|
|
| daily menu » rate the banner | guess the city | one on one |
|
|
#861 |
|
Registered User
Join Date: Aug 2008
Posts: 1,726
Likes (Received): 16
|
rkramesh, I'm not entirely sure what 1C is going to look like, but I do know that they're integrating it with the existing terminals. It should look like 1B as far as materials and lines go, but could have a lot in common with the design of terminal 1A.
I hope the new structure doesn't stand out as being different form 1A and B. This is what 1A looks like post part-renovation (they're still working on it)... Up the departure level ramp ![]() ![]() Departure level ![]() ![]() Arrivals 1. ![]() ![]() 2. ![]() ![]() 3. ![]() ![]() 4. ![]() ![]() 5. ![]() ![]() 6. Auto-rickshaw and taxi queue. The white wall with the cables hanging, is where the west end of 1C will connect. ![]()
|
|
|
|
|
|
#862 | |
|
Registered User
Join Date: Aug 2008
Posts: 1,726
Likes (Received): 16
|
Quote:
The new BRTS King Long buses are weirdly coloured, but they're nice to look at, and ply on the city's arterial roads. There's a picture of one of 'em somewhere in this forum... Here's some info from the BEST's website... http://www.bestundertaking.com/Trave...ike-Ticket.pdf |
|
|
|
|
|
|
#863 | |
|
Registered User
Join Date: Aug 2007
Posts: 8,468
|
Quote:
From some past news on Mid-day and Mumbai Mirror, people have been complaining about King-Long buses. Many drivers have complained after they changed from regular BEST buses to the King Long ones. Here's the Mid-day article about it. I do agree that we should ply Volvos/Mercedes throughout Mumbai. |
|
|
|
|
|
|
#864 |
|
Registered User
Join Date: Feb 2005
Location: Austin, TX
Posts: 2,051
Likes (Received): 0
|
|
|
|
|
|
|
#866 | |
|
Registered User
Join Date: Aug 2008
Posts: 1,726
Likes (Received): 16
|
The BRTS King Long bus was the only one in that pdf.
Quote:
It's just the intercity buses that are currently on offer. More to come, soon... |
|
|
|
|
|
|
#867 |
|
Ramesh
Join Date: Jul 2007
Location: Bengaluru
Posts: 979
Likes (Received): 0
|
Thanks for the Nice pics KB - isnt Terminal 1-B a part of the domestic terminal series - I thought the 1 series were domestic and the 2 series are international.
![]() ![]() Departure level ![]() I dont recollect terminal 1 having a curved departure ramp as seen in 2 of your pics - is this new - ? I thought it was only perminal 2 A,B and c that had this curved departure ramps... Otherwise the renovation has made it a different animal altogether...in the right direction... |
|
|
|
|
|
#868 |
|
Registered User
Join Date: May 2005
Posts: 4,585
Likes (Received): 1
|
terminal 1-a has always had the ramp. its used by air india and kingfisher
|
|
|
|
|
|
#869 |
|
Registered User
Join Date: Aug 2008
Posts: 1,726
Likes (Received): 16
|
rKramesh, terminal 1A opened in 1992 with Indian Airlines as the sole occupant. Kingfisher airlines has been using this teriminal as well, ever since it started operations in '05.
|
|
|
|
|
|
#870 |
|
Registered User
Join Date: Aug 2008
Posts: 1,726
Likes (Received): 16
|
|
|
|
|
|
|
#871 |
|
Registered User
Join Date: Aug 2007
Posts: 8,468
|
Look at the Bombay Blue Bar...
The whites seem to enjoy it... :P |
|
|
|
|
|
#872 |
|
Registered User
Join Date: Aug 2008
Posts: 1,726
Likes (Received): 16
|
Don't we all??
|
|
|
|
|
|
#873 |
|
Registered User
Join Date: Aug 2007
Posts: 8,468
|
I don't think these all stuff was there like couple of years back... did they just add all such things recently or something?
|
|
|
|
|
|
#874 |
|
--
Join Date: Jun 2008
Location: Hyderabad/Dubai
Posts: 1,803
Likes (Received): 43
|
I am a bit confused now....
Are they building a new airport, expanding the existing one or both?? |
|
|
|
|
|
#875 |
|
Registered User
Join Date: Aug 2008
Posts: 1,726
Likes (Received): 16
|
The Bombay Blue bar is new, yes. The upgrade to terminal 2 B is recent (and temporary). There used to be a bar in 2 A (not sure about 2 C)
|
|
|
|
|
|
#876 |
|
Registered User
Join Date: Aug 2007
Posts: 8,468
|
Thanks KB.
SK- They are planning to do both. While renovating(not really expanding) the old airport is undergoing right now, the new airport at Navi Mumbai is a long way to start undergo construction... |
|
|
|
|
|
#877 |
|
Ramesh
Join Date: Jul 2007
Location: Bengaluru
Posts: 979
Likes (Received): 0
|
Thanks for the clarification BB and KB and the pics KB. The terminal is wearing new clothes inside - GVK seems a capable number - raises expectation for the brand new terminals coming up.
SK I know it might seems odd that the old terminals are bing done up even if they will be demolished, but the terminals were so poor and far behind the contemporary that GVK had to update them just to get them to be acceptable as a half decent airport till he new ones get built grounds up and ready for use in 3-4 years time. |
|
|
|
|
|
#878 |
|
--
Join Date: Jun 2008
Location: Hyderabad/Dubai
Posts: 1,803
Likes (Received): 43
|
makes sense i guess. Me been to CSIA only twice, and i must admit, it was horrendous with the typical Indian airport smell as soon as you walk out of the plane........The private sector has become the savior of new India |
|
|
|
|
|
#879 |
|
Registered User
Join Date: Aug 2007
Posts: 8,468
|
New India, but old problems, eh?
|
|
|
|
|
|
#880 | |
|
Registered User
Join Date: Feb 2005
Location: Austin, TX
Posts: 2,051
Likes (Received): 0
|
Quote:
|
|
|
|
|
![]() |
| Tags |
| bom, csia, mumbai, mumbai airport |
| Thread Tools | |
| Display Modes | Rate This Thread |
|
|