318.it, SP103 Milan.it, Pedemontana Veneta.it, A1.me, A4.nl, N356.nl, N381.nl, S3.pl, S7.pl, S8.pl, DK7.pl, DK89.pl, A121.ru, P268.ru, LU12.es and E02.lk modified
September 22nd, 2015: ?.ko added; A9.at, A4.bg, A5.hr, A11.hr, D2.hr, R6.ko, S8.pl, D1.sk and R40.se modified
October 3rd, 2015: D3.cz, MO.cz, A89.fr and S3.pl added; S36.at, D3.cz, D8.cz, D11.cz, R4.cz, R6.cz, I11.cz, I35.cz, I44.cz, A46.de, R6.ko, ?.ko, A7.lu, N356.nl, A1.rs, D1.sk, A2-AP7.es, A7.es, A21.es, A27.es, A32.es, A38.es, A54.es, A316.es, A8009.es, AC15.es, B25.es and CA35.es modified
October 11th, 2015: MKAD2.by added; A9.at, MKAD2.by, ?.ba, R6.cz, I11.cz, A23.de, A26.de, A36.it, M4.pk, A1.rs, A4.rs, A7.es and A27.es modified
October 13th, 2015: S7.pl added; I11.cz, I35.cz, A1.pl, A4.pl, S3.pl, S5.pl, S8.pl, S14.pl, S11.pl, S17.pl, S61.pl, S69.pl, DK19.pl, DW902.pl, A3.ro, A27.es and A8009.es modified
October 18th, 2015: QC-A70.ca and QC-A73.ca added; SNST.bg, II18.bg, QC-A410.ca, A23.de, A4.rs, D1.sk, A316.es, B24.es and R40.se modified
October 25th, 2015: Argentina added; II18.bg, QC-A73.ca, M11.ie, S3.pl, DK20.pl, A57.es and AG??.es added; A9.at, A3.bg, A4.bg, II18.bg, QC-A70.ca, QC-A73.ca, B10.de, S3.pl, A1.pl, S5.pl, S8.pl, DW902.pl, D1.sk, A8.es and A54.es modified
November 1st, 2015: A15.nl, S19.pl and S61.pl added; Autopista Illia. ar, S10.at, ?.ba, A4.bg, I1.bg, QC-A410.ca, A11.hr, D2.hr, A14.de, A23.de, B10.de, SS199.it, SS597.it, ?.ko, S19.pl, S61.pl, A1.ro, R2.sk, A32.es and A8009.es modified
November 8th, 2015: B85.de, Fv557.no and E22.se added; ON-401.ca, A11.hr, D2.hr, R6.cz, B535.de, A36.it, M5.ru, D1.sk, R2.sk and SE40.es modified
November 14th, 2015: QC-A73.ca, A11.hr, R6.cz, B49.de, B51.de, B85.de, A1var.it, Fv557.no, M4.pk, S61.pl, A26.pt, A26-1.pt, R2.sk and A8009.es modified

Last edited by MichiH; November 14th, 2015 at 03:10 PM.
MichiH no está en línea  
Old December 28th, 2013, 05:01 AM   #4
arnau_Vic
Registered User
 
Join Date: May 2011
Posts: 354
Likes (Received): 39

arnau_Vic no está en línea  
Old December 28th, 2013, 05:09 AM   #5
Verso
Islander
 
Verso's Avatar
 
Join Date: Jun 2006
Location: Ljubljana
Posts: 22,087
Likes (Received): 4749

"New motorways" could mean recently opened motorways. A better title would be "Motorways under construction".
__________________
take a ride on slovenian highways

PhirgataZFs1694 liked this post
Verso no está en línea  
Old December 28th, 2013, 10:00 AM   #6
mcarling
Registered User
 
Join Date: Nov 2008
Posts: 4,605
Likes (Received): 491

Since you're including extensions, why not the A5 in Austria?
mcarling no está en línea  
Old December 28th, 2013, 10:21 AM   #7
JackFrost
Hun Solo
 
JackFrost's Avatar
 
Join Date: Nov 2010
Location: Sopron/Wien
Posts: 4,279
Likes (Received): 11827

isnt a motorway u/c in Serbia between Nis and the bulgarian border?
JackFrost no está en línea  
Old December 28th, 2013, 11:12 AM   #8
MichiH
Registered User
 
Join Date: Jan 2013
Location: Lower Franconia
Posts: 4,406
Likes (Received): 2082

Quote:
Originally Posted by Verso View Post
"New motorways" could mean recently opened motorways. A better title would be "Motorways under construction".
I also include roads that will be rededicated (e.g. A448.de). The list only contains u/c motorways at the moment. After completion of the first new motorway I will not remove the project but I will change the color red --> green, see this list. I wrote "happened or expected openings" .

Quote:
Originally Posted by mcarling View Post
Since you're including extensions, why not the A5 in Austria?
It is not yet u/c, see project page.

Quote:
Geplanter Baubeginn Abschnitt Schrick - Poysbrunn: 2014
Quote:
Originally Posted by Jack_Frost View Post
isnt a motorway u/c in Serbia between Nis and the bulgarian border?
True. I thought all sections are u/c. Is the project page outdated? There are also more A1 sections u/c but I have to less information about what is really u/c (outdated project page?) . The A2 sections are also looking strange b/c I have no information about start and end of construction. I am hoping anyone could help to complete the Serbian list.

PS: There are a lot of question marks left, e.g. the month of construction start in Bosnia, Hungary, Poland, Switzerland,... No project page link of the Bulgarian, Czech and Romanian projects,...
MichiH no está en línea  
Old December 28th, 2013, 11:37 AM   #9
JackFrost
Hun Solo
 
JackFrost's Avatar
 
Join Date: Nov 2010
Location: Sopron/Wien
Posts: 4,279
Likes (Received): 11827

Quote:
Originally Posted by MichiH View Post
PS: There are a lot of question marks left, e.g. the month of construction start in Bosnia, Hungary, Poland, Switzerland,... No project page link of the Bulgarian, Czech and Romanian projects,...
constructing M43 was scheduled to start in november 2012, but actual works began in march 2013
JackFrost no está en línea  
Old December 28th, 2013, 11:57 AM   #10
ChrisZwolle
Road user
 
ChrisZwolle's Avatar
 
Join Date: May 2006
Location: Zwolle
Posts: 43,600
Likes (Received): 19389

The Netherlands

A4: Delft - Schiedam 7 km (2012 to 2015) - project - map
A4: Dinteloord - Tholen 14 km (2011 to March 2015) - project - map
A9: Badhoevedorp - Raasdorp 4 km (December 2013 to 2017) - project - map
A13-A16: Rotterdam - Berkel en Rodenrijs 9 km (2016 to 2021) project - map
A15: Ressen - Oudbroeken 15 km (2015 to 2021) - map
A24: Vlaardingen - Rozenburg 4 km (2015 to 2021) - project - map
ChrisZwolle está en línea ahora  
Old December 28th, 2013, 01:37 PM   #11
italystf
Registered User
 
Join Date: Aug 2011
Posts: 6,456
Likes (Received): 2185

Italy
A1 La Quercia - Barberino nel Mugello "Variante di Valico" 43km
A12 Tarquinia - Civitavecchia 16,5km
A21racc Ospitaletto - Azzano Mella 12km
A31 Albettone\Barbarano Vicentino - Badia Polesine 40,5km
A33 Asti - Cuneo: don't know actually which parts are already U/C and which still in planning stage
A35 Brescia - Milan "BeBreMi"
A36 Osio sotto\Brembate - Busto Arsizio "Pedemontana Lombarda" 87km
A58 Outer East Milan bypass "TEEM" 33km
Pedemontana Veneta Montecchio Maggiore - Spresiano 95km
SS76 Fabriano - Fossato di Vico
SS77 Camerino - Foligno
SS106 "Jonica" several parts between Policoro and Reggio Calabria, don't know where works are currently ongoing
SS626 Caltanissetta - Agrigento 59km (some parts already open)
__________________
“The transponder’s personalised signal would be picked up when the car passed through an intersection, and then relayed to a central computer which would calculate the charge according to the intersection and the time of day and add it to the car’s bill” - Nobel Economics Prize winner William Vickrey, proposing a system of electronic tolling for the Washington metropolitan area, 1959
In real life, electronic toll collection was first introduced in Bergen, Norway in 1986, and well into the 21th century many countries still struggle to implement it.
italystf no está en línea  
Old December 28th, 2013, 02:09 PM   #12
g.spinoza
Lord Kelvin
 
g.spinoza's Avatar
 
Join Date: Jul 2010
Location: Torino
Posts: 9,500
Likes (Received): 2110

Italystf, the SS roads are not highest class as MichiH requested. Plus, A36 is not all in construction right now. Only 2 lots are.
g.spinoza está en línea ahora  
Old December 28th, 2013, 02:14 PM   #13
MichiH
Registered User
 
Join Date: Jan 2013
Location: Lower Franconia
Posts: 4,406
Likes (Received): 2082

I've added Belgium, Luxembourg and The Netherlands.
I've also modified A5.ch and M43.hu.

Quote:
Originally Posted by italystf View Post
Italy
Thanks . Do you also have information about construction start and estimated completion? Project page? Will all sections be opened at once or partially (e.g. 43km is a long distance).
Quote:
Originally Posted by italystf View Post
Pedemontana Veneta Montecchio Maggiore - Spresiano 95km
Numbering? Is the entire 95km section u/c? Will the entire section be opened at once?

Quote:
Originally Posted by italystf View Post
SS76,...
I guess these are expressways, aren't they?
MichiH no está en línea  
Old December 28th, 2013, 03:53 PM   #14
g.spinoza
Lord Kelvin
 
g.spinoza's Avatar
 
Join Date: Jul 2010
Location: Torino
Posts: 9,500
Likes (Received): 2110

Quote:
Originally Posted by MichiH View Post

Numbering? Is the entire 95km section u/c? Will the entire section be opened at once?
Technically this is going to be an expressway, not a motorway. Numbering has not be decided yet. To my knowledge, only a couple of lots are u/c one near a4 an the other near bassano if i'm not mistaken. Don't know if they are going to open strech by stretch bur the whole road is scheduled to be ready around 2017.

Quote:
I guess these are expressways, aren't they?
Yes they are.
g.spinoza está en línea ahora  
Old December 28th, 2013, 04:00 PM   #15
italystf
Registered User
 
Join Date: Aug 2011
Posts: 6,456
Likes (Received): 2185

Quote:
Originally Posted by g.spinoza View Post
Italystf, the SS roads are not highest class as MichiH requested. Plus, A36 is not all in construction right now. Only 2 lots are.
Obviously only Axx are autostrade. All other roads I mentioned are superstrade (at least 2x2, full grade separation). MichiH said that motorway-like roads will be included in a second time, so I anticipated (it's obvious that SSxx aren't autostrade in Italy).

Quote:
Originally Posted by MichiH View Post
I've added Belgium, Luxembourg and The Netherlands.
I've also modified A5.ch and M43.hu.


Thanks . Do you also have information about construction start and estimated completion? Project page? Will all sections be opened at once or partially (e.g. 43km is a long distance).



Numbering? Is the entire 95km section u/c? Will the entire section be opened at once?



I guess these are expressways, aren't they?
All SSxx plus the Pedemontana Veneta are expressways. They're basically like motorways, but have blue signs and 110 speed limit. Minimum width for new expressways is 22m, for motorways is 24,5m. Of course some old motorways and expressways are narrower. Expressways are currently all toll-free, the Pedemontana Veneta will be the first tolled expressway (width 24m, almost a motorway but 110 s.l. ). Its number it's still not known. Works are currently ongoing in different stretches but not along its entire lenght. However they will start soon since the official opening date is 2016, but knowing past Italian projects, it wouldn't surprise me if it opens in 2018 or later.

The Variante di Valico will open in 2015 (initially was planned in 2013) all together. Some parts are already completed but since it's an alternative to the current A1, it won't make any sense to have half of it open, not connected to the A1 at both ends.

EDIT: Spinoza already replied.
__________________
“The transponder’s personalised signal would be picked up when the car passed through an intersection, and then relayed to a central computer which would calculate the charge according to the intersection and the time of day and add it to the car’s bill” - Nobel Economics Prize winner William Vickrey, proposing a system of electronic tolling for the Washington metropolitan area, 1959
In real life, electronic toll collection was first introduced in Bergen, Norway in 1986, and well into the 21th century many countries still struggle to implement it.
italystf no está en línea  
Old December 28th, 2013, 04:10 PM   #16
g.spinoza
Lord Kelvin
 
g.spinoza's Avatar
 
Join Date: Jul 2010
Location: Torino
Posts: 9,500
Likes (Received): 2110

Motorway width should be 25m not 24.5. Pedemontana veneta is 24.5, thus expressway, but maybe I remember wrong.
g.spinoza está en línea ahora  
Old December 28th, 2013, 04:17 PM   #17
italystf
Registered User
 
Join Date: Aug 2011
Posts: 6,456
Likes (Received): 2185

Quote:
Originally Posted by g.spinoza View Post
Motorway width should be 25m not 24.5. Pedemontana veneta is 24.5, thus expressway, but maybe I remember wrong.
Sorry, my mistake. However I remembered that there was that 0,5m difference that prevented that road from being classificated as a motorway.
Stupid decision, if you ask me. Drivers will still need to pay like a motorway, but with the disvantage of driving at no more than 110 even with good weather and low traffic in what it looks like exactly a motorway (0,5m in a 4-lane highway is unnoticeable at naked eye).
__________________
“The transponder’s personalised signal would be picked up when the car passed through an intersection, and then relayed to a central computer which would calculate the charge according to the intersection and the time of day and add it to the car’s bill” - Nobel Economics Prize winner William Vickrey, proposing a system of electronic tolling for the Washington metropolitan area, 1959
In real life, electronic toll collection was first introduced in Bergen, Norway in 1986, and well into the 21th century many countries still struggle to implement it.
italystf no está en línea  
Old December 28th, 2013, 04:41 PM   #18
Verso
Islander
 
Verso's Avatar
 
Join Date: Jun 2006
Location: Ljubljana
Posts: 22,087
Likes (Received): 4749

Quote:
Originally Posted by MichiH View Post
I also include roads that will be rededicated (e.g. A448.de).
What does that mean? What's special about A448?
Verso no está en línea  
Old December 28th, 2013, 04:55 PM   #19
MichiH
Registered User
 
Join Date: Jan 2013
Location: Lower Franconia
Posts: 4,406
Likes (Received): 2082

The Bochum ring road is a state road (L705). The road is 2x2 and is currently renewed. After completion of the eastern extension (map) the entire western and southern Bochum ring road will be dedicated (renamed) to A448. The German Autobahn network will increase in 2017 by 7.8km - due to a redidication.
MichiH no está en línea  
Old December 28th, 2013, 05:02 PM   #20
Kemo
Registered User
 
Join Date: Jan 2012
Location: Segiet
Posts: 10,727
Likes (Received): 18762

What does the number 12 mean? It's everywhere.

Quote:
Originally Posted by MichiH View Post

Bosnia and Herzegovina

A1: Drivusa – Biljesevo 12 ?km (2011 to January 2014) – project – map
A1: Vlakovo – Lepenica 12 ?km (2012 to April 2014) – project – map
A1: Zvirovici – Zvirici 12 ?km (? to June 2014) – project – map
A1: Lepenica – Tarcin 12 ?km (2012 to July 2014) – project – map
A1: Svilaj – Odzak 12 10.4km (September 2013 to November 2014) – project – map
A1: Vogosca – Vlakovo 12 ?km (? to ?) – project – map

Bulgaria

A3: Sandanski – Kulata 12 15.0km (April 2012 to March 2014) – ? – map
A4: Chirpan – Dimitrovgrad 12 31.4km (October 2011 to 2nd half-year 2014) – ? – map
A4: Dimitrovgrad – Harmanli 12 34.2km (July 2011 to 2nd half-year 2014) – ? – map
A4: Svilengrad bypass 2 8.9km (Spring 2011 to 2nd half-year 2014) – ? – map
A4: Generalovo – Kapitan Andreevo 12 5.4km (November 2011 to 2nd half-year 2014) – ? – map
A3: Dupnitsa – Blagoevgrad 12 37.0km (July 2013 to May 2015) – ? – map

PS
A1: Wloclawek-West – Kowal 12 21.0km (June 2010 to May 2014)
A1: Swierklany – Mszana 12 7.2km (November 2007 to May 2014)
A4: Tarnow-North – Debica-East 12 34.8km (July 2010 to November 2014)
A4: Rzeszow-East – Jaroslaw-West 12 39.9km (September 2010 to December 2014)
A1: Lodz-North – Tuszyn 12 38.6km (December 2010 to June 2015)

(The last one is Design & Build, the actual construction started in March 2013. Added 1,3km - Łódź South interchange within a different contract)

Last edited by Kemo; December 28th, 2013 at 05:12 PM.
Kemo no está en línea  


Closed Thread

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Related topics on SkyscraperCity


All times are GMT +2. The time now is 06:09 PM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2018, vBulletin Solutions Inc.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.