#1 · (Edited)
Special thanks to Maxim98 and tampamobster21


Downtown Tampa Development Rundown

Central Business District

Venu - 50 stories, ~550 feet, 215 units, APR, Timeline: Developer hopes to break ground in the third quarter of 2007. An on-site sales center opened in February.

Move-in date: Late 2009


Trump Tower Tampa - 52 stories, 591 ft., On Hold, Project sold to Related Group, funding from hedge fund possible soon - Completion Unknown


Union Station Tampa - 2x 50 story office buildings, proposed (initaily approved), 840,000 sq. feet of office space, 17,500 sq. feet of retail, height announced at 540 feet though it is truly unknown

Rendering coutesy of tampaguy75

Tampa Tower I+II - 51 stories x2, 625 ft, 474 units, PRP



Element - 34 stories, 460 ft, 400 units, U/C



TWELVE Tampa - 47 story hotel and condo, APR, 562 feet, Developer expects to begin end of '07 to early '08

rendering courtesy of jonkee

Vancouver Acqusations Project - 36 stories, mixed-use, timetable unknown, PRP


Six Ten Franklin - 33 stories, 474 units, APR, Site cleared, awaiting financing, Completion late 2008


Downtown W - 40 stories, 425 feet, includes 4 star hotel and condos, waiting for current site's tenents to finnish construction on their new building



Skypoint - 32 stories, 410 feet, 400 units, recently completed


Kress Block - 27 + 23 stories, 401 units, APR, reportedly for sale ($32m) or looking for development partner


The Royal - 27 stories, 182 units, PRP, Groundbreaking 2007


Central Park - 3 x 26 story towers, Black History Museum, Housing Authority HQ, Apartments, Construction 2007-2011




Floridan Hotel - 17 stories, Refurbishing of Historic Hotel, U/C, devloper aiming for a January 1st, 2008 completion


Tampa Heights - Redevelopment, Multiple 10 story buildings

USF Davis Islands Campus - 7 stories, complete

Carriage House - 4 stories, APR, Construction 2007


Citi Lofts - 4 stories, 4 units, U/C, Completion 2007


Arlington Lofts - 2 stories, 21 units, complete


Spain Lofts - 3 stories, 6 units, Completed


Children's Museum - 500,000 sq feet, construction to begin summer/fall 2007, completion summer 2009


Tampa Museum of Art -
1st phase- 68,000 sq. feet, 2 stories, construction set for January 2008
2nd phase- 52,000 sq. feet, 3 stories, 58 feet



Channel District + Harbor Island

Place Phase III - 38 stories, 420 feet, goes up for approval in May




The Place Tower - Phase II - 32 stories, 350 ft, 300 units, APR, sales center opening in June



Newks Tower - 40 stories, APR, 250 units, On Hold. Pending purchase to Related Group


Del Villar - 36 stories, 120 units, APR,



The Towers at Channelside - 2 x 30 stories, 257 units, topped out, complete mid 2007


Blu Channelside - 2 x 30 stories, 250 units, being redesigned
Old renderings-


Seaboard Square - 2x 29 stories, 20 stories along with midrises stories, PRP, construction beginning mid 2007 on hotel and some condos

Novare Channelside - 29 stories, APR, includes park and townhomes


Great Gulf - 25 and 19 stories, mixed-use, timetable unknown


Finergy - 25 + 11 story complex, 212 condos, 110 hotel rooms, APR, For Sale


The Martin - 22 stories, 321 units, APR, Groundbreaking Spring 2007, Completion late 2008


Navio - 22 stories, 160 units, APR, construction to begin early 2008


Prime Meridian Center - 20 story office tower, supposed to break ground spring '08


102 Whiting - 20 stories, 210 feet, 180 units, status unknown

The Plaza at Harbor Island - 20 stories, 138 units, building 1 topped out - Second tower APR


Grand Central at Kennedy - 14 + 12 stories, 392 units, topped out, completion mid 2007


Ventana - 2x11 stories, 84 units, topped out, completion 2006


Seaport Channelside - 8 stories, 422 rental units, U/C, completion late 2007


The Place - Phase I - 8 stories, 165 units, topped out, completion mid 2007



Slade - 8 stories, 280 units, U/C


Tampa Museum of History - 5 stories, APR, construction to begin summer 2007



Hyde Park Historic District + N. Bayshore Drive


Parkside (C) - 26, 19, 8 stories, 134 Units, APR, apparently dead for now

View - 26 stories, dead, developer coming with office building proposal on same site


DeSoto Tower - 20 stories, 230 feet, APR by courts after being rejected by city

Bayshore Patriot's Corner Tower - 19 stories, 190 feet tall, 31 units, PRP

Hyde Park Village - 2x 9 story tower, 90 feet, 163 condo units, PRP, reviatlaization of Hyde Park Village icluding redoing of 45,000 square feet of retail

University of Tampa Dorm II - 7 stories, nearing completion

The Boulevard - 2x8 stories, 346 units, APR, Groundbreaking expected spring/summer 2007


Verano - 7 stories, 65 units, 104 feet, APR, sales about to begin


Valencia - 7, 5x3 stories, U/C, Completion Beginning 2006


Grande at SoHo - 6 stories, 46,000 sq. feet office, 200 parking spaces, expected to begin late '07 with late '08 completion



Inn at Four Green Fields - 6 story hotel, PRP, construction to begin 2007


West End - 550 apartments, 60 town homes, 340 condominiums, several public parks and 25,000 square ft. of retail, U/C
*Vintage Lofts- phase 1 of West End, 238 apartments, 50 townhomes, 240 condos, 8,500 square feet of retail


The Epicurean - 5 stories, 75 rooms/units, U/C, completion late 2008



Hyde Park Square - 3 stories, mixed-use, 5 condo units with retail and offices, PRP

Stratford on Howard - 4x3 stories, 22 units



Tampa General Garage Extension - 10 stories, U/C, Completion 2006

Westshore Business District + Rocky Point


Tampa Bay One - 21, 2x15 stories, APR, Groundbreaking Imminent, developer waiting for right moment, estimated to about fall 2007

Ritz Carlton Rocky Point - 2x 20 stories, 220 feet, PRP, 184 condos, 274 hotel rooms


New Port Tampa Bay - 4x17 stories, U/C


Avion Park - 400,000 sq. feet office space, 3 hotels, 3 restaraunts, ~35,000 sq. feet retail, U/C




The Cove - 2x16 stories, PRP, status unknown


MetWest International- 3x 10 story office buildings, 270 room hotel, 254 apartments, 74,000 sq. ft. of retail, PRP


West Shore Yacht Club - 15 stories, U/C


Blue Meridian - 14 stories, APR, sales underway


Rocky Point Westin - 18 stories, U/C


Cornerstone Plaza - 2x 10 story office building, 600,000 sq. ft. rentable space, site cleared


Corporate Center 4 - 8 story office tower, 247,000 sq. ft. rentable space, site cleared, completion late fall 2008


West View - 8 story, 2x 5 story office buildings, 580,000 sq. ft. rentable space, includes court yard and green space


e-Suites - 8 story hotel, 224 rooms


Highwood Bay Center - 2x 7 story office buildings, 420,000 square feet, 1st building done, 2nd building will begin construction when 1st is full


Westshore Westin Center - 260 room westin hotel, 30,000 sq. feet retail, 300,000 sq. feet of office


Crossland Development - 6 stories, 350 units of senior housing and luxury apartments, 12,700 sq. feet of retail, APR


Le Jardin - 4 stories, 403 units, retail included but amount unknown, U/C


Last updated:
1/21/08
 
See less See more
72
#10 ·
Here's a recently anounced project, the project is being led by the owner of Bern's steakhouse. A steakhouse which is consistantly in the top 3 in the U.S.A. This will be located in the South Howard district of Tampa.

The Epicurean - 5 stories, 75 rooms/units, site prep, completiong late 2008




A hotel built for your palate

For now, it's a dusty construction lot on S Howard Avenue.

But by the end of 2008, it'll be The Epicurean Hotel, a 75-room boutique hotel that will include a rooftop pool and bar, a spa and a parking garage.

On Sunday, Bern's Steak House owner David Laxer unveiled plans for the luxury condominium hotel project four years in the making that his family will open across the street from their restaurant.

With a focus on food, the hotel will feature upscale wine and cooking demonstrations, classes and wine tastings at the Bern Laxer School of Food and Wine.

It will also feature a new 18, 000-square-foot signature restaurant that will serve hotel and local guests from breakfast into the late night.

Chef partner Jeannie Pierola didn't reveal a lot about the restaurant, except to say it will have a very different approach.

Bern's Fine Wine and Spirits, now located down the street from the steak house, will expand into a new 9, 000 square foot location in the hotel that will house guest wine lockers and storage.

"I don't think there's anything in the country like this, " Laxer said.

Alexandra Zayas can be reached at zayas@sptimes.com or 813 226-3354.

http://www.sptimes.com/2007/04/30/Tampabay/A_hotel_built_for_you.shtml

Update: the Tampa Bay Business Journal had more information:

Urban Studio Architects, Smith & Associates Real Estate and Coral Hospitality are working with Bern's on the new property. Urban Studio Architects provided design services, and Smith & Associates is responsible for selling the suites.

Coral Hospitality is providing technical services and consulting during the pre-opening stages and then will provide hotel management services after the opening, scheduled for the fourth quarter of 2008.

The hotel will house a restaurant and an expanded Bern's Fine Wines & Spirits shop that includes wine storage for guests. Suite will have between 365 and 800 square feet and will be priced in the mid-$200,000s.

Amenities include 24-hour room service, wireless Internet service, flat-screen satellite television, bar service at the rooftop pool, workout facilities, full-service day spa and business meeting space. Additionally, guests may attend educational seminars in a culinary and wine classroom.

http://tampabay.bizjournals.com/tampabay/stories/2007/04/30/daily5.html
 
#12 ·
Depends. It's stepped. Needless to say, Tampa Tower is having a fun time with the FAA over its height, which isn't even dramatic.

Trump was forced to drop two feet (yes, two feet) because it scratched the limit on the south side of the CBD, yet it is less than 600 ft. Projects in between the CBD and Channel District face very stringent restrictions thanks to the GA field on the southern tip of Davis Islands.
 
#13 ·
The new design was relaeased for the Art Museum project:

Tampa Museum of Art -
1st phase- 68,000 sq. feet, 2 stories, construction set for January 2008
2nd phase- 52,000 sq. feet, 3 stories, 58 feet



Article:

Tampa Museum Design Unveiled
Posted May 10, 2007 by The Tampa Tribune
Updated May 10, 2007 at 11:23 PM

As architect Stanley Saitowitz unveiled his designs for a new Tampa Museum of Art, the excitement in the board room was palpable.

For good reason: The moment was seven years in the making.

For an hour Thursday afternoon, all of the turmoil – the fundraising troubles, the arguments between the mayor and museum leaders, the doubts about whether a new building ever would be built – seemed to dissolve.

All eyes focused on Saitowitz – the architect from California - and his designs for a new building along the Hillsborough River, at the northern edge of Curtis Hixon Park.

Just before Saitowitz began his presentation, museum board Chairwoman Cornelia Corbett set the tone.

“It’s kind of a big moment,” she said.

Saitowitz explained his vision to museum officials: a building that complements the water, is modern and features garden space, including an interior courtyard that opens to the sky.

He said he envisions the new museum to be 58-feet tall, the same height as the adjacent Poe parking garage.

It will be divided among two buildings: One building will be two stories, with a spacious lobby and a museum store at the bottom level. The lobby will be transparent and looks out to the river, the University of Tampa and the Tampa Bay Performing Art Center.

The upper level will be devoted to gallery space, featuring polished stone floors, white walls and a glass ceiling with track lighting.

A separate gallery will be devoted to the museum’s glass collection.

The second building, which will be three stories, will include shipping and receiving areas; storage and exhibition preparation rooms; and administrative offices.

An outdoor sculpture garden overlooks the river.

Saitowitz became animated as he talked about the potential for the roof.

“It would be a really amazing party space,” Saitowitz said. “It’s just such an amazing prospect.”

The rooftop will be considered a “green” roof, meaning it will be environmentally friendly and flush with plants.

The exterior of the building would be wrapped in expanded metal. Fiber optic lights will be embedded between the layers.

The lights could be programmed to change color. Or an artist could work with them to create a design.

“I wanted to make this a wall of intrigue and discovery,” Saitowitz said.

Those in attendance clearly were awed.

“You have blown me out of the water,” museum board member Sara Richter told the architect. “This was worth waiting for.”

The museum hopes to raise $25 million within the next two years. Museum officials will not say how much they have raised, but records reviewed by the Tribune last month showed they have pledges for $5.1 million and $1.7 million in cash.

The city will contribute $17.5 million in Community Investment Tax money.

Plans call for the architect to design a 120,000-square-foot building, spread over two phases. The buildings for the first phase unveiled Thursday were a combined 68,000 square feet.

The museum has money for about 50,000 square feet, Corbett said, but hopes to raise enough to build the full 120,000 square feet some day.

“We are achieving that vision,” Corbett said. “We will build what we can afford, no more, no less.”

After Saitowitz’s presentation, the museum’s building committee burst into applause. The group then unanimously passed a motion endorsing the designs, which preceded another round of applause.

Corbett threw her arms into the air and shouted “Woo!”

http://www.tboblogs.com/index.php/newswire/story/tampa-museum-design-unveiled/
 
#19 ·
Does anyone know the status for seaboard square? Is that the development just north of Grand Central? I haven't been back to tampa for awhile but last time I was there, they were doing work on that piece of property. Also is anyone going to be taking a pics of that area please let me know. I am excited to go back to tampa the last week of june and see all the construction in the channelside area close to completion
 
#20 ·
^Seaboard Sqaure is the development just north of the Towers at Channelside, near the Southern end of the deistrict. A few months back the developer anounced that th hotel and one condo building may begin construction as early as September.

Now you may have Seaboard Sqaure confused with Seaport which is just 2 blocks north of Grand Central. That project has its first building U/C on the 3rd floor.

For pictures check out the Tampa Photos Thread, there are lots of pics there.
 
#21 ·
Courtney Campbell Soon May Be Puttin' On The Ritz
Skip directly to the full story.
By ELLEN GEDALIUS The Tampa Tribune

Published: May 26, 2007


TAMPA - Plans are under way to bring a Ritz-Carlton hotel to the shores beside the Courtney Campbell Parkway.

Developers hope it becomes the area's first five-star hotel.

Clearwater-based developers Orion Communities and RPS LLC are in the final stages of negotiations with the hotel chain, said Sandip Patel, president and chief executive of the development companies.

He hopes to reach an agreement within the next two months, break ground on the 6-acre parcel in early 2008 and open in October 2010.

"It's just going to be the showpiece for the city," Patel said

A Ritz-Carlton official would not discuss the deal other than to say no contract had been signed.

If the plans go through, the Radisson Bay Harbor hotel will be torn down to make room for the new development, said John Grandoff, an attorney for the developer.

Plans call for two 220-foot towers on the Courtney Campbell at Rocky Point Drive. One tower will have 274 hotel rooms and 48 residential units.

The second tower will have 136 condo units.


"Some people want to live at the Ritz," Grandoff said.

The hotel will include a restaurant and boutique retail shops, such as a jewelry and clothing stores. It also will feature boat docks, but those will be accessible only to condominium dwellers.

Building the dock requires approval from the Tampa Port Authority.

The hotel will be close to Rocky Point's bars and restaurants. Several other hotel and condo projects are in the area as well.

The development team debuted plans at a city council meeting Thursday night; those plans were well-received, Councilman John Dingfelder said.

"Between Ikea and Ritz-Carlton, it was definitely a good evening for Tampa and putting Tampa back on the map," Dingfelder said Friday.

Mark Huey, the city's economic development administrator, said he had been trying for years to bring a Ritz-Carlton to Tampa.

"This is the closest a Ritz-Carlton deal has come," Huey said. "Of all the five-star hotels, they have the strongest brand identity. That's something our community has lacked."

Huey said he hopes having a five-star hotel in Tampa will help the city land more national conventions and other large events.

The city council is expected to give preliminary approval to the project June 14.

Researcher Catherine Hammer contributed to this story. Reporter Ellen Gedalius can be reached at egedalius@tampatrib.com or (813) 259-7679.

http://www.tbo.com/news/money/MGB5NPHD52F.html

Currently the best rendering we have:



From one of the developer's websites: http://orioncommunities.com/rockypoint.htm
 
#27 ·
First off feel free to visit the Tampa sub-forum here:

http://www.skyscrapercity.com/forumdisplay.php?f=842

Below is our current development list for the Tampa Metro Area. This includes St. Petersberg, Clearwater and a few other smaller towns.

Tampa

Central Business District

AER - 36 stories, 350 units, 10,000 sq. ft. retail, approved


Grant Block - 23 stories, 262 feet, 10k sqft retail, 360 apartment units, approved


Kress Block - 22 stories, 58 units, 190 hotel rooms, 17,000 sq. ft commercial space, historic facade restoration, proposed


Tempo at Encore - 7 stories, 203 units, U/C


The Aurora - 5 stories, 351 units, U/C


Aspire - 5 stories, 408 units, proposed


Mize Capital HQ - 4 stories, 14K sq. ft. office, proposed


Straz Riverwalk Plaza - park, restaurant, retail space


Harbour Island

Framework Harbour Island - 21 stories, 235 units, U/C


Manor at Harbour Island - 21 stories, 219 units, 340 units, approved


Vinik Redevlopment

Massive redevelopment of the southside of Downtown featuring:

Mixed-Use Redevelopment District
A dozen buildings of various heights and use (tallest ~25 stories/250 feet)
1.1 million square feet office space
660,000 square feet of residential space
575,000 square feet of hotel and meeting space
330,000 square feet for USF's new downtown medical school and heart institute
250,000 square feet of ground-level retail space for shops and restaurants
50,000 square-foot central energy and cooling plant
Five new parking garages with more than 5,000 spaces



Features:

Convention Hotel - 23 stories, 350 hotel rooms, 50 residential units, approved


USF Medical School - 12 stories, ~200 feet, medical school


Channel District

Skyhouse - 23 stories, 320 units, topped out


The Martin - 21 stories, 261 feet, 323 units, 38,323 sq. ft. retail, potential grocery store, approved


Atlantico - 7 stories, 300 units, 5,000 sq feet retail, site demo


Tampa Heights

Riverside Heights - large redevelopment proposal, several midrises, includes 1 tower with 317 units, 17,000 sq. feet retail, approved






Celstar Corp. Office Building - 5 stories, 60,000 sq. ft. office, PRP


Ybor City

Gas Worx - 29 stories, 1443 units, 67K sq ft retail including grocery store, proposed


Ybor City Hotel - 4 stories, proposed


Cadrecha Block Redevlopment - 4 stories, mixed-use, proposed


Framework Ybor City - 4 stories, 234 apartments, approved


Ashley Center Centro Ybor buildout - Conversion of closed move theatre space into offices


1728 East 2nd Avenue - 2 stories, 22 units, approved


Rock Brothers Bewery - 2 stories, brewery


Westshore

LSI Campus - 6 stories, 176,000 sq. feet medical commercial, U/C


Crescent Westshore - 5 stories, 364 units, U/C


4310 Spruce - 5 stories, 262 units, U/C


Valera - 4 stories, 350 units, nearly complete


Grady Square - 4 stories, 557 units, approved


MetWest Apartments - 254 units, proposed

Rocky Point

Ascentia Rocky Point - 14 stories, 258 units, proposed


Pinnacle Hotel Rocky Point - 9 stories, 180 rooms, proposed


Hyde Park/SoHo

Broadstone - 5 stories, 259 units, nearly complete


Atlis Grand Central - 5 stories, 272 units, proposed


SoHo Flats - 4 stories, 46 units, 20,000 sq. feet retail, proposed

Hyde Park Village revitalization - rennovation of retail complex


Bayshore

Aquatica - 15 stories, 31 units, 155 feet, approved


Seminole Heights

Warehouse Lofts - 3 stories, 52 units, U/C


East Tampa

Hard Rock Expansion - 16 stories, 537 rooms, proposed

TIA/Drew Park

Tampa International Airport Modernization and Expansion: Decongestion Phase - Involves modernizing the aging 1971 Landside Terminal and building new facilities to lessen traffic and passenger congestion.



Highlights
Relocation of Rental Car operations into a consolidated facility
Automated People Mover connecting the new facility with the Economy Garages and the Landside Terminal
Sweeping terraces on the east and west sides of the Landside Terminal
Completely revamping the configuration of Level 3 of the Landside Terminal to feature a more open environment, relocating retail, and moving APM shuttle bays for the Airsides.

UT

ResCom Phase 1 - 8 stories, 519 beds


West Tampa

West Bank Redevelopment - redevelopment of low income housing units, park rennovation, 1600 residential units, retail, approved


The District at North Hyde Park - 4 stories, 274 units, proposed


Fort Homer Hesterly Armory Restoration - Jewish Community Center, U/C


Julian B. Lane Riverfront Park Redevelopment - Redevelopment of the existing park, proposed


Temple Terrace/University Area

University Mall Redevelopment - Redevelopment of the existing mall, retail and possible office/grocer/club warehouse/fitness center space, Proposed
 
#28 ·
St. Pete

ONE - 41 stories, 456 feet, 253 units, 173 hotel rooms, proposed


Bliss - 18 stories, 204 feet, 29 units, site work


330 3rd Street South - 17 stories, 358 units, topped out


145 North 4th Avenue - 16 stories, 72 units, approved


The Salvador - 13 stories, 74 units, proposed


Galaxy Hotel - 10 stories, 92 rooms, proposed


The Hermitage - 8 stories, 348 units, U/C


Beacon 430 - 4 stories, 326 units, U/C


Arlington Townhomes - 4 stories, 34 units, U/C


Sundial St. Pete - retail complex rennovation


USF Business School - 4 stories


700 Central Avenue - 4 stories, 50,000 sq. ft. retail, includes grocery store


Tierra Verde

Sunset Pointe at Collonay Key - 6 stories, 30 units, approved

Snell Island

Water Club - two 9 story towers, 84 units, U/C


Carillon

Echelon City Center - several buildings up to 22 stories/250 feet, massive mixed use development



Features:

2.8 million square feet total
Office buildings of 22 and 20 stories
500,000 sq. ft. office
172,000 sq. ft. retail space
1,500 apartment units
120-room boutique hotel, with a flag like Aloft or Indigo

Office buildings - 22 and 20 stories



One Park West - 14 stories, 198 units, 16,000 sq. ft. retail



Clearwater

Downtown

SkyView - 10 stories, 52 units, U/C


Prospect Lake Apartments - 5 stories, 257 units, U/C


Belleview

Belleview Biltmore Redevlopment - redevelopment of historic plantation style resort, site demo


Includes:

Belleview Place Condominiums - Four 7 story buildings with 30 units each


Belleview Biltmore Inn - 4 stories - 33 rooms


Belleview Place Townhomes - 2 stories, 22 units


Clearwater Beach

Wyndham Grand Resort - 14 stories, 450 rooms, U/C


Opal Sands Resort - 15 stories, 230 hotel rooms, U/C


Hampton Inn - 15 stories, 171 rooms, U/C


Marquesas - two 15 story towers, 208 hotel rooms, 74 condos, approved


The Views - 14 stories, 202 rooms, approved

Clearwater Beach Guesthouse - 10 stories, 155 hotel rooms, approved

Mainstream Partners Hotel - 10 stories, 144 rooms, approved

Sea Captain Hotel - 9 stories, 85 rooms, rooftop bar, approved


Anastasopoulos Hotel - 9 stories, 159 rooms, proposed

Dunedin

Victoria Place - 4 stories, 30 units, U/C


Dunedin Gateway Apartments - 3 stories, 120 units, commercial space, approved
 