| daily menu » rate the banner | guess the city | one on one |
|
|
#2701 |
|
Registered User
Join Date: May 2011
Location: tuticorin
Posts: 2,793
Likes (Received): 61
|
tuticorin view of old harbour.. 2004 snap.
![]() tuticorin snow basilica church ![]() sea water intake ![]() VVD coconut oil mill ![]() mahal ![]() light house ![]() "sagar southern" a very nice hotel placed near tuticorin near a bird sanctuary
|
|
|
|
|
|
#2702 |
|
Registered User
Join Date: May 2011
Location: tuticorin
Posts: 2,793
Likes (Received): 61
|
2004 snap..
salt pan in tuticorin ![]() tuticorin home architecture ![]() clock ![]() around tuticorin ![]() ![]() ![]() ![]() tuticorin port in 1890's
|
|
|
|
|
|
#2703 |
|
Registered User
Join Date: May 2011
Location: tuticorin
Posts: 2,793
Likes (Received): 61
|
CPF exposed the hidden plans of coastal energen power plant through this map
|
|
|
|
|
|
#2704 |
|
Registered User
Join Date: May 2011
Location: tuticorin
Posts: 2,793
Likes (Received): 61
|
GREEN TECH FOUNDATION GIVE GOLD MEDAL FOR TUTICORIN PORT FOR WELL MAINTAINING THE SURROUNDING OF PORT. For the last 3 years tuticorin port got silver medal for this year 2011' tuticorin port got gold medal..central environmental welfare and environmental scientists give this precious award to tuticorin port
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() source : tutyonline.net |
|
|
|
|
|
#2705 |
|
Registered User
Join Date: May 2011
Location: tuticorin
Posts: 2,793
Likes (Received): 61
|
About coastal energen power plant,
தூத்துக்குடி | Coastal Energen Pvt Ltd| Tuticorin | 1200 MW Power Plant Project Website: http://www.coastalenergen.com/ Coastal Energen Pvt Ltd (ENERGEN), the Power Generating Flagship Company of the Coal and Oil Group, is setting up a 1200 MW coal fired thermal power plant in the district of Tuticorin in the State of Tamil Nadu , India. Our maiden power project in Tuticorin, Tamil Nadu, South India is a logical extension of our multi disciplinary capabilities building on our diverse strengths and leveraging our varied experiences in “Fuel Management” which gives Coastal Energen a distinct advantage as a low cost Power Producer. Tuticorin has been identified by both the Central Government of India and State Government of Tamilnadu as a power generating centre for southern Tamilnadu lying as it does in the middle of the power corridor. Situated only 13 kms from Tuticorin town, our project enjoys the following advantages: • Close proximity to a major town (13 kms) • Within 21 kms of a major port • Excellent road, Rail & Air connectivity • Excellent grid connectivity The project has achieved fast progress since its inception. • Land fully acquired • PPA Agreement Signed • MOEF Clearance issued • Funding fully tied up and secured • BTG order finalized • Discussion with PGCIL for power evacuation • Engineering Consultants appointed • Manpower in place • Site preparation completed • Geo-technical investigations completed • Construction water and power in place • Water allocated by TWAD Board for process requirements |
|
|
|
|
|
#2706 |
|
Registered User
Join Date: May 2011
Location: tuticorin
Posts: 2,793
Likes (Received): 61
|
About NTPL JV power plant,
தூத்துக்குடி | Tuticorin NTPL JV power plant | 1000MW Location : Tuticorin Capacity : 2 x 500MW Total cost of the project without IDC : 4909 Crores Name of the contractor : Main plant contractor M/s. BHEL Zero date : 12.05.2008 Schedule date of commissioning : Unit I - Mar.2012 Unit II - Aug.2012 Present stage of the project : Site preparation works are under progress. LOA issued to M/s L&T for coal handling system of the project. |
|
|
|
|
|
#2707 |
|
Registered User
Join Date: May 2011
Location: tuticorin
Posts: 2,793
Likes (Received): 61
|
About udangudi power plant,
உடன்குடி/தூத்துக்குடி | Udangudi Power plant | 1600MW Location : Udangudi near Trichendur Capacity : 2 x 800MW Total cost of the project without IDC : 9083 Crores Name of the contractor : Yet to be finalised Zero date : Yet to be fixed Schedule date of commissioning : Unit I - Mar.2013 Unit II- Sep.2013 Present stage of the project : Preliminary works are completed. Site specific studies such as EIA study has been completed. Public hearing are over. On receipt of approval from state level CZMA(Coastal Zone Management Authority), application will be filed to the MOEF for Environmental clearance of the project. http://www.tneb.in/template_3.php?te...d=0&subcid=167 |
|
|
|
|
|
#2708 |
|
Registered User
Join Date: May 2011
Location: tuticorin
Posts: 2,793
Likes (Received): 61
|
* தூத்துக்குடி | Tuticorin | Spic Electric Power Corporation (Private) Ltd (SEPC)
* தூத்துக்குடி | Tuticorin | Sri City Infrastructure Dev. Ltd | 1000 MW Power Plants * மனப்பட் (தூத்துக்குடி) | Manapad (Tuticorin) | Ind-Barat Power Pvt. Ltd | 1320 MW Power Plant * 1,000 MW with Neyveli Lignite Corporation at Tuticorin * The TNEB also proposes 1,000 MW expansion on its own at Tuticorin |
|
|
|
|
|
#2709 |
|
Chennai!!
Join Date: Nov 2009
Location: Chennai
Posts: 8,744
Likes (Received): 1298
|
Nice work joe!
Tuticorin is gonna be the future powerhouse of TN |
|
|
|
|
|
#2710 |
|
Registered User
Join Date: Oct 2008
Location: tuticorin
Posts: 222
Likes (Received): 4
|
excellent work joe
|
|
|
|
|
|
#2711 | |
|
Registered User
Join Date: May 2008
Location: Tuticorin / Dubai
Posts: 887
Likes (Received): 8
|
Quote:
http://tutyonline.net/view/31_21714/20110930181235.html Well done Tuty Port trust.... Thanks Joe! |
|
|
|
|
|
|
#2712 | |
|
Registered User
Join Date: May 2008
Location: Tuticorin / Dubai
Posts: 887
Likes (Received): 8
|
Quote:
This project cannot finish by 2013, as project has not obtained all clearance. The NLC power project also will miss the 2012 dates. I have done a compilation of all thermal plants coming up around tuticorin sometime back... will repost it and try it make some latest updates... |
|
|
|
|
|
|
#2713 | |
|
Registered User
Join Date: May 2008
Location: Tuticorin / Dubai
Posts: 887
Likes (Received): 8
|
Date : May 15th, 2010, 01:58 AM
Quote:
|
|
|
|
|
|
|
#2714 | |
|
Registered User
Join Date: May 2008
Location: Tuticorin / Dubai
Posts: 887
Likes (Received): 8
|
On November 28th, 2010, 09:50 PM
Link : http://www.skyscrapercity.com/showpo...postcount=1505 Just thought of reposting an earlier compilation we have done on the list of thermal power plants coming in Tuty district. Hopefully during this year end vacation I will try to get some snaps. Cheers! Quote:
Last edited by BlackPearl; September 30th, 2011 at 08:47 PM. Reason: Edit |
|
|
|
|
|
|
#2715 |
|
Registered User
Join Date: May 2008
Location: Tuticorin / Dubai
Posts: 887
Likes (Received): 8
|
Update on September 2011
1. Tuticorin Thermal Power Station (TTPS) Location : Near Tuty Port Capacity : 1050 MW (5 X 210 MW) Status : Fully Operational Last expansion on 1992 Coal transported by conveyor from Port Proposed Expansion by another 1000 MW was shelved. . The proposed expansion is now revived and TNEB is now looking at a 1 X 800 MW after the new govt was formed. Too early to see an application for clearance for this project. 2. Ind Barath Location : Within 2 Kms from bypass road junction on Madurai Road, approximately 28 Kms from Port Capacity : 210 MW (some reports have 126 / 189 MW , confirmed capacity awaited) Status : Trial Runs ongoing, operational in the month of May 2010 (this month) Current Status : Operational Coal requirement will be transported by road. 3. Neyveli TamilNadu Power Ltd (NTPL) Location : Near Tuty Port, besides TTPS Capacity : 1000 MW (2 X 500 MW) Status : Construction in progress, Operational by 2012 Current Status : In my opinion this will be operational by mid 2013 Refer one of the tenders from BHEL which is the main contractor for the plant construction. The tender is for 12 months and the start of the job is Oct 2011which is very unlikely. http://www.bhelpssr.co.in/data/tende...ech%20spec.pdf Coal to be transported by conveyor from Port 4. Coastal Energen (Mutiara Thermal Power Plant) Location : 3 Kms Off ECR, approx 30 KMs from Tuty Port Capacity : 1200 MW (2 X 600 MW) Status : Construction in progress, Operational by 2012 Current Status : Not very sure on the current status. Good progress but not sure if it will be operational by 2012. Coal likely to be transported by road from Tuty Port Coal will be eventually transported by rail from the port using the Tuty-Madurai new line. The proposal for a coal jetty near their plant has not taken off Expansions plans to 3600 MW plant Public hearing for the first expansion 2 * 800 MW held in May 2011 , In general no news available in public about the project for a long time now. 5. Sterlite Captive Thermal Plant Location : On Madurai By-pass Road near Milavittan Railway Station or Sterlite Complex, Approx of 18 Kms from Tuty Port Capacity : 160 MW (2 x 80 MW) Status : Construction in progress, Operational by 2011 Current Status : I dont know the current status of this project Coal likely to be transported by road (possibility of rail also) Coal will be transported by rail, rail slidings commissioned 6. Ind Barath Location : Near Ottapidaram, Approx 25-30 Kms from Tuty Port Capacity : 450 MW (3 x 150 MW) Status : In the progress of getting clearances, operational by 2012 Current Status : Based on news this project will be operational as scheduled in 2012 Coal likely to be transported by road (possibility of rail also) 7. SPIC Electric Company Location : Near Tuty Port, Site not known Capacity : 525 MW (Not confirmed) Status : In feasibility analysis, operational by ???? Current Status : Doubtful given the fact SPIC is still in trouble Coal likely to be transported by conveyor (not confirmed) Total Capacity : 4595 MW Operational : 1050 MW Every 200 MW plant requires around 1 million ton of coal. By 2012, another 3000 MW will be operational requiring around 15 million tonnes of coal to be imported by Tuty port. Of which nearly 10 million tonnes will be transported by road. Clearly the Tuty by-pass road needs an expansion to 6-lane by 2012. Then I need to make mention about the other projects in Tuty District 1. Udangudi Power Corporation Ltd Location : Before Udangudi, 11-12 Kms from Tiruchendur in ECR to Kanniyakumari Capacity : 1600 MW (2 x 800 MW) Status : In the progress of getting clearances, operational by 2015 Current Status : Govt working on speeding up the implementation, however it is likely to be operational only by 2015 Coal likely to be transported by conveyor Govt is also looking at adding 1 more unit of 800MW, no dates as of now. 2. Ind Barath Location : Near Manapad (Approx 25-30 Kms from Tiruchendur in ECR to Kanniyakumari) Capacity : 1320 MW (2 x 660 MW) Status : In the progress of getting clearances, operational by 2015 Current Status : On course for 2015 Coal likely to be transported by conveyor There is also likelihood of another power plant proposal near Vembar (50 KMs from Tuty in ECR Road to Ramanathapuram), this is unconfirmed news but some kind of preliminary work is going on. Current Status : No further news on the same I will be updating the list whenever we get any status update on the above projects. Cheers ! Last edited by BlackPearl; October 1st, 2011 at 09:22 AM. |
|
|
|
|
|
#2716 |
|
Registered User
Join Date: May 2008
Location: Tuticorin / Dubai
Posts: 887
Likes (Received): 8
|
|
|
|
|
|
|
#2717 | |
|
Registered User
Join Date: May 2008
Location: Tuticorin / Dubai
Posts: 887
Likes (Received): 8
|
Quote:
|
|
|
|
|
|
|
#2718 |
|
Registered User
Join Date: Jun 2006
Location: Salem-Chennai
Posts: 14,774
Likes (Received): 861
|
![]() ![]() great updates. You made my work easier. I am preparing an excel list for the 63,000MW project under proposal, planned, construction, commissioning for TN. You have excellently compiled for Tuticorin area.. With your permission you can I use these status for my sheet?After compiling everyone, I will post it in our power thread. Many projects in Nagai and Cuddalore area looks to be mere paper project. But yet even if TN can make 25% of that 63,000MW by 2020 we will back in full swing for industrialization. Un-interrupted power and also cheap tarric is the main key for fast industrialization.
__________________
Click on----> அருள் முருகன்
தமிழ்நாடு/இந்தியா |
|
|
|
|
|
#2719 |
|
Registered User
Join Date: Mar 2010
Location: 600024
Posts: 4,273
Likes (Received): 66
|
Tuticorin-Dwarka Express train from March next: DRM
Tuticorin-Dwarka express train (Vivek Express) services, which were announced in the current railway budget, will be introduced before March, 2012, A.K. Goel, Divisional Railway Manager, Southern Railway, Madurai, has said here on Friday.
After getting an approval from the Railway Safety Commissioner, the bypass railway line, which is adjacent to Vanchi Maniyachi, would be thrown open to passenger trains from Tuticorin to Tirunelveli and vice versa, he replied on a query. Passage of trains along bypass track to Tirunelveli could reduce journey hours much to the likes of passengers, he said. On electrification project for cargo trains, he said that erection of poles with power lines was at the nearing stage of completion but transformer facilities at power sub-stations had to be set up alongside, subsequently. The project was likely to be commissioned after six months, he said. A team of track men had been involved in executing night patrol along railway tracks to avert any attempts of sabotage. Surveillance had been increased onboard trains to ensure safety of passengers, Mr. Goel said. Mr. Goel along with officials, including T. Venkatasubramanian, Additional Divisional Railway Manager, and S.R. Raguraman, Senior Divisional Operating Manager, were at Milavittan railway station on the inauguration of railway siding project of Sterlite Copper. Source |
|
|
|
|
|
#2720 |
|
Registered User
Join Date: May 2011
Location: tuticorin
Posts: 2,793
Likes (Received): 61
|
|
|
|
|
![]() |
| Tags |
| pearl city, port, power city, thoothukudi, tuticorin, tuticorin infra, tuticorin projects |
| Thread Tools | |
| Display Modes | Rate This Thread |
|
|