daily menu » rate the banner | guess the city | one on oneforums map | privacy policy | DMCA | news magazine | posting guidelines

Go Back   SkyscraperCity > European Forums > Euroscrapers > Local discussions > Romania & Moldova > Development Forums > Infrastructure & Transport

Infrastructure & Transport Infrastructure projects, transport & mobility



Global Announcement

As a general reminder, please respect others and respect copyrights. Go here to familiarize yourself with our posting policy.


Closed Thread

 
Thread Tools
Old January 2nd, 2014, 09:43 PM   #1
bogdymol
bogdymod
 
bogdymol's Avatar
 
Join Date: Feb 2010
Posts: 9,825

Post Romanian Motorways - Index and Statistics



This thread is intended to contain relevant data about Motorway development in Romania.

Planned Romanian motorway map:


Map taken from wikipedia.

Current Romanian motorway map (existing and under construction):



Romanian motorways map made by forum user SfantuMM (download link - 47 MB).

Romanian Motorways development each year:



Future numbering of Romanian Motorways:


official map, approved by CNADNR

Romanian Motorways stats:



Useful threads in the Romanian Infrastructure & Transport sub-forum:
Motorways threads: [RO] Romania | road infrastructure • autostrăzi şi drumuri

Romanian Road Quality Map
Road Safety & Legislation
EU funding for Infrastructure and Transport
Accidents statistics on Romanian Motorways

Useful external links:
Wiki article about Romanian Motorways: ro | en | nl
Exits list
EU Comprehensive and Core Motorway network for Romania
Google Maps
Romanian traffic census map: 2005 | 2010 | prediction for 2015 based on 2005 traffic count
CNADNR
Ministerul Transporturilor
Departamentul pentru Proiecte de Infrastructură şi Investiții Străine
Politicians motorway plan: 1969 | 1996 | 2007 | 2013
Romanian Court of Accounts (Curtea de Conturi) report for motorways 2005-2010
Programul Operațional Sectorial - Transporturi

Târgu Mureș - Iași planned motorway feasibility study map
Planned Motorways and Expressways map in western Romania

Important note:
  • To keep this thread clean, it will remain closed. Users are kindly asked to post in the Roadside Rest Area thread any useful information regarding Romanian Motorways development. One of the moderators will then update posts in this thread to keep it up-to-date.
  • Pentru a menține acest thread curat, el va rămâne închis. Membrii forum-ului sunt rugați să posteze în thread-ul Roadside Rest Area orice informație utilă în legătură cu dezvoltarea rețelei de Autostrăzi din România. Unul dintre moderatori va actualiza apoi postările din acest thread pentru a-l menține "la zi".
__________________
Been in A B BG CZ D F GR H HR I L PL RO RSM SK SLO SRB UK US V
Drove in A B CZ D F GR H HR I L PL RO RSM SK SLO SRB UK US
join eRepublik!

vancouverro, Clinlin, roata, nasty, gogo3o and 13 others liked this post

Last edited by bogdymol; March 9th, 2014 at 11:44 AM.
bogdymol no está en línea  

Sponsored Links
 
Old January 2nd, 2014, 09:52 PM   #2
bogdymol
bogdymod
 
bogdymol's Avatar
 
Join Date: Feb 2010
Posts: 9,825

Motorways - Index and Statistics - A1 Motorway

A1 Motorway thread

Bucharest – Piteşti – Sibiu – Deva – Timişoara – Arad – Nădlac –> Hungary



Wiki article: ro | en | nl | Exits list | cnadnr

Stats:



A1 Sibiu - Nădlac map

Bucharest - Pitești (96 km)
Opening date: 1972
Pitești bypass (13,66 km)
Opening date: 19.11.2007
Sibiu - Pitești (116,64 km) (map from 2007 feasibility study)
EU: 85%; State budget: 15%
Expected opening date: 2020
* Feasibility study from 2007 has expired. Another one will be tendered soon. Tender for construction after FS will be completed.
Sibiu bypass (17,56 km)
Constructor: Max Boegl – Geiger-Comtram JV + Vectra Service SRL
Price: 48.816.180,35 € + 9.852.910,04 €
EU: 85%; State budget: 15%
Contract signed: 12.05.2008 + 15.01.2010
Opening date: 01.12.2010
Orăștie - Sibiu lot 4 (16,11 km)
Constructor: ASTALDI S.p.A-SC EURO CONSTRUCT TRADING 98 SRL – SC ASTALROM SA
Price: 484.839.529,89 lei
EU: 85%; State budget: 15%
Contract signed: 07.06.2011
Opening date: 19.12.2013
Orăștie - Sibiu lot 3 (22,11 km)
Constructor: IMPREGILO S.p.A.
Price: 604.791.600 lei
EU: 85%; State budget: 15%
Contract signed: 07.06.2011
Expected opening date: late 2014
* Opening of this motorway is delayed because of problems with landslides.
Orăștie - Sibiu lot 2 (19,75 km)
Constructor: S.C. STRACO GRUP S.R.L. – STUDIO CORONA S.R.L. CIVIL ENGINEERING
Price: 377.780.208,81 lei
EU: 85%; State budget: 15%
Contract signed: 07.06.2011
Opening date: 19.12.2013
Orăștie - Sibiu lot 1 (24,11 km) - presentation: video 1 & video 2
Constructor: S.C. STRABAG S.R.L.
Price: 551.041.792,37 lei
EU: 85%; State budget: 15%
Contract signed: 07.06.2011
Opening date: 19.12.2013
Deva - Orăștie (32,8 km)
Constructor: JV STRABAG AG - SC STRABAG SRL- SC STRACO GRUP SRL
Price: 197.391.744,61 €
EU: 55%; State budget: 45%
Contract signed: 12.11.2010
Opening date: 21.12.2012 + 30.05.2013
Lugoj - Deva lot 4 ( km)
Constructor: UMB
Price:
EU: 85%; State budget: 15%
Contract signed: 2013
Expected opening date: late 2015
Lugoj - Deva lot 3 ( km)
Constructor: Teloxim + Comsa + Aldesa Construc**ciones + Arcadis Eurometudes
Price: 132.000.000 €
EU: 85%; State budget: 15%
Contract signed: 2013
Expected opening date: late 2015
Lugoj - Deva lot 2 ( km)
Constructor: Salini/Impregilo + Secol
Price: 128.000.000 €
EU: 85%; State budget: 15%
Contract signed: 2013
Expected opening date: late 2015
Lugoj - Deva lot 1 (27,40 km)
Constructor: Tirrena Scavi + Societa Italiana pentru Condotte d’Acqua
Price: 681.040.913,98 lei*
EU: 85%; State budget: 15%
Contract signed: 20.05.2011
Opening date: 23.12.2013**
* The price also includes the 10-km long A6 motorway link from A1 to Lugoj bypass.
** On that date only 17 km of the motorway was opened. Because there is no proper exit at the western point of this motorway, he remaining 10 km will open when Timisoara-Lugoj lot 2 motorway section will open.
Timișoara - Lugoj lot 2 (25,60 km)
Constructor: Tirrena Scavi + Societa Italiana pentru Condotte d’Acqua
Price: 423.356.307,32 lei
EU: 85%; State budget: 15%
Contract signed: .12.2013
Expected opening date: late 2015
Timișoara - Lugoj lot 1 (9,5 km)
Constructor: S.C.SPEDITION UMB S.R.L.-S.C.TEHNOSTRADE S.R.L. – CARENA SpA IMPRESA DI COSTRUZIONI
Price: 210.369.462,74 lei
EU: 85%; State budget: 15%
Contract signed: 20.05.2011
Opening date: 23.10.2012
Arad - Timișoara (32,25 km) - Project's website

Constructor: JV FCC Construction S.A / ASTALDI S.p.A
Price: 482.920.350 lei (135.438.734 €)
EU: 85%; State budget: 15%
Contract signed: 26.01.2009
Opening date: 17.12.2011
Arad bypass (12,25 km)
Constructor: JV FCC Construccion / PORR Bau GmbH
Price: 428.895.737 lei (120.628.811 €)
EU: 85%; State budget: 15%
Contract signed: 24.04.2009
Opening date: 17.12.2011 (half profile) | 06.06.2012 (full profile)
Nădlac - Arad, lot 2 (16,66 km)
Constructor: ALPINE Bau GmbH
Price: 411.489.216,05 lei
EU: 85%; State budget: 15%
Contract signed: 20.05.2011

* Due to the bankrupcy of the Constructor, this contract was canceled when approx. 85% of the works were completed. The re-tendering will start soon.
Expected opening date: late 2014
Nădlac - Arad, lot 1 (22,22 km)
Constructor: S.C. ROMSTRADE S.R.L. – MONTEADRIANO ENGENHARIA E CONSTRUÇÃO S.A. – S.C. DONREP CONSTRUCT S.R.L.
Price: 382.959.483,93 lei
EU: 85%; State budget: 15%
Contract signed: 20.05.2011

* Due to misuse of EU funds, the contract was canceled when approx. 30% of works were completed. This motorway section was re-tendered.
New Constructor: Astaldi Sp.A. - Max Boegl
Price: 69.000.000 €
Contract signed: .12.2013
Expected opening date: December 2014
__________________
Been in A B BG CZ D F GR H HR I L PL RO RSM SK SLO SRB UK US V
Drove in A B CZ D F GR H HR I L PL RO RSM SK SLO SRB UK US
join eRepublik!

Last edited by bogdymol; January 17th, 2014 at 12:51 PM.
bogdymol no está en línea  
Old January 2nd, 2014, 09:54 PM   #3
bogdymol
bogdymod
 
bogdymol's Avatar
 
Join Date: Feb 2010
Posts: 9,825

Motorways - Index and Statistics - A2 Motorway

A2 Motorway thread

Bucharest – Constanţa



A2 Bucharest - Constanța map

Wiki article: ro | en | nl | Exits list | cnadnr

Stats:



Bucharest - Fundulea (26,50 km)
Constructor: JV Romis SRL
Price: 73.803.166,05 €
Contract signed: 2001
Opening date: 04.04.2004
Fundulea - Lehliu (29,10 km)
Constructor: Asocierea Yuksel - Makimsar - Ener
Price: 87.068.112,27 €
Contract signed: 2001
Opening date: 04.04.2004
Lehliu - Drajna (41,60 km)
Constructor: Colas
Price: 116.825.569,52 €
Contract signed: 2001
Opening date: .11.2004
Drajna - Fetești (37 km)
Constructor: JV Astaldi - Max Bogl - CCCF
Price: 64.549.332,05 €
Contract signed: 09.12.2003
Opening date: 01.05.2007
Fetești - Cernavodă (18 km)
Opening date: 1987
Cernavodă - Medgidia (20,49 km)
Constructor: Colas
* Shortly after works started there was a financial disagreement between Colas and the Romanian Government. Because of this the contract was canceled and re-tendered soon after that.
New constructor: JV ASTALDI SPA - MAX BOGL
Price: 498.399.999,87 lei
Contract signed: 07.10.2011
Opening date: 29.11.2012
Medgidia - Constanța (30,82 km)
Constructor: JV ASTALDI SPA - MAX BOGL
Price: 596.053.996,00 lei
Contract signed: 04.06.2009
Opening date: 30.09.2011 + 19.07.2012
__________________
Been in A B BG CZ D F GR H HR I L PL RO RSM SK SLO SRB UK US V
Drove in A B CZ D F GR H HR I L PL RO RSM SK SLO SRB UK US
join eRepublik!

Last edited by bogdymol; January 5th, 2014 at 05:34 PM.
bogdymol no está en línea  
Old January 2nd, 2014, 09:55 PM   #4
bogdymol
bogdymod
 
bogdymol's Avatar
 
Join Date: Feb 2010
Posts: 9,825

Motorways - Index and Statistics - A3 Motorway

A3 Motorway thread

Bucharest – Ploieşti – Braşov – Târgu Mureș – Cluj-Napoca – Zalău – Oradea – Borș –> Hungary



Wiki article: ro | en | nl | Exits list

Stats:



A3 Bucharest - Ploiești map

Bucharest - Bucharest ring-road (6,5 km)
Constructor: Impressa Pizzarotti / Tirrena Scavi
State budget 100%
Contract signed:
Expected opening date: late 2014
Bucharest ring-road - Moara Vlăsiei (13 km)
Constructor: Impressa Pizzarotti / Tirrena Scavi
Price: 183,62 million €
State budget 100%
Contract signed: 25.10.2006
Opening date: 19.07.2012
Moara Vlăsiei - Ploiești (42,5 km) (map)
Constructor: Asocierea SC Spedition UMB SRL, SC PA&CO International SRL, SC Euroconstruct Trading 98 SRL, SC Com-Axa SRL
Price: 238 million €
State budget 100%
Contract signed: 25.10.2006
Opening date: 19.07.2012
Ploiești - Comarnic (48,6 km)
Planned
Comarnic - Brașov (54 km)
Constructor: VSA - VINCI Concessions (37.5%), STRABAG (37.5%) and AKTOR (25%)
Other bidders:
Impregilo - Salini
Spedition UMB - Tehnostrade (no bid submitted)
China Communications Construction (later retreated from the tender)
PPP (Public-Private Partenership) Project - State budget 100% - 29 years long concession contract
Expected opening date: 2017
Brașov - Târgu Mureș (151 km)
Planned
Târgu Mureș - Câmpia Turzii (48 km)
Planned
Expected opening date: 2016
Câmpia Turzii - Turda (10 km)
Constructor: Bechtel International Inc. + Enka İnșaat ve Sanayi A.Ș.
State budget 100%
Contract signed: 2004
Opening date: 13.11.2010
Turda - Gilău (42 km)
Constructor: Bechtel International Inc. + Enka İnșaat ve Sanayi A.Ș.
State budget 100%
Contract signed: 2004
Opening date: 01.12.2009
Gilău - Nădășelu (9 km) (map)
Constructor: Spedition UMB
Price: 258,2 million lei
State budget 100%
Contract signed: spring 2013
Expected opening date: 2015
* Because of budget cuts, although the contract for construction was signed, the works haven't started yet
* Design: 4 months; Construction: 18 months
Nădășelu - Suplacu de Barcău (91 km)
Planned
Suplacu de Barcău - Borș (64 km)
Constructor: Bechtel International Inc. + Enka İnșaat ve Sanayi A.Ș.
State budget 100%
Contract signed: 2004
* Contract was canceled when approx. 50% of works were completed. It hasn't been re-tendered yet.
----------------------------

Contract with Bechtel International Inc. (cnadnr | autostradatransilvania.ro):
* contract for building Brașov - Făgăraș - Sighișoara - Târgu Mureș - Turda - Cluj-Napoca - Zalău - Suplacu de Barcău - Borș (415 km) motorway (map)
* contract was signed in 2004 without a tender for 2.2 billion € and should have been completed until 2013
* every year that contract value was raising, from 2.2 billion € when the contract was signed to 2.56 then 3.9, and finally the last rumors say it was up to 4.7 billion €. The contract was modified numerous times and it wasn't made public.
* until 2011 the total amount payed to Bechtel was 1.267 billion €
* Bechtel built Gilău - Câmpia Turzii section (52,5 km). This section is 97,18% completed. The remaining percents up to 100% are because of an uncompleted bridge over Someșul Mic river. This bridge is not necessary for traffic today, but it will be in the future.
* Bechtel also built 50,12% of Suplacu de Barcău - Borș section.
* in May 2013 the contract with Bechtel was canceled after a mutual agreement
__________________
Been in A B BG CZ D F GR H HR I L PL RO RSM SK SLO SRB UK US V
Drove in A B CZ D F GR H HR I L PL RO RSM SK SLO SRB UK US
join eRepublik!

Last edited by bogdymol; January 5th, 2014 at 05:31 PM.
bogdymol no está en línea  
Old January 2nd, 2014, 09:57 PM   #5
bogdymol
bogdymod
 
bogdymol's Avatar
 
Join Date: Feb 2010
Posts: 9,825

Motorways - Index and Statistics - A4 Motorway

A4 Motorway thread

Constanța bypass



Wiki article: ro | en | nl | Exits list | cnadnr | Project's website

Stats:



Centura Constanța (21,8 km)
Constructor: FCC Construccion SA / Astaldi SpA JV
Price: 801.012.341 lei
EU: 85%; State budget: 15%
Contract signed: 21.11.2008
Opening date: 29.07.2011 + 30.09.2011 + 19.07.2012 + 12.07.2013
__________________
Been in A B BG CZ D F GR H HR I L PL RO RSM SK SLO SRB UK US V
Drove in A B CZ D F GR H HR I L PL RO RSM SK SLO SRB UK US
join eRepublik!

andrei_d, solchante liked this post

Last edited by bogdymol; January 3rd, 2014 at 05:17 PM.
bogdymol no está en línea  
Old January 2nd, 2014, 10:01 PM   #6
bogdymol
bogdymod
 
bogdymol's Avatar
 
Join Date: Feb 2010
Posts: 9,825

Motorways - Index and Statistics - A6 Motorway

A6 Motorway Thread

Lugoj - Calafat



Wiki article: ro | en | nl | Exits list

Stats:



Connection motorway road A1 - Lugoj bypass (10 km)
Constructor: Tirrena Scavi + Societa Italiana pentru Condotte d’Acqua
Price: 681.040.913,98 lei*
EU: 85%; State budget: 15%
Contract signed: 20.05.2011
Opening date: 23.12.2013
* The price also includes the 27-km long A1 motorway Lugoj - Deva lot 1
__________________
Been in A B BG CZ D F GR H HR I L PL RO RSM SK SLO SRB UK US V
Drove in A B CZ D F GR H HR I L PL RO RSM SK SLO SRB UK US
join eRepublik!

Le Clerk, Pop Bogdan, andrei_d liked this post

Last edited by bogdymol; January 3rd, 2014 at 05:17 PM.
bogdymol no está en línea  
Old January 2nd, 2014, 10:04 PM   #7
bogdymol
bogdymod
 
bogdymol's Avatar
 
Join Date: Feb 2010
Posts: 9,825

Motorways - Index and Statistics - A7 Motorway

A7 Motorway thread

Bacău bypass

Bacău bypass map (click on it for larger version):



Bacău bypass will be initially built as half-profile motorway (2+1 lanes).

Bacău bypass (17 km half-profile motorway + 13,7 km of connection road)
Estimated value: 591.224.807,10 lei
Submited bids during tender:
Asocierea PA&CO International – Idecon SAU - 353,2 milioane de lei
Eko Insaat Ve Tc AS - 363,8 milioane de lei
Asocierea Impregilo Spa-Salini Spa - 550 milioane de lei
Asocierea Max Boegl Romania SRL – Astaldi SpA - 488,4 milioane de lei
Asocierea Tirrena Scavi SpA – Societa Italiana per Condotte d’Aqua Spa - 452,9 milioane de lei
Asocierea Aktor SA – Arcadia Company SA - 489,4 milioane de lei
OHL SA - 398, 8 milioane lei
SC Vega 93 SRL - 439,8 milioane lei
SC Strabag SRL - 393,3 milioane lei
SC SA&PE Construct SRL - 383,9 milioane lei
EU: 85%; State budget: 15%
Expected opening date: late 2015
__________________
Been in A B BG CZ D F GR H HR I L PL RO RSM SK SLO SRB UK US V
Drove in A B CZ D F GR H HR I L PL RO RSM SK SLO SRB UK US
join eRepublik!

nasty, andrei_d liked this post

Last edited by bogdymol; January 5th, 2014 at 09:02 PM.
bogdymol no está en línea  
Old January 2nd, 2014, 10:06 PM   #8
bogdymol
bogdymod
 
bogdymol's Avatar
 
Join Date: Feb 2010
Posts: 9,825

Motorways - Index and Statistics - A10 Motorway

A10 Motorway thread

Sebeș - Turda



Wiki article: ro | en | nl | Exits list

Stats:



Sebeș - Turda Motorway sectors map (interactive map).

Sebeș - Turda lot 1 (17 km)
Estimated value: 627.312.447 lei
Submited bids during tender:
Asocierea Corsan Corviam Construccion SA & SC Selina SRL & Louis Berger SAS & SC Road Consulting & Design Solutions SRL - 457.310.773 lei
Asocierea PA&CO International SRL – CARENA SpA - 523.007.256 lei
Asocierea Impregilo SpA – Salini SpA - 539.488.704 lei
Impresa Pizzarotti & C SpA - 541.739.137 lei
Asocierea Associazione Cooperativa Muratori & Affini Ravenna S.C.P.A.- Societatea de Constructii Napoca S.A - S.C. Imob Lux Construct SRL - SC Tel Drum SA - Impressa Ferrara S.N.C. Di Angela & Rossella Ferrara - SC Fincodrum SA - R.C.M. Costruzioni SRL - Schiavo & C. S.p. A - Eurocerad International SRL - 552.890.671 lei
JV SC Strabag SRL – SC Straco Grup SRL - 594.625.718 lei
Asocierea Tirrena Scavi S.p.A Societa Italiana per Condotte d’Acqua S.p.A - 604.717.699 lei
Asocierea OHL SA – TANCRAD SRL - 618.213.904 lei
Asocierea Max Boegl Romania Srl – Astaldi Spa – Astalrom SA - 657.739.258 lei
EU: 85%; State budget: 15%
Expected opening date: late 2015
Sebeș - Turda lot 2 (24,25 km)
Estimated value: 736.038.791 lei
Submited bids during tender:
Asocierea RCM Costruzioni SRL - SC Imob Lux Construct Srl - SC Consinit Srl - Societatea de Constructii Napoca SA - Impresa Ferrara S.N.C Di Angela & Rossella Ferrara- SC T Dancor RomConstruct Srl - SC Shelter Construct Srl - Associazione Cooperativa Muratori & Affini Ravenna S.C.P.A. - Schiavo & C.SpA - Eurocerad International Srl - 460.019.270 lei
Asocierea Corsan Corviam Construccion SA & SC Selina SRL & Louis Berger SAS & SC Road Consulting & Design Solutions SRL - 471.432.845 lei
Asocierea Impregilo SpA – Salini SpA - 499.569.581 lei
Asocierea PA&CO International SRL –CARENA SpA - 525.194.105 lei
Asocierea Aktor SA – Euroconstruct Trading’98 SRL - 549.332.493 lei
Asocierea OHL S.A. – Tancrad SRL - 549.633.496 lei
Asocierea Tirrena Scavi S.p.A Societa Italiana per Condotte d’Acqua S.p.A - 665.996.518 lei
Asocierea Lena Engenharia E Contruções SA – Teloxim Con SRL- Consitrans SRL - 640.333.284 lei
JV SC Strabag SRL – SC Straco Grup SRL - 618.950.315 lei
Asocierea Astaldi Spa & Max Boegl Romania – Astalrom SA - 719.013.892 lei
EU: 85%; State budget: 15%
Expected opening date: late 2015
Sebeș - Turda lot 3 (12,45 km)
Estimated value: 532.095.949 lei
Submited bids during tender:
Asocierea Corsan Corviam Construccion SA - SC Selina SRL - Louis Berger SAS - SC Road Consulting & Design Solutions SRL - 380.448.603 lei
„Azvirt” LLC - 398.340.053 lei
Asocierea Tirrena Scavi S.p.A Societa Italiana per Condotte d’Acqua S.p.A - 420.511.921 lei
Asocierea PA&CO International SRL – CARENA SpA - 447.915.351 lei
JV SC Strabag SRL – SC Straco Grup SRL - 472.493.656 lei
Asocierea SC Hidroconstructia SA - Secol Spa - SC Secol Romania SRL - 474.363.106 lei
Impresa Pizzarotti & C SpA - 474.946.430 lei
Asocierea Max Boegl Romania Srl – Astaldi Spa - Astalrom SA - 480.469.378 lei
Asocierea SC Tel Drum SA – SC ImobLux Construct SRL –Impresa Ferrara S.N.C. DI Angela & Rossella Ferrara – SC T Dancor Romconstruct SRL - RCM Costruzioni SRL- G.S. Edil Soc. Coop.- Schiavo & C.S.p.A.- SC Eurocerad International SRL - 485.497.115 lei
Asocierea Aktor SA – Euroconstruct Trading’98 SRL - 500.241.416 lei
SC PORR Construct SRL – PORR Bau GmbH -520.619.478 lei
Asocierea OHL S.A. – Tancrad SRL - 546.393.798 lei
Asocierea FCC Construction SA & Lena Engenharia E Contruções SA - 677.176.042 lei
EU: 85%; State budget: 15%
Expected opening date: late 2015
Sebeș - Turda lot 4 (16,30 km)
Estimated value: 585.728.197 lei
Submited bids during tender:
Asocierea PA&CO International SRL – CARENA SpA - 449.029.116 lei
SC PORR Construct SRL – PORR Bau GmbH - 470.004.894 lei
Asocierea Societatea de Constructii Napoca SA - SC Imob Lux Construct Srl - SC T Dancor RomConstruct Srl - SC Tel Drum SA - Impresa Ferrara S.N.C DI Angela & Rossella Ferrara- RCM Costruzioni SRL - Associazione Cooperativa Muratori & Affini Ravenna S.C.P.A. – Schiavo & C.SpA - Eurocerad International SRL - 471.086.745 lei
Asocierea Tirrena Scavi S.p.A Societa Italiana per Condotte d’Acqua S.p.A - 502.530.589 lei
Asocierea OHL S.A. – Tancrad SRL - 515.351.933 lei
Asocierea Lena Engenharia E Contruções SA - FCC Construction SA - 519.260.656 lei
Asocierea Astaldi Spa - Max Boegl Romania – Astalrom SA - 524.894.168 lei
JV SC Strabag SRL – SC Straco Grup SRL - 525.406.150 lei
Asocierea Teloxim Con Srl & SC Via Design SRL - 532.733.436 lei
Asocierea Aktor SA – Euroconstruct Trading’98 SRL - 545.320.286 lei
Asocierea Impregilo SpA – Salini SpA - 603.641.221 lei
EU: 85%; State budget: 15%
Expected opening date: late 2015
All sectors should be completed 22 months after the contract is signed (4 months for design + 18 for construction).
__________________
Been in A B BG CZ D F GR H HR I L PL RO RSM SK SLO SRB UK US V
Drove in A B CZ D F GR H HR I L PL RO RSM SK SLO SRB UK US
join eRepublik!

Last edited by bogdymol; February 7th, 2014 at 10:53 PM.
bogdymol no está en línea  
Old January 4th, 2014, 11:46 PM   #9
bogdymol
bogdymod
 
bogdymol's Avatar
 
Join Date: Feb 2010
Posts: 9,825

Motorways - Index and Statistics - A12 Motorway

A12 Motorway thread

Craiova - Slatina - Pitești



Wiki article: ro | en | nl | cnadnr

Stats:



Interactive map

Craiova - Pitești (121,18 km)
Estimated value: 1.5 billion €
Submited bids during tender:
Obrascon Huarte Lain SA - OHL ZS SA
China Communications Construction Company - Dogus Insaat VE Ticaret AS - Egis Projects
Spedition UMB - Tehnostrade - Vectra Service
Strabag AG - Strabag SE - Vinci Construction Grands Projects - Vinci Construction Terassament - Aktor SA - Aktor Concessions SA
Impregilo SpA - Salini SpA
PPP (Public-Private Partenership) Project - State budget 100% - 29 years long concession contract
Expected opening date: 2017
__________________
Been in A B BG CZ D F GR H HR I L PL RO RSM SK SLO SRB UK US V
Drove in A B CZ D F GR H HR I L PL RO RSM SK SLO SRB UK US
join eRepublik!

Le Clerk, fbsoft, Demetriade, MHN, Ciprian and 1 others liked this post

Last edited by bogdymol; March 9th, 2014 at 11:42 AM.
bogdymol no está en línea  


Closed Thread

Tags
autostrada, index, maps, motorways, romania

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT +2. The time now is 04:33 AM.


Powered by vBulletin® Version 3.8.8 Beta 1
Copyright ©2000 - 2014, vBulletin Solutions, Inc.
Feedback Buttons provided by Advanced Post Thanks / Like v3.2.5 (Pro) - vBulletin Mods & Addons Copyright © 2014 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2014 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu