daily menu » rate the banner | guess the city | one on oneforums map | privacy policy | DMCA | news magazine | posting guidelines

Go Back   SkyscraperCity > World Development News Forums > General Urban Developments > DN Archives



Global Announcement

As a general reminder, please respect others and respect copyrights. Go here to familiarize yourself with our posting policy.


Reply

 
Thread Tools
Old October 13th, 2010, 05:38 PM   #481
Gokufan
Registered User
 
Gokufan's Avatar
 
Join Date: Oct 2008
Location: Warszawa
Posts: 843
Likes (Received): 2331

I think that it will be completed outdoor, only some work inside should be left...
Gokufan no está en línea   Reply With Quote

Sponsored Links
Old October 13th, 2010, 06:53 PM   #482
Cracovia
Registered User
 
Cracovia's Avatar
 
Join Date: May 2007
Location: Nottingham
Posts: 1,638
Likes (Received): 121

yea in Polish press they have stated that construction should resume in 8-12 weeks and that the building will be topped out in 2012
Cracovia no está en línea   Reply With Quote
Old October 18th, 2010, 05:42 PM   #483
sieradzanin1
Moderator
 
sieradzanin1's Avatar
 
Join Date: Dec 2007
Location: Sieradz [Poland]
Posts: 10,363
Likes (Received): 1046

http://www.rp.pl

By January 2011, work will commence again at the tower project Libeskind
http://translate.google.pl/translate...stcount%3D1747
sieradzanin1 no está en línea   Reply With Quote
Old October 21st, 2010, 06:40 PM   #484
sieradzanin1
Moderator
 
sieradzanin1's Avatar
 
Join Date: Dec 2007
Location: Sieradz [Poland]
Posts: 10,363
Likes (Received): 1046

Quote:
Originally Posted by Polex View Post
Aktualnie trwa procedura przetargowa na wyłonienie wykonawcy. Przewiduje się, że zostanie zakończona za ok. 2 tygodnie.
Wybrany wykonawca ma niezwłocznie wejść na teren budowy i przygotować obiekt do podjęcia prac. Być może jeszcze w tym roku pojawią się żurawie.

Przewiduje się, że na Euro 2012 gotowa będzie cała bryła budynku łącznie z elewacjami na 3 stronach. Nie wiadomo jeszcze czy uda się to w pełni z 4 stroną (jedyną płaską w całym budynku, przy której znajdzie się technologiczne wyposażenie).

Wizualizacja widoków z różnych stron i piętr (Uwaga! Nie ma ujęć z najwyższych pięter!):
http://i52.************/15zk12s.jpg
translate.google.

http://translate.google.pl/translate...stcount%3D1755

Currently, the tender procedure to select a contractor. It is expected that will be completed in approximately two weeks.
The selected contractor shall immediately go to the site and prepare the facility to work. Perhaps this year there will be cranes.

It is expected that the Euro 2012 will be ready the whole shape of the building together with the elevations on 3 sides. It is not known yet whether this can be fully with the four party (the only flat throughout the building, which will be the technological equipment).

Visualization of views from various parties and Floors (Note: There are no shots from the top floors!)
[IMG]http://i52.************/15zk12s.jpg[/IMG]
sieradzanin1 no está en línea   Reply With Quote
Old October 23rd, 2010, 01:12 PM   #485
Gokufan
Registered User
 
Gokufan's Avatar
 
Join Date: Oct 2008
Location: Warszawa
Posts: 843
Likes (Received): 2331

Construction should start again by January.

In Polish:
http://www.rp.pl/artykul/550233-Orco...ie-obniza.html

EDIT: Oh, this have already been posted...
Gokufan no está en línea   Reply With Quote
Old November 5th, 2010, 01:40 PM   #486
sieradzanin1
Moderator
 
sieradzanin1's Avatar
 
Join Date: Dec 2007
Location: Sieradz [Poland]
Posts: 10,363
Likes (Received): 1046

Reminding the project.

by Andrzej Gąsior



Quote:
Originally Posted by P4TR1CK View Post
Pozwolicie że pochwalę się moim modelem:











sieradzanin1 no está en línea   Reply With Quote
Old November 5th, 2010, 01:41 PM   #487
sieradzanin1
Moderator
 
sieradzanin1's Avatar
 
Join Date: Dec 2007
Location: Sieradz [Poland]
Posts: 10,363
Likes (Received): 1046

Unfinished:

Quote:
Originally Posted by P4TR1CK View Post
2 lata temu robiłem model w Cinema 4D (nie dokończyłem go ponieważ z każdym nowym wielokątem program wolniej chodził aż praca nad modelem stała się uciążliwa. Jak będę miał lepszą kartę graficzną i więcej pamięci to go dokończe):



Uprościłem go do samej bryły i wrzuciłem do SketchUp'a.
sieradzanin1 no está en línea   Reply With Quote
Old November 22nd, 2010, 03:45 PM   #488
sieradzanin1
Moderator
 
sieradzanin1's Avatar
 
Join Date: Dec 2007
Location: Sieradz [Poland]
Posts: 10,363
Likes (Received): 1046

Quote:
http://www.zw.com.pl/artykul/535670_...szkieletu.html

Martwy czas szkieletu
Robert Biskupski 19-11-2010, ostatnia aktualizacja 19-11-2010 21:03



Od odzyskania przez Orco pozwolenia na budowę Żagla mija ponad półtora miesiąca, a przy Złotej 44 wciąż nic się nie dzieje.Szkielet Żagla najpierw czekał na decyzje sądu (budowę zablokowało siedmiu lokatorów sąsiedniego budynku) i urzędów, teraz czeka na wybór wykonawcy.

Pozwolenie wojewoda przywrócił deweloperowi 7 października. Orco obiecywało wówczas, że w ciągu dwóch, maksymalnie trzech miesięcy robotnicy wrócą na budowę. Tymczasem z firmami, które 17-piętrowy kikut mają przekształcić w 54-piętrowy apartamentowiec, wciąż się toczą negocjacje.

– Znaczenie Złotej 44 dla całego Orco jest tak duże, że wszystkie ustalenia muszą być precyzyjne – tłumaczy dyrektor marketingu i sprzedaży Orco Alicja Kościesza. – Jest to ogromne przedsięwzięcie inwestycyjne i każdy szczegół musi być dopięty „na ostatni guzik”. A na to potrzeba czasu.

Jeszcze niedawno prezes Orco Jean Francois Ott wyliczał, że każdy dzień przestoju na budowie to dla dewelopera ok. 45 tys. zł straty. – Chcemy je rozpocząć jak najszybciej nie tylko dlatego, że przestój powoduje koszty, ale także ze względu na to, że Warszawa czeka na tę wieżę – mówi Alicja Kościesza.

Generalny wykonawca ma być wyłoniony w ciągu najbliższych dni. Czy to oznacza, że jeszcze w tym roku na budowę wrócą dźwigi?

– Bardzo byśmy chcieli, aby tak się stało – mówi Alicja Kościesza. – Trudno nam to jednak zagwarantować, do końca roku pozostało zaledwie kilka tygodni. Z pewnością jednak jeszcze w tym roku na placu budowy zacznie się zauważalny ruch.

Elewacja budynku ma być gotowa na mistrzostwa Euro 2012. Deweloperowi kibicują w tym urzędnicy i radni. – Ten wieżowiec, dzieło światowej sławy architekta Dawida Liebeskinda, znacznie uatrakcyjni krajobraz Warszawy, będzie co pokazać zagranicznym turystom – mówi przewodniczący śródmiejskiej Komisji Ładu Przestrzennego Grzegorz Walkiewicz. – Chcielibyśmy, żeby prace ruszyły też przy innych szkieletach, których w Śródmieściu jest kilka.
Translated

From regaining by Orco the building permit of the Sail he is passing the over one and a half month, and by Golden 44 still nothing oneself not dzieje.Szkielet of the Sail at first waited for rulings (seven residents of the neighbouring building blocked the structure) and of offices, now is waiting for the selection of the contractor.
sieradzanin1 no está en línea   Reply With Quote
Old November 22nd, 2010, 05:04 PM   #489
Dzwonsson
Neen, man!
 
Join Date: Feb 2008
Location: Rotterdam
Posts: 3,893

45 days passed after the retrieval of the construction permit for the Sail, however
there is still nothing happening at 44 Golden Street construction site.
At first the skyscraper's framework has been awaiting the court sentence and
offices decisions and now it's awaiting the general constructor selection.


And the most important information coming up in the article:

- The voivode has revived the construction permit at October 7, the developer
promised then the laborers will be back at the construction site within 2 or 3 months.
ORCO, however, is still negotiating with prospective companies, that will continue the
construction and manage it to an end.

- Every single day of work stoppage costs the developer ca. 11,000€.

- The general constructor will be selected within several days and activities
at the construction site will be observable at the end of the year.

Last edited by Dzwonsson; November 22nd, 2010 at 06:56 PM.
Dzwonsson no está en línea   Reply With Quote
Old November 26th, 2010, 02:42 PM   #490
sieradzanin1
Moderator
 
sieradzanin1's Avatar
 
Join Date: Dec 2007
Location: Sieradz [Poland]
Posts: 10,363
Likes (Received): 1046

Today :

Quote:
Originally Posted by morris71 View Post
Na razie nic się nie dzieje

Quote:
Originally Posted by Pedroni View Post
jakiś człowiek (zdjęcia nr 1 i 2) się tam dzisiaj na dole, na chodniku kręcił, ale ta jaskółka raczej jeszcze wiosny nie czyni - na pozostałych zdjęciach tak jak u Morrisa cisza i pustka :






sieradzanin1 no está en línea   Reply With Quote
Old December 2nd, 2010, 05:13 PM   #491
sieradzanin1
Moderator
 
sieradzanin1's Avatar
 
Join Date: Dec 2007
Location: Sieradz [Poland]
Posts: 10,363
Likes (Received): 1046

Snow !!

Orco is scheduling a press conference for 10 December on the occasion of resuming construction. They will move 2011 in January. In December sale of luxury apartments.

Quote:
Originally Posted by morris71 View Post






Quote:
Originally Posted by swaveck View Post
sieradzanin1 no está en línea   Reply With Quote
Old December 4th, 2010, 11:04 PM   #492
LoveAgent.
Need new name...
 
LoveAgent.'s Avatar
 
Join Date: Jun 2009
Location: London/Warsaw
Posts: 1,337
Likes (Received): 264

http://www.facebook.com/event.php?eid=171033009598079

"Light & Music" performance dedicated to Warsaw, its' Citizents and all Fans of
Złota 44 - residnetial building designed by Daniel Libeskind, prepared on the
occasion of resuming the construction works of this one of the most ground
breaking architecture projects in Poland.

Date: December 10
Time: 4.00 pm
Place: Zlota 44 fasade, corner of Zlota and Emilii Plater street, Warsaw, Poland

Let's meet at Złota 44!


LoveAgent. no está en línea   Reply With Quote
Old December 8th, 2010, 03:22 PM   #493
sieradzanin1
Moderator
 
sieradzanin1's Avatar
 
Join Date: Dec 2007
Location: Sieradz [Poland]
Posts: 10,363
Likes (Received): 1046

Inso/Consorzio Cooperative Costruzioni consortium will be a general contractor of the project.

http://forsal.pl/artykuly/470495,orc...warszawie.html
sieradzanin1 no está en línea   Reply With Quote
Old December 8th, 2010, 04:36 PM   #494
Lucky Luke
Registered User
 
Lucky Luke's Avatar
 
Join Date: Oct 2004
Location: Warszawa
Posts: 4,670
Likes (Received): 1541

January will be great month for skyscraper fans in Warsaw with Zlota and Hines both U/C and in spring Ghelamco might start their construction
__________________
There is nothing to see here ;)
Lucky Luke no está en línea   Reply With Quote
Old December 10th, 2010, 03:20 PM   #495
sieradzanin1
Moderator
 
sieradzanin1's Avatar
 
Join Date: Dec 2007
Location: Sieradz [Poland]
Posts: 10,363
Likes (Received): 1046

http://www.bloomberg.com/news/2010-1...-ceo-says.html

Quote:
Orco Property Group SA, a developer with most of its assets in central Europe, is ready to resume work on its flagship Warsaw tower after local authorities ended their suspension of the permit.

The company expects revenue of 250 million euros ($331 million) from the Zlota 44 project designed by Daniel Liebeskind, Chief Executive Officer Jean-Francois Ott said in an interview in the Polish capital today. Construction costs will be about 100 million euros, and the financing includes 50 million euros from UniCredit SpA unit Bank Pekao SA, he said.

Orco, whose debt is 14 times its market capitalization, had 998 million euros of bank loans in September, while the value of outstanding bonds exceeded 235 million euros, according to a regulatory statement on Nov. 25. The current market value of its equity is 89 million euros
sieradzanin1 no está en línea   Reply With Quote
Old December 10th, 2010, 03:33 PM   #496
Locke
Guac Bowl Merchant
 
Locke's Avatar
 
Join Date: Sep 2005
Posts: 7,470
Likes (Received): 5539

This is great news, its a first rate addition to the skyline and a decent height for Warsaw(though come on Orco, how about that 350m tower now)
Locke no está en línea   Reply With Quote
Old December 11th, 2010, 04:13 PM   #497
sieradzanin1
Moderator
 
sieradzanin1's Avatar
 
Join Date: Dec 2007
Location: Sieradz [Poland]
Posts: 10,363
Likes (Received): 1046

Quote:
Originally Posted by JeV View Post
Jeszcze coś od Polexa!

Quote:
Originally Posted by Luidi_wawa View Post
Byłem na konferencji o 14:30 i później na pokazie, który był również transmitowane do wewnątrz
Niestety, z powodu komplikacji rodzinnych (choroba żony), nie dotarł Daniel Libeskind. Został odczytany jego list, który mam również w wersji drukowanej.
Był p. Ott, p. Alicja Kościesza, przedstawiciele nowych wykonawców - i ogólnie: sporo Włochów. Po konferencji pojawiła się tajemnicza starsza pani w moherowym berecie, buszująca przy stole z ciasteczkami...

Stół szwedzki wyborny, przyszłe lobby zaaranżowane jak dobry klub nocny, nagrzewnice wprowadziły upalną atmosferę.

Poniżej zdjęcia sprzed konferencji, w trakcie no i w zasadzie: Złota 44 w pięknych perspektywach już jest gotowa!

































sieradzanin1 no está en línea   Reply With Quote
Old December 14th, 2010, 12:13 AM   #498
Bez_imena
Kosovo is Serbia!
 
Bez_imena's Avatar
 
Join Date: Oct 2009
Location: Serbia, Србија
Posts: 5,744
Likes (Received): 3785

Cool
__________________
Kosovo is Serbia!
Bez_imena está en línea ahora   Reply With Quote
Old December 14th, 2010, 12:55 AM   #499
Turbosnail
Registered User
 
Turbosnail's Avatar
 
Join Date: Dec 2004
Posts: 1,993
Likes (Received): 269

Warsaw has so much potential - they need to build this!!
Turbosnail no está en línea   Reply With Quote
Old December 17th, 2010, 10:22 PM   #500
jackdaniel123
Registered User
 
Join Date: Dec 2010
Posts: 1
Likes (Received): 0

caravan parks

Hi this is Jack.. This Forum site is good and very interesting though i'am new to this site is use full to every one Thanks..

caravan parks
jackdaniel123 no está en línea   Reply With Quote


Reply

Tags
libeskind, warsaw, warszawa, z44

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Related topics on SkyscraperCity


All times are GMT +2. The time now is 02:00 AM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2018, vBulletin Solutions Inc.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

tech management by Sysprosium