Old May 24th, 2008, 02:25 AM   #181
karejeeta
tommy569
 
Join Date: Mar 2008
Location: Toronto
Posts: 137
Likes (Received): 0

Will terminal 1 be fully be demolised or just the part needed to make way for the central pier.
karejeeta no está en línea   Reply With Quote

Sponsored Links
Old May 24th, 2008, 05:04 PM   #182
LOTPolskie767
Registered User
 
Join Date: Feb 2008
Location: warsaw
Posts: 15
Likes (Received): 0

NO terminal 1 will not be demolished. Only a slight where the current 4 airbridges are will be removed to build the central pier. After terminal 2 is completed it is said that terminal 1 will be used as a low-cost carrier terminal replacing etudia which is crowded and dirty.
LOTPolskie767 no está en línea   Reply With Quote
Old May 31st, 2008, 06:57 PM   #183
karejeeta
tommy569
 
Join Date: Mar 2008
Location: Toronto
Posts: 137
Likes (Received): 0

Has any aircraft in Warsaw been serviced with the two air bridges.
karejeeta no está en línea   Reply With Quote
Old June 23rd, 2008, 12:42 AM   #184
equivoque
Et paradoxe... Ça suffit!
 
equivoque's Avatar
 
Join Date: Jul 2005
Location: Warszawa/Berlin
Posts: 736
Likes (Received): 2

By Pstrykacz

T2











T1












Unfinished South Pier








Central Pier

equivoque no está en línea   Reply With Quote
Old August 13th, 2008, 04:37 AM   #185
karejeeta
tommy569
 
Join Date: Mar 2008
Location: Toronto
Posts: 137
Likes (Received): 0

Is there any new on the third terminal, where it will be loacted and on the status of construction?? When will the central and south pier be open for passengers? And finally when will the fast train line between the airport and the central station commence??
karejeeta no está en línea   Reply With Quote
Old August 16th, 2008, 05:45 PM   #186
LOTPolskie767
Registered User
 
Join Date: Feb 2008
Location: warsaw
Posts: 15
Likes (Received): 0

not yet, but we know that it will be on the other side of the terminal and that a new runway will be bulit paralell to 11/29. Constructoin will begin in 2009. Central and south pier should be open spring 2009. ANd train line between the airport is right now under construction. i do not know when it will commence.
LOTPolskie767 no está en línea   Reply With Quote
Old December 10th, 2008, 02:57 AM   #187
LOTPolskie767
Registered User
 
Join Date: Feb 2008
Location: warsaw
Posts: 15
Likes (Received): 0

i have found out as u see on the last picture where u see the 4 old airbridges over there still in the terminal the ones with number 9, 10 , 11 will be re used to be change to color orange and added to gates :B 44/43 B 42/41 and B33/34 in between those there are already 3 orange reused airbridges
LOTPolskie767 no está en línea   Reply With Quote
Old December 10th, 2008, 03:04 AM   #188
Shezan
BANNED
 
Join Date: Jun 2007
Location: The 80s
Posts: 16,216
Likes (Received): 593

it' s a mini-FRA T2!
Shezan no está en línea   Reply With Quote
Old December 14th, 2008, 05:45 AM   #189
karejeeta
tommy569
 
Join Date: Mar 2008
Location: Toronto
Posts: 137
Likes (Received): 0

When will the SouthPeir be connected, the CentralPeir made and what will happen to the old terminal 1??? Heard that Etuida termianl is being closed what will be put in where it stands???
karejeeta no está en línea   Reply With Quote
Old December 14th, 2008, 08:43 PM   #190
LOTPolskie767
Registered User
 
Join Date: Feb 2008
Location: warsaw
Posts: 15
Likes (Received): 0

Well, it varies most likley the start of creating the central pier now will begin in April 2009. It will finish in 2011. Terminal 1 will be operating as usuall for low cost carriers. Norwegian will be moving in in april as well as germanwings and easyjet. Some traditional carriers such as Air france will most likley be staying there for a while as well as Aerosvit and Aeroflot. Etudia is be closed (thank god) and no one wants anything to do with it. Nothing will be bulit over it and they wont touch the terminal so far for what i know. Terminal 1 will though get some re-modernization and will be made to create better standars for passengers.
LOTPolskie767 no está en línea   Reply With Quote
Old December 14th, 2008, 09:02 PM   #191
karejeeta
tommy569
 
Join Date: Mar 2008
Location: Toronto
Posts: 137
Likes (Received): 0

What will be done in terminal 1, and how will the central pier be built as terminal 1 boarding bridges is in the way??
karejeeta no está en línea   Reply With Quote
Old December 14th, 2008, 09:53 PM   #192
Homem
Walking man
 
Homem's Avatar
 
Join Date: Oct 2008
Location: Paris , France
Posts: 752
Likes (Received): 111

Will the really shameful Etiuda terminal be destroyed ? I hope.
So,no third terminal for Euro 2012 ? Can T1/T2 absorb such an incredible traffic increase ?
Apparently no second airport (as Modlin...) in the region for 2012 too?
Homem no está en línea   Reply With Quote
Old December 15th, 2008, 12:18 AM   #193
LOTPolskie767
Registered User
 
Join Date: Feb 2008
Location: warsaw
Posts: 15
Likes (Received): 0

to tell you the truth all of the gates and the area where the boarding was held in terminal 1 will be upgraded im sure to stores and where the central pier will be bulit will be just like the other boarding areas at terminal 2 they will keep the current stores but they will add on more stores and demolish (most likley) the wall between termianl 1 and the central pier to have give more space and not to make it look stupid. They will take 3 of the airbridges add them to 3 of the remaining gates on the other side of the piers and repaint them the last on is in no need and will be scraped and is already partially borken no useable. (ive used it to get on a bus)
LOTPolskie767 no está en línea   Reply With Quote
Old December 23rd, 2008, 07:42 PM   #194
karejeeta
tommy569
 
Join Date: Mar 2008
Location: Toronto
Posts: 137
Likes (Received): 0

When will the pretarg be announced for finishing T2, central and south peir along with the train station and anyother investments???
karejeeta no está en línea   Reply With Quote
Old January 24th, 2009, 01:47 AM   #195
LOTPolskie767
Registered User
 
Join Date: Feb 2008
Location: warsaw
Posts: 15
Likes (Received): 0

Documentation for completion of T2 in preparation

01.21.2009, 12:34
Warsaw, 8 January, 2009 – ‘Polish Airports’ State Enterprise signed a contract with Estudio Lamela for the preparation of documentation required to complete terminal investment projects at the Warsaw airport. This constitutes the next stage of the Warsaw Frederic Chopin Airport modernisation and development plan presented in October 2008.

According to the schedule adopted by PPL and announced in October, the selected company has three months to prepare the documentation that will be used to complete construction works at the airport’s apron. Within five months Estudio Lamela will prepare the documentation required to complete the construction of T2 South Pier and construct the Central Pier.

Estudio Lamela will also, within five months, disclose an architectonic concept of the modernisation of Terminal T1 Zone and its integration with T2.

‘Awarding the contract for preparing the documentation is another significant step towards fulfilling the Warsaw airport investment plan communicated in October. Everything is going according to plan. This quarter, we expect to announce a tender for construction works at the apron.’ – says Michał Marzec, General Director of ‘Polish Airports’ State Enterprise

PPL’s investment plans regarding Warsaw Frederic Chopin Airport revealed in October, scheduled to be fulfilled by 2012, amount to PLN 1.2 billion.

The plans include the completion of the construction of T2 (South Pier), construction of Central Pier, and, in the last stage, modernisation of T1 and integration of both terminal zones (T1 and T2) into one building. Apart from investments directly related to the terminal, the plan envisages the construction of a new aircraft parking apron in front of T1, modernisation of aerodrome pavements (including runways), construction of new sections of taxiways and an aircraft de-icing apron, as well the development of centralised fuel supply infrastructure.

Investments not relating to airport infrastructure include the construction of a five-star hotel in front of the terminal (currently a tender for building design is being carried out, in cooperation with the Union of Polish Architects) and the construction on Airport premises of an office building with a conference centre.

The tender for construction works pertaining to the completion of the construction of T2 South Pier and construction of Central Pier will be announced, according to the time schedule, in the second quarter of 2009. The completion of works is planned for the fourth quarter of 2010.


www.lotnisko-chopina.pl which is the airports website.
LOTPolskie767 no está en línea   Reply With Quote
Old January 25th, 2009, 06:33 PM   #196
Homem
Walking man
 
Homem's Avatar
 
Join Date: Oct 2008
Location: Paris , France
Posts: 752
Likes (Received): 111

Good news LOTPolskie767.
What will be the capacity of the extended/modernized F. Chopin Airport, surely 20 millions passengers/year ?
And what about Etiuda terminal :demolished or not ?
Will Modlin Int. Airport really be built , and in time for the Euro 2012 ?
__________________

Marcher debout

"Ali Topu Agop'a at", Hrant Dink.

Rire ensemble de nos différences.


https://www.youtube.com/watch?v=LjwFcSRzO48
Homem no está en línea   Reply With Quote
Old January 26th, 2009, 10:14 PM   #197
LOTPolskie767
Registered User
 
Join Date: Feb 2008
Location: warsaw
Posts: 15
Likes (Received): 0

Sadly the Extended f. Chopin Airport, only able to take 12.5 but i think thats terminal 1's 3.5 (passed 8 million in 2007) and 6.5 of terminal 2's but i think if u push it liek they did in 2007 i think it would be 22 million. Etudia will be i think just left for. No one will use it. Modlin be bulit for 2012 ? No one knows I hope so.
LOTPolskie767 no está en línea   Reply With Quote
Old January 28th, 2009, 04:23 AM   #198
karejeeta
tommy569
 
Join Date: Mar 2008
Location: Toronto
Posts: 137
Likes (Received): 0

Any new on the rail link between Warsaw airport and Warsaw Central Station?? Has the pretrag been anncouanced??
karejeeta no está en línea   Reply With Quote
Old February 8th, 2009, 02:56 AM   #199
karejeeta
tommy569
 
Join Date: Mar 2008
Location: Toronto
Posts: 137
Likes (Received): 0

Any news on the train link between the airport and downtown Warsaw?? When will the documention be complete to finish the terminal2?? and what else will be done at the airport???
karejeeta no está en línea   Reply With Quote
Old February 10th, 2009, 10:59 PM   #200
LOTPolskie767
Registered User
 
Join Date: Feb 2008
Location: warsaw
Posts: 15
Likes (Received): 0

yes, there will be the train link i think they are schedule to finish 2012.
http://www.youtube.com/watch?v=-SU-84P7TXQ here is the documentary in polish sry it tells how it will be in 2012 and how the plan looks like enjoy. Also the new runway will possibly be built. Terminal 3 is coming up as a rumor.
LOTPolskie767 no está en línea   Reply With Quote


Reply

Tags
european hub airport, warsaw

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Related topics on SkyscraperCity


All times are GMT +2. The time now is 10:39 AM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2018, vBulletin Solutions Inc.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

tech management by Sysprosium