Old January 6th, 2015, 06:26 AM   #1
mavillav
Uuuuooo =P
 
mavillav's Avatar
 
Join Date: Apr 2009
Location: Quito
Posts: 6,491
Likes (Received): 3886

CUENCA | Public Transport

Mayor of Cuenca Paúl Granada announced on June 28 (2013) that contracts had been signed for the construction of a 10·5 km tram route, the first modern line to be built in Ecuador. Scheduled to open in 2015, the route will serve a total of 27 stops and will be able to carry up to 120 000 passengers a day.

The CITA Cuenca consortium of Alstom, CIM, TSO and INEO has been awarded a US$142·6m contract covering the supply of rolling stock, electrification and power supply equipment as well as systems integration. Alstom's share of the contract is worth €70m, according to the company.

As the centre of Cuenca is a UNESCO World Heritage Site, the city has opted for what Alstom says will be the first APS catenary-free power supply system to be installed in the Americas.

A fleet of 14 Citadis trams are to be supplied from Alstom plants in France. The 100% low-floor vehicles will be 33 m long, with a capacity of around 300 passengers, wide doors and large central aisles for unimpeded passenger flow.

'This project and our Citadis will improve the urban mobility of Cuenca, home to about 500 000 inhabitants, with one of the cleanest, most efficient and most comfortable means of public transportation', said Michel Boccaccio, Senior Vice-President of Alstom Transport in Latin America. 'It is also an opportunity to show other Latin American countries that similar projects can be developed in their cities'

A separate $72·1m contract covering the construction of the rolling stock maintenance depot, preparation of the alignment and other works has been awarded to the Tranvía Cuatro Ríos de Cuenca consortium. Project management and supervision is being undertaken by SMT-AC/Artelia Ville & Transport under a third contract worth $8·2m.

With a total estimated cost of $232m, the project is being mainly financed by the French government's Emerging Country Reserve loan scheme.



__________________

Patryk, geometarkv, broadcast20081 liked this post

Last edited by dimlys1994; December 22nd, 2015 at 09:34 PM.
mavillav no está en línea   Reply With Quote

Sponsored Links
Old January 6th, 2015, 06:34 AM   #2
mavillav
Uuuuooo =P
 
mavillav's Avatar
 
Join Date: Apr 2009
Location: Quito
Posts: 6,491
Likes (Received): 3886

updates





tram





mavillav no está en línea   Reply With Quote
Old January 6th, 2015, 08:44 AM   #3
dimlys1994
Moderator
 
dimlys1994's Avatar
 
Join Date: Dec 2010
Location: Dniepropetrovsk
Posts: 16,334
Likes (Received): 26107

Map of light rail from urbanrail.net:

__________________
dimlys1994 está en línea ahora   Reply With Quote
Old January 10th, 2015, 06:19 AM   #4
mavillav
Uuuuooo =P
 
mavillav's Avatar
 
Join Date: Apr 2009
Location: Quito
Posts: 6,491
Likes (Received): 3886

tram rails installation





__________________

dimlys1994, geometarkv liked this post
mavillav no está en línea   Reply With Quote
Old May 12th, 2015, 06:30 PM   #5
dimlys1994
Moderator
 
dimlys1994's Avatar
 
Join Date: Dec 2010
Location: Dniepropetrovsk
Posts: 16,334
Likes (Received): 26107

From Railway Gazette:

Quote:
http://www.railwaygazette.com/news/n...n-its-way.html

First Cuenca tram on its way
12 May 2015







ECUADOR: The first Citadis tram for Cuenca has left Alstom’s La Rochelle factory in France. It is scheduled to sail from the port of Antwerpen on May 17 and is expected to arrive in Cuenca by the end of June.

In 2013 the city of Cuenca signed a US$142·6m contract with the CITA Cuenca consortium, which is led by Alstom and includes CIM, Ineo, and TSO. Alstom’s share covers the supply of 14 trams, as well as electrification, power supplies and systems integration.

A separate US$72·1m contract covering the construction of the rolling stock maintenance depot, preparation of the alignment and other works was awarded to the Tranvía Cuatro Ríos de Cuenca consortium. Project management and supervision is being undertaken by SMT-AC/Artelia Ville & Transport under a third contract worth US$8·2m

...
__________________

austrian liked this post
dimlys1994 está en línea ahora   Reply With Quote
Old October 18th, 2015, 11:25 PM   #6
broadcast20081
Registered User
 
broadcast20081's Avatar
 
Join Date: Feb 2014
Posts: 267
Likes (Received): 231


https://farm1.staticflickr.com/708/2...8727a180_c.jpg
__________________

dimlys1994, austrian liked this post
broadcast20081 no está en línea   Reply With Quote
Old October 18th, 2015, 11:29 PM   #7
broadcast20081
Registered User
 
broadcast20081's Avatar
 
Join Date: Feb 2014
Posts: 267
Likes (Received): 231

Chaos on Avenida de las Americas due to the construction of the tram.


http://www.eltiempo.com.ec/noticias-...-intensifican/

Last edited by broadcast20081; October 19th, 2015 at 12:03 AM.
broadcast20081 no está en línea   Reply With Quote
Old October 18th, 2015, 11:42 PM   #8
broadcast20081
Registered User
 
broadcast20081's Avatar
 
Join Date: Feb 2014
Posts: 267
Likes (Received): 231

Dynamic testing of the tram of Cuenca starts Oct 19th 2015


http://www.ecuavisa.com/articulo/not...a-llego-cuenca

Quote:
According the schedule of CITA, the route for the testing of the tram starts on Oct/19/2015 on avenida de las Americas, in the segment between Canton Gualaceo Street and Carlos Arizaga St. This route includes Avenida Mexico.
More info avail in Spanish at:
http://www.cuenca.gov.ec/?q=content/...ctubre-de-2015
Traduction: broadcast20081
__________________

dimlys1994 liked this post

Last edited by broadcast20081; October 19th, 2015 at 12:00 AM.
broadcast20081 no está en línea   Reply With Quote
Old October 29th, 2015, 09:26 AM   #9
broadcast20081
Registered User
 
broadcast20081's Avatar
 
Join Date: Feb 2014
Posts: 267
Likes (Received): 231

Is that famous "Arthur the stray dog"??

__________________

dimlys1994, Jlagu liked this post

Last edited by broadcast20081; November 13th, 2015 at 05:02 AM.
broadcast20081 no está en línea   Reply With Quote
Old October 29th, 2015, 09:29 AM   #10
broadcast20081
Registered User
 
broadcast20081's Avatar
 
Join Date: Feb 2014
Posts: 267
Likes (Received): 231

__________________

Tramwayman, dimlys1994, Jlagu liked this post
broadcast20081 no está en línea   Reply With Quote
Old November 5th, 2015, 02:37 PM   #11
broadcast20081
Registered User
 
broadcast20081's Avatar
 
Join Date: Feb 2014
Posts: 267
Likes (Received): 231

FIRST DYNAMIC TEST OF TRAM OF CUENCA WITH PASSANGERS

__________________

dimlys1994 liked this post
broadcast20081 no está en línea   Reply With Quote
Old November 5th, 2015, 02:47 PM   #12
broadcast20081
Registered User
 
broadcast20081's Avatar
 
Join Date: Feb 2014
Posts: 267
Likes (Received): 231

MAJOR OF CUENCA MARCELO CABRERA TELLS TRAMWAY OF CUENCA WILL BE AVAIL TO THE PUBLIC BY WINTER OF 2016 (JULY-AUG)


http://www.elcomercio.com/actualidad...os-prueba.html

MAJOR MARCELO CABRERA WITH QUEEN OF CUENCA


http://www.elcomercio.com/actualidad...os-prueba.html

QUEENS OF CUENCA AND MISS CHOLA CUENCANA RIDING TRAMWAY

http://www.elcomercio.com/actualidad...os-prueba.html
__________________

dimlys1994 liked this post

Last edited by broadcast20081; November 5th, 2015 at 02:59 PM.
broadcast20081 no está en línea   Reply With Quote
Old November 5th, 2015, 02:57 PM   #13
broadcast20081
Registered User
 
broadcast20081's Avatar
 
Join Date: Feb 2014
Posts: 267
Likes (Received): 231


http://www.eluniverso.com/noticias/2...eba-su-tranvia


http://www.eltiempo.com.ec/noticias-...con-pasajeros/


http://www.elcomercio.com/actualidad...os-prueba.html


http://www.metroecuador.com.ec/notic...c6arTIYsVAaQM/
__________________

dimlys1994 liked this post
broadcast20081 no está en línea   Reply With Quote
Old November 5th, 2015, 03:06 PM   #14
broadcast20081
Registered User
 
broadcast20081's Avatar
 
Join Date: Feb 2014
Posts: 267
Likes (Received): 231

137 PASSENGERS AMONG LOCAL AUTHORITIES, TECHNICIANS AND THE AMBASSADOR OF FRANCE IN ECUADOR FRANCOISE GAUTHIER


http://www.notimundo.com.ec/articulo..._137_pasajeros
__________________

dimlys1994 liked this post

Last edited by broadcast20081; November 13th, 2015 at 08:41 AM.
broadcast20081 no está en línea   Reply With Quote
Old November 13th, 2015, 05:12 AM   #15
broadcast20081
Registered User
 
broadcast20081's Avatar
 
Join Date: Feb 2014
Posts: 267
Likes (Received): 231

Tramway of Cuenca -Driver's view-
Dynamic tests with passengers


Courtesy of: Gerardo Ayavaca
__________________

dimlys1994 liked this post

Last edited by broadcast20081; November 13th, 2015 at 08:40 AM.
broadcast20081 no está en línea   Reply With Quote
Old November 13th, 2015, 07:56 PM   #16
broadcast20081
Registered User
 
broadcast20081's Avatar
 
Join Date: Feb 2014
Posts: 267
Likes (Received): 231

Currently the works of the tramway in El Centro (downtown) has been suspended by petition of the owners of the stores to avoid a negative impact in their business. This request was approved by mayor of Cuenca Marcelo Cabrera. The works in downtown will continue by middle of January.
broadcast20081 no está en línea   Reply With Quote
Old December 4th, 2015, 04:02 AM   #17
broadcast20081
Registered User
 
broadcast20081's Avatar
 
Join Date: Feb 2014
Posts: 267
Likes (Received): 231

Rails on Gran Colombia St, North of "El Centro"







Gran Colombia St and Huayna-Capac Ave
(transition of Old Cuenca to Moderno Cuenca)











PARKING PATIO OF THE UNITS







__________________

dimlys1994, austrian liked this post
broadcast20081 no está en línea   Reply With Quote
Old December 4th, 2015, 04:03 AM   #18
broadcast20081
Registered User
 
broadcast20081's Avatar
 
Join Date: Feb 2014
Posts: 267
Likes (Received): 231

Measurements of the doors of the tram

6 doors each side
4 double
2 simple

__________________

dimlys1994, austrian liked this post
broadcast20081 no está en línea   Reply With Quote
Old May 19th, 2016, 02:04 AM   #19
broadcast20081
Registered User
 
broadcast20081's Avatar
 
Join Date: Feb 2014
Posts: 267
Likes (Received): 231

broadcast20081 no está en línea   Reply With Quote
Old May 19th, 2016, 02:09 AM   #20
broadcast20081
Registered User
 
broadcast20081's Avatar
 
Join Date: Feb 2014
Posts: 267
Likes (Received): 231





__________________

lechevallierpatrick liked this post
broadcast20081 no está en línea   Reply With Quote


Reply

Tags
cuenca, transport

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Related topics on SkyscraperCity


All times are GMT +2. The time now is 10:24 AM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2018, vBulletin Solutions Inc.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

tech management by Sysprosium