daily menu » rate the banner | guess the city | one on oneforums map | privacy policy | DMCA | news magazine | posting guidelines

Go Back   SkyscraperCity > European Forums > Fórum Português > Arquitectura e Urbanismo > Portugal > Projectos



Global Announcement

As a general reminder, please respect others and respect copyrights. Go here to familiarize yourself with our posting policy.


Reply

 
Thread Tools
Old March 3rd, 2006, 04:14 AM   #1
Petronius
Ich bin's
 
Join Date: Mar 2004
Location: Porto
Posts: 2,059
Likes (Received): 4

ainda as energias renováveis:



Quatro propostas para produção de energia eólica


Consórcios nacionais e espanhóis disputam negócio







Produzir energia a partir do vento é um negócio interessante para quatro grupos de empresas nacionais e estrangeiras. As propostas foram recebidas hoje oficialmente no Ministério da Economia.










São quatro os consórcios de empresas que concorrem à atribuição de pelo menos 800 megawatts de produção de energia eólica. Em sessão pública, o júri do concurso confirmou a recepção das quatro propostas.
Dois consórcios são liderados por duas grandes empresas nacionais, a Galp e a EDP. E, os outros dois grupos são controlados por empresas espanholas, Iberdrola e Union Fenosa.

O consórcio onde participa a Galp prevê investir mais de mil milhões de euros. O grupo da EDP prefere não revelar números, mas acredita igualmente na vitória.

Numa primeira fase, o Governo pode atribuir até mil megawatts de potência de energia eólica. Mais tarde vai decorrer uma segunda fase onde vão estar a concurso mais 400 megawatts.

Com Lusa


http://sic.sapo.pt/online/noticias/d...gia+eolica.htm
__________________
Wha?
Petronius no está en línea   Reply With Quote

Sponsored Links
 
Old March 3rd, 2006, 04:14 AM   #2
Petronius
Ich bin's
 
Join Date: Mar 2004
Location: Porto
Posts: 2,059
Likes (Received): 4

http://www.diarioeconomico.com/edici...lo/624088.html

Quatro consórcios candidataram-se para o concurso de potência eólica

DE com Reuters



Quatro consórcios apresentaram candidaturas ao concurso público para atribuição de até 1500 Mega Watts (MW) de potência eólica, cujo prazo de entrega terminou às 17h00, disse Manuela Fonseca, da Direcção Geral de Geologia e Energia (DGGE).


Os quatro consórcios são liderados, respectivamente, pela EDP-Energias de Portugal , pela Galp Energia, pela Iberdrola-Gamesa e pela ENEL-Unión Fenosa .

"Quatro agrupamentos de empresas entregaram proposta (para o concurso). Amanhã proceder-se-á à abertura das propostas, pelas 10h00", afirmou Manuela Fonseca.

O consórcio da EDP inclui a TP-Termoeléctrica Portuguesa - detida pela Sonae e a Endesa -, a Generg da Electrabel , a Finerge da Endesa, a SIIF da EDF e a Enercom.

A Galp Energia lidera outro agrupamento que inclui a Martifer, a Enersis da Babcock & Brown, a Efacec e a Repower Portugal , a Repower Systems e a fábrica de pás Power Blades.

O consórcio liderado pela Iberdrola-Gamesa inclui a Visabeira, a Alberto Mesquita, a MECI e a Galucho.

A ENEL/Unión Fenosa lidera um agrupamento do qual fazem arte também a WPB, a Suzlon Energy IAS e a Enervento.

A primeira fase é de até 1000 MW e a segunda de até 500 MW.

Este é um dos maiores concursos de energia eólica da União Europeia (UE) e, segundo dados da EWEA-European Wind Energy Association, representa cerca de um quarto da nova capacidade que foi instalada, em 2006, nos 25 Estados Membros.

O projecto permitirá produzir energia eléctrica para abastecer à volta de 750 000 casas e será mais um passo para a redução de emissões de poluição para a atmosfera, essencialmente monóxido de carbono, ao abrigo do Protocolo de Quioto.

De acordo com dados das Nações Unidas, estas emissões aumentaram 37% entre 1990 e 2003, o terceiro maior aumento mundial.
__________________
Wha?
Petronius no está en línea   Reply With Quote
Old March 3rd, 2006, 04:15 AM   #3
Petronius
Ich bin's
 
Join Date: Mar 2004
Location: Porto
Posts: 2,059
Likes (Received): 4

http://www.diarioeconomico.com/edici...lo/623991.html

Consórcio da Galp prevê investir 1,03 mil milhões de euros na energia eólica

DE com Lusa



O agrupamento Ventinveste, liderado pela Galp Energia, quer investir 1,035 mil milhões de euros na criação de um cluster industrial para a energia eólica que prevê a construção de 9 parques com 800 megawatts (MW) de potência.

O agrupamento Ventinveste anunciou hoje ter entregue, no último dia do prazo do concurso lançado pelo Governo, a proposta para a atribuição de licenças para a produção de energia eólica em associação com a Martifer, Enersis, Efacec Energia, Repower Portugal, Repower Systems AG e fábrica de pás Power Blades.

Liderado pela Galp Energia, com uma participação accionista de 34%, o agrupamento conta ainda com a Martifer com 31%, a Enersis com 30%, a Eface Energia (com 2%) e a Repower Systems, Repower Portugal e Power Blades com 1% cada.

A Ventinveste prevê criar 1250 novos postos de trabalho e instalar nove parques eólicos em distritos como Beja, Castelo Branco, Coimbra, Leiria, Lisboa, Vila Real e Viseu.

Só na componente eólica, o consórcio prevê investir 920 milhões de euros, com o primeiro parque a entrar em funcionamento no final de 2008 e o último em 2013.

A componente industrial envolve um investimento de 80 milhões de euros - 25 milhões em investimento directo e 55 milhões de euros em investimento indirecto - e engloba a criação de 23 unidades industriais a localizar em zonas classificadas pelo Programa de Recuperação de Áreas e Sectores Deprimidos (PRASD).

As unidades industriais terão uma capacidade de produção anual de 80 aerogeradores e 267 conjuntos de pás e deverão ser instaladas nos distritos de Aveiro, Braga, Coimbra, Lisboa, Porto, Santarém e Vises.

Este projecto tem um horizonte temporal de pelo menos 17 anos de actividade, esperando-se que gere um valor acrescentado bruto (VAB) de 100 milhões de euros no ano em que atingir a velocidade de cruzeiro.

As exportações durante o período de actividade, que serão cerca de 60% da produção total, deverão atingir os 3.600 milhões de euros.

O agrupamento Ventinveste prevê que dos 1250 novos postos de trabalho, dos quais 650 directos, mais de 64% sejam emprego especializado, 10% técnico e 26% indiferenciado.

O consórcio assegura ainda a transferência de tecnologia para o país, através da Repower Systems, nomeadamente no fabrico de pás e aerogeradores da mais recente tecnologia e compromete-se a dotar o Fundo de Inovação previsto no programa do concurso com 35 milhões de euros.

O Governo lançou, em Julho do ano passado, um concurso para a atribuição de 1500 megawatts de potência eólica e a criação de um "cluster" industrial, cujo prazo de entrega das propostas termina hoje às 17h00.

Além do agrupamento liderado pela Galp Energia, apenas o consórcio Novas Energias Ibéricas, liderado pela Iberdrola e Gamesa, apresentou o seu projecto industrial.

O consórcio liderado pela EDP deverá apresentar também hoje a sua proposta para o concurso no valor de 1,2 mil milhões de euros.

O caderno de encargos foi ainda levantado pelo consórcio formado pelos portugueses Grupo Lena (através da Lena SGPS e Eneólica), os finlandeses WinWind e a Enersin, do grupo espanhol Elecnor e pela Union Fenosa.
__________________
Wha?
Petronius no está en línea   Reply With Quote
Old March 3rd, 2006, 04:18 AM   #4
Petronius
Ich bin's
 
Join Date: Mar 2004
Location: Porto
Posts: 2,059
Likes (Received): 4

e ainda como foi visto lá fora:

no prestigiado jornal britânico The Guardian

Portugal powers ahead as wind champion

· Massive new project to harness Atlantic gales
· Lisbon setting European pace on renewables

Giles Tremlett
Thursday March 2, 2006
The Guardian


Portugal signalled the launch of one of Europe's biggest wind power projects yesterday - a move that will supply enough electricity for 750,000 homes.
The contract is the equivalent to a quarter of all the wind power installed in the European Union last year. It will help cement the growing reputation of Portugal - a country importing 86% of its energy needs - as a renewable energy champion. This year, it has already approved the building of the world's largest solar plant.

Portugal powers ahead as wind champion

· Massive new project to harness Atlantic gales
· Lisbon setting European pace on renewables

Giles Tremlett
Thursday March 2, 2006
The Guardian


Portugal signalled the launch of one of Europe's biggest wind power projects yesterday - a move that will supply enough electricity for 750,000 homes.
The contract is the equivalent to a quarter of all the wind power installed in the European Union last year. It will help cement the growing reputation of Portugal - a country importing 86% of its energy needs - as a renewable energy champion. This year, it has already approved the building of the world's largest solar plant.


Article continues

--------------------------------------------------------------------------------

--------------------------------------------------------------------------------

The new wind project will rank Portugal alongside Denmark and Spain as the European countries with the highest proportion of wind energy in the national grid. It will more than double wind power capacity in Portugal.
The winning consortium will be asked to erect about 500 turbines at various locations. "This is definitely one of the biggest tenders we've seen [in Europe]," Christian Kjaer, policy director at the Brussels-based European Wind Energy Association, told Reuters news agency. "We've seen those [auctions] more in the United States and Canada."

Half a dozen consortiums featuring some of Europe's biggest power companies were expected to have lodged their bids for the two-phase 1,500-megawatt project by last night's deadline. The winner is expected to be announced during the summer.

Portugal's Socialist government also aims to create 1,600 jobs by allocating €900m (£613m) for turbine equipment manufacturing.

With a 520-mile coastline, often battered by Atlantic gales, Portugal is well-placed to take advantage of wind power.

Last year, the country increased its wind power target for 2010 from 3,750 to 4,400MW. Lisbon is looking to wind to help meet its goals under the Kyoto protocol on curbing greenhouse gas emissions.

The country's emissions surged almost 37% from 1990 to 2003 - the third-highest increase in the world. One of the EU's poorer countries has, however, already shown signs of leading Europe in renewable energy.

Its energy plans range from the world's first commercial wave farm to putting a hydroelectric dam on its last big undammed river, the Sabor. The government set aside a €2.5bn renewable energy war chest last year.

It recently granted a licence for the world's biggest solar energy plant, which will be able to produce enough electricity to power 21,000 homes for the southern town of Moura.

The 62MW plant will use 350,000 solar panels spread over an area the size of 150 football pitches. It will be 12 times the size of the biggest solar power plant currently in operation near Leipzig, Germany.

A wave power plant is also being established near the northern town of Povoa de Varzim. Using sausage-shaped floating generators made by a Scottish company to lap up energy from the Atlantic, it is due to generate sufficient power by the end of this year to supply 1,200 homes.

Some energy experts predict that Portugal could eventually produce 20% of its needs from the sea.

Gathering force

The global wind power market increased by 43% last year. The total capacity now stands at 59,322MW. This is a fraction of the total electricity supply, but the figure is rapidly growing. The countries with the highest total installed capacity are Germany (18,428MW), Spain (10,027) the US (9,149), India (4,430) and Denmark (3,122). Britain, China, Italy, Japan, the Netherlands and Portugal have all reached the 1,000MW mark.
__________________
Wha?
Petronius no está en línea   Reply With Quote
Old March 3rd, 2006, 04:19 AM   #5
Petronius
Ich bin's
 
Join Date: Mar 2004
Location: Porto
Posts: 2,059
Likes (Received): 4

__________________
Wha?
Petronius no está en línea   Reply With Quote
Old March 3rd, 2006, 01:41 PM   #6
TeKnO_Lx
Registered User
 
TeKnO_Lx's Avatar
 
Join Date: Oct 2004
Location: Lisboa
Posts: 6,622
Likes (Received): 167

Boa Socrates

500 turbinas, 1600 postos de trabalho, Impressionante

espero que vence um competidor nacional, e crie um gigante "ibérico" no sector
Portugal tem todas as condiçoes naturais para ser sustentavel a nivel energetico a longo prazo, energia eolica/ondas maioritariamente na região Norte e Centro e Solar no Alentejo e Algarve



btw sabem se jáe está em construção a central solar no ALentejo?
__________________
Europe
TeKnO_Lx no está en línea   Reply With Quote
Old March 3rd, 2006, 05:50 PM   #7
Barragon
Barra for Friends
 
Barragon's Avatar
 
Join Date: Dec 2004
Location: Barreiro
Posts: 84,755
Likes (Received): 1594

Excelentes notícias!! vamos ser os campeoes das energias renováveis.
__________________
::: Portuguese Forum :::

The Latest Photo Reports: Região de Lisboa :: Alentejo

Fat people are harder to kidnap
Barragon no está en línea   Reply With Quote
Old March 4th, 2006, 02:13 AM   #8
Filipe_Golias
Biochem Guy
 
Filipe_Golias's Avatar
 
Join Date: Aug 2005
Location: Porto
Posts: 8,566
Likes (Received): 0

Não é pra ser picuinhas mas... porque é que o thread já existente não servia para isto?

Quote:
The contract is the equivalent to a quarter of all the wind power installed in the European Union last year. It will help cement the growing reputation of Portugal - a country importing 86% of its energy needs - as a renewable energy champion. This year, it has already approved the building of the world's largest solar plant.
Nós importamos 86% da nossa energia???????

1/4 da potência eólica instalada na UE em 2005???

Força com as ER's! Que sejamos campeões em algo lucrativo e benéfico!
__________________
"I have TWO WORDS for you, mister - CROSS-LINKING!"

Filipe_Golias no está en línea   Reply With Quote
Old March 4th, 2006, 02:16 AM   #9
Daniel_Portugal
I Love You... Soraia
 
Daniel_Portugal's Avatar
 
Join Date: Sep 2005
Location: PORTO Metro Area
Posts: 28,490
Likes (Received): 32

belas noticias!
__________________
pila
Daniel_Portugal no está en línea   Reply With Quote
Old March 4th, 2006, 03:46 AM   #10
Barragon
Barra for Friends
 
Barragon's Avatar
 
Join Date: Dec 2004
Location: Barreiro
Posts: 84,755
Likes (Received): 1594

Eu acho que o nosso país tem boas potencialidades para ser autosuficiente energeticamente ..... alem de que podemos até exportar!
__________________
::: Portuguese Forum :::

The Latest Photo Reports: Região de Lisboa :: Alentejo

Fat people are harder to kidnap
Barragon no está en línea   Reply With Quote
Old March 4th, 2006, 07:07 PM   #11
Petronius
Ich bin's
 
Join Date: Mar 2004
Location: Porto
Posts: 2,059
Likes (Received): 4

Quote:
Originally Posted by Filipe_Golias
Não é pra ser picuinhas mas... porque é que o thread já existente não servia para isto?
desculpa so' me lembrei disso depois de ter lançado o thread...


Quote:
Nós importamos 86% da nossa energia???????

1/4 da potência eólica instalada na UE em 2005???

Força com as ER's! Que sejamos campeões em algo lucrativo e benéfico!
pois é , e é por isso aue é importante apostar nas energias renovaveis.... ainda bem que o nosso governo acordou para o problema.
__________________
Wha?
Petronius no está en línea   Reply With Quote
Old March 4th, 2006, 07:54 PM   #12
[Smeagol]
Registered User
 
[Smeagol]'s Avatar
 
Join Date: Dec 2003
Location: Pombal e Aveiro
Posts: 1,332
Likes (Received): 1

penso q essa percentagem de 86% é referente a energia no geral... ou seja tbm contabiliza as importações de combustiveis fósseis... mas n deixa de ser um volor muito elevado... tenho a certeza q qd todos estes projectos tiverem concluidos teremos poupado muitos barris de petróleo
[Smeagol] no está en línea   Reply With Quote
Old March 4th, 2006, 09:53 PM   #13
Barragon
Barra for Friends
 
Barragon's Avatar
 
Join Date: Dec 2004
Location: Barreiro
Posts: 84,755
Likes (Received): 1594

Quando estes projectos estiverem todos construídos..... será que há mais... ou é só para chegarmos às metas??
__________________
::: Portuguese Forum :::

The Latest Photo Reports: Região de Lisboa :: Alentejo

Fat people are harder to kidnap
Barragon no está en línea   Reply With Quote
Old March 5th, 2006, 02:07 AM   #14
Portugues
BANNED
 
Join Date: Jan 2006
Posts: 2,680
Likes (Received): 0

Quote:
Originally Posted by TeKnO_Lx
500 turbinas, 1600 postos de trabalho
Das duas uma, ou o povo não está a par do assunto ou então engole a desinformação do Governo! Vocês acreditam mesmo na criação dos 1600 postos de trabalho?
Portugues no está en línea   Reply With Quote
Old March 5th, 2006, 02:39 AM   #15
Filipe_Golias
Biochem Guy
 
Filipe_Golias's Avatar
 
Join Date: Aug 2005
Location: Porto
Posts: 8,566
Likes (Received): 0

Então faça o trabalho que compete ao governo e informe-nos lá sobre o verdadeiro nº de postos de trabalho. Acha que tudo isto se vai governar sozinho??

Quando cria emprego é desinformação do governo, quando não cria é inércia do mesmo. Haja pachorra...
__________________
"I have TWO WORDS for you, mister - CROSS-LINKING!"

Filipe_Golias no está en línea   Reply With Quote
Old March 5th, 2006, 02:55 AM   #16
Portugues
BANNED
 
Join Date: Jan 2006
Posts: 2,680
Likes (Received): 0

Quote:
Originally Posted by Filipe_Golias
Então faça o trabalho que compete ao governo e informe-nos lá sobre o verdadeiro nº de postos de trabalho. Acha que tudo isto se vai governar sozinho??
Você acredita que uma turbina precisa de 3 trabalhadores permanentes, sejam eles técnicos, administativos ou executivos?
Portugues no está en línea   Reply With Quote
Old March 5th, 2006, 05:00 AM   #17
Barragon
Barra for Friends
 
Barragon's Avatar
 
Join Date: Dec 2004
Location: Barreiro
Posts: 84,755
Likes (Received): 1594

Que ignorância..... os técnicos não são para trabalhar nas turbinas...
__________________
::: Portuguese Forum :::

The Latest Photo Reports: Região de Lisboa :: Alentejo

Fat people are harder to kidnap
Barragon no está en línea   Reply With Quote
Old March 5th, 2006, 05:46 AM   #18
Filipe_Golias
Biochem Guy
 
Filipe_Golias's Avatar
 
Join Date: Aug 2005
Location: Porto
Posts: 8,566
Likes (Received): 0

Quote:
Originally Posted by Portugues
Você acredita que uma turbina precisa de 3 trabalhadores permanentes, sejam eles técnicos, administativos ou executivos?
Você acredita que um aerogerador é só a "turbina"? Para onde vai a electricidade gerada? Onde se acumula, é potenciada e introduzida na rede eléctrica geral? É tudo feito por obra e graça do Espírito Santo?
__________________
"I have TWO WORDS for you, mister - CROSS-LINKING!"

Filipe_Golias no está en línea   Reply With Quote
Old March 5th, 2006, 05:49 AM   #19
Barragon
Barra for Friends
 
Barragon's Avatar
 
Join Date: Dec 2004
Location: Barreiro
Posts: 84,755
Likes (Received): 1594

que comentário mais ignorante!
__________________
::: Portuguese Forum :::

The Latest Photo Reports: Região de Lisboa :: Alentejo

Fat people are harder to kidnap
Barragon no está en línea   Reply With Quote
Old March 6th, 2006, 02:14 AM   #20
Petronius
Ich bin's
 
Join Date: Mar 2004
Location: Porto
Posts: 2,059
Likes (Received): 4

enfim...
__________________
Wha?
Petronius no está en línea   Reply With Quote


Reply

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT +2. The time now is 02:57 AM.


Powered by vBulletin® Version 3.8.8 Beta 1
Copyright ©2000 - 2014, vBulletin Solutions, Inc.
Feedback Buttons provided by Advanced Post Thanks / Like v3.2.5 (Pro) - vBulletin Mods & Addons Copyright © 2014 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2014 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu