daily menu » rate the banner | guess the city | one on oneforums map | privacy policy | DMCA | news magazine | posting guidelines

Go Back   SkyscraperCity > World Development News Forums > Highrises > Proposed Highrises



Global Announcement

As a general reminder, please respect others and respect copyrights. Go here to familiarize yourself with our posting policy.


Reply

 
Thread Tools
Old February 4th, 2016, 07:59 AM   #1
desertpunk
Whiskey Tango Foxtrot
 
desertpunk's Avatar
 
Join Date: Oct 2009
Location: ELP ~ ABQ
Posts: 55,648
Likes (Received): 53453

MONTREAL | Tour Des Canadiens 2 | 120m | 37 fl | Demo



--------------------------------------------------------------------------------------------------------------------------------------------------------

Phase 2 of Tour des Canadiens to take inspiration from ice


http://montrealgazette.com/business/...ation-from-ice

Quote:
Published on: September 17, 2015 | Last Updated: September 17, 2015 6:55 PM EST


“Sorry for the trouble getting here with all this construction,” joked Daniel Peritz, senior vice-president of Canderel, as the developer and partners Thursday launched Phase 2 of the Tour des Canadiens.

The tower is part of the expansive 15-year, $2-billion Quad Windsor construction project underway around the Bell Centre.

In keeping with the hockey franchise partnership, the 37-storey sculpted glass tower with 438 condo units will take its inspiration from ice, with illuminated “icicle tips” glowing in the night skyline.

The tower, to be located on the south side of the Bell Centre, on what is now a grim St-Antoine St., will be connected to the Bell Centre and the transit hub that is Windsor Station by a raised glass pedestrian walkway.

And just as for Phase 1, residents will enjoy priority bookings for Canadiens tickets and access to training sessions, among other privileges.

The consortium developing the project — Cadillac Fairview, Canderel, the Fonds immobilier de solidarité FTQ and the Club de hockey Canadien — is also hoping for a repeat of the success of Phase 1. Launched in 2012, the project sold out in three months, a record in Montreal, Peritz said, calling the structure “the most iconic residential address in our fair city.”

Tour 1 will be delivered in early spring, Peritz said.

[...]

This is just part of the massive $2 bln Quad Windsor development in Centre-Ville. Demolition is underway.
__________________
We are floating in space...

ChuckScraperMiami#1 liked this post
desertpunk no está en línea   Reply With Quote

Sponsored Links
Old February 4th, 2016, 08:00 AM   #2
desertpunk
Whiskey Tango Foxtrot
 
desertpunk's Avatar
 
Join Date: Oct 2009
Location: ELP ~ ABQ
Posts: 55,648
Likes (Received): 53453


http://skyrisecities.com/news/2015/0...nches-montreal
__________________
We are floating in space...

ChuckScraperMiami#1 liked this post
desertpunk no está en línea   Reply With Quote
Old February 4th, 2016, 08:02 AM   #3
desertpunk
Whiskey Tango Foxtrot
 
desertpunk's Avatar
 
Join Date: Oct 2009
Location: ELP ~ ABQ
Posts: 55,648
Likes (Received): 53453

Demolition 2/03:


Demolition of old buildings on St-Antoine 7 by Vanishing Montréal, on Flickr


Demolition of old buildings on St-Antoine 8 by Vanishing Montréal, on Flickr


Demolition of old buildings on St-Antoine 9 by Vanishing Montréal, on Flickr
__________________
We are floating in space...

ChuckScraperMiami#1 liked this post
desertpunk no está en línea   Reply With Quote
Old May 12th, 2016, 07:49 PM   #4
hotwheels123
Registered User
 
Join Date: May 2016
Location: Mississauga
Posts: 486
Likes (Received): 316

Developers Add 12 Floors to Tour des Canadiens 2


Quote:
Sales have been a resounding success since the launch of Tour des Canadiens 2 in September 2015, so much so that developers Canderel, Cadillac Fairview, Fonds immobilier de solidarité FTQ and Club de hockey Canadien have announced the addition of 12 more floors to the Montreal condo. The sequel to the nearly complete first Tour des Canadiens tower, the second building will now include 575 units housed within 49 storeys.
hotwheels123 no está en línea   Reply With Quote
Old July 14th, 2016, 12:15 AM   #5
hotwheels123
Registered User
 
Join Date: May 2016
Location: Mississauga
Posts: 486
Likes (Received): 316

Tour des Canadiens Phase 1 Completed, Phase 2 to Begin


Quote:
When we last checked in with the grey-scale Tour des Canadiens 1 in Montreal, it had topped off and most of the exterior construction on the sports-themed condominium development was completed. The building's 552 condo units have been sold and the interiors are now completed. In fact, the first tenants have begun to move into the skyscraper, and many of the units are now appearing on Montreal's rental market.
hotwheels123 no está en línea   Reply With Quote
Old December 4th, 2017, 05:13 AM   #6
MartinMtl
Registered User
 
Join Date: Sep 2007
Posts: 110
Likes (Received): 243

(my pic)

MartinMtl no está en línea   Reply With Quote


Reply

Tags
montreal, quad windsor, tour des canadiens 2

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Related topics on SkyscraperCity


All times are GMT +2. The time now is 09:43 PM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2017, vBulletin Solutions Inc.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2017 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2017 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu