The list should contain all under construction new motorway and expressway sections in Europe which have been opened for traffic since 1st January 2014.
The list is divided into several posts sorted by the English country names. The data is frequently updated.
The modifications are always specified in a new post with a reference to the source. The edit list is a modification summary.


All information without engagement

*** The author gladly takes notes for completion / correction ***
*** Please post regular updates only in the respective country thread of the project. Thank you. ***

History:

Summary of 2014 openings (by date/by country/km per country)
Summary of 2015 openings (by date)
Summary of 2016 openings (by date)
Summary of 2017 openings (by date)
Summary of 2018 openings (by date)
Summary of 2019 openings (by date)

Project lists of countries which have been dropped in 2017

External lists:
- Recent motorway openings
- Motorway opening calender


Definition:

The definition of motorway and expressway status is country-specific. The subsequent definition describes the pre-conditions which must be fulfilled to add new projects:

New motorways and expressways are projects which are currently under construction or have been opened since 1st January 2014.

The pre-conditions to be added to the list are based on the Convention on road traffic done at Vienna on 8th November 1968.

The future road:
- must feature 2 carriageways with each 2 lanes
- must be grade-separated
- should be access-controlled
- does not have U turns to travel in reverse

It doesn't matter if the future road will feature hard shoulders.
A median is not mandatory but there must be a fixed barrier between the carriageways, for instance guard railing.
If a 2nd carriageway is planned but not yet u/c, the project is added if the other pre-conditions - except barrier - are already fulfilled.
Projects which were under construction but are suspended now, are added too, if the completion is still planned by the countries' demand plan.
In addition, roads will be added which will be rededicated to motorway or expressway status of the respective country.
The opening date does not refer to the completion of the works but to the official opening of the road.
Widening projects are not included.


Legend:

<Numbering>: <section from ... to ...> <Length> km (<start of construction> to <estimated opening>/<actual opening>) [optionally: <comment>] project page / openstreetmap / openstreetmap with proposed routes / Google Maps / Sentinel-hub Playground

c/w = carriageway, i/c = interchange, AS/AD/AK = interchange (German version)


Collaboration:

The list comprises European countries only and will not be expanded anymore because it didn't work, see here.
Edit December 30th, 2017: The list is currently not comprising all countries of the world which depends on many reasons like incomplete data or different road standards.
If you want to add your country's project list, please post all required and known information within the country's thread. Please refer to the legend for required data.


Please post regular updates only in the respective country thread of the project.

Why? Because I think that any kind of info about projects under construction is a nice info related to the country. I'm quite sure that there are many people reading the thread of their country only. These people usually have most accurate info about the projects of their country and I think they would post updates and corrections when they see that others have already posted anything about these projects, e.g. pics showing the progress et cetera.....
 
See less See more
#2 · (Edited)
#3 · (Edited)
Recent openings

February 2020:
Hungary M4: Cegled – west of Abony-West 7km (<= 2019 to <= February 2020) - / OSM / prop / GM / SP
Hungary M4: Üllo – Albertirsa 30km (April 2017 to 7th February 2020) - / OSM / prop / GM / SP
France N57: Rioz – Breurey 4.8km (2017/18? to 25th February 2020) - / OSM / prop / GM / SP

March 2020:
Italy SS96 Barese: Mellitto – Toritto 5.4km (March 2010 to 17th March 2020) - / OSM / prop / GM / SP

April 2020:
Poland DW935: Rybnik-Zamyslow – Zory 10.2km (April 2017 to 10th April 2020) project / OSM / prop / GM / SP
Germany B2: south of Untersteinbach – AS Mauk 4.1km (December 2016 to 15th April 2020) [1st c/w] project / OSM / prop / GM / SP
Norway E39: Tasta – Schancheholen 4.5km (April 2014 to 22nd April 2020) project / OSM / prop / GM / SP
Norway Rv13: Madlaveien (E39) – Hundvag 5.7km (May 2014 to 22nd April 2020) project / OSM / prop / GM / SP

May 2020:
The Netherlands N381: Donkerbroek – Oosterwolde (N351) ~7km (February 2019 to 11th May 2020) [2nd c/w] - / OSM / prop / GM / SP
Poland S61: Szczuczyn-North – north of Szczuczyn-West 3.7km (October 2018 to 15th May 2020) [2nd c/w] project / OSM / prop / GM / SP
Poland S61: south of Szczuczyn-West – Koniecki Male 2.9km (October 2018 to 15th May 2020) [2nd c/w] project / OSM / prop / GM / SP

 
#4 · (Edited)
April 2020:
France N19: Boissy-Saint-Leger-East – south of Boissy-Saint-Leger ~2km (March 2014 to April 2020) - / OSM / prop / GM / SP


May 2020:
Germany B47: AS Worms-West – AS Worms-Horchheimer Straße 1.1km (August 2016 to May 2020) project / OSM / prop / GM / SP

Spring 2020:
Albania A2: Mbrostar Ura – Levan 22km (2013 to Spring 2020) [2nd c/w] - / OSM / prop / GM / SP
France N141: La Vigerie – Saint-Yrieix 5.5km (<= 2015 to Spring 2020) project / OSM / prop / GM / SP
Italy SS76: Albacina – Serra San Quirico 11km (Early 2009 to Spring 2020) [2nd c/w] project / OSM / prop / GM / SP
Italy SP103 Milan: Segrate (A51) – Segrate 1.3km (October 2017 to Spring 2020) project / OSM / prop / GM / SP
Spain A11: Langa de Duero – San Esteban de Gormaz 11.4km (2009/10 to Spring 2020) - / OSM / prop / GM / SP
Serbia A1: west of Ostruznica bridge – Ostruznica 2.5km (January 2016 to >= Spring 2020?) [2nd c/w] project / OSM / prop / GM / SP

June 2020:
Germany B2: south of Untersteinbach – AS Mauk 4.1km (December 2016 to June 2020) project / OSM / prop / GM / SP
Hungary M4: west of Abony-West – Abony-East 12km (March 2018 to June 2020) - / OSM / prop / GM / SP
Hungary M25: Andornaktalya – Füzesabony 15km (March 2018 to June 2020) - / OSM / prop / GM / SP
Poland A2: Warsaw-Lubelska (S17) – Konik 5.6km (March 2018 to June 2020) project / OSM / prop / GM / SP
Poland A2: Konik – west of Minsk Mazowiecki 9.0km (August 2018 to June 2020) project / OSM / prop / GM / SP
Poland A6: rededication Szczecin-Dabie – west of Szczecin-Rzesnica 3.6km (June 2020) project / OSM / prop / GM / SP

July 2020:
Norway E6: Rudshogda – Arnkvern 19km (October 2017 to 1st July 2020) project / OSM / prop / GM / SP
Spain SG20: Segovia-North (A601) – east of Segovia-South (AP61) 8.4km (May 2016 to Early July 2020) - / OSM / prop / GM / SP
Hungary M4: Berettyoujfalu – HU/RO border (Nagykereki) 26.5km (July 2017 to July 2020) - / OSM / prop / GM / SP
Poland S17: Warsaw-Lubelska (S2) – Ostrow 15.2km (March 2018 to July 2020) project / OSM / prop / GM / SP
Poland S17: Ostrow – Antoninek 8.0km (May 2018 to July 2020) project / OSM / prop / GM / SP
Slovakia D4: Rovinka – Ketelec (R7) 4.1km (March 2017 to July 2020) project / OSM / prop / GM / SP
Slovakia R7: Ketelec (D4) – Dunajska Luzna-South 8.2km (2017 to July 2020) project / OSM / prop / GM / SP
Slovakia R7: Dunajska Luzna-South – Holice 17.4km (October 2016 to July 2020) project / OSM / prop / GM / SP
Norway Rv3: Tonset – Akroken 14km (June 2018 to 30th July 2020) project / OSM / prop / GM / SP

Mid 2020:
Belgium N5: Frasnes – Couvin-North 1km (October 2016 to Mid 2020) project / OSM / prop / GM / SP
Czechia I13: Trebusice-North – east of Trebusice-East 1.4km (November 2017 to Mid 2020) project / OSM / prop / GM / SP
France A85: Perree viaduct 1km (November 2017 to Mid 2020) [2nd c/w] project / OSM / prop / GM / SP
France A85: La Roumer viaduct 2km (November 2017 to Mid 2020) [2nd c/w] project / OSM / prop / GM / SP
France A85: west of Langeais – Langeais 1km (November 2017 to Mid 2020) [2nd c/w] project / OSM / prop / GM / SP
Italy SS729: Ardara – Martis 12.4km (Spring 2017 to Mid 2020) - / OSM / prop / GM / SP
Italy SS729: west of Oschiri – Berchidda 9.5km (Spring 2017 to Mid 2020) - / OSM / prop / GM / SP
Romania A3: HU/RO border ("Bors") – Oradea 4.6km (2004 to Mid 2020) - / OSM / prop / GM / SP
Slovakia D1: Hricovske Podhradie (D3) – Lietavska Lucka 11.3km (February 2014 to Mid 2020) project / OSM / prop / GM / SP

 
#398 ·
January 2018:
Romania A10: Decea – Aiud 8.5km (July 2014 to 9th January 2018) – ? – map
There are rumors that this is corect, but no one knows for sure until that date (9th January).

December 2017:
Romania A10: Decea – Aiud 8.5km (July 2014 to December 2017?) – ? – map
Romania A10: Turda (A3) – Decea 16.8km (July 2014 to Late 2017?) – ? – map
First line is the same as above. For the second line rumors are set for February (optimistic) or April-May.
 
#5 · (Edited)
Lists sorted by country

Albania

2014 opening:

A3: Mushqeta – Elbasan ~14km (April 2011 to 31st July 2014) - / OSM / prop / GM / SP
SH4: Kavaje – Rrogozhine ~20km (2010 to August 2014) - / OSM / prop / GM / SP

2017:

A3: Tirana – south of Berzhite 8km (April 2011 to June 2017?) [1st c/w] - / OSM / prop / GM / SP

2019:

A3: Tirana – south of Berzhite 8km (April 2011 to Mid March 2019) [2nd c/w] - / OSM / prop / GM / SP
A3: south of Berzhite – Mushqeta 5km (April 2011 to Mid March 2019) [1st c/w] - / OSM / prop / GM / SP
A3: south of Berzhite – Mushqeta 5km (April 2011 to 4th June 2019) [2nd c/w] - / OSM / prop / GM / SP
A2: Mbrostar Ura – Levan 22km (2013 to Mid July 2019) [1st c/w] - / OSM / prop / GM / SP

2020:

A2: Mbrostar Ura – Levan 22km (2013 to Spring 2020) [2nd c/w] - / OSM / prop / GM / SP


Austria

2014 opening:

S10: Freistadt-North – Freistadt-South 5.9km (Summer 2011 to 16th November 2014) project / OSM / prop / GM / SP

2015 opening:

A9: Bosrucktunnel 7.3km (2007 to 19th October 2015) [2nd c/w] project / OSM / prop / GM / SP
S36: west of Sankt Georgen – east of Sankt Georgen ~1.5km (April 2013 to 1st December 2015) project / OSM / prop / GM / SP
S10: Freistadt-South – Unterweitersdorf 13.6km (Spring 2012 to 20th December 2015) project / OSM / prop / GM / SP

2017 opening:

A9: Gleinalmtunnel 8.3km (September 2013 to 21st July 2017) [2nd c/w] project / OSM / prop / GM / SP
A5: Poysbrunn – Schrick 25km (April 2015 to 8th December 2017) project / OSM / prop / GM / SP

2018 opening:

A9: Tunnelkette Klaus 8km (September 2013 to 19th December 2018) [2nd c/w] project / OSM / prop / GM / SP

2019 opening:

A5: Drasenhofen-North – south of Drasenhofen 5.5km (April 2018 to 8th September 2019) [1st c/w] project / OSM / prop / GM / SP

2020 opening:

S16: Landeck-West – east of Perjen tunnel ~4km (Spring 2015 to September 2020) [2nd c/w] project / OSM / prop / GM / SP
S36: rededication north of Unzmarkt – west of Sankt Georgen ~3.5km (1st October 2020) project / OSM / prop / GM / SP
S36: north of Unzmarkt – south of Unzmarkt ~2.5km (March 2017 to 1st October 2020) project / OSM / prop / GM / SP

2023 opening:

A11: north of Karawanks tunnel – AT/SLO border 4.9km (September 2015 to Summer 2023) [2nd c/w] project / OSM / prop / GM / SP
S7: Riegersdorf (A2) – Dobersdorf 14.8km (May 2015 to Late 2023) project / OSM / prop / GM / SP
A26: Linz-Danube-North – Linz-Danube-South 0.9km (January 2019 to December 2023) project / OSM / prop / GM / SP

 
#6 · (Edited)
Belarus

2014 opening:

M6: Dubraulyany – Plianty 8km (2011 to 2014) - / OSM / prop / GM / SP

2015 opening:

M14: Haroski (P28) – Ostroshitskij Gorodok (M3) 28km (Early 2014 to 6th October 2015) - / OSM / prop / GM / SP
M14: Rakaw (M6) – Haroski (P28) 18km (Early 2014 to Late December 2015) - / OSM / prop / GM / SP

2016 opening:

M14: Boroviki (M1) – Rakaw (M6) 42km (2014 to 22nd December 2016) - / OSM / prop / GM / SP


Belgium

2017 opening:

A11: Brugge (N31) – Westkapelle 12km (March 2014 to 1st September 2017) project / OSM / prop / GM / SP
N5: Couvon-North – Couvin-South 4km (October 2011 to 17th October 2017) project / OSM / prop / GM / SP

2018 opening:

A11: rededication Westkapelle – Zelzate-West 38km (Mid 2018) [not fully grade-separated] - / OSM / prop / GM / SP

2019 opening:

N5: Couvin-South – B/F border (Bruly) 9km (August 2015 to 6th September 2019) project / OSM / prop / GM / SP

2020 opening:

N5: Frasnes – Couvin-North 1km (October 2016 to Mid 2020) project / OSM / prop / GM / SP


Bosnia and Herzegovina (map and summary)

2014 opening:

A1: Josanica – Butila 5.7km (October 2007 to 26th June 2014) project / OSM / prop / GM / SP
A1: Butila – Vlakovo 3.9km (July 2013 to 26th June 2014) project / OSM / prop / GM / SP
A1: Zenica-South – Biljesevo 6.5km (August 2010 to 25th August 2014) project / OSM / prop / GM / SP
A1: Medugorje – Zvirovici 9.1km (October 2010 to 17th September 2014) project / OSM / prop / GM / SP
A1: Vlakovo – Lepenica 10.2km (January 2013 to 7th October 2014) project / OSM / prop / GM / SP
A1: Lepenica – Tarcin 10.1km (June 2012 to 7th October 2014) project / OSM / prop / GM / SP

2015 opening:

?: Butila (A1) – Brijesce 3.5km (October 2010 to 24th November 2015) project / OSM / prop / GM / SP

2016 opening:

"BaDoHwy": Prnjavor – Johovac 34.5km (Summer 2012 to 11th September 2016) project / OSM / prop / GM / SP

2017 opening:

"BaDoHwy": Mahovljani – Drugovic 10km (October 2014 to 1st October 2017) project / OSM / prop / GM / SP
?: Brijesce – Boljakov Potok 1.5km (May 2016 to 22nd November 2017) - / OSM / prop / GM / SP
A1: Svilaj – Odzak 9km (November 2013 to 11th December 2017) project / OSM / prop / GM / SP

2018 opening:

"BaDoHwy": Drugovic – Prnjavor 24km (October 2014 to 2nd October 2018) project / OSM / prop / GM / SP

2020 opening:

A1: Zenica-North – Zenica-South 10.1km (October 2014 to November 2020) project / OSM / prop / GM / SP
A1: HR/BIH border (Svilaj) – Svilaj 2km (November 2013 to >= Late 2020) project / OSM / prop / GM / SP
A1: Mostar-South – Pocitelj 20km (October 2018 to >= 2020) - / OSM / prop / GM / SP

2021 opening:

A1: Johovac – Doboj-North 6km (June 2019 to June 2021) project / OSM / prop / GM / SP
"BaDoHwy": Johovac – Johovac (A1) 3km (Summer 2012 to June 2021) project / OSM / prop / GM / SP

2022 opening:

A1: Pocitelj – Medugorje 11km (October 2019 to April 2022) - / OSM / prop / GM / SP
E661: HR/BIH border – Gradiska 4km (September 2004 to Spring 2022) - / OSM / prop / GM / SP

2023 opening:

A1: Zepce-South – Zenica-North 19km (2019 to 2023) - / OSM / prop / GM / SP

2025 opening:

A?: SRB/BIH border (Bosanska Raca) – Bosanska Raca 0.3km (October 2019 to <= 2025) - / OSM / prop / GM / SP

 
#7 · (Edited)
Bulgaria

2014 opening:

A4: Generalovo – Kapitan Andreevo 5.4km (November 2011 to 14th August 2014) - / OSM / prop / GM / SP

2015 opening:

A4: Dimitrovgrad – Harmanli 31.5km (July 2011 to 28th May 2015) project / OSM / prop / GM / SP
A4: Kapitan Petko Voyvoda – east of Svilengrad 8.9km (Spring 2011 to 7th June 2015) [2nd c/w] - / OSM / prop / GM / SP
A3: Marino pole – Kulata 3.2km (April 2012 to 16th July 2015) [1st c/w] project / OSM / prop / GM / SP
A3: Marino pole – Kulata 3.2km (April 2012 to 31st July 2015) [2nd c/w] project / OSM / prop / GM / SP
A3: south of Sandanski – Marino pole 11.5km (April 2012 to 31st July 2015) project / OSM / prop / GM / SP
A2: Belokopitovo – Panayot Volovo 4.9km (August 2013 to 3rd August 2015) - / OSM / prop / GM / SP
A3: Dupnitsa – Blagoevgrad ~40km (July 2013 to 22nd October 2015) project / OSM / prop / GM / SP
II18: Kakach river – Lyulin (A3) 3.0km (September 2012 to 22nd October 2015) project / OSM / prop / GM / SP
A4: Chirpan – Dimitrovgrad 33.8km (October 2011 to 29th October 2015) project / OSM / prop / GM / SP
I1: Montana bypass 12.5km (September 2013 to 29th December 2015) project / OSM / prop / GM / SP
A6: Trebich (II18) – Iliyantsi-Rozhen Boulevard 2.5km (February 2015 to 30th December 2015) project / OSM / prop / GM / SP
A6: Benkovski-Lazar Mihailov Boulevard – Sofia-East (A2) 10.1km (February 2015 to 30th December 2015) project / OSM / prop / GM / SP

2016 opening:

A6: Iliyantsi-Rozhen Boulevard – Benkovski-Lazar Mihailov Boulevard 3.0km (February 2015 to 28th April 2016) project / OSM / prop / GM / SP
II18: Trebich (A6) – Kakach river 5.5km (October 2015 to 13th September 2016) - / OSM / prop / GM / SP
A6: Mramor – Trebich (II18) ~1km (2015 to 13th September 2016) - / OSM / prop / GM / SP
II18: north of Kazichane bridge – south of Kazichane bridge 0.6km (August 2016 to 9th December 2016) [2nd c/w] - / OSM / prop / GM / SP

2018 opening:

A3: Kresna – south of Sandanski 23.6km (August 2016 to 17th December 2018) project / OSM / prop / GM / SP

2019 opening:

A3: Blagoevgrad – Blagoevgrad-South 6.8km (August 2017 to 23rd May 2019) project / OSM / prop / GM / SP
A2: Yablanitsa – Boaza 9.3km (Early 2018 to 11th October 2019) - / OSM / prop / GM / SP

2021 opening:

A6: Dragoman – Herakovo 16.9km (May 2019 to Mid 2021) - / OSM / prop / GM / SP
A2: Buhovtsi – Belokopitovo 16.3km (August 2018 to Summer 2021) - / OSM / prop / GM / SP
A3: Blagoevgrad-South – Zheleznitsa 5.1km (October 2019 to Late 2021) - / OSM / prop / GM / SP
II18: Mladost – Trakya (A1) 5.9km (October 2019 to December 2021) - / OSM / prop / GM / SP

2022 opening:

A6: Kalotina – Dragoman 14.5km (February 2020 to January 2022) - / OSM / prop / GM / SP
A3: Zheleznitsa – Krupnik 5.8km (February 2019 to Early 2022) project / OSM / prop / GM / SP
A2: Boaza – Dermantzi (I307) 15.3km (April 2019 to 2022) - / OSM / prop / GM / SP

 
#8 · (Edited)
Croatia

2014 opening:

D1: Split-Dracevac – Klis (near Klis Kosa) 3km (? to 23rd June 2014) [2nd c/w] - / OSM / prop / GM / SP
D2: Osijek (A5) – Osijek (Z4085) 7.5km (September 2011 to 28th November 2014) [2nd c/w] - / OSM / prop / GM / SP
D1: Split-Dracevac – Klis (near Ozrna) 1.5km (? to 30th November 2014) [2nd c/w] - / OSM / prop / GM / SP

2015 opening:

A5: Sredanci (A3) – Zoljani 3.2km (September 2011 to 2nd March 2015) - / OSM / prop / GM / SP
A11: Busevec – Lekenik 11.2km (April 2010 to 22nd April 2015) - / OSM / prop / GM / SP
D14: Mokrice (A2) – Andrasevec 4.5km (2012 to 7th October 2015) [1st c/w] - / OSM / prop / GM / SP
A11: Jakusevec (A3) – Velika Gorica 8.5km (April 2006 to 3rd November 2015) - / OSM / prop / GM / SP
D2: Osijek (Z4085) – Osijek (Z4091) 4.6km (September 2011 to 5th November 2015) [2nd c/w] - / OSM / prop / GM / SP

2016 opening:

D10: south of Gradec – Gradec 1.0km (2011 to 15th June 2016) - / OSM / prop / GM / SP
D10: Gradec – Krizevci 11.0km (2011 to 2nd September 2016) - / OSM / prop / GM / SP

2017 opening:

D14: Andrasevec – Bedekovcina 5.0km (March 2015 to 6th February 2017) [1st c/w] - / OSM / prop / GM / SP
D538: Virovitica (D5) – Suhopolje 9.1km (September 2014 to 4th December 2017) [1st c/w] - / OSM / prop / GM / SP

2019 opening:

D12: Vrbovec (D10) – Farkasevac 10.5km (2011 to 16th April 2019) - / OSM / prop / GM / SP
D14: Bedekovcina – Zlatar Bistrica 6.5km (2017 to 25th October 2019) [1st c/w] - / OSM / prop / GM / SP

2020 opening:

A5: Zoljani – HR/BIH border 2.0km (September 2011 to >= Late 2020) - / OSM / prop / GM / SP

2021 opening:

A8: Vranja – Rogovici 28km (November 2018 to Late 2021) [2nd c/w] - / OSM / prop / GM / SP

2022 opening:

D5?: Novi Varos – HR/BIH border (Gradiska) 4.0km (October 2019 to Spring 2022) - / OSM / prop / GM / SP
A5: Beli Manastir – north of Drava bridge ~18km (August 2018 to 2022) - / OSM / prop / GM / SP
A5: north of Drava bridge – Osijek ~6km (July 2011 to 2022) - / OSM / prop / GM / SP


Cyprus

No new motorway or expressway currently u/c

 
#244 ·
Denmark

2014 opening:

PR18: Brande-North – Brande-South 7km (2012 to 27th May 2014) [2nd c/w] – projectmap
PR15: Harup – Lasby 11.7km (2010 to 1st December 2014) – projectmap

2015 opening:

PR17: Traervej – Ballerup 5km (Fall 2012 to 13th July 2015) – projectmap

2016 opening:

PR15: Funder – Harup 17.5km (2010 to 11th September 2016) – projectmap

2017 opening:

502: Tjorring – Herning-Snejbjerg 10km (February 2015 to Early 2017) – projectmap

2018 opening:

PR18: Holstebro-North – Tjorring 40km (May 2015 to May 2018) – projectmap

2019 opening:

PR53: Dalby – Frederikssund-South (PR17) 9.3km (April 2016 to 2019) – projectmap

It has been announced to day that the 10 km Route 502 section will opened on 28th of May 2017 http://www.vejdirektoratet.dk/DA/om...n-vest-om-Herning-åbner-den-28.-maj-2017.aspx

This section is called "Messemotorvejen".
 
#9 · (Edited)
Czechia

2014 opening:

I44: Zvole – Vlachov 2.9km (April 2009 to 31st July 2014) project / OSM / prop / GM / SP
I35: Lesna – Priluky 1.7km (November 2009 to 8th September 2014) project / OSM / prop / GM / SP

2015 opening:

MO: Prague-Malovanka – Prague-Troja 5.5km (2007 to 19th September 2015) project / OSM / prop / GM / SP
I11: Mokre Lazce – Ostrava-Krasne Pole 9.8km (January 2009 to 13th October 2015) project / OSM / prop / GM / SP
D6: Bosov – Lubenec 4.1km (May 2010 to 10th November 2015) project / OSM / prop / GM / SP

2016 opening:

Since 1st January 2016, R road classification has been abandoned. Former R roads are dedicated as D or I roads now, the actual dedication is as follows:map
D8: Rehlovice – Bilinka 12.4km (November 2007 to 17th December 2016) project / OSM / prop / GM / SP

2017 opening:

D11: Praskacka – Hradec Kralove ~4km (July 2014 to 21st August 2017) project / OSM / prop / GM / SP
I35: Priluky – Mstenovice 0.7km (November 2009 to 11th September 2017) project / OSM / prop / GM / SP
D3: Borek – Usilne ~2.5km (April 2015 to 27th September 2017) project / OSM / prop / GM / SP
D4: Pribram/Skalka – Haje 4.8km (April 2015 to 4th October 2017) project / OSM / prop / GM / SP
D3: Veseli nad Luznici – Bosilec 5.1km (April 2015 to 12th October 2017) project / OSM / prop / GM / SP
I11: Nebory – Oldrichovice 4.9km (August 2014 to 17th October 2017) project / OSM / prop / GM / SP
I11: Oldrichovice – south of Bystrice 6.2km (August 2014 to 17th October 2017) project / OSM / prop / GM / SP

2018 opening:

D7: Bitozeves – Postoloprty-West 3.8km (July 2016 to 30th August 2018) project / OSM / prop / GM / SP

2019 opening:

D3: Bosilec – Sevetin 8.1km (September 2015 to 24th June 2019) project / OSM / prop / GM / SP
D3: Sevetin – Borek 10.7km (March 2017 to 10th December 2019) [2nd c/w] project / OSM / prop / GM / SP
D1: Prerov-North (D55) – Lipnik nad Becvou (D35) 14.3km (July 2015 to 12th December 2019) project / OSM / prop / GM / SP
I11: Ostrava-Krasne Pole – Ostrava-Poruba 6.7km (November 2012 to 19th December 2019) project / OSM / prop / GM / SP

2020 opening:

I13: Trebusice-North – east of Trebusice-East 1.4km (November 2017 to Mid 2020) project / OSM / prop / GM / SP
D6: Krusovice – Revnicov 4.2km (December 2017 to November 2020) project / OSM / prop / GM / SP
D6: Revnicov – Nove Straseci 5.6km (December 2017 to November 2020) project / OSM / prop / GM / SP
D48: Rybi – Rychaltice 11.5km (May 2017 to December 2020) project / OSM / prop / GM / SP

2021 opening:

D6: west of Lubenec – east of Lubenec 4.9km (March 2018 to March 2021) project / OSM / prop / GM / SP
D7: Panensky Tynec – east of Panensky Tynec 3.5km (September 2019 to October 2021) project / OSM / prop / GM / SP
D55: Otrokovice-East – Otrokovice-South 3.1km (October 2018 to October 2021) project / OSM / prop / GM / SP
D11: north of Smirice – Jaromer-North 7.4km (May 2018 to December 2021) project / OSM / prop / GM / SP

2022 opening:

D35: Opatovice – Casy 12.6km (March 2019 to January 2022) project / OSM / prop / GM / SP
D48: west of Frydek-Mistek-West (D56) – Frydek-Mistek-South 3.6km (May 2018 to January 2022) project / OSM / prop / GM / SP
D56: Frydek-Mistek-Sviadnov – Frydek-Mistek-West (D48) 2.3km (May 2018 to January 2022) project / OSM / prop / GM / SP
D11: Hradec Kralove – north of Smirice 15.5km (October 2018 to June 2022) project / OSM / prop / GM / SP
D48: Frydek-Mistek-South – Frydek-Mistek-East 5.0km (May 2018 to July 2022) project / OSM / prop / GM / SP
I68: Tranovice (D48) – Nebory 5.4km (October 2019 to July 2022) project / OSM / prop / GM / SP
D3: Usilne – Hodejovice 7.5km (April 2019 to September 2022) project / OSM / prop / GM / SP
D3: Hodejovice – Trebonin 12.5km (March 2019 to September 2022) project / OSM / prop / GM / SP
D35: Casy – Ostrov 14.7km (December 2018 to 2022) project / OSM / prop / GM / SP
D49: Hulin (D1/D55) – Frystak 16.4km (September 2008 to 2022/23) project / OSM / prop / GM / SP

 
#10 · (Edited)
Denmark

2014 opening:

PR18: Brande-North – Brande-South 7km (2012 to 27th May 2014) [2nd c/w] project / OSM / prop / GM / SP
PR15: Harup – Lasby 11.7km (2010 to 1st December 2014) project / OSM / prop / GM / SP

2015 opening:

PR17: Tvaervej – Ballerup 5km (Fall 2012 to 13th July 2015) project / OSM / prop / GM / SP

2016 opening:

PR15: Funder – Harup 17.5km (2010 to 11th September 2016) project / OSM / prop / GM / SP

2017 opening:

SR502: Tjorring – Herning-Snejbjerg 10km (February 2015 to 28th May 2017) project / OSM / prop / GM / SP
PR18: Tvis – Tjorring 18km (May 2015 to 27th November 2017) project / OSM / prop / GM / SP

2018 opening:

PR18: Holstebro-North – Tvis 22km (May 2015 to 30th September 2018) project / OSM / prop / GM / SP

2019 opening:

PR23: Jernlose – Kvanlose 4.0km (September 2017 to Mid July 2019) project / OSM / prop / GM / SP
PR23: Knabstrup – Jernlose 2.5km (September 2017 to 20th September 2019) project / OSM / prop / GM / SP
PR53: Dalby – Frederikssund-South (PR17) 9.3km (April 2016 to 30th September 2019) project / OSM / prop / GM / SP


Estonia

2014 opening:

T11: east of Luige – west of Kurna 1.6km (October 2013 to Fall 2014) - / OSM / prop / GM / SP

2015 opening:

T11: west of Kurna – Jüri (T2) 4.4km (April 2014 to October 2015) - / OSM / prop / GM / SP

2017 opening:

T11: Jüri (T2) – east of Porguvälja 1km (September 2015 to January 2017) - / OSM / prop / GM / SP
T11: Kanama (T4) – Saku 5.5km (May 2016 to September 2017) - / OSM / prop / GM / SP

2018 opening:

T11: south of Lagedi – north of Veneküla 3.2km (August 2016 to June 2018) - / OSM / prop / GM / SP

2019 opening:

T11: north of Porguvalja – south of Lagedi 3.7km (Fall 2017 to March 2019?) - / OSM / prop / GM / SP

2020 opening:

T1: Aaspere – west of Haljala 6.4km (July 2019 to October 2020) - / OSM / prop / GM / SP
T2: Kose – Ardu 12.7km (September 2017 to December 2020) - / OSM / prop / GM / SP
T2: Ardu – Voobu 11.5km (February 2018 to December 2020) - / OSM / prop / GM / SP

2021 opening:

T11: Saku – west of Luige 4.1km (May 2019 to Spring 2021) - / OSM / prop / GM / SP
T11: north of Veneküla – Tallin-East (T1) 3.0km (August 2017 to 2021?) - / OSM / prop / GM / SP

 
#11 · (Edited)
Finland

2014 opening:

Vt7: Pyhtää – Kotko-West 14km (November 2011 to 12th August 2014) project / OSM / prop / GM / SP
Vt7: Loviisa – Ahvenkoski 15km (November 2011 to 1st September 2014) project / OSM / prop / GM / SP
Vt5: Vuorela – Palvaranta 5km (October 2009 to September 2014) project / OSM / prop / GM / SP
Vt7: Hamina-Lankamalmi – Hamina-East 15.7km (Early 2012 to 17th December 2014) project / OSM / prop / GM / SP

2015 opening:

Vt8: Masku – Raisio-North 9km (February 2014 to 27th November 2015) project / OSM / prop / GM / SP

2016 opening:

Vt6: Luumäki (Vt26) – Jurvala-East 17km (October 2015 to 23rd November 2016) project / OSM / prop / GM / SP
Vt8: Nousianinen – Masku 3km (February 2014 to 22nd December 2016) project / OSM / prop / GM / SP

2017 opening:

Vt7: Hamina-East – Kattilainen 5km (June 2015 to 10th February 2017) project / OSM / prop / GM / SP
Vt4: Myllyntaus – Rannankylä 3.5km (Late 2016 to 13th October 2017) project / OSM / prop / GM / SP
Vt6: Jurvala-East – west of Selkäharju (Vt13) 9km (October 2015 to 31st October 2017) project / OSM / prop / GM / SP

2018 opening:

Vt7: Kattilainen – Virojoki 19.5km (June 2015 to 14th February 2018) project / OSM / prop / GM / SP
Vt7: Virojoki – Vaalimaan 7.5km (June 2015 to 1st March 2018) project / OSM / prop / GM / SP

2019 opening:

Vt4: Äänekoski – Myllyntaus 4km (August 2017 to 11th January 2019) project / OSM / prop / GM / SP
Vt4: south of Asemakylä – north of Kello 8km (May 2017 to 14th November 2019) project / OSM / prop / GM / SP

2020 opening:

Vt12: Okeroinen – Kujala (Vt4) 6km (Spring 2017 to Late 2020) project / OSM / prop / GM / SP

2021 opening:

Kt40: Pukkilan – Kirismäen (Vt1) 3km (March 2019 to 2021) project / OSM / prop / GM / SP

2022 opening:

Vt4: north of Tikkakoski – Kirri 14km (May 2019 to Late 2022) project / OSM / prop / GM / SP

 
#12 · (Edited)
France

2014 opening:

D222: Tregueux-Le Creach – Tregueux-La Croix Gibat 2km (? to 27th January 2014) project / OSM / prop / GM / SP
A50: Tunnel de Toulon 3.2km (September 2007 to 19th March 2014) [2nd c/w] - / OSM / prop / GM / SP
N7: Saint-Prix – Saint-Martin-Estreaux 9.5km (2007 to 19th March 2014) - / OSM / prop / GM / SP
A75: rededication Pezenas-North – Pezenas-South ~4km (1st July 2014) - / OSM / prop / GM / SP
D177: Guichen-South – Guignen ~5km (? to 22nd May 2014) - / OSM / prop / GM / SP
D642: Hazebrouck-East – east of Strazeele 6km (? to 30th June 2014) - / OSM / prop / GM / SP
N249: Montourneau – Bressuire-West 11km (April 2012 to 3rd October 2014) - / OSM / prop / GM / SP
N88: Albi-Le Lude – Albi-Stadium 1.5km (? to 15th October 2014) [2nd c/w] project / OSM / prop / GM / SP
N7: Moiry – Maison-Rouge 3.5km (? to 30th October 2014) - / OSM / prop / GM / SP
D767: south of Colpo – Locmaria-Grand-Champ 6km (? to 6th November 2014) - / OSM / prop / GM / SP
D1206: north of Machilly – Annemasse-East ~7km (? to 24th November 2014) - / OSM / prop / GM / SP
N249: Cholet (D160) – Cholet (A87) 3.3km (March 2011 to 4th December 2014) [2nd c/w] - / OSM / prop / GM / SP
D924: West of Ecouche – Argentan-West (A88) ~7km (2011 to 12th December 2014) - / OSM / prop / GM / SP

2015 opening:

A719: Gannat-East – Vichy 13.8km (August 2011 to 12th January 2015) project / OSM / prop / GM / SP
A89: Brive-North – Saint-Germain-les-Vergnes 4km (? to 7th February 2015) [2nd c/w] - / OSM / prop / GM / SP
A150: Yvetot – Barentin 18km (March 2013 to 9th February 2015) project / OSM / prop / GM / SP
N88: Albi-Stadium – north of Albi-Caussels 2.3km (? to 20th February 2015) [2nd c/w] project / OSM / prop / GM / SP
N79: Verosvres – Col des Vaux ~2km (? to 23rd June 2015) project / OSM / prop / GM / SP
N88: La Baraque St-Jean – La Mothe 13.7km (December 2010 to 2nd July 2015) project / OSM / prop / GM / SP
A466: Quincieux (A46) – Les Cheres (A6) 4km (? to 4th July 2015) project / OSM / prop / GM / SP
D177: Guignen – Le Tertre ~2km (? to 22nd July 2015) - / OSM / prop / GM / SP
D170: Bonneuil-en-France – Gonesse 3km (? to 6th October 2015) [direction Bonneuil-en-France] - / OSM / prop / GM / SP
D177: north of Loheac – south of Loheac ~3km (2013 to 12th November 2015) - / OSM / prop / GM / SP
N164: west of Loudeac – Loudeac-North (D700) 4.1km (? to 10th December 2015) [2nd c/w] - / OSM / prop / GM / SP
D170: Bonneuil-en-France – Gonesse 3km (? to 17th December 2015) [direction Gonesse] - / OSM / prop / GM / SP
N79: Bresnay – Chemilly 6.3km (July 2013 to 18th December 2015) [2nd c/w] project / OSM / prop / GM / SP
D177: Renac – Sainte-Marie 2.0km (? to 23rd December 2015) - / OSM / prop / GM / SP
D498: Bonson-West – Bonson-East 3.1km (? to 23rd December 2015) - / OSM / prop / GM / SP

2016 opening:

N7: Maison-Rouge – Saint-Pierre-le-Moutier-North 2.1km (? to 29th June 2016) - / OSM / prop / GM / SP
D177: Le Tertre – north of Loheac 3.5km (2013 to 9th November 2016) - / OSM / prop / GM / SP
D177: Courbouton – Pipriac ~4.5km (? to 9th November 2016) - / OSM / prop / GM / SP
A507: Frais Vallon – Marseille-East (A50) 5.2km (1993 to 29th November 2016) project / OSM / prop / GM / SP
D16: L/F border (Belval) – Audun-le-Tiche 3km (? to 16th December 2016) - / OSM / prop / GM / SP
N7: Varennes-sur-Allier-North – south of Varennes-sur-Allier 4.8km (2009 to 20th December 2016) - / OSM / prop / GM / SP

2017 opening:

D222: Tregueux-La Croix Gibat – Yffiniac 1.8km (? to 30th January 2017) project / OSM / prop / GM / SP
D700: Bel Air – La Fourchette 3km (? to 30th January 2017) - / OSM / prop / GM / SP
D173: Retiers-South – La Noe Jollys 6.8km (? to 31st January 2017) - / OSM / prop / GM / SP
N70: Paray-le-Monial (N79) – Saint-Vincent-Bragny 5.2km (? to 22nd March 2017) - / OSM / prop / GM / SP
D173: Saint-Morand – Le Moulin 3.5km (Late 2015 to Late April 2017) - / OSM / prop / GM / SP
D775: Le Lion-d'Angers-South – Grez-Neuville ~3km (? to 15th May 2017) - / OSM / prop / GM / SP
D1032: Noyon – Ribecourt 7.5km (2012 to 22nd May 2017) - / OSM / prop / GM / SP
A9: Saint-Jean-de-Vedas – Saint Aunes ~12km (October 2014 to 30th May 2017) [eastbound] project / OSM / prop / GM / SP
A9: Saint-Jean-de-Vedas – Saint Aunes ~12km (October 2014 to 31st May 2017) [westbound; existing A9 was renumbered to A709] project / OSM / prop / GM / SP
N10: south of Reignac – south of Touverac 6.6km (2014 to 1st June 2017) [1st c/w] - / OSM / prop / GM / SP
D924: Landigou – Durcet 3km (February 2016 to 15th June 2017) - / OSM / prop / GM / SP
N10: south of Reignac – south of Touverac 6.6km (2014 to 26th June 2017) [2nd c/w] - / OSM / prop / GM / SP
N19: Amblans – Lure-West 3km (Summer 2013 to 11th July 2017) project / OSM / prop / GM / SP
D775: Grez-Neuville - La Membrolle-North ~3km (? to 13th July 2017) - / OSM / prop / GM / SP
N164: east of Saint-Meen-le-Grand – Montauban-de-Bretagne (N12) 5.4km (January 2014 to 6th October 2017) [1st c/w] project / OSM / prop / GM / SP
N70: Blanzy – Saint-Eusebe 4km (Fall 2015 to 23th October 2017) [2nd c/w] - / OSM / prop / GM / SP
D222: Yffiniac – Yffiniac (N12) 0.7km (? to 27th November 2017) project / OSM / prop / GM / SP
D949?: east of Bournezeau – west of Chantonnay 5.5km (? to 11th December 2017) - / OSM / prop / GM / SP
N57: Breurey – Voray-sur-l'Ognon 4.8km (January 2015 to 20th December 2017) - / OSM / prop / GM / SP
A304: Rocroi – Rimogne 8km (July 2011 to 21st December 2017) project / OSM / prop / GM / SP
N164: east of Saint-Meen-le-Grand – Montauban-de-Bretagne (N12) 5.4km (January 2014 to 22th December 2017) [2nd c/w] project / OSM / prop / GM / SP

2018 opening:

A89: east of Lentilly – Limonest (A6) 5.5km (Mid 2015 to 3rd March 2018) project / OSM / prop / GM / SP
D9: Gare d'Aix-en-Provence-TGV-East – Calas 3km (? to 17th April 2018) - / OSM / prop / GM / SP
D177: Pipriac – Saint-Just 2.7km (? to 31st May 2018) - / OSM / prop / GM / SP
A85: Sauldre viaduct Romorantin-Lanthenay 1km (November 2016 to June 2018) [2nd c/w] project / OSM / prop / GM / SP
N2: Crepy-en-Valois – east of Gondreville 3.5km (2013 to 6th July 2018) [1st c/w] - / OSM / prop / GM / SP
N82: Neulise – Balbigny 5.2km (2014 to 6th July 2018) - / OSM / prop / GM / SP
N88: Malpas – Brive-Charensac-West 8.7km (Spring 2010 to 16th July 2018) project / OSM / prop / GM / SP
N70: north of Palinges – Genelard 6km (April 2017 to 19th July 2018) [2nd c/w] - / OSM / prop / GM / SP
A304: Rimogne – Charleville-Mezieres (A34) 23km (July 2011 to 31st July 2018) project / OSM / prop / GM / SP
N2: Crepy-en-Valois – east of Gondreville 3.5km (2013 to September 2018) [2nd c/w] - / OSM / prop / GM / SP
N2: east of Gondreville – Vaumoise/Vauciennes 3.5km (2013 to September 2018) - / OSM / prop / GM / SP
A507: Les Arnavaux (A7) – Sainte-Marthe 3km (August 2014 to 17th October 2018) [northbound] project / OSM / prop / GM / SP
D902: Beauzelle (4) – Beauzelle (5) 0.6km (? to 19th October 2018) - / OSM / prop / GM / SP
A507: Les Arnavaux (A7) – Sainte-Marthe 3km (August 2014 to 25th October 2018) [southbound] project / OSM / prop / GM / SP
N44: Moncetz-Longevas – St-Germain-la-Ville 4.2km (October 2016 to 30th October 2018) [northbound] - / OSM / prop / GM / SP
N44: Moncetz-Longevas – St-Germain-la-Ville 4.2km (October 2016 to 12th November 2018) [southbound] - / OSM / prop / GM / SP
D173: Martigne-Ferchaud-South – Saint-Morand ~5km (? to 13th December 2018) - / OSM / prop / GM / SP
N70: Saint-Eusebe – Montchanin-East 4km (Fall 2015 to Mid December 2018) [2nd c/w] - / OSM / prop / GM / SP

2019 opening:

A85: west of Cher viaduct – Saint Aignan 2km (November 2016 to 1st March 2019) [2nd c/w] project / OSM / prop / GM / SP
D924: Durcet – east of Durcet 2km (? to 17th May 2019) - / OSM / prop / GM / SP
N10: south of Touverac – north of Chevanceaux 4.7km (2014 to 20th June 2019) project / OSM / prop / GM / SP
N70: north of Palinges – south of Palinges 1km (April 2017 to 1st July 2019) [2nd c/w] - / OSM / prop / GM / SP
D973: Marcey-les-Greves – Les Martellieres (A84) 4.8km (February 2016 to 16th September 2019) - / OSM / prop / GM / SP
D301: Aix-Noulette (D937) – Bully-les-Mines (A21) 0.8km (September 2017 to 20th September 2019) [2nd c/w] - / OSM / prop / GM / SP
N79: Paray-le-Monial-East – Charolles-West 8km (February 2017 to 1st October 2019) [1st c/w] - / OSM / prop / GM / SP
A406: west of Macon-Loche – Macon-South 4.5km (July 2017 to 7th October 2019) project / OSM / prop / GM / SP
N88: Baraqueville – Les Molinieres 7.3km (September 2014 to 14th October 2019) [direction Albi] - / OSM / prop / GM / SP
N88: Baraqueville – Les Molinieres 7.3km (September 2014 to 15th October 2019) [direction Rodez] - / OSM / prop / GM / SP
N4: Saint-Georges – Hertzing 3km (Early 2016 to 8th November 2019) - / OSM / prop / GM / SP
A16: L'Isle-Adam (N184) – La Croix Verte (N104) 8km (2016 to 14th November 2019) [northbound] project / OSM / prop / GM / SP
A16: L'Isle-Adam (N184) – La Croix Verte (N104) 8km (2016 to 15th November 2019) [southbound] project / OSM / prop / GM / SP
N7: north of Villeneuve-sur-Allier – Villeneuve-sur-Allier 5.3km (Late 2010 to 19th/20th November 2019) - / OSM / prop / GM / SP
N79: Paray-le-Monial-East – Charolles-West 8km (February 2017 to 18th December 2019) [2nd c/w] - / OSM / prop / GM / SP
N19: Botans – Moval 3.5km (March 2017 to 19th December 2019) - / OSM / prop / GM / SP
N79: Prisse – west of Macon-Loche 5km (2017? to 20th December 2019) [2nd c/w] - / OSM / prop / GM / SP

2020 opening:

N57: Rioz – Breurey 4.8km (2017/18? to 25th February 2020) - / OSM / prop / GM / SP
A79: Montmarault (A71) – north of Montmarault 4km (Early 2018 to April 2020) project / OSM / prop / GM / SP
N19: Boissy-Saint-Leger-East – south of Boissy-Saint-Leger ~2km (March 2014 to April 2020) - / OSM / prop / GM / SP
N141: La Vigerie – Saint-Yrieix 5.5km (<= 2015 to Spring 2020) project / OSM / prop / GM / SP
A85: Perree viaduct 1km (November 2017 to Mid 2020) [2nd c/w] project / OSM / prop / GM / SP
A85: La Roumer viaduct 2km (November 2017 to Mid 2020) [2nd c/w] project / OSM / prop / GM / SP
A85: west of Langeais – Langeais 1km (November 2017 to Mid 2020) [2nd c/w] project / OSM / prop / GM / SP
N19: Port-sur-Saone-West – Charmoille 7.9km (2016 to Summer 2020) - / OSM / prop / GM / SP
N88: La Mothe – Baraqueville 7km (Spring 2017 to Summer 2020) - / OSM / prop / GM / SP
N7: Villeneuve-sur-Allier – south of Villeneuve-sur-Allier 1.7km (Late 2010 to 2020) - / OSM / prop / GM / SP
N353: Entzheim (A35) – Fegersheim (N83) 3.5km (October 2015 to 2020) project / OSM / prop / GM / SP
D173: Martigne-Ferchaud-North – Martigne-Ferchaud-South ~2km (<= 2017 to 2020) [2nd c/w] - / OSM / prop / GM / SP
N57: Cayenne – north of Ecole-Valentin (A36) 3km (March 2015 to Fall 2020) - / OSM / prop / GM / SP
N164: Lennon – Landeleau 12.5km (July 2017 to Late 2020) project / OSM / prop / GM / SP
D173: La Noe Jollys – south of Martigne-Ferchaud-North 3.3km (February 2019 to Late 2020) - / OSM / prop / GM / SP
D177: Saint-Just – Renac 7km (Mid 2018 to Late 2020) - / OSM / prop / GM / SP
N1: La Possession-North – Saint-Denis-West 12.5km (December 2013 to >= 2020) project / OSM / prop / GM / SP

2021 opening:

A355: Vendenheim (A4/A35) – Duppigheim (A35/A352) 24km (September 2018 to 2021) project / OSM / prop / GM / SP
N27: Arques-la-Bataille – Manehouville 7.7km (July 2012 to 2021) - / OSM / prop / GM / SP

2022 opening:

N1013: Parville-East – Fayeux 7.3km (2014 to 2022) project / OSM / prop / GM / SP
N124: Aubiet-East – Gimont-East 11.5km (January 2015 to 2022) project / OSM / prop / GM / SP
N141: Roumazieres – Chabanais 12km (Early 2018 to 2022) project / OSM / prop / GM / SP
N88: south of Yssingeaux – Yssingeaux 3km (February 2020 to Late 2022) - / OSM / prop / GM / SP

2023 opening:

N57: Devecey – Cayenne 1.5km (June 2019 to Mid 2023) - / OSM / prop / GM / SP

 
#13 · (Edited)
Germany (map)

2014 opening:

A30: AS Bad Oeynhausen-North – AS Dehme 1.6km (September 2008 to 12th March 2014) project / OSM / prop / GM / SP
A524: west of AK Duisburg-South – west of AS Duisburg-Rahm 1.9km (February 2010 to Early July 2014) - / OSM / prop / GM / SP
A44: AS Hessisch Lichtenau-West – AS Hessisch Lichtenau-Center 2.2km (April 2008 to 24th July 2014) project / OSM / prop / GM / SP
B243: AS Bad Lauterberg – AS Bad Sachsa 8.6km (October 2008 to 5th September 2014) project / OSM / prop / GM / SP
A66: AS Neuhof-South – AS Neuhof-North 3.7km (October 2005 to 13th September 2014) project / OSM / prop / GM / SP
A4: AS Düren – AS Kerpen 12.9km (September 2008 to 17th September 2014) [direction Cologne] project / OSM / prop / GM / SP
A4: AS Düren – AS Kerpen 12.9km (September 2008 to 20th September 2014) [direction Aachen; discontinuation: 12.8km] project / OSM / prop / GM / SP
A281: AS Bremen-Seehausen – AS Bremen-Strom 4.1km (April 2009 to 29th September 2014) project / OSM / prop / GM / SP
A62: south of AS Weselberg – Schwarzbach viaduct 3.6km (September 2013 to Late September 2014) [2nd c/w] - / OSM / prop / GM / SP
A14: AS Colbitz – AS Wolmirstedt 5.7km (November 2011 to 29th October 2014) project / OSM / prop / GM / SP
A4: AS Magdala – AS Jena-Göschwitz 11.8km (May 2007 to 30th October 2014) [direction Erfurt] project / OSM / prop / GM / SP
A4: AS Magdala – AS Jena-Göschwitz 11.8km (May 2007 to 18th November 2014) [direction Dresden; discontinuation: 12.6km] project / OSM / prop / GM / SP
A26: AS Horneburg – AS Jork 4.6km (Summer 2006 to 28th November 2014) [direction Stade] project / OSM / prop / GM / SP
A21: south of Nettelsee – Stolpe 2km (February 2012 to 2nd December 2014) project / OSM / prop / GM / SP
B2: AS Roth-Otto-Lilienthal-Kaserne – south of Untersteinbach 3.3km (October 2012 to 5th December 2014) project / OSM / prop / GM / SP
B50: AK Wittlich – AS Platten 5.4km (May 2003 to 15th December 2014) project / OSM / prop / GM / SP

2015 opening:

A26: AS Horneburg – AS Jork 4.6km (Summer 2006 to 17th July 2015) [direction Hamburg] project / OSM / prop / GM / SP
A71: Etzleben – AS Sömmerda-East 11.4km (June 2010 to 3rd September 2015) project / OSM / prop / GM / SP
A23: AS Itzehoe-Center – south of Stör bridge 2.5km (January 2007 to 26th October 2015) project / OSM / prop / GM / SP
B10: Walmersbach – AS Hinterweidenthal 2.5km (June 2010 to 30th October 2015) project / OSM / prop / GM / SP
A14: AK Schwerin – AS Grabow 14.4km (November 2012 to 21st December 2015) - / OSM / prop / GM / SP
A14: AS Groß Warnow – AS Karstädt 10.8km (October 2013 to 21st December 2015) project / OSM / prop / GM / SP

2016 opening:

A23: south of Stör bridge – AS Itzehoe-South 2.0km (2010 to 14th June 2016) project / OSM / prop / GM / SP
B535: AS Mannheim-Friedrichsfeld – AS Schwetzingen-Center 1.9km (December 2010 to 4th August 2016) [2nd c/w] project / OSM / prop / GM / SP
B33: AS Offenburg-Zunsweier – AS Gengenbach-North 2.8km (October 2010 to 25th October 2016) - / OSM / prop / GM / SP
B85: Piendling – Untertraubenbach 3.2km (March 2014 to 28th October 2016) project / OSM / prop / GM / SP

2017 opening:

A448: rededication AD Bochum-West – AS Bochum-Wiemelhausen 5.9km (1st January 2017) project / OSM / prop / GM / SP
B47: AS Worms (A61) – AS Worms-West 2.1km (May 2016 to Mid 2017) [2nd c/w] project / OSM / prop / GM / SP
B300: AS Gallenbach – AS Aichach-West 2.7km (October 2014 to 11th October 2017) project / OSM / prop / GM / SP
A8: east of Walbrücke – AS Merzig-Schwemlingen 2.0km (April 2015 to October 2017) [2nd c/w] project / OSM / prop / GM / SP
B33: AS Offenburg-Elgersweier (B3) – AS Offenburg-Zunsweier 2.4km (October 2010 to 30th October 2017) - / OSM / prop / GM / SP
A21: north of AS Nettelsee – south of Nettelsee 2.1km (February 2012 to 9th December 2017) project / OSM / prop / GM / SP
A14: AS Grabow – AS Groß Warnow 11.5km (June 2015 to 20th December 2017) - / OSM / prop / GM / SP

2018 opening:

A33: AS Halle-Künsebeck – AS Bielefeld-Center 7.9km (September 2009 to 4th April 2018) project / OSM / prop / GM / SP
A44: AS Hessisch Lichtenau-East – Hasselbach 4.3km (September 2010 to 13th April 2018) project / OSM / prop / GM / SP
A44: Hasselbach – AS Waldkappel 6.9km (March 2011 to 13th April 2018) project / OSM / prop / GM / SP
A44: AS Heiligenhaus – AS Heiligenhaus-Hetterscheidt 4.9km (April 2010 to 14th April 2018) project / OSM / prop / GM / SP
A72: south of AS Borna-North – AS Borna-North 1.0km (July 2013 to 30th June 2018) project / OSM / prop / GM / SP
A44: west of AK Jackerath – AK Holz 10.2km (May 2012 to 1st July 2018) [direction Mönchengladbach] project / OSM / prop / GM / SP
B33: AS Allensbach-West – east of AS Allensbach-West 1.2km (November 2015 to 2nd July 2018) [1st c/w] project / OSM / prop / GM / SP
B85: AS Schafhof – AS Freihölz 2.5km (June 2017 to Mid July 2018) project / OSM / prop / GM / SP
A8: east of AS Merzig-Wellingen – east of Walbrücke 1.5km (April 2015 to August 2018) [2nd c/w] project / OSM / prop / GM / SP
B49: Landfill site Beselich – Beselich/Merenberg 3.4km (May 2011 to 20th August 2018) [direction Wetzlar] project / OSM / prop / GM / SP
A448: AS Altenbochum (East) – AK Bochum/Witten 1.4km (October 2012 to 24th August 2018) project / OSM / prop / GM / SP
A44: west of AK Jackerath – AK Holz 10.2km (May 2012 to 2nd September 2018) [direction Aachen; discontinuation: 7.5km] project / OSM / prop / GM / SP
B49: Landfill site Beselich – Beselich/Merenberg 3.4km (May 2011 to 5th September 2018) [direction Limburg] project / OSM / prop / GM / SP
B300: AS Dasing (A8) – AS Gallenbach 1.5km (October 2014 to 21st September 2018) project / OSM / prop / GM / SP
B14: south of AS Waldrems – north of AS Nellmersbach 1.0km (June 2016 to 26th September 2018) - / OSM / prop / GM / SP
B266: AS Bad Neuenahr (A573) – AS Bad Neuenahr-East 1.8km (February 2009 to 12th October 2018) project / OSM / prop / GM / SP
B175: north of AS Mosel (B93) – AS Mosel-VW 1km (May 2016 to 9th November 2018) - / OSM / prop / GM / SP
B85: AS Neubäu-West – AS Neubäu-East 4.0km (November 2015 to 16th November 2018) [1st c/w] project / OSM / prop / GM / SP
A30: AS Gohfeld – AS Bad Oeynhausen-North 5.3km (September 2008 to 9th December 2018) [1st c/w; direction Osnabrück] project / OSM / prop / GM / SP
A30: AS Dehme – AS Bad Oeynhausen-East 1.9km (September 2008 to 9th December 2018) project / OSM / prop / GM / SP
B33: AS Allensbach-West – east of AS Allensbach-West 1.2km (November 2015 to 11th December 2018) [2nd c/w] project / OSM / prop / GM / SP
A30: AS Gohfeld – AS Bad Oeynhausen-North 5.3km (September 2008 to 13th December 2018) [1st c/w; direction Hannover] project / OSM / prop / GM / SP
B101: AS Thyrow – AS Trebbin-North 5.0km (May 2015 to 14th December 2018) project / OSM / prop / GM / SP

2019 opening:

A36: rededication AD Vienenburg (A369) – AK Bernburg (A14) 84.5km (1st January 2019) - / OSM / prop / GM / SP
A369: rededication AD Vienenburg (A36) – Bad Harzburger Dreieck (B6) 4.3km (1st January 2019) - / OSM / prop / GM / SP
A33: north of AS Halle – Halle-Künsebeck 4.9km (December 2012 to 11th January 2019) project / OSM / prop / GM / SP
B29: east of Böbingen – west of Essingen 6.9km (July 2015 to 28th April 2019) project / OSM / prop / GM / SP
A30: AS Gohfeld – east of AS Gohfeld 1.5km (September 2008 to Early June 2019) [2nd c/w] [discontinuation: 1.4km] project / OSM / prop / GM / SP
A33: AS Belm (B51) – south of AS Osnabrück-Schinkel 2.2km (February 2015 to 12th June 2019) project / OSM / prop / GM / SP
B51: AS Belm-Icker – AS Belm (A33) 1.5km (February 2015 to 12th June 2019) project / OSM / prop / GM / SP
A30: east of AS Gohfeld – AS Bad Oeynhausen-North 3.8km (September 2008 to 2nd August 2019) [2nd c/w] project / OSM / prop / GM / SP
A72: AS Borna-North – AS Rötha 8.5km (July 2013 to 2nd August 2019) [direction Chemnitz] project / OSM / prop / GM / SP
B51: AS Belm-Vehrte – AS Belm-Icker 2.0km (February 2015 to 7th August 2019) project / OSM / prop / GM / SP
A94: AS Pastetten – AS Dorfen 17.4km (April 2012 to 1st October 2019) project / OSM / prop / GM / SP
A94: AS Dorfen – AS Heldenstein 14.9km (July 2013 to 1st October 2019) project / OSM / prop / GM / SP
B75: AS Hamburg-Georgswerder – AS Hamburg-Wilhelmsburg-South (A26) 4.8km (October 2016 to 6th October 2019) [rededication of A252/A253: 6.0km] project / OSM / prop / GM / SP
A72: AS Borna-North – AS Rötha 8.5km (July 2013 to 16th October 2019) [direction Leipzig] project / OSM / prop / GM / SP
B318: AS Holzkirchen (A8) – AS Holzkirchen 1.5km (June 2017 to November 2019) project / OSM / prop / GM / SP
A33: AS Borgholzhausen – north of AS Halle 7.9km (December 2012 to 18th November 2019) project / OSM / prop / GM / SP
A46: AS Bestwig – AS Olsberg 5.6km (September 2009 to 18th November 2019) - / OSM / prop / GM / SP
B15n: AS Ergoldsbach – AS Essenbach 7.2km (August 2013 to 20th November 2019) project / OSM / prop / GM / SP
B50: AS Platten – east of AS Kommen 19.9km (July 2009 to 21st November 2019) project / OSM / prop / GM / SP
B30: AS Ravensburg-South – AS Karrer 3.4km (July 2013 to 2nd December 2019) project / OSM / prop / GM / SP
B33: east of AS Allensbach-West – AS Allensbach-Center 2.4km (November 2015 to 6th December 2019) project / OSM / prop / GM / SP

2020 opening:

B47: AS Worms-West – AS Worms-Horchheimer Straße 1.1km (August 2016 to April 2020) project / OSM / prop / GM / SP
B2: south of Untersteinbach – AS Mauk 4.1km (December 2016 to June 2020) project / OSM / prop / GM / SP
B47: east of Rosengarten – east of AS Bürstadt (B44) 2.6km (December 2018 to August 2020) [2nd c/w] project / OSM / prop / GM / SP
A14: AS Tangerhütte – AS Colbitz 8.5km (August 2017 to November 2020) project / OSM / prop / GM / SP
B286: AS Schweinfurt-Center (A70) – AS Schwebheim 3.1km (July 2017 to 2020) [2nd c/w] project / OSM / prop / GM / SP
B31: Immenstaad – Friedrichshafen/Waggershausen 7.1km (November 2014 to Late 2020) project / OSM / prop / GM / SP
B85: east of Regen bridge – Piendling 1.7km (July 2017 to Late 2020) project / OSM / prop / GM / SP
B51: AS Münster-Warendorfer Straße (B481) – AS Münster-Wolbecker Straße 2.7km (June 2015 to >= 2020?) project / OSM / prop / GM / SP

2021 opening:

A524: west of AS Duisburg-Huckingen – west of AK Duisburg-South (A59) 1.2km (June 2017 to April 2021) - / OSM / prop / GM / SP
B27: AS Donaueschingen – AS Hüfingen (B31) 4.1km (June 2016 to Spring 2021) project / OSM / prop / GM / SP
A98: AD Hochrhein – AS Rheinfelden-Karsau 2.5km (March 2009 to Mid 2021) project / OSM / prop / GM / SP
B10: AS Hinterweidenthal – east of Hinterweidenthal 1.3km (September 2013 to Summer 2021) project / OSM / prop / GM / SP
A14: AS Lüderitz – AS Tangerhütte 14.8km (August 2018 to 2021) project / OSM / prop / GM / SP
A44: AK Ratingen-East (A3) – AS Heiligenhaus 4.0km (September 2016 to 2021) project / OSM / prop / GM / SP
B66: AS Leopoldshöhe-Rollkrug – AS Leopoldshöhe-Asemissen 2.1km (August 2017 to 2021) - / OSM / prop / GM / SP
A448: rededication AS Bochum-Wiemelhausen – AS Altenbochum (West) 0.9km (Late 2021) project / OSM / prop / GM / SP
A448: AS Altenbochum (West) – AS Altenbochum (East) 1.9km (October 2012 to Late 2021) project / OSM / prop / GM / SP
B2: AS Oberau-North – AS Oberau-South 4.2km (September 2015 to Late 2021) project / OSM / prop / GM / SP
B303: east of AS Schirnding-West – west of AS Schirnding-East 2.5km (July 2017 to Late 2021) [2nd c/w] project / OSM / prop / GM / SP
B49: AS Solms – AS Oberbiel-East 3.2km (May 2010 to >= Late 2021) [~300m/~1000m in service since 2014/15] project / OSM / prop / GM / SP

2022 opening:

A44: AS Helsa-East – AS Hessisch Lichtenau-West 6.1km (May 2010 to Early 2022) project / OSM / prop / GM / SP
A49: AS Neuental – AS Schwalmstadt 11.8km (March 2011 to Mid 2022) project / OSM / prop / GM / SP
B236: Dortmund-Aplerbecker Mark – AS Dortmund/Schwerte (A1) 1.7km (August 2018 to Mid 2022) project / OSM / prop / GM / SP
A21: Klein Barkau – north of Nettelsee 6.2km (September 2018 to 2022) project / OSM / prop / GM / SP
A21: north of Nettelsee – north of AS Nettelsee ~2km (Early 2018 to 2022) project / OSM / prop / GM / SP
A44: AS Waldkappel – AS Ringgau 7.9km (July 2016 to 2022) project / OSM / prop / GM / SP
A94: north of AS Malching – north of AS Kirchham 6.0km (June 2016 to 2022) project / OSM / prop / GM / SP
B47: AS Worms-Horchheimer Straße – AS Worms-South 1.2km (February 2018 to 2022) project / OSM / prop / GM / SP
B49: AS Tiefenbach – AS Leun 2.1km (August 2016 to 2022) project / OSM / prop / GM / SP
B85: east of Altenkreith – east of Regen bridge 1.7km (July 2017 to 2022) project / OSM / prop / GM / SP
A26: AS Jork – AS Buxtehude 4.5km (Summer 2006 to Late 2022) project / OSM / prop / GM / SP
A26: AS Buxtehude – AS Neu Wulmstorf 4.1km (September 2013 to Late 2022) project / OSM / prop / GM / SP
B10: west of AS Neu-Ulm-Finningen – east of AS Nersingen (A7) 5.5km (May 2018 to Late 2022) [2nd c/w] project / OSM / prop / GM / SP
B33: Hegne – Waldsiedlung 1.2km (January 2019 to Late 2022) project / OSM / prop / GM / SP
B33: Waldsiedlung – AS Reichenau 0.9km (June 2014 to Late 2022?) project / OSM / prop / GM / SP

2023 opening:

A40: rededication AS Dortmund-East (B236) – AK Dortmund/Unna (A1/A44) 9.5km (Spring 2023) project / OSM / prop / GM / SP
A44: AS Sontra-East – AD Wommen (A4) ~7.5km (August 2017 to 2023) project / OSM / prop / GM / SP
A100: AD Neukölln – AS Am Treptower Park 3.2km (May 2013 to 2023) project / OSM / prop / GM / SP
A661: AS Frankfurt-Friedberger Landstraße – AS Frankfurt-East 2.2km (November 2007 to 2023) [2nd c/w] project / OSM / prop / GM / SP
B15n: AS Essenbach – AS Essenbach (A92) 1.8km (August 2013 to Late 2023?) project / OSM / prop / GM / SP

2024 opening:

B175: AS Mosel-VW – Glauchau-Waldenburger Straße 4.5km (2019 to 2024) project / OSM / prop / GM / SP
A281: AS Bremen-Gröpelingen – AS Bremen-Seehausen 4.9km (January 2019 to Late 2024) project / OSM / prop / GM / SP

2025 opening:

A44: AS Ringgau – AS Sontra-West ~4km (Early 2017 to 2025) project / OSM / prop / GM / SP
A44: AS Sontra-West – AS Sontra-East ~9km (June 2018 to 2025) project / OSM / prop / GM / SP
B58: east of Rhine bridge – Wesel-Schepersfeld (B70) 3.7km (July 2019 to 2025) - / OSM / prop / GM / SP
A143: AD Halle-North (A14) – AS Halle-Neustadt 12.4km (December 2019 to Late 2025) project / OSM / prop / GM / SP

2026 opening:

B10: AS Godramstein – AS Landau-North (A65) 4.1km (November 2018 to 2026) [2nd c/w] project / OSM / prop / GM / SP
A72: AS Rötha – AK Leipzig (A38) 7.2km (November 2018 to Late 2026) project / OSM / prop / GM / SP

2027 opening:

B33: AS Allensbach-Center – AS Allensbach-East 2.0km (December 2019 to 2027) project / OSM / prop / GM / SP

 
#51 ·
Italy
SS318: Casacastalda – Valfabbrica 6.8km (< 2007 to 2016) [~4km 1st c/w only] – projectmap
SS318: Valfabbrica – Pianello 8.5km (2009 to 2016) – projectmap
Updated opening dates:
Casacastalda-Valfabbrica - end spring 2016
Pianello-Casacastalda - January 2016
 
#14 · (Edited)
Greece

2015 opening:

A1: Roditsa – Anthili (A3) 4km (2006 to 16th February 2015) - / OSM / prop / GM / SP
A1: Raches – Agia Marina 19.2km (2007 to 16th March 2015) [direction Lamia] - / OSM / prop / GM / SP
A1: Raches – Agia Marina 19.2km (2007 to 19th March 2015) [direction Larissa] - / OSM / prop / GM / SP
A25: Provatas – Strymoniko ~10km (? to Late November 2015) project / OSM / prop / GM / SP
A25: Neo Petritsi – Kamaroto ~10km (? to ~23rd December 2015) project / OSM / prop / GM / SP

2016 opening:

A71: Leuktro (A7) – Sparti 46km (? to 18th April 2016) project / OSM / prop / GM / SP
A27: Niki – Florina 14.5km (2011 to 20th May 2016) project / OSM / prop / GM / SP
?: south of Nea Poteidaia – Kassandria 17.5km (2010 to 13th June 2016) project / OSM / prop / GM / SP
A8: Kiato – Korinthos (A7) 25km (2008 to Early August 2016) project / OSM / prop / GM / SP
A7: Thouria – Kalamata-Artemida 7.5km (? to 19th November 2016) - / OSM / prop / GM / SP
A8: Xylokastro – Kiato 12km (2008 to 22nd December 2016) [1st c/w] project / OSM / prop / GM / SP
A7: Kalamata-Artemida – Kalamata-East 1.2km (? to 23rd December 2016) - / OSM / prop / GM / SP
A5: Amfilochia – Kouvaras 26km (2008 to 27th December 2016) project / OSM / prop / GM / SP

2017 opening:

?: Naousa – Patrida 7.7km (2009 to 7th February 2017) - / OSM / prop / GM / SP
A5: Avgo – Filippiada 38km (2008 to 22nd February 2017) project / OSM / prop / GM / SP
A1: Skotina – Aegani 10km (2008 to 7th April 2017) project / OSM / prop / GM / SP
A1: Pyrgetos – Evangelismos 14km (2008 to 7th April 2017) project / OSM / prop / GM / SP
A8: Patra-Rio (A5/A9) – Xylokatro ~93km (2008 to 11th April 2017) project / OSM / prop / GM / SP
A8: Xylokastro – Kiato 12km (2008 to 11th April 2017) [2nd c/w] project / OSM / prop / GM / SP
A5: Kefalovryso – Klokova 37km (2008 to 12th April 2017) project / OSM / prop / GM / SP
A5: Klokova – Antirrio 6.5km (2008 to 1st June 2017) project / OSM / prop / GM / SP
?: Nea Moudania – north of Portes 4.2km (? to 2nd June 2017) - / OSM / prop / GM / SP
A25: Kato Christos – Provatas ~11km (? to 2nd June 2017) project / OSM / prop / GM / SP
A29: Krystalopigi – Koromilia 15km (2012 to 14th July 2017) project / OSM / prop / GM / SP
A5: Sellades – Amfilochia 27km (2008 to 26th July 2017) project / OSM / prop / GM / SP
A5: Ioannina (A2) – Avgo 12km (2008 to 3rd August 2017) project / OSM / prop / GM / SP
A3: Trikala – Xyniada 79km (2008 to 22nd December 2017) project / OSM / prop / GM / SP

2018 opening:

A90: Gournes – Chersonissos 9.5km (2014 to 4th April 2018) [2nd c/w] - / OSM / prop / GM / SP

2019 opening:

A52: Aktio-Airport – Vonitsa-South 13km (2009 to 24th April 2019) - / OSM / prop / GM / SP

2020 opening:

EO65: Nea Santa – Assiros (A25) 11.4km (2014 to 2020?) - / OSM / prop / GM / SP

2021 opening:

A3: Stavos – Anthili (A1) 14km (2008 to Early 2021) - / OSM / prop / GM / SP
A52: Prevazo Aktio Toll station – Aktio-Airport 2km (2009 to 2021) [contract canceled] - / OSM / prop / GM / SP
A52: Vonitsa-South – Ambraktia (A5) 35km (2009 to 2021) [contract canceled] - / OSM / prop / GM / SP
A3: Xyniada – Stavos 18km (2008 to Late 2021) - / OSM / prop / GM / SP

2022 opening:

A5: Patra-Mintilogli – Varda 37.5km (2008 to Early 2022) - / OSM / prop / GM / SP

2023 opening:

A5: Varda – Pyrgos 37.5km (2008 to Late 2023) ? / OSM / prop / GM / SP

Unknown opening date:

A3: Panagia (A2) – Trikala ~60km (2008 to suspended) project / OSM / prop / GM / SP

 
#15 · (Edited)
Hungary

2014 opening:

M86: Szombathely – Vat 9.2km (September 2009 to 28th June 2014) - / OSM / prop / GM / SP
M3: Vaja/Mateszalka – Vasarosnameny 11.9km (May 2013 to 10th October 2014) project / OSM / prop / GM / SP

2015 opening:

M85: Kony – Enese 2.3km (June 2013 to 16th June 2015) - / OSM / prop / GM / SP
M85: Rabapatona – Györ (M1) 6.8km (June 2013 to 16th June 2015) - / OSM / prop / GM / SP
M43: Mako – HU/RO border (Nagylak) 23.1km (October 2012 to 11th July 2015) project / OSM / prop / GM / SP
M60: Keszü – Pecs 1.8km (January 2014 to 31st July 2015) [1st c/w] project / OSM / prop / GM / SP
M85: Csorna-East (M86) – Kony 5.8km (June 2013 to 9th September 2015) - / OSM / prop / GM / SP
M86: Szilsarkany – north of Csorna-East (M85) 9.3km (June 2013 to 9th September 2015) - / OSM / prop / GM / SP
M86: north of Csorna-East (M85) – north of Csorna 1.1km (June 2013 to 9th September 2015) [1st c/w] - / OSM / prop / GM / SP
M86: Szeleste – Hegyfalu 7.5km (October 2013 to 18th September 2015) - / OSM / prop / GM / SP

2016 opening:

M86: Hegyfalu – Szilsarkany 33.4km (October 2013 to 25th October 2016) - / OSM / prop / GM / SP

2017 opening:

M35: Debrecen-South – Debrecen-Airport 5.4km (July 2016 to 13th December 2017) - / OSM / prop / GM / SP
M85: Farad – Csorna-South (M86) 4.4km (Fall 2016 to 15th December 2017) - / OSM / prop / GM / SP

2018 opening:

M30: SK/HU border (Tornyosnemeti) – Tornyosnemeti 1.7km (June 2016 to 16th January 2018) - / OSM / prop / GM / SP
F8: Varpalota-West – Varpalota-East 9.4km (2014 to 9th March 2018) - / OSM / prop / GM / SP
M4: Cegledbercel – Cegled 8.1km (April 2017 to 16th August 2018) - / OSM / prop / GM / SP
M25: Eger-South – Andornaktalya 4km (June 2017 to 7th November 2018) - / OSM / prop / GM / SP
M4: Berettyoujfalu (M35) – Berettyoujfalu-North 4km (July 2016 to 20th December 2018) - / OSM / prop / GM / SP
M35: Debrecen-Airport – Berettyoujfalu (M4) 20.2km (July 2016 to 20th December 2018) - / OSM / prop / GM / SP

2019 opening:

M2: north of Vac-South – north of Dunakeszi/Fot 16km (May 2017 to 30th September 2019) [2nd c/w] - / OSM / prop / GM / SP
M44: Tiszakürt – Kondoros 62km (December 2016 to 2nd October 2019) - / OSM / prop / GM / SP
M4: Albertirsa – Cegledbercel 3km (April 2017 to 9th October 2019) - / OSM / prop / GM / SP
M70: east of Tornyiszentmiklos – north of Csörnyeföld 5.0km (Fall 2017 to 13th December 2019) [2nd c/w] - / OSM / prop / GM / SP
M70: south of Csörnyeföld – north of Letenye 5.5km (Fall 2017 to 13th December 2019) [2nd c/w] - / OSM / prop / GM / SP
M15: SK/HU border (Rajka) – Level (M1) 14km (February 2018 to 18th December 2019) [2nd c/w] - / OSM / prop / GM / SP

2020 opening:

M4: Cegled – west of Abony-West 7km (<= 2019 to <= February 2020) - / OSM / prop / GM / SP
M4: Üllo – Albertirsa 30km (April 2017 to 7th February 2020) - / OSM / prop / GM / SP
M4: west of Abony-West – Abony-East 12km (March 2018 to June 2020) - / OSM / prop / GM / SP
M25: Andornaktalya – Füzesabony 15km (March 2018 to June 2020) - / OSM / prop / GM / SP
M4: Berettyoujfalu – HU/RO border (Nagykereki) 26.5km (July 2017 to July 2020) - / OSM / prop / GM / SP
M76: Keszthely – Hollad (M7) 8.6km (February 2018 to September 2020) - / OSM / prop / GM / SP
M85: Sopron-North – Farad 57.5km (March 2018 to December 2020) - / OSM / prop / GM / SP

2021 opening:

M44: Kondoros – Bekescsaba 18km (Early 2018 to January 2021) - / OSM / prop / GM / SP
M8: AT/HU border (Szentgotthard) – Körmend-North 29km (March 2018 to February 2021) [1st c/w] - / OSM / prop / GM / SP
M30: Tornyosnemeti – Miskolc-East 56.7km (March 2018 to August 2021) - / OSM / prop / GM / SP
M44: Lakitelek – Tiszakürt 9km (July 2018 to August 2021) - / OSM / prop / GM / SP
M4: Abony-East – Törökszentmiklos 24.9km (October 2013 to December 2021) - / OSM / prop / GM / SP

 
#606 · (Edited)
Hungary

2014 opening:

M86: Szombathely – Vat 9.2km (September 2009 to 28th June 2014) – ? – map
M3: Vaja/Mateszalka – Vasarosnameny 11.9km (May 2013 to 10th October 2014) – projectmap

2015 opening:

M85: Kony – Enese 2.3km (June 2013 to 16th June 2015) – ? – map
M85: Rabapatona – Györ (M1) 6.8km (June 2013 to 16th June 2015) – ? – map
M43: Mako – HU/RO border (Nagylak) 23.1km (October 2012 to 11th July 2015) – projectmap
M60: Keszü – Pecs 1.8km (January 2014 to 31st July 2015) [1st c/w] – projectmap
M85: Csorna-East (M86) – Kony 5.8km (June 2013 to 9th September 2015) – ? – map
M86: Szilsarkany – north of Csorna-East (M85) 9.3km (June 2013 to 9th September 2015) – ? – map
M86: north of Csorna-East (M85) – north of Csorna 1.1km (June 2013 to 9th September 2015) [1st c/w] – ? – map
M86: Szeleste – Hegyfalu 7.5km (October 2013 to 18th September 2015) – ? – map

2016 opening:

M86: Hegyfalu – Szilsarkany 33.4km (October 2013 to 25th October 2016) – ? – map

2017 opening:

M35: Debrecen-South – Debrecen-Airport 5.4km (July 2016 to 13th December 2017) – ? – map
M85: Farad – Csorna-South (M86) 4.4km (Fall 2016 to 15th December 2017) – ? – map

2018 opening:

M30: SK/HU border (Tornyosnemeti) – Tornyosnemeti 1.7km (June 2016 to 16th January 2018) – ? – map
F8: Varpalota-West – Varpalota-East 9.4km (2014 to 9th March 2018) – ? – map
M4: Cegledbercel – Cegled 8.1km (April 2017 to 16th August 2018) – ? – map
M25: Eger-South – Andornaktalya 4km (June 2017 to 7th November 2018) – ? – map
M4: Berettyoujfalu (M35) – Berettyoujfalu-North 4km (July 2016 to 20th December 2018) – ? – map
M35: Debrecen-Airport – Berettyoujfalu (M4) 20.2km (July 2016 to 20th December 2018) – ? – map

2019 opening:

M2: north of Vac-South – north of Dunakeszi/Fot 16km (May 2017 to 30th September 2019) [2nd c/w] – ? – map
M44: Tiszakürt – Kondoros 62km (December 2016 to 2nd October 2019) – ? – map
M4: Albertirsa – Cegledbercel 3km (April 2017 to 9th October 2019) – ? – map
M4: Cegled – Abony-West 7km (? to October 2019) – ? – map
M70: east of Tornyiszentmiklos – north of Csörnyeföld 5.0km (Fall 2017 to Mid December 2019) [2nd c/w] – ? – map
M70: south of Csörnyeföld – north of Letenye 5.5km (Fall 2017 to Mid December Fall 2019) [2nd c/w] – ? – map
M4: Üllo – Albertirsa 33km (April 2017 to December 2019) – ? – map

2020 opening:

M15: SK/HU border (Rajka) – Level (M1) 14km (February 2018 to March 2020) [2nd c/w] – ? – map
M4: Berettyoujfalu – HU/RO border (Nagykereki) 26.5km (July 2017 to Early 2020) – ? – map
M4: Abony-West – Abony-East 11.2km (March 2018 to Summer 2020) – ? – map
M25: Andornaktalya – Füzesabony 15km (March 2018 to Summer 2020) – ? – map
M76: Keszthely – Hollad (M7) 8.6km (February 2018 to 2020) – ? – map
M85: Sopron-North – Farad 57.5km (March 2018 to December 2020) – ? – map

2021 opening:

M44: Kondoros – Bekescsaba 18km (Early 2018 to January 2021) – ? – map
M8: AT/HU border (Szentgotthard) – Körmend-North 29km (March 2018 to Early 2021) [1st c/w] – ? – map
M30: Tornyosnemeti – Miskolc-East 56.7km (March 2018 to August 2021) – ? – map
M44: Lakitelek – Tiszakürt 9.9km (July 2018 to August 2021) – ? – map

2022 opening:

M4: Abony-East – Törökszentmiklos 24.9km (October 2013 to Early 2022) – ? – map

I recommend some update:

M70: Widening and upgrade to motorway happening at once. Not needed to separate the sections. Length is not changing. Date: 2019. december.

M4: Cegléd - Abony (W) is used. Remaining sections in 2019 (december): Üllő - Albertirsa[29,9 km], Abony (W) - Abony (E)[11,5 km]. 2x2 Expressway.
2020. január: Berettyóújfalu - Nagykereki [26,5 km]. Motorway.
2021. december: Abony (E) - Törökszentmiklós (W) [26,6 km]. 2x2 Expressway.

M15: Same as M70. Date: 2020. március. Motorway.

M25: Andornaktálya - Füzesabony (M3) [14,5 km]: 2020. június. 2x2 Expressway.

M76: Hollád (M7) - Keszthely-Fenékpuszta [8,6 km]: 2020. szeptember. 2x2 Expressway.

M85: Csorna (W) / Farád - Sopron /Fertőrákos [57,5 km]: 2020. december. 2x2 Expressway.

M44: Kondoros - Békéscsaba [18 km]: 2021. január. 2x2 Expressway.
Lakitelek - Tiszakürt [9,9 km]: 2021. augusztus. 2x2 Expressway.

M8: Körmend (E) - Szentgotthárd [28,9 km]: 2021. február. 2x1 Expressway.

M30: Miskolc (N) - Tornyosnémeti (S) [56,8 km]: 2021. augusztus. Motorway.


Planned upcoming sections (by name):
M0: Northwest (11 - M10) [8,1 km], West (M10 - M1).
M2: Vác - Hont [41,4 km].
M3: Vásárosnamény - Beregdaróc.
M4: Törökszentmiklós (W) - Berettyóújfalu (M35xM4).
M6: Bóly - Ivándárda [20,5 km].
M8: Balatonfőkajár (M7) - Dunaújváros (M6), Dunavecse - Kecskemét (M5), Kecskemét (M5) - Szolnok (M4) [All of them ~117 km].
M9: Kaposvár (E) - Szekszárd (M6).
M10: Üröm / Solymár (M0) - Esztergom.
M34: Vásárosnamény (M3) - Záhony [39,3 km].
M47: Berettyóújfalu (M35xM4) - Szeged (M43) [160 km].
M49: Vaja (M3) - Csenger.
M60: Pécs (SW) - Szigetvár.
M76: Zalaegerszeg (N) - Keszthely-Fenékpuszta [30 km], Körmend (M8) - Zalaegerszeg (N).
M83: Győr (M1) - Pápa.
M85: Fertőrákos - Ausztria [5,3 km].
M86: Csorna (N) - Levél (M15).
M87: Szombathely - Kőszeg.
M100: Esztergom - Bicske (M1).
 
#16 · (Edited)
Iceland

No new motorway or expressway currently u/c


Ireland

2015 opening:

M11: Rathnew – Arklow-North 16.5km (June 2013 to 13th July 2015) project / OSM / prop / GM / SP

2017 opening:

N17: Tuam-North – Tuam-West 4.2km (May 2014 to 27th September 2017) project / OSM / prop / GM / SP
M17: Tuam-West – Rathmorrissy (M6) 25.5km (May 2014 to 27th September 2017) project / OSM / prop / GM / SP
M18: Rathmorrissy (M6) – Gort 27.7km (May 2014 to 27th September 2017) project / OSM / prop / GM / SP

2019 opening:

M11: Clough – Enniscorthy-South 27km (October 2015 to 18th July 2019) project / OSM / prop / GM / SP

 
#17 · (Edited)
Italy

2014 opening:

SS727: Forli (A14) – Forli-Zona Industriale 4.4km (June 2012 to 26th June 2014) project / OSM / prop / GM / SP
A31: Albettone/Barbarano – Agugliaro 6.6km (September 2005 to 1st July 2014) project / OSM / prop / GM / SP
A35: Melzo (A58) – Rovato (SP19) 49.8km (Summer 2009 to 23rd July 2014) project / OSM / prop / GM / SP
A35: Rovato (SP19) – east of Brescia-West (A4) 6km (Summer 2009 to 23rd July 2014) [1st c/w; w/o A4 i/c] project / OSM / prop / GM / SP
A58: Pozzuolo Martesana (SP103) – Comazzo 7km (June 2012 to 23rd July 2014) project / OSM / prop / GM / SP
SP14 Milan: Segrate – Vignate 6.7km (2010 to 23rd July 2014) project / OSM / prop / GM / SP
SP14 Milan: Vignate – Liscate (A58) 5.2km (2010 to 23rd July 2014) project / OSM / prop / GM / SP
SP103 Milan: Pioltello - Pozzuolo Martesana (A58) 6.8km (2008 to 23rd July 2014) project / OSM / prop / GM / SP
SS106: Nova Siri Scalo bypass 5km (September 2011 to 5th November 2014) project / OSM / prop / GM / SP
A31: Santa Margherita d'Adige – Badia Polesine (SS434) 18km (September 2005 to 15th December 2014) project / OSM / prop / GM / SP

2015 opening:

SS77: Colfiorito – Bavareto 9km (November 2009 to 16th January 2015) project / OSM / prop / GM / SP
A60: Azzate Buguggiate (A8) – Ponte di Vedano (SS712) 4.5km (2010 to 25th January 2015) project / OSM / prop / GM / SP
A36: Cassano Magnago (A8) – Lomazzo (A9) 15km (February 2010 to 26th January 2015) project / OSM / prop / GM / SP
Strada a Mare Guido Rossa: Genoa-Cornigliano – Genoa-Sampierdarena 1.6km (February 2011 to 7th February 2015) - / OSM / prop / GM / SP
A31: Noventa Vicentina – Santa Margherita d'Adige 7km (September 2005 to 23rd March 2015) project / OSM / prop / GM / SP
A52: Fiera di Milano (A8) – Novate Milanese ~2km (April 2014 to 27th April 2015) project / OSM / prop / GM / SP
A58: Ornate (A4) – Pozzuolo Martesana (SP103) 9km (2012 to 16th May 2015) project / OSM / prop / GM / SP
A58: Comazzo – Cerro al Lambro (A1) 17km (2012 to 16th May 2015) project / OSM / prop / GM / SP
A59: Grandate (A9) – Albate 3km (2010 to 23rd May 2015) project / OSM / prop / GM / SP
SP415 Lodi: Spino d'Adda – Dovera 6.5km (July 2013 to 22nd June 2015) project / OSM / prop / GM / SP
SS106: Roccella Jonica-Canne – Gioiosa-East 8km (May 2013 to 9th July 2015) project / OSM / prop / GM / SP
SS106: Gioiosa-East – Gioiosa Jonica 4km (September 2011 to 9th July 2015) project / OSM / prop / GM / SP
A12: south of Mignone bridge – Civitavecchia-Aurelia 4km (October 2011 to 17th July 2015) project / OSM / prop / GM / SP
A12: Tarquinia-Tuscania-Viterbo – south of Mignone bridge 10.5km (October 2011 to 31st July 2015) project / OSM / prop / GM / SP
A31: Agugliaro – Noventa Vicentina 6km (September 2005 to 31st August 2015) project / OSM / prop / GM / SP
A36: Lomazzo (A9) – Lentate sul Seveso (SS35) 7.5km (October 2012 to 5th November 2015) project / OSM / prop / GM / SP
A1: Aglio – Barberino 6.1km (2004 to 5th December 2015) [2nd c/w] project / OSM / prop / GM / SP
A1var: La Quercia – Aglio 37km (2004 to 23rd December 2015) project / OSM / prop / GM / SP

2016 opening:

SS729: Codrongianos (SS131) – Ardara 11.8km (September 2013 to 23rd June 2016) project / OSM / prop / GM / SP
SS729: Monti/Telti – west of Olbia-South (SS131DCN) 15.5km (December 2013 to 23rd June 2016) project / OSM / prop / GM / SP
SS640: east of Caltanissetta-Xirbi – west of Caltanissetta (SS626) 5km (April 2012 to 8th July 2016) project / OSM / prop / GM / SP
SS223: north of Palazzo Lama – Palazzo Lama ~3km (2013 to 14th July 2016) project / OSM / prop / GM / SP
SS77: Foligno (SS3) – Colfiorito 19km (November 2009 to 28th July 2016) project / OSM / prop / GM / SP
SS77: Bavareto – Pontelatrave 8km (November 2009 to 28th July 2016) project / OSM / prop / GM / SP
SS318: Casacastalda – Valfabbrica 6.8km (< 2007 to 28th July 2016) [~4km 1st c/w only] project / OSM / prop / GM / SP
SS318: Valfabbrica – Pianello 8.5km (2009 to 28th July 2016) project / OSM / prop / GM / SP
SS16: Maglie – west of Otranto 12.7km (June 2013 to 5th August 2016) - / OSM / prop / GM / SP
SS16: west of Otranto – Otranto 1.4km (June 2013 to 17th November 2016) - / OSM / prop / GM / SP
SS223: Palazzo Lama – south of Palazzo Lama ~1km (2013 to 22nd November 2016) project / OSM / prop / GM / SP

2017 opening:

SS223: Casale di Pari – Lampugnano 3.7km (2013 to 1st March 2017) project / OSM / prop / GM / SP
SS640: Agrigento – Canicatti 32.2km (March 2009 to 28th March 2017) [partially opened in 2015] project / OSM / prop / GM / SP
SS729: east of Martis – west of Ozieri 2.8km (August 2014 to 29th April 2017) project / OSM / prop / GM / SP
SS729: west of Olbia-South (SS131DCN) – Olbia-Airport 2.5km (June 2012 to 31st July 2017) project / OSM / prop / GM / SP
SS534: Spezzano Albanese-Terme – east of Doria 7.5km (March 2014 to 4th August 2017) [2nd c/w] - / OSM / prop / GM / SP
SS76: Fossato di Vico – Cancelli di Fabriano 7.5km (Early 2009 to 7th August 2017) [1st c/w] project / OSM / prop / GM / SP
SS195: Sarroch-North – Sarroch 2km (? to 12th August 2017) - / OSM / prop / GM / SP
SS223: south of Palazzo Lama – north of Casale di Pari 1.8km (2013 to 24th August 2017) project / OSM / prop / GM / SP
SS96 Barese: north of Altamura – Mellitto 10km (December 2013 to 8th September 2017) - / OSM / prop / GM / SP
SS640: east of Cannemaschi – Caltanissetta-Favarella 8.5km (April 2012 to 25th September 2017) project / OSM / prop / GM / SP
A35: Rovato (SP19) – west of Brescia-West (A4) 5.6km (January 2017 to 13th November 2017) [2nd c/w] project / OSM / prop / GM / SP
SS729: Martis (SS132) – east of Martis ~2km (August 2014 to 20th December 2017) project / OSM / prop / GM / SP
SS729: west of Ozieri – west of Oschiri ~7km (August 2014 to 20th December 2017) project / OSM / prop / GM / SP

2018 opening:

SS640: east of Caltanissetta-Favarella – Caltanissetta-Sanatorio 2.7km (April 2012 to 20th January 2018) project / OSM / prop / GM / SP
SS223: north of Casale di Pari – Casale di Pari 2.5km (2013 to 29th March 2018) project / OSM / prop / GM / SP
SS534: east of Sibari (A2) – Spezzano Albanese-Terme 5.6km (March 2014 to 8th August 2018) - / OSM / prop / GM / SP
SS534: Sibari (A2) – east of Sibari (A2) 0.9km (March 2014 to 5th December 2018) - / OSM / prop / GM / SP
SS675: Monte Romano-East – Cinelli 6.4km (July 2015 to 13th December 2018) project / OSM / prop / GM / SP

2019 opening:

SS96 Barese: Toritto – Modungo/Bitetto 9km (December 2013 to Early April 2019) - / OSM / prop / GM / SP
SPV: Thiene (A31) – Breganze-West 5km (November 2011 to 3rd June 2019) project / OSM / prop / GM / SP
SS96 Barese: Altamura-South (SS99) – north of Altamura 3.4km (October 2015 to 5th July 2019) [2nd c/w] - / OSM / prop / GM / SP
SS99 Barese: Altamura-South (SS96) – south of Altamura-South 1.0km (October 2015 to 5th July 2019) - / OSM / prop / GM / SP
SS106: west of Palizzi Marina – east of Palizzi Marina 3.8km (August 2006 to 23rd July 2019) [1st c/w] project / OSM / prop / GM / SP
SS76: Fossato di Vico – Cancelli di Fabriano 7.5km (Early 2009 to 29th October 2019) [2nd c/w] project / OSM / prop / GM / SP

2020 opening:

SS96 Barese: Mellitto – Toritto 5.4km (March 2010 to January 2020) - / OSM / prop / GM / SP
SR8: Taranto-North – Taranto-South 4.5km (<= 2015 to March 2020) - / OSM / prop / GM / SP
SPV: Malo – Thiene (A31) ~7km (April 2014 to April 2020) project / OSM / prop / GM / SP
SS76: Albacina – Serra San Quirico 11km (Early 2009 to Spring 2020) [2nd c/w] project / OSM / prop / GM / SP
SP103 Milan: Segrate (A51) – Segrate 1.3km (October 2017 to Spring 2020) project / OSM / prop / GM / SP
SS729: Ardara – Martis 12.4km (Spring 2017 to Mid 2020) - / OSM / prop / GM / SP
SS729: west of Oschiri – Berchidda 9.5km (Spring 2017 to Mid 2020) - / OSM / prop / GM / SP
SS195: Sarroch – Pula 4km (December 2011 to Summer 2020) - / OSM / prop / GM / SP
SS729: Monti-West – Monti/Telti 6.4km (February 2015 to Summer 2020) project / OSM / prop / GM / SP
SPV: Montecchio/Arzignano – Castelgomberto 9.8km (April 2014 to Summer 2020) project / OSM / prop / GM / SP
SPV: Breganze-West – Marostica 9km (April 2014 to September 2020) project / OSM / prop / GM / SP
SPV: Marostica – Bassano-East (SS47) 8.5km (February 2013 to September 2020) project / OSM / prop / GM / SP
SPV: Bassano-East (SS47) – Mussolente/Loria 5km (April 2014 to September 2020) project / OSM / prop / GM / SP
SPV: Mussolente/Loria – Riese 3.5km (October 2014 to September 2020) [completed November 2019; to be opened with neighboring section] project / OSM / prop / GM / SP
SPV: Riese – Montebelluna-East 20.2km (October 2014 to September 2020) project / OSM / prop / GM / SP
A15: Trecasali – Parma (A1) 9.5km (September 2016 to 2020) - / OSM / prop / GM / SP
SPV: Montebelluna-East – Spresiano 13.6km (<= 2016 to Late 2020) project / OSM / prop / GM / SP
SP46racc: Costabissara – Vicenza-West 5.5km (March 2018 to December 2020) - / OSM / prop / GM / SP
SS729: Berchidda – Monti-West 9.4km (June 2014 to >= 2020?) project / OSM / prop / GM / SP
SS106: west of Palizzi Marina – east of Palizzi Marina 3.8km (August 2006 to >= 2020?) [2nd c/w] project / OSM / prop / GM / SP
SS640: Caltanissetta-Favarella – east of Caltanissetta-Favarella 1km (April 2012 to >= 2020?) project / OSM / prop / GM / SP
SS640: Caltanissetta-Sanatorio – east of Caltanissetta-Xirbi 9km (April 2012 to >= 2020?) project / OSM / prop / GM / SP
SS640: west of Caltanissetta (SS626) – Caltanissetta (A19) 3km (April 2012 to >= 2020?) project / OSM / prop / GM / SP
SPV: Montecchio Maggiore (A4) – Montecchio Maggiore (SR11) 1.0km (April 2014 to 2020/22) project / OSM / prop / GM / SP

2021 opening:

SPV: Spresiano – Spresiano (A27) 2.5km (<= 2018 to May 2021) project / OSM / prop / GM / SP
SS172: San Paolo – Orimini 4.5km (July 2018 to August 2021) - / OSM / prop / GM / SP
SPV: Castelgomberto – Malo 9.1km (October 2014 to Fall 2021) project / OSM / prop / GM / SP
SP195: east of Capoterra – Villa d'Orri 8km (<= 2015? to Late 2021) - / OSM / prop / GM / SP
SP415 Milan: Caleppio – Zelo Buon Persico 4km (October 2019 to Late 2021) - / OSM / prop / GM / SP

2022 opening:

A18: Rosolini – Ispica/Pozzallo 8km (June 2014 to Early 2022) project / OSM / prop / GM / SP
A18: Ispica/Pozzallo – Modica 11km (June 2014 to Early 2022) project / OSM / prop / GM / SP
A52: rededication Novate Milanese – Paderno Dugnano (SS35) ~6km (Spring 2022) project / OSM / prop / GM / SP

Unknown opening date:

SP1 BT: Andria-North-East – Trani-North (SS16bis) 7.5km (January 2014 to ?) - / OSM / prop / GM / SP

 
#18 · (Edited)
Kosovo

2015 opening:

?: Prishtina (R6/R7) – Prishtina-South (M2) 3km (October 2014 to 25th October 2015) - / OSM / prop / GM / SP

2016 opening:

N9: Kijeve – Gjergjice 6.7km (June 2014 to Mid 2016) - / OSM / prop / GM / SP
R6: Prishtina (R7) – Babush 20.4km (October 2014 to 31st December 2016) project / OSM / prop / GM / SP

2017 opening:

R6: Babush – Ferizaj 11.1km (October 2014 to 22nd December 2017) project / OSM / prop / GM / SP

2018 opening:

R6: Ferizaj – Doganaj 10.5km (October 2014 to 14th June 2018) project / OSM / prop / GM / SP

2019 opening:

R6: Doganaj – Hani i Elezit 18.2km (October 2014 to 29th May 2019) project / OSM / prop / GM / SP

2020 opening:

N2: Smrekonice – Vushtrri-East 4.6km (May 2018 to 2020) - / OSM / prop / GM / SP
R7.1: Banuelle – Bresalc 22.3km (April 2018 to Late 2020) - / OSM / prop / GM / SP

 
#19 · (Edited)
Latvia

2014 opening:

A12: Ludza – Nirza 17.8km (2008 to 1st October 2014) [1st c/w] project / OSM / prop / GM / SP


Lithuania

2016 opening:

A2: Pasilaiciai – Pilaite 5.4km (July 2015 to 20th December 2016) - – OSM / prop / GM / SP

2017 opening:

A5: Sasnava – Gudeliai 9.8km (May 2016 to August 2017) - – OSM / prop / GM / SP

2018 opening:

A5: Sasnava-South – Sasnava 8km (September 2017 to September 2018) - – OSM / prop / GM / SP
A5: Pietariai – Sasnava-South 4km (September 2017 to October 2018) - – OSM / prop / GM / SP
A5: Gudeliai – Mauruciai 12km (Early 2018 to Late October 2018?) - – OSM / prop / GM / SP

2020 opening:

A14: Nemencinele (108) – south of Paraudondvariai (172) 5km (2019 to 2020) - – OSM / prop / GM / SP


Luxembourg

2015 opening:

A7: Lorentzweiler – Waldhaff 8.5km (2003 to 23rd September 2015) project / OSM / prop / GM / SP

2016 opening:

A13: west of Hellange – east of Hellange 1.4km (October 2014 to 5th September 2016) [1st c/w] - / OSM / prop / GM / SP
B40: Belval – L/F border (Belval) 1.4km (2006 to 16th December 2016) - / OSM / prop / GM / SP
A13: west of Hellange – east of Hellange 1.4km (October 2014 to 17th December 2016) [2nd c/w] - / OSM / prop / GM / SP

2022 opening:

B40: Esch (A4) – Belval 1.4km (<= 2018? to 2022) - / OSM / prop / GM / SP

 
#20 · (Edited)
#60 ·
http://wikimapia.org/#lang=en&lat=51.479031&lon=16.894226&z=12&m=o
S5: Poznan-West (A2) – Mosina 16.0km (August 2015 to November 2017) – ? – map
Project: http://www.poznan-wronczyn.drogas5.pl/

http://wikimapia.org/#lang=en&lat=53.276711&lon=16.481895&z=12&m=o
S7: Zulawy-West – west of Nowy Dwor Gdanski 18.9km (October 2015 to October 2018) – ? – map
http://www.s7-koszwaly-ndg.pl/

S7: south of Nowy Dwor Gdanski – Elblag-South 20.0km (October 2015 to October 2018) – ? – map
http://www.s7-ndg-kazimierzowo.pl/
 
#21 · (Edited)
The Netherlands

2014 opening:

N33: Assen (A28) – Gieten 14km (February 2013 to 12th May 2014) [2nd c/w] project / OSM / prop / GM / SP
N33: Gieten – Veendam-South 12km (February 2013 to 26th May 2014) [2nd c/w] project / OSM / prop / GM / SP
N33: Veendam-South – Zuitbroek (A7) 11km (February 2013 to 7th July 2014) [2nd c/w] project / OSM / prop / GM / SP
N31: Leeumwarden-South (A32) – Leeumwarden-Drachtsterweg 2.5km (Late 2010 to 16th September 2014) [2nd c/w] - / OSM / prop / GM / SP
A4: Dinteloord – Tholen 14km (2011 to 24th November 2014) project / OSM / prop / GM / SP
N31: Marssum (A31) – Leeumwarden-South (A32) 8km (Late 2010 to 18th December 2014) - / OSM / prop / GM / SP

2015 opening:

N62: Hoogedijk (N61) – Terneuzen-South (Sluiskil Tunnel) 4.8km (November 2011 to 23rd May 2015) project / OSM / prop / GM / SP
N261: Waalwijk (A59) – Tilburg-North 7km (September 2012 to Mid 2015) - / OSM / prop / GM / SP
N356: Broeksterwald – De Westereen 2.8km (December 2012 to 17th August 2015) project / OSM / prop / GM / SP
N381: Wijnjewoude – Donkerbroek 5.5km (May 2014 to 14th September 2015) - / OSM / prop / GM / SP
N356: Dokkum-South – Broeksterwald 4km (December 2012 to 28th September 2015) project / OSM / prop / GM / SP
A15: rededication Oostvoorne – Rozenburg 15km (31st October 2015) - / OSM / prop / GM / SP
N381: Drachten (A7) – Wijnjewoude 5.0km (May 2014 to 30th November 2015) - / OSM / prop / GM / SP
A4: Delft – Schiedam-North 7km (April 2012 to 18th December 2015) [direction The Hague] project / OSM / prop / GM / SP
A4: Delft – Schiedam-North 7km (April 2012 to 20th December 2015) [direction Rotterdam] project / OSM / prop / GM / SP

2016 opening:

A9: Badhoevedorp – Raasdorp 4km (December 2013 to 11th June 2016) [direction Amstelveen] project / OSM / prop / GM / SP
N62: Heinkenszand (A58) – 's-Heerenhoek (N254) 5.3km (August 2014 to 30th June 2016) project / OSM / prop / GM / SP
N356: De Westereen – Burgum 10km (June 2014 to 7th October 2016) project / OSM / prop / GM / SP
N356: Burgum – Nijega (N31) 5km (2014/15 to 7th October 2016) project / OSM / prop / GM / SP
N279: 's-Hertogenbosch (A2) – Veghel (A50) 13km (February 2015 to 27th/28th November 2016) - / OSM / prop / GM / SP
A2: Maastricht-Kruisdonk – Maastricht-Europaplein 3km (2010 to 16th December 2016) project / OSM / prop / GM / SP
N300: Gracht – Avantis (N281) 0.7km (? to 16th December 2016) project / OSM / prop / GM / SP

2017 opening:

A9: Badhoevedorp – Raasdorp 4km (December 2013 to 10th April 2017) [direction Haarlem; discontinuation: 4km] project / OSM / prop / GM / SP
N300: Eygelshoven – Kerkrade-Gaiazoo 2.2km (? to 2nd June 2017) project / OSM / prop / GM / SP
N300: Brunssum-Rimburgerweg – Landgraaf-Gravenweg 5.5km (? to 28th July 2017) project / OSM / prop / GM / SP
N307: west of Hoorn-Oostergouw – Westhoud 7km (2014 to October 2017) - / OSM / prop / GM / SP
N31: Midlum – south of Harlingen 3km (November 2015 to 7th November 2017) project / OSM / prop / GM / SP
N300: Brunssum-West (N276) – Brunssum (N274) 2.4km (? to 10th November 2017) project / OSM / prop / GM / SP
N300: Kerkrade-Gaiazoo – Gracht 3.0km (? to 17th November 2017) project / OSM / prop / GM / SP

2018 opening:

N300: Landgraaf-Gravenweg – Eygelshoven ~1km (? to 27th April 2018) project / OSM / prop / GM / SP
N18: Haaksbergen-North – Enschede-West (A35) ~7km (September 2016 to 2nd May 2018) - / OSM / prop / GM / SP
N35: Zwolle-Oldeneelallee – east of Wijthmen 4km (Spring 2017 to 25th June 2018) - / OSM / prop / GM / SP
N300: Brunssum (N274) – Brunssum-Ganzepool 2.6km (? to Early/Mid 2018?) project / OSM / prop / GM / SP
N62: Terneuzen-South – NL/B border (Zelzate) 10.3km (Mid 2017 to 31st October 2018) project / OSM / prop / GM / SP
N300: Nuth (N298) – Brunssum-West (N276) 5.0km (? to 2nd November 2018) [westbound] project / OSM / prop / GM / SP
N300: Brunssum-Ganzepool – Brunssum-Rimburgerweg 1.2km (? to 2nd November 2018) project / OSM / prop / GM / SP
N307: Westhoud – Venhuizen 7km (2014 to 13th November 2018) - / OSM / prop / GM / SP
N307: Hoorn (A7) – west of Hoorn-Oostergouw 1.3km (2014 to 24th November 2018) - / OSM / prop / GM / SP
N300: Nuth (N298) – Brunssum-West (N276) 5.0km (? to 20th December 2018) [eastbound] project / OSM / prop / GM / SP

2019 opening:

N300: Nuth (A76) – Nuth (N298) 1.2km (? to 30th September 2019) project / OSM / prop / GM / SP

2020 opening:

N381: Donkerbroek – Oosterwolde (N351) ~7km (February 2019 to July 2020) [2nd c/w] - / OSM / prop / GM / SP
N34: Holsloot (A1) – Coeverden-North 7km (October 2019 to >= Late 2020) - / OSM / prop / GM / SP

2021 opening:

N702: Literatuurwijk-South – Muziekwijk-West 2km (March 2019 to Late 2021) project / OSM / prop / GM / SP

2022 opening:

N434: Ommedijk (A44) – Hofvliet (A4) 4km (August 2017 to Late 2022) project / OSM / prop / GM / SP

2024 opening:

A24: Vlaardingen-West (A20) – Rozenburg (A15) 4.2km (Late 2018 to 2024) project / OSM / prop / GM / SP
N7: Groningen-West – Groningen-Southeast 4km (Spring 2018 to 2024) - / OSM / prop / GM / SP
A16: Berkel en Rodenrijs (A13) – Terbregseplein (A20) 11km (March 2019 to December 2024) project / OSM / prop / GM / SP

 
#299 ·
S3: Gorzow Wielkopolski-North – Gorzow Wielkopolski-South 11.7km (October 2014 to September 2017) [2nd c/w] – projectmap
2x2 profile is supposed to be opened by the end of June (but it doesn't mean the end of construction works).

S8: Kobylka – Radzymin-South 7.3km (February 2016 to October 2017) – projectmap
This should have the "discontinuation" postscript. ~3 km of existing S8 will stop being a motorway (not only formally, but also physically - there will be a roundabout and one carriageway will be demolished).

S5: Ostroda-South (S7) – Ornowo 8.7km (June 2015 to December 2017) – projectmap
Ornowo is Ostróda West

_______

There is a road (DW925) connecting DTŚ and A4 which is a kind of urban expressway (2x2, grade-separated). One section was opened in 2016, one section is u/c, and one should start next year. The only problem is that junctions with DTŚ and A4 are diamond-type interchanges with traffic signals, so I'm not sure if this road qualifies for your list.
 
#22 · (Edited)
North Macedonia (map)

2018 opening:

A1: Demir Kapija – Smokvica 28.2km (2012 to 23rd April 2018) project / OSM / prop / GM / SP

2019 opening:

A4: Kadrifakovo (A3) – north of Stip 9km (February 2014 to Mid March 2019) project / OSM / prop / GM / SP
A4: Miladinovci (A1) – Kadrifakovo (A3) 40km (February 2014 to 5th June 2019) project / OSM / prop / GM / SP

2021 opening:

A2: Kichevo – Ohrid 56km (May 2014 to June 2021) project / OSM / prop / GM / SP


Norway

2014 opening:

E18: Langaker – Gulli 24km (Fall 2010 to 4th July 2014) [2nd c/w] project / OSM / prop / GM / SP
E18: Momarken – Melleby 7.7km (2012 to 1st October 2014) - / OSM / prop / GM / SP
E6: Skaberud – Labdalen 8km (2012 to 24th November 2014) project / OSM / prop / GM / SP
E6: Langset – Minnesund 2km (2012 to 27th November 2014) project / OSM / prop / GM / SP
E16: Slomarka – Kongsvinger 16.5km (2011 to 27th November 2014) project / OSM / prop / GM / SP
E6: Labdalen – Korslund 9km (2012 to 13th December 2014) project / OSM / prop / GM / SP

2015 opening:

E6: Korslund – Langset 3.8km (2012 to 25th June 2015) project / OSM / prop / GM / SP
Fv557: Liavatnet – Sandeide 4.2km (April 2011 to 12th November 2015) project / OSM / prop / GM / SP

2016 opening:

E18: Retvet – Knapstad 6.2km (2013 to 25th November 2016) project / OSM / prop / GM / SP
Rv4: Jaren-North – Gran-North 4.3km (2013 to 16th December 2016) project / OSM / prop / GM / SP
Rv4: Gran-South – north of Lunner 2.9km (2013 to 16th December 2016) project / OSM / prop / GM / SP
E6: Sjoa – Frya 33km (June 2013 to 17th December 2016) [partially 1st c/w or 2+1 only] project / OSM / prop / GM / SP

2017 opening:

E39: Sandved – Hove 1.5km (February 2015 to 7th July 2017) [2nd c/w] project / OSM / prop / GM / SP
Rv4: Gran-North – Gran-South 2.1km (2013 to 8th July 2017) project / OSM / prop / GM / SP
E18: Larvik – Bommestad 4km (2013 to 28th September 2017) project / OSM / prop / GM / SP

2018 opening:

E18: Sky – Larvik 3km (2013 to 24th March 2018) project / OSM / prop / GM / SP
E16: Voyenenga – Sandvika (E18) 3.5km (February 2015 to 5th October 2018) [1st c/w] project / OSM / prop / GM / SP
E6: Tonstad – Jaktoyen 9.6km (April 2016 to 19th December 2018) project / OSM / prop / GM / SP

2019 opening:

E18: Arendal-West – Tvedestrand 22.8km (March 2017 to 2nd July 2019) project / OSM / prop / GM / SP
E6: Katerud – Kolomoen (Rv3) 12km (August 2017 to 8th October 2019) project / OSM / prop / GM / SP
E16: Voyenenga – Sandvika (E18) 3.5km (February 2015 to 9th October 2019) [2nd c/w] project / OSM / prop / GM / SP
E18: Dordal – Rugtvedt 17km (Spring 2017 to 2nd December 2019) project / OSM / prop / GM / SP
Rv13: Hundvag – Solbakk 15km (2013 to 30th December 2019) project / OSM / prop / GM / SP

2020 opening:

E39: Tasta – Schancheholen 4.5km (April 2014 to Late March 2020) project / OSM / prop / GM / SP
Rv13: Madlaveien (E39) – Hundvag 5.7km (May 2014 to Late March 2020) project / OSM / prop / GM / SP
E6: Rudshogda – Arnkvern 19km (October 2017 to 1st July 2020) project / OSM / prop / GM / SP
Rv3: Tonset – Akroken 14km (June 2018 to 30th July 2020) project / OSM / prop / GM / SP
E6: Moelv – Rudshogda 6km (October 2017 to December 2020) project / OSM / prop / GM / SP
E6: Arnkvern – Katerud 7km (August 2017 to December 2020) project / OSM / prop / GM / SP

2022 opening:

E39: Lindland – Kristiansand-West 26km (November 2018 to October 2022) project / OSM / prop / GM / SP
E6: Melhus-South – Kval 7km (October 2019 to 2022) project / OSM / prop / GM / SP
E39: Nordas/Soras (Fv580) – Ulven 16.2km (September 2015 to 2022) project / OSM / prop / GM / SP
Fv580: Flyplassvegen – Nordas/Soras (E39) 2km (September 2015 to 2022) project / OSM / prop / GM / SP

2026 opening:

E39: Bokn – Harestad 28km (January 2018 to 2026) project / OSM / prop / GM / SP

 
#23 · (Edited)
Poland (map and summary)

2014 opening:
S8: Roza (S14) – Rzgow 16.4km (October 2011 to 11th April 2014) project / OSM / prop / GM / SP
S14: Dobron – Roza (S8) 4.4km (October 2011 to 11th April 2014) project / OSM / prop / GM / SP
A1: Wloclawek-West – Kowal 19.7km (June 2010 to 30th April 2014) project / OSM / prop / GM / SP
S3: Gorzow Wielkopolski-South − Skwierzyna-West 18.5km (July 2011 to 15th May 2014) project / OSM / prop / GM / SP
S3: Skwierzyna-West − Miedzyrzecz-North 18.1km (July 2011 to 15th May 2014) project / OSM / prop / GM / SP
A1: Swierklany – Mszana 7.3km (November 2007 to 23rd May 2014) project / OSM / prop / GM / SP
DK1: Tychy-Wartoglowiec (DK86) – Tychy-Cielmice 6.4km (September 2011 to 1st August 2014) project / OSM / prop / GM / SP
S8: Lask – Roza (S14) 7.4km (October 2011 to 8th August 2014) project / OSM / prop / GM / SP
DW902: Zabrze/Gliwice-Sosnica – Zabrze-Guido 2.7km (May 2012 to 8th August 2014) project / OSM / prop / GM / SP
S5: Rydzyna – Korzensko 28.1km (August 2010 to 15th September 2014) project / OSM / prop / GM / SP
S17: Jastkow – Lublin-Slawinek (S19) 7.7km (June 2011 to 25th September 2014) project / OSM / prop / GM / SP
DK82: Lublin-Slawinek (S17/S19) – Lublin-Slawin 5.5km (August 2012 to 25th September 2014) project / OSM / prop / GM / SP
S17: Lublin-Rudnik (S19) – Lublin-Felin 13.8km (December 2011 to 15th October 2014) project / OSM / prop / GM / SP
DK55: Grudziadz-Poludniowa – Grudziadz-Konstytucji 3 Maja 1.2km (September 2013 to 27th October 2014) project / OSM / prop / GM / SP
DK8: Bialystok-Szosa Elcka – Bialystok-Produkcyjna 1.4km (May 2013 to 28th October 2014) project / OSM / prop / GM / SP
S8: Wielun– Zloczew 19.0km (January 2012 to 29th October 2014) project / OSM / prop / GM / SP
S8: Zloczew – Sieradz-South 19.9km (January 2012 to 29th October 2014) project / OSM / prop / GM / SP
A4: Tarnow-North – Debica-East 34.9km (July 2010 to 30th October 2014) project / OSM / prop / GM / SP
S17: Lublin-Slawinek (S19) – Lublin-Rudnik (S19) 10.2km (December 2011 to 31st October 2014) project / OSM / prop / GM / SP
DW902: Gliwice-Kujawska – Zabrze/Gliwice-Sosnica 3.0km (July 2012 to 5th November 2014) project / OSM / prop / GM / SP
S1: Bielsko-Biala-Mikuszowice – Buczkowice 6.3km (August 2010 to 6th November 2014) project / OSM / prop / GM / SP
S61: Suwalki-South – Raczki 12.2km (December 2012 to 6th November 2014) project / OSM / prop / GM / SP
S8: Sieradz-South – Lask 35.0km (January 2012 to 29th November 2014) project / OSM / prop / GM / SP
S11: Poznan-Rokietnica – Poznan-Tarnowo Podgorne 6.6km (April 2013 to 19th December 2014) project / OSM / prop / GM / SP

2015 opening:
S8: Warsaw-Janki (DK7) – Opacz (S2) 6.3km (March 2014 to 17th July 2015) project / OSM / prop / GM / SP
S1: Buczkowice – Zywiec-Sola 9.5km (August 2010 to 24th July 2015) project / OSM / prop / GM / SP
DK7: Warsaw-Janki (S8) – Sekocin Stary 2.0km (September 2014 to 17th September 2015) project / OSM / prop / GM / SP
S8: rededication Warsaw-Powazkowska – Warsaw-Modlinska 4.6km (20th September 2015) project / OSM / prop / GM / SP
S61: Szczuczyn-North – north of Szczuczyn-West 3.7km (August 2012 to 13th November 2015) [1st c/w] project / OSM / prop / GM / SP
S61: north of Szczuczyn-West – south of Szczuczyn-West 1.5km (August 2012 to 13th November 2015) project / OSM / prop / GM / SP
S61: south of Szczuczyn-West – Koniecki Male 2.9km (August 2012 to 13th November 2015) [1st c/w] project / OSM / prop / GM / SP
S8: Paszkow – Warsaw-Janki (DK7) 3.8km (March 2014 to 14th December 2015) project / OSM / prop / GM / SP

2016 opening:
DW902: Gliwice-Jezioranskiego – Gliwice-Kujawska 5.4km (December 2012 to 20th March 2016) project / OSM / prop / GM / SP
DK89: Gdansk-Letnica – Gdansk-Przerobka 2.9km (October 2011 to 24th April 2016) project / OSM / prop / GM / SP
A1: Lodz-North (A2) – Tuszyn 40.6km (March 2013 to 1st July 2016) project / OSM / prop / GM / SP
S8: Rzgow – Lodz-South (A1) 5.1km (October 2011 to 1st July 2016) project / OSM / prop / GM / SP
S7: north of Milomlyn-North – south of Milomlyn-North 1.0km (November 2014 to 18th July 2016) [2nd c/w] project / OSM / prop / GM / SP
A4: Rzeszow-East (S19) – Jaroslaw-West 41.2km (September 2010 to 20th July 2016) [1.5km 1st c/w only] project / OSM / prop / GM / SP
DW925: Ruda Slaska-1 Maja – Ruda Slaska-Bukowa 1.2km (June 2015 to 5th August 2016) project / OSM / prop / GM / SP
A4: west of Jaroslaw-West 1.5km (September 2010 to 31st August 2016) [2nd c/w] project / OSM / prop / GM / SP
S8: west of Mezenin – Mezenin 4.1km (August 2014 to 5th September 2016) [1st c/w] project / OSM / prop / GM / SP
S3: Miedzyrzecz-North – Miedzyrzecz-South 6.4km (November 2014 to 19th October 2016) [2nd c/w] project / OSM / prop / GM / SP
S19: Lublin-Weglin – south of Lublin-Weglin 1.6km (November 2014 to 27th October 2016) project / OSM / prop / GM / SP
S19: Lublin-Slawinek (S17) – Lublin-Weglin 9.2km (November 2014 to 9th December 2016) project / OSM / prop / GM / SP
S7: south of Milomlyn-North – Milomlyn-South 3.1km (November 2014 to 19th December 2016) [2nd c/w] project / OSM / prop / GM / SP
S7: Milomlyn-South – Ostroda-North 5.1km (November 2014 to 19th December 2016) project / OSM / prop / GM / SP
S8: Zambrow-East – west of Mezenin 11.3km (August 2014 to 22nd December 2016) project / OSM / prop / GM / SP
S8: west of Mezenin – Mezenin 4.1km (August 2014 to 22nd December 2016) [2nd c/w] project / OSM / prop / GM / SP

2017 opening:
S5: Mieleszyn – Gniezno-South 18.6km (December 2014 to 4th May 2017) project / OSM / prop / GM / SP
S7: Szydlowiec-South – Skarzysko-Kamienna-North 4.5km (July 2014 to 23rd May 2017) project / OSM / prop / GM / SP
S7: Nidzica-North – Napierki 22.7km (March 2015 to 23rd June 2017) project (2) / OSM / prop / GM / SP
S7: Krakow-Nowa Huta – Krakow-Przewoz 4.5km (August 2014 to 29th June 2017) project / OSM / prop / GM / SP
S7: Radom-South – Szydlowiec-South 17.6km (July 2014 to 12th July 2017) project / OSM / prop / GM / SP
S11: Ostrow Wielkopolski-East – Przygodzice 12.5km (January 2015 to 12th July 2017) project / OSM / prop / GM / SP
DK15: Latkowo – Markowice 16.9km (April 2015 to 17th July 2017) project / OSM / prop / GM / SP
S7: Ostroda-South (S5) – Rychnowo 11.7km (April 2015 to 11th August 2017) project / OSM / prop / GM / SP
S11: north of Mieszkow – Mieszkow 1.8km (February 2015 to 30th August 2017) [1st c/w] project / OSM / prop / GM / SP
S11: Mieszkow – Jarocin 7.9km (February 2015 to 30th August 2017) project / OSM / prop / GM / SP
S19: Sokolow Malopolski-North – north of Sokolow Malopolski-East 1.7km (July 2015 to 1st September 2017) [1st c/w] project / OSM / prop / GM / SP
S19: north of Sokolow Malopolski-East – south of Sokolow Malopolski-East 1.3km (July 2015 to 1st September 2017) project / OSM / prop / GM / SP
S19: south of Sokolow Malopolski-East – Stobierna 8.9km (July 2015 to 1st September 2017) [1st c/w] project / OSM / prop / GM / SP
S19: near Stobierna 0.8km (July 2015 to 1st September 2017) project / OSM / prop / GM / SP
S7: Jedrzejow-East – Moczydlo 19.9km (October 2014 to 23rd September 2017) project / OSM / prop / GM / SP
DK20: Koscierzyna bypass 10.9km (October 2015 to 1st October 2017) [1st c/w] project / OSM / prop / GM / SP
S7: Rychnowo – east of Rychnowo 2.7km (April 2015 to 6th October 2017) [1st c/w] project / OSM / prop / GM / SP
S3: Gorzow Wielkopolski-North – Gorzow Wielkopolski-South 11.7km (October 2014 to 9th October 2017) [2nd c/w] project / OSM / prop / GM / SP
S3: Sulechow – north of Oder bridge Cigacice 3.1km (April 2015 to 21st October 2017) [2nd c/w] project / OSM / prop / GM / SP
S3: south of Oder bridge Cigacice – north of Zielona Gora-North 9.6km (April 2015 to 21st October 2017) [2nd c/w] project / OSM / prop / GM / SP
S5: Korzensko – Kroscina 19.3km (September 2014 to 6th November 2017) project / OSM / prop / GM / SP
S7: Rychnowo – east of Rychnowo 2.7km (April 2015 to 6th December 2017) [2nd c/w] project / OSM / prop / GM / SP
S7: east of Rychnowo – Olsztynek-West (S51) 8.6km (April 2015 to 6th December 2017) project / OSM / prop / GM / SP
S19: Swilcza – Rzeszow-South 6.3km (May 2015 to 7th December 2017) project / OSM / prop / GM / SP
S5: Ostroda-South (S7) – Ostroda-West 8.7km (June 2015 to 22nd December 2017) [1st c/w] project / OSM / prop / GM / SP
S5: Kroscina – Wroclaw-North (A8) 29.7km (November 2014 to 22nd December 2017) project / OSM / prop / GM / SP
S7: Ostroda North – west of Drweca bridge 3km (June 2015 to 22nd December 2017) project / OSM / prop / GM / SP
S7: east of Drweca bridge – Ostroda-South (S5) 3km (June 2015 to 22nd December 2017) project / OSM / prop / GM / SP
S8: Marki – Drewnica (S17) 2.6km (February 2015 to 22nd December 2017) project / OSM / prop / GM / SP
S8: Drewnica (S17) – Kobylka 5.5km (January 2016 to 22nd December 2017) project / OSM / prop / GM / SP
S8: Kobylka – Radzymin-South 7.3km (February 2016 to 22nd December 2017) [discontinuation: ~3km] project / OSM / prop / GM / SP
S8: Prosienica – Zambrow-West 14.9km (March 2015 to 22nd December 2017) project / OSM / prop / GM / SP
S51: Olsztyn-South (DK16) – Olsztynek-East 13.3km (March 2015 to 22nd December 2017) project / OSM / prop / GM / SP
S8: Mezenin – Jezewo 14.3km (March 2015 to 30th December 2017) project / OSM / prop / GM / SP

2018 opening:
S3: Legnica-West – Legnica-South (A4) 5.8km (July 2015 to 7th May 2018) project / OSM / prop / GM / SP
S11: Kepno-North – Kepno-Krazkowy (S8) 4.0km (November 2016 to 23rd May 2018) project / OSM / prop / GM / SP
S7: west of Drweca bridge – east of Drweca bridge 1km (June 2015 to 25th May 2018) [1st c/w] project / OSM / prop / GM / SP
S7: west of Drweca bridge – east of Drweca bridge 1km (June 2015 to 11th June 2018) [2nd c/w] project / OSM / prop / GM / SP
S5: Ostroda-South (S7) – Ostroda-West 8.7km (June 2015 to June 2018) [2nd c/w] project / OSM / prop / GM / SP
S3: Lubin-South – Legnica-West 17.1km (July 2015 to 25th June 2018) project / OSM / prop / GM / SP
S8: Ostrow Mazowiecka-North – Prosienica 9.4km (March 2016 to 20th July 2018) project / OSM / prop / GM / SP
S12: Pulawy-Wisla – Pulawy-Azoty 1.3km (April 2016 to 7th August 2018) [2nd c/w] project / OSM / prop / GM / SP
S12: Pulawy-Azoty – Kurow-West (S17) 11.1km (April 2016 to 22nd August 2018) project / OSM / prop / GM / SP
S3: Lubin-North – Lubin-South 9.1km (September 2015 to 27th August 2018) project / OSM / prop / GM / SP
S7: south of Kielce-South – north of Brzegi 7.8km (June 2015 to 4th September 2018) project / OSM / prop / GM / SP
S3: north of Nowa Sol-South – Nowa Sol-South 3km (March 2016 to 15th September 2018) [2nd c/w] project / OSM / prop / GM / SP
S3: Nowa Sol-South – Gaworzyce 16.4km (August 2015 to 15th September 2018) project / OSM / prop / GM / SP
S3: Gaworzyce – Kazmierzow 16.9km (July 2015 to 15th September 2018) project / OSM / prop / GM / SP
S8: Poreba – Ostrow Mazowiecka-South 16.8km (March 2016 to 17th September 2018) project / OSM / prop / GM / SP
DW925: Ruda Slaska-Bukowa – Ruda Slaska-Kokota 1.2km (April 2017 to 21st September 2018) project / OSM / prop / GM / SP
S5: Leszno-South – Rydzyna 9.5km (May 2016 to 5th October 2016) project / OSM / prop / GM / SP
S3: Legnica-South (A4) – Jawor-East 21.4km (June 2016 to 15th October 2018) project / OSM / prop / GM / SP
S3: Jawor-East – Bolkow 15.4km (April 2016 to 15th October 2018) project / OSM / prop / GM / SP
S7: Zulawy-West – east of Cedry Male 6km (October 2015 to 18th October 2018) project / OSM / prop / GM / SP
S7: Radom-North – Radom-South 25.2km (December 2015 to 19th October 2018) project / OSM / prop / GM / SP
S8: Wyszkow-North – Poreba 12.3km (March 2016 to 19th October 2018) project / OSM / prop / GM / SP
S7: Kielce-South – south of Kielce-South 2.0km (June 2015 to 25th October 2018) project / OSM / prop / GM / SP
S7: south of Nowy Dwor Gdanski – east of Zulawy-East 3.4km (October 2015 to 26th October 2018) project / OSM / prop / GM / SP
DK47: Zabornia (S7) – Chabowka 0.9km (April 2016 to 30th October 2018) [1st c/w] project / OSM / prop / GM / SP
S7: east of Cedry Male – west of Nowy Dwor Gdanski 13.2km (October 2015 to 31st October 2018) project / OSM / prop / GM / SP
S7: east of Zulawy-East – Elblag-South 16.0km (October 2015 to 31st October 2018) project / OSM / prop / GM / SP
S5: Lipno – Leszno-South 19.2km (May 2016 to 9th November 2018) project / OSM / prop / GM / SP
S3: south of Zielona Gora-North – north of Zielona Gora-South 2.8km (October 2015 to 30th November 2018) [2nd c/w] project / OSM / prop / GM / SP
S3: south of Zielona Gora-South – Niedoradz 8.0km (April 2015 to 30th November 2018) [2nd c/w] project / OSM / prop / GM / SP
S3: Niedoradz – north of Nowa Sol-West 6.6km (March 2016 to 30th November 2018) [2nd c/w] project / OSM / prop / GM / SP
S8: west of Siestrzen – Siestrzen 1.5km (February 2017 to 30th November 2018) project / OSM / prop / GM / SP
S8: Siestrzen – Paszkow 11.6km (August 2016 to 30th November 2018) [2.5km near Mlochow opened 28th November] project / OSM / prop / GM / SP
DK16: Olsztyn-West – Olsztyn-South (S51) 7.5km (December 2015 to 6th December 2018) project / OSM / prop / GM / SP
S7: north of Brzegi – Mnichow 7.6km (June 2015 to 13th December 2018) project / OSM / prop / GM / SP
S3: north of Nowa Sol-West – north of Nowa Sol-South 7.4km (March 2016 to 20th December 2018) [2nd c/w] project / OSM / prop / GM / SP
S16: Olsztyn-East (DK51) – Wojtowo 2km (July 2016 to 20th December 2018) project / OSM / prop / GM / SP
DK51: Olsztyn-Cementowa – Olsztyn-East (S16) 1.8km (September 2016 to 20th December 2018) project / OSM / prop / GM / SP
S7: Mnichow – Jedrzejow-North 4.1km (June 2015 to 21st December 2018) project / OSM / prop / GM / SP
S5: Poznan-West (A2) – Mosina 16.0km (August 2015 to 30th December 2018) [1st c/w] project / OSM / prop / GM / SP

2019 opening:
S51: Olsztyn-East (S16) – Olsztyn-Jaroty 8.6km (July 2016 to 1st February 2019) project / OSM / prop / GM / SP
S6: Osina – Nowogard-West 6.2km (December 2016 to 7th April 2019) project / OSM / prop / GM / SP
S61: Suwalki-North – Suwalki-South 12.8km (February 2017 to 13th April 2019) project / OSM / prop / GM / SP
S6: Goleniow-North (S3) – Glewice 5.9km (December 2016 to Late April 2019) project / OSM / prop / GM / SP
S17: Trojanow – Ruda 3km (March 2017 to 1st May 2019) [1st c/w] project / OSM / prop / GM / SP
S6: Glewice – Osina 7.1km (December 2016 to 8th May 2019) project / OSM / prop / GM / SP
S17: Skrudki – Kurow-West (S12) 13.2km (December 2016 to 19th June 2019) project / OSM / prop / GM / SP
S51: Olsztyn-Jaroty – Olsztyn-South (DK16) 6.1km (July 2016 to 1st July 2019) project / OSM / prop / GM / SP
S17: Garwolin-South – Trojanow 22km (March 2017 to 4th July 2019) project / OSM / prop / GM / SP
S17: Trojanow – Ruda 3km (March 2017 to 4th July 2019) [2nd c/w] project / OSM / prop / GM / SP
S17: Ruda – Ryki-North 4km (March 2017 to 4th July 2019) project / OSM / prop / GM / SP
A1: Czestochowa-South – Wozniki 16.7km (March 2016 to 2nd August 2019) project / OSM / prop / GM / SP
A1: Wozniki – Pyrzowice (S1) 16.8km (September 2015 to 2nd August 2019) project / OSM / prop / GM / SP
S6: Lisowo – north of Ploty-North 8.3km (March 2017 to 22nd August 2019) [1st c/w] project / OSM / prop / GM / SP
DW669: Bialystok-Aleja Jana Pawla II – Bialystok-Wiadukt 6.3km (February 2017 to 28th August 2019) project / OSM / prop / GM / SP
DW631: Warsaw-Powstancow – Warsaw-Marsa 3.8km (April 2016 to 30th August 2019) project / OSM / prop / GM / SP
DW631: Warsaw-Zolnierska – Warsaw-Chelmzynska 0.9km (April 2016 to 30th August 2019) [direction Zielonka] project / OSM / prop / GM / SP
S17: Ryki-North – Skrudki 16km (March 2017 to 6th September 2019) project / OSM / prop / GM / SP
S5: Poznan-West (A2) – Mosina 16.0km (August 2015 to 10th September 2019) [2nd c/w] project / OSM / prop / GM / SP
S7: Skomielna Biala – Zabornia (DK47) 5.2km (April 2016 to 28th September 2019) project / OSM / prop / GM / SP
DK47: Zabornia (S7) – Chabowka 0.9km (April 2016 to 28th September 2019) [2nd c/w] project / OSM / prop / GM / SP
S6: north of Ploty-North – Kielpino 14.2km (December 2016 to 30th September 2019) project / OSM / prop / GM / SP
S6: Kielpino – Kolobrzeg-West 24.1km (December 2016 to 30th September 2019) project / OSM / prop / GM / SP
S6: Kolobrzeg-West – Ustronie Morskie 14.7km (February 2017 to 10th October 2019) project / OSM / prop / GM / SP
S6: Ustronie Morskie – Bielice (S11) 25.1km (March 2017 to 10th October 2019) project / OSM / prop / GM / SP
S6: Bielice (S11) – Koszalin-North 2.5km (March 2016 to 10th October 2019) project / OSM / prop / GM / SP
S11: Bielice (S6) – Koszalin-West 2.0km (March 2016 to 10th October 2019) project / OSM / prop / GM / SP
S8: Radziejowice – west of Siestrzen 8.4km (February 2017 to 10th October 2019) project / OSM / prop / GM / SP
S6: Nowogard-East – Lisowo 12.0km (March 2017 to 30th October 2019) project / OSM / prop / GM / SP
S6: Lisowo – north of Ploty-North 8.3km (March 2017 to 30th October 2019) [2nd c/w] project / OSM / prop / GM / SP
DK25: Slawecinek – Latkowo 5.8km (December 2017 to 30th October 2019) project / OSM / prop / GM / SP
S11: Szczecinek-North – Turowo 11.6km (March 2017 to 7th November 2019) project / OSM / prop / GM / SP
S6: Sianow-East – east of Sianow-East 2.0km (March 2016 to 8th November 2019) project / OSM / prop / GM / SP
S6: Koszalin-North – Koszalin-East 3km (March 2016 to 29th November 2019) project / OSM / prop / GM / SP
S5: Mosina – Koscian-South 19.9km (December 2017 to 14th December 2019) project / OSM / prop / GM / SP
S5: Koscian-South – Lipno 16.0km (March 2018 to 14th December 2019) project / OSM / prop / GM / SP
S7: Skarzysko-Kamienna-North – Skarzysko-Kamienna-South 7.6km (October 2017 to 18th December 2019) project / OSM / prop / GM / SP
S3: north of Oder bridge Cigacice – south of Oder bridge Cigacice 1km (April 2015 to 20th December 2019) [2nd c/w] project / OSM / prop / GM / SP
S7: Lubien – Naprawa 7.6km (July 2015 to 20th December 2019) [1st c/w] project / OSM / prop / GM / SP
DK45: Opole (DK46/DK94) – south of Opole-Wroclawska 1.8km (April 2018 to 20th December 2019) project / OSM / prop / GM / SP
DK45: south of Opole-Wroclawska – Opole-Niemodlinska 1.8km (April 2018 to 20th December 2019) [1st c/w] project / OSM / prop / GM / SP
DK50: Gora Kalwaria-Marianki – east of Gora Kalwaria 3.9km (May 2017 to 20th December 2019) project / OSM / prop / GM / SP
DK79: Gora Kalwaria-Katy – Gora Kalwaria-Marianki 5.1km (May 2017 to 20th December 2019) project / OSM / prop / GM / SP
A1: Czestochowa-North – Czestochowa-Blachownia 20.3km (September 2016 to 23rd December 2019) project / OSM / prop / GM / SP
A1: Czestochowa-Blachownia – Czestochowa-South 4.7km (July 2016 to 23rd December 2019) project / OSM / prop / GM / SP
S5: Znin-North – Mieleszyn 25.1km (April 2017 to 23rd December 2019) project / OSM / prop / GM / SP
S17: Antoninek – north of Garwolin-North 13.0km (August 2017 to 23rd December 2019) project / OSM / prop / GM / SP
S5: Bydgoszcz-North – Maksymilianowo 6.8km (August 2017 to 31st December 2019) project / OSM / prop / GM / SP
S5: Maksymilianowo – Bydgoszcz-Oplawiec 7.3km (June 2017 to 31st December 2019) project / OSM / prop / GM / SP

2020 opening:
DW935: Rybnik-Zamyslow – Zory 10.2km (April 2017 to 10th April 2020) project / OSM / prop / GM / SP
S61: Szczuczyn-North – north of Szczuczyn-West 3.7km (October 2018 to 15th May 2020) [2nd c/w] project / OSM / prop / GM / SP
S61: south of Szczuczyn-West – Koniecki Male 2.9km (October 2018 to 15th May 2020) [2nd c/w] project / OSM / prop / GM / SP
A2: Warsaw-Lubelska (S17) – Konik 5.6km (March 2018 to June 2020) project / OSM / prop / GM / SP
A2: Konik – west of Minsk Mazowiecki 9.0km (August 2018 to June 2020) project / OSM / prop / GM / SP
A6: rededication Szczecin-Dabie – west of Szczecin-Rzesnica 3.6km (June 2020) project / OSM / prop / GM / SP
S17: Warsaw-Lubelska (S2) – Ostrow 15.2km (March 2018 to July 2020) project / OSM / prop / GM / SP
S17: Ostrow – Antoninek 8.0km (May 2018 to July 2020) project / OSM / prop / GM / SP
S5: Bydgoszcz-Oplawiec – north of Bydgoszcz-Blonie (S10) 13.5km (November 2017 to Summer 2020) project / OSM / prop / GM / SP
DK8: Porosły – Bialystok-Szosa Elcka 1.7km (August 2018 to September 2020) project / OSM / prop / GM / SP
S10: Kobylanka – Stargard-West 6.4km (March 2019 to October 2020) [2nd c/w] project / OSM / prop / GM / SP
S5: Szubin-North – Szubin-South 4.0km (May 2017 to November 2020) [2nd c/w] project / OSM / prop / GM / SP
S5: Szubin-South – Żnin-North 15.2km (May 2017 to November 2020) project / OSM / prop / GM / SP
S2: Warsaw-Przyczolkowa – Warsaw-Wal Miedzeszynski 6.5km (July 2017 to Late 2020) project / OSM / prop / GM / SP
S2: Warsaw-Wal Miedzeszynski – Warsaw-Lubelska (S17) 7.5km (October 2017 to Late 2020) project / OSM / prop / GM / SP
Trasa Lagiewnicka: Krakow-Grota-Roweckiego – Krakow-Turowicza 3.7km (July 2018 to December 2020) project / OSM / prop / GM / SP

2021 opening:
S7: Tarczyn-North – Grojec-North 7.9km (February 2019 to March 2021) project / OSM / prop / GM / SP
DK35: Szczawno-Zdroj – Wałbrzych 5.0km (April 2019 to March 2021) - / OSM / prop / GM / SP
S1: Pyrzowice-Lotnisko – Podwarpie 10.0km (February 2019 to April 2021) [2nd c/w] - / OSM / prop / GM / SP
S3: Ostromice – Miekowo 22.4km (May 2019 to April 2021) project / OSM / prop / GM / SP
S3: north of Kliniska – south of Kliniska 2.5km (April 2019 to April 2021) project / OSM / prop / GM / SP
S3: north of Szczecin-Rzesnica – west of Szczecin-Rzesnica 1.4km (April 2019 to April 2021) project / OSM / prop / GM / SP
S7: Lesznowola – Tarczyn-North 14.8km (January 2020 to April 2021) project / OSM / prop / GM / SP
S17: Warsaw-Zakret – Warsaw-Lubelska (S2) 2.5km (November 2019 to April 2021) project / OSM / prop / GM / SP
S3: Kazmierzow – Lubin-North 14.4km (October 2015 to May 2021) project / OSM / prop / GM / SP
S7: Szczepanowice – Widoma 14.0km (September 2019 to May 2021) project / OSM / prop / GM / SP
S17: north of Tomaszow Lubelski-North – south of Tomaszow Lubelski-North 1.2km (March 2019 to May 2021) project / OSM / prop / GM / SP
S17: south of Tomaszow Lubelski-North – north of Tomaszow Lubelski-South 5.4km (March 2019 to May 2021) [1st c/w] project / OSM / prop / GM / SP
S17: north of Tomaszow Lubelski-South – south of Tomaszow Lubelski-South 1.2km (March 2019 to May 2021) project / OSM / prop / GM / SP
S19: Krasnik-South – Janow Lubelski-North 18.1km (June 2019 to May 2021) project / OSM / prop / GM / SP
S19: Janow Lubelski-North – Janow Lubelski-South 7.0km (July 2019 to May 2021) project / OSM / prop / GM / SP
S19: Janow Lubelski-South – Lasy Janowskie 8.0km (July 2019 to May 2021) project / OSM / prop / GM / SP
S11: Kepno-Krazkowy (S8) – Kepno-East 3.4km (June 2019 to June 2021) project / OSM / prop / GM / SP
S11: Kepno-East – Baranow 3.6km (June 2019 to June 2021) [1st c/w] project / OSM / prop / GM / SP
S19: south of Lublin-Weglin – Niedrzwica Duza 12.0km (August 2019 to June 2021) project / OSM / prop / GM / SP
S19: Niedrzwica Duża – Krasnik-North 20.0km (January 2020 to June 2021) project / OSM / prop / GM / SP
S19: Krasnik-North – Krasnik-South 10.0km (October 2019 to June 2021) project / OSM / prop / GM / SP
S61: Koniecki Małe – north of Stawiski 17.0km (September 2019 to June 2021) project / OSM / prop / GM / SP
S61: Raczki – Wysokie 20.1km (October 2019 to June 2021) project / OSM / prop / GM / SP
S6: Bozepole Wielkie – Luzino 15.0km (March 2020 to July 2021) project / OSM / prop / GM / SP
S61: Elk-South – Szczuczyn-North 19.6km (March 2020 to July 2021) project / OSM / prop / GM / SP
S7: Napierki – Mlawa-East 14.0km (March 2020 to Mid 2021) project / OSM / prop / GM / SP
S7: Mlawa-East – Strzegowo 21.5km (October 2019 to Mid 2021) project / OSM / prop / GM / SP
S7: Strzegowo – Pienki 22.0km (September 2019 to Mid 2021) project / OSM / prop / GM / SP
S7: Pienki – Plonsk-North 13.8km (September 2019 to Mid 2021) project / OSM / prop / GM / SP
S6: Szemud – Gdynia-Wielki Kack (S7) 18.7km (October 2019 to Summer 2021) project / OSM / prop / GM / SP
S61: south of Stawiski – Budy Stawiskie 3.2km (October 2019 to Summer 2021) [2nd c/w] project / OSM / prop / GM / SP
S61: Budy Stawiskie – Kisielnica 13.2km (October 2019 to Summer 2021) project / OSM / prop / GM / SP
S61: Lomza-South – Sniadowo 17.0km (August 2019 to Summer 2021) project / OSM / prop / GM / SP
S6: Luzino – Szemud 10.3km (October 2019 to October 2021) project / OSM / prop / GM / SP
S19: Lasy Janowskie – Zdziary 9.3km (March 2020 to October 2021) project / OSM / prop / GM / SP
S19: Zdziary – Rudnik nad Sanem 9.0km (October 2019 to October 2021) project / OSM / prop / GM / SP
S19: Rudnik nad Sanem – Nisko-South 6.0km (January 2020 to October 2021) project / OSM / prop / GM / SP
S61: Lomza-West – Lomza-South 7.2km (March 2020 to October 2021) - / OSM / prop / GM / SP
A1: Kamiensk – Radomsko 16.7km (May 2019 to November 2021) project / OSM / prop / GM / SP
A1: Radomsko – Szczepocice Prywatne 7km (March 2019 to November 2021) project / OSM / prop / GM / SP
DK46: Wydrowice – Sosnowka 6.7km (August 2019 to November 2021) project / OSM / prop / GM / SP
S2: Warsaw-Pulawska – Warsaw-Przyczolkowa 4.6km (Januar 2018 to 2021) project / OSM / prop / GM / SP
S7: Lubien – Naprawa 7.6km (July 2015 to Fall 2021) [2nd c/w] project / OSM / prop / GM / SP
S7: Naprawa – Skomielna Biala 3.0km (July 2015 to Fall 2021) project / OSM / prop / GM / SP
S5: west of Bydgoszcz-Blonie (S10) – Szubin-North 9.7km (August 2017 to December 2021) project / OSM / prop / GM / SP
S14: Lodz-Teofilow – Lodz-Lublinek 12.2km (July 2019 to December 2021) project / OSM / prop / GM / SP
S19: Podgorze – Kamien 10.5km (March 2020 to December 2021) project / OSM / prop / GM / SP

2022 opening:
A1: Szczepocice Prywatne – Czestochowa-North 16.9km (April 2019 to March 2022) project / OSM / prop / GM / SP
S19: Nisko-South – Podgorze 11.5km (March 2020 to May 2022) project / OSM / prop / GM / SP
A18: rededication Jedrzychowice – Lubieszow 21.9km (June 2022) - / OSM / prop / GM / SP
S5: Nowe Marzy (A1) – east of Swiecie-North 9.6km (July 2017 to August 2022) project / OSM / prop / GM / SP
S5: west of Swiecie-North – east of Swiecie-West 5.3km (July 2017 to August 2022) [2nd c/w] project / OSM / prop / GM / SP
S5: west of Swiecie-West – north of Swiecie-South 3.3km (July 2017 to August 2022) [2nd c/w] project / OSM / prop / GM / SP
S5: south of Swiecie-South – Bydgoszcz-North 22.4km (July 2017 to August 2022) project / OSM / prop / GM / SP
S61: LT/PL border (Budzisko) – Suwalki-North 24.2km (March 2020 to September 2022) project / OSM / prop / GM / SP
S7: Warsaw-Lotnisko – Lesznowola 6.6km (March 2020 to November 2022) project / OSM / prop / GM / SP
A1: Piotrkow Trybunalski-South – Kamiensk 22.4km (September 2019 to December 2022) project / OSM / prop / GM / SP

2023 opening:
S14: Emilia (A2) – Lodz-Teofilow 16.3km (March 2020 to April 2023) project / OSM / prop / GM / SP
S1: Przybedza – Milowka 8.5km (May 2020 to August 2023) - / OSM / prop / GM / SP

Unknown opening date:
S6: Koszalin-East – Sianow-East 10.0km (March 2016 to suspended) [contract canceled] project / OSM / prop / GM / SP
S10: Walcz-West – Witankowo 17.8km (November 2015 to suspended) [contract canceled] project / OSM / prop / GM / SP


 
#24 · (Edited)
Portugal

2014 opening:

A13: Coimbra – Almalagues 7km (April 2012 to 25th April 2014) - / OSM / prop / GM / SP
A16: Brandoa (A36) – Pontinha 0.8km (January 2009 to 21st November 2014) - / OSM / prop / GM / SP

2015 opening:

N125: Faro-North – Rio Seco 2.5km (2009 to 17th August 2015) project / OSM / prop / GM / SP

2016 opening:

A4: Padronelo – Vila Real 25.4km (June 2009 to 7th May 2016) - / OSM / prop / GM / SP

2017 opening:

A26-1: Santo Andre – Sines (A26) 10.8km (September 2010 to 10th March 2017) - / OSM / prop / GM / SP

2020 opening:

A26: Azinheira (IC1) – east of Santa Margarida do Sado 12km (September 2010 to Early 2020) - / OSM / prop / GM / SP
A25: Vilar Formoso – P/E border (Vilar Formoso) 3km (May 2019 to August 2020) - / OSM / prop / GM / SP

Unknown opening date:

A26: Santiago do Cacem-West – Roncao 15.8km (September 2010 to suspended) [2nd c/w] - / OSM / prop / GM / SP
A26: Roncao – Azinheira (IC1) 23km (September 2010 to suspended) - / OSM / prop / GM / SP
A26: east of Santa Margarida do Sado – Figueira dos Cavaleiros 7km (September 2010 to suspended) - / OSM / prop / GM / SP
A26: Figueira dos Cavaleiros – Sao Brissos 26.5km (September 2010 to suspended) - / OSM / prop / GM / SP
IP2: Evora-North (A6) – Evora-South 12km (2011 to suspended) - / OSM / prop / GM / SP

 
#52 ·
Spain (map)
http://wikimapia.org/#lang=en&lat=37.970861&lon=-3.515239&z=15&m=o
A316: Puente del Obispo-South - Puente del Obispo-North 5.8km (? to December 2015) – projectmap
A316: Puente del Obispo-North – Baeza-West 4.5km (? to December 2015) – projectmap
Opened :)
http://www.juntadeandalucia.es/pres...tovia/olivar/dan/continuidad/kms/ubeda/martos

A316: Puente del Obispo-South - Puente del Obispo-North 5.8km (? to 16th November 2015) – projectmap
A316: Puente del Obispo-North – Baeza-West 4.5km (? to 16th November 2015) – projectmap

http://wikimapia.org/#lang=en&lat=37.970861&lon=-3.515239&z=15&m=o

Edit: Probably I should have posted this in the thread about Spanish motorways?
 
#25 · (Edited)
Romania (map, overview, summary)

2014 opening:

A1: Cunta – Saliste 22.1km (2011 to 14th November 2014) project / OSM / prop / GM / SP
A1: Nadlac – Pecica 27km (October 2011 to 19th December 2014) - / OSM / prop / GM / SP

2015 opening:

A1: HU/RO border (Nadlac) – Nadlac 2.5km (October 2011 to 11th July 2015) - / OSM / prop / GM / SP
A1: Pecica – Arad-West 10.5km (October 2011 to 11th July 2015) project / OSM / prop / GM / SP
A1: Timisoara-East – Balint (A6) 35.6km (2011 to 23rd December 2015) - / OSM / prop / GM / SP

2017 opening:

A1: Dumbrava – Margina 15km (2013 to 6th March 2017) project / OSM / prop / GM / SP

2018 opening:

A10: Turda (A3) – Decea 16.8km (July 2014 to 30th July 2018) - / OSM / prop / GM / SP
A10: Decea – Aiud 8.5km (July 2014 to 30th July 2018) - / OSM / prop / GM / SP
A3: Nadaselu – Gilau 9.5km (July 2014 to 28th September 2018) - / OSM / prop / GM / SP
A3: Iernut – Ungheni-Airport 13.7km (Mid 2016 to 12th December 2018) - / OSM / prop / GM / SP
A3: Bucharest Ring Road – Bucharest-Gherghitei Street 6.5km (April 2012 to 14th December 2018) - / OSM / prop / GM / SP

2019 opening:

A1: Ilia – Deva/Soimus 22.1km (2013 to 14th August 2019) - / OSM / prop / GM / SP
A1: Holdea – Ilia 20.5km (2013 to 23rd December 2019) - / OSM / prop / GM / SP

2020 opening:

A3: HU/RO border ("Bors") – Oradea 4.6km (2004 to Mid 2020) - / OSM / prop / GM / SP
A3: Ludus – Iernut 18km (Early 2017 to 2020) - / OSM / prop / GM / SP
A3: Campia Turzii – Ludus 16km (Early 2017 to >= 2020) - / OSM / prop / GM / SP
A10: Aiud – Alba Iulia-North 28.7km (July 2014 to >= 2020) - / OSM / prop / GM / SP
A10: Alba Iulia-North – Sebes (A1) 16.0km (Spring 2015 to >= 2020) - / OSM / prop / GM / SP
A3: Oradea – Suplacu de Barcau 55.5km (2004 to >= 2020?) [contract canceled] - / OSM / prop / GM / SP

2021 opening:

A12: Bals-West – Slatina-East 39.9km (Early 2019 to Early 2021?) - / OSM / prop / GM / SP

2022 opening:

A3: Cristian – Rasnov 6.3km (May 2019 to 2022) - / OSM / prop / GM / SP
A7: Bacau-North – Bacau-South 17km (May 2016 to 2022) - / OSM / prop / GM / SP

2023 opening:

A1: Sibiu-South – Boita 13km (Mid 2020 to Mid 2023) - / OSM / prop / GM / SP
A1: Margina – Holdea ~14km (2013 to >= 2023) - / OSM / prop / GM / SP

Unknown opening date:

A12: Craiova – Bals-West 17.7km (2019 to ?) - / OSM / prop / GM / SP

 
#106 ·
#26 · (Edited)
Serbia

2014 opening:

A1: Batajnica i/c 2.6km (< 2006 to 29th November 2014) [2nd c/w] project / OSM / prop / GM / SP

2015 opening:

A1: south of Vladicin han – Donji Neradovac 26.3km (April 2012 to 28th November 2015) project / OSM / prop / GM / SP
A4: Crvena Reka – Ciflik 12.7km (October 2011 to 30th December 2015) project / OSM / prop / GM / SP

2016 opening:

A1: Grabovnica – Grdelica 5.6km (June 2012 to 11th April 2016) project / OSM / prop / GM / SP
A1: Dobanovci – west of Ostruznica bridge 10.1km (May 2014 to 20th April 2016) [2nd c/w] project / OSM / prop / GM / SP
B24: Badnjevac – Gradac 3.0km (Late 2011 to 2nd August 2016) - / OSM / prop / GM / SP
B24: Gradac – west of Batocina 3.7km (July 2012 to 2nd August 2016) - / OSM / prop / GM / SP
A2: south of Ljig – Preljina 40.4km (2012 to 7th November 2016) project / OSM / prop / GM / SP
A4: Ciflik – Stanicenje 12.1km (June 2013 to 28th December 2016) project / OSM / prop / GM / SP

2017 opening:

A4: south of Sarlah tunnel – Pirot-East ~6.7km (June 2013 to 16th September 2017) project / OSM / prop / GM / SP
A4: Pirot-East – Dimitrovgrad-West 14.3km (November 2010 to 16th September 2017) project / OSM / prop / GM / SP
A4: Dimitrovgrad-West – Gradinje 8.6km (2010 to 16th September 2017) project / OSM / prop / GM / SP
B24: Botunje – Badnjevac 3.5km (May 2013 to 4th October 2017) - / OSM / prop / GM / SP

2018 opening:

A4: north of Pirot-North – north of Sarlah tunnel 5.5km (June 2013 to 18th March 2018) project / OSM / prop / GM / SP
A4: west of Gradinje – Graninje 1.5km (2010 to 18th March 2018) [2nd c/w] project / OSM / prop / GM / SP
A4: Stanicenje – west of Sopot tunnel 1km (June 2013 to 26th July 2018) [1st c/w] project / OSM / prop / GM / SP
A4: west of Sopot tunnel – north of Pirot-North 2km (June 2013 to 26th July 2018) project / OSM / prop / GM / SP
A1: Srpska Kuca – south of Levosoje 8.1km (Fall 2015 to 1st September 2018) [1st c/w] project / OSM / prop / GM / SP
A1: Srpska Kuca – Levosoje 5.9km (Fall 2015 to 19th September 2018) [2nd c/w] project / OSM / prop / GM / SP
A1: Levosoje – south of Levosoje 2.2km (Fall 2015 to November 2018) [2nd c/w] project / OSM / prop / GM / SP

2019 opening:

A4: north of Sarleh tunnel – south of Sarlah tunnel 1.4km (June 2013 to 8th March 2019) [1st c/w] project / OSM / prop / GM / SP
A1: Grdelica – south of Vladicin han 26.1km (September 2013 to 18th May 2019) project / OSM / prop / GM / SP
A4: north of Sarleh tunnel – south of Sarlah tunnel 1.4km (June 2013 to 9th July 2019) [2nd c/w] project / OSM / prop / GM / SP
A4: Stanicenje – west of Sopot tunnel 1km (June 2013 to 27th July 2019) project / OSM / prop / GM / SP
A2: Obrenovac – Ub 26.2km (August 2014 to 18th August 2019) project / OSM / prop / GM / SP
A2: Ub – Lajkovac 12.5km (Mid 2010 to 18th August 2019) [completed November 2014; to be opened with neighboring section] project / OSM / prop / GM / SP
A2: Lajkovac – south of Ljig 24.6km (August 2014 to 18th August 2019) project / OSM / prop / GM / SP
A4: Prosek – Crvena Reka 22.5km (March 2012 to 9th November 2019) project / OSM / prop / GM / SP
A2: Surcin (A1) – Obrenovac 17.6km (March 2017 to 18th December 2019) project / OSM / prop / GM / SP

2020 opening:

A1: west of Ostruznica bridge – Ostruznica 2.5km (January 2016 to >= Spring 2020?) [2nd c/w] project / OSM / prop / GM / SP
A1: Ostruznica – Orlovacha 8.0km (July 2018 to September 2020) [2nd c/w] project / OSM / prop / GM / SP

2021 opening:

A1: Orlovacha – east of Strazevica tunnel 3.5km (July 2018 to Late 2021) [2nd c/w] project / OSM / prop / GM / SP
A5: Krusevac-West – Pojate (A1) 27.8km (December 2019 to Late 2021) project / OSM / prop / GM / SP

2022 opening:

A2: Preljina – Pozega 31.0km (May 2019 to Mid 2022) project / OSM / prop / GM / SP
A1: east of Strazevica tunnel – Bubanj Potok (A3) 7.0km (July 2018 to September 2022) project / OSM / prop / GM / SP
RuSaLo: Ruma (A3) – Klenak 21.1km (December 2019 to Late 2022) - / OSM / prop / GM / SP

2023 opening:

RuSaLo: Klenak – Loznica 55.9km (December 2019 to Late 2023) - / OSM / prop / GM / SP

2025 opening:

A?: Kuzmin (A3) – SRB/BIH border (Sremska Raca) 18km (October 2019 to <= 2025) - / OSM / prop / GM / SP

 
#485 ·

2018 opening:

A1: west of Ostruznica bridge – Ostruznica 2.5km (January 2016 to Late 2018) [2nd c/w] – projectmap
New date: end of summer 2019.


2020 opening:

A1: Ostruznica – east of Strazevica tunnel 11.5km (July 2018 to July 2020) [2nd c/w] – projectmap
A1: east of Strazevica tunnel – Bubanj Potok (A3) 7.0km (July 2018 to July 2020) – projectmap
They say that the whole Belgrade bypass till Bubanj Potok will be finished by July 2021, but the section between Ostružnica and Straževica tunnel might be opened before that.
 
This is an older thread, you may not receive a response, and could be reviving an old thread. Please consider creating a new thread.