daily menu » rate the banner | guess the city | one on oneforums map | privacy policy | DMCA | news magazine | posting guidelines

Go Back   SkyscraperCity > World Development News Forums > Highrises

Highrises Discussions of projects under construction between 100-199m/300-649ft tall.
» Proposed Highrises



Global Announcement

As a general reminder, please respect others and respect copyrights. Go here to familiarize yourself with our posting policy.


Reply

 
Thread Tools
Old July 11th, 2014, 01:28 AM   #1
Faisal Shourov
Bleach lover
 
Faisal Shourov's Avatar
 
Join Date: Jan 2013
Location: Toronto/Dhaka
Posts: 2,125
Likes (Received): 4250

SHENZHEN | Education Village redevelopment project | 158m | 518ft | 52 fl | 32 fl x 5 | U/C

Project information:

Project is located in Luohu District, Shenzhen, Wenjin Road north of Tau Leng area, convenient unobstructed living facilities mature; surrounding the distribution of many schools, rich educational resources; adjacent plots are low-density project, on the west side, the north side of the school, east of the multilayer wood dragon community; northeast have bamboo mountain, south of the mountain overlooking Hong Kong's Sheung Shui rolling, Exterior in good condition. The total land area of approximately 29,695.29 square meters, including construction area of approximately 27,718.69 square meters, green area of approximately 1,976.60 square meters, floor area ratio of 5.63 planned total gross floor area of approximately 193,268.54 square meters, floor area ratio of total floor area of approximately 155,592.67 square meters. Among them, the construction area of about 146,680 square meters of residential and commercial construction area of about 3390 square meters. Project by Shenzhen Watson Architecture and Engineering Design Consultants Ltd featuring architectural planning and design, planning has five each 32 storey high-rise, a 52-story high-rise (height of approximately 158.55 meters), supporting the Kindergarten Class 9, the total number of approximately 1829, about 980 parking spaces. Project is divided into two phases, of which one, two, three, five, seven, and supporting facilities for a development of six super-tall as two developers.

Source: http://baike.baidu.com/view/4256301.htm
Faisal Shourov no está en línea   Reply With Quote

Sponsored Links
Old July 11th, 2014, 01:29 AM   #2
Faisal Shourov
Bleach lover
 
Faisal Shourov's Avatar
 
Join Date: Jan 2013
Location: Toronto/Dhaka
Posts: 2,125
Likes (Received): 4250

Renders:







Faisal Shourov no está en línea   Reply With Quote
Old July 11th, 2014, 01:30 AM   #3
Faisal Shourov
Bleach lover
 
Faisal Shourov's Avatar
 
Join Date: Jan 2013
Location: Toronto/Dhaka
Posts: 2,125
Likes (Received): 4250

By 1788111 on 9.4.2013

__________________

eurico liked this post
Faisal Shourov no está en línea   Reply With Quote


Reply

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Related topics on SkyscraperCity


All times are GMT +2. The time now is 09:37 AM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2017, vBulletin Solutions Inc.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2017 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2017 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu