[Budapest] Projects and Construction Updates
Please use this thread to inform us about what's going on along the Danube metropolis
|
|
|
|
|
|
#2 |
|
novaguy
Join Date: Nov 2005
Location: ottawa
Posts: 369
Likes (Received): 0
|
I GUESS NOTHING IS GOING ON IN BUDAPEST.
|
|
|
|
|
|
#3 |
|
Registered User
Join Date: Oct 2003
Location: Bratislava
Posts: 1,730
Likes (Received): 2
|
Duna Tower
65 m high, 15 floors... ![]() ![]()
|
|
|
|
|
|
#4 |
|
Registered User
Join Date: Oct 2003
Location: Bratislava
Posts: 1,730
Likes (Received): 2
|
Europa Tower
23000 m2 ![]() ![]()
|
|
|
|
|
|
#5 |
|
Registered User
Join Date: Oct 2003
Location: Bratislava
Posts: 1,730
Likes (Received): 2
|
Duna City
The proposed schedule takes into consideration the market cycles of each segment, the interaction of various elements, the development capacity of the area at hand as well as the time and spatial limitations of the desired development quality. In the first phase, the former warehouse would be assigned a function. This would help introduce and popularise the development area. These functions would include catering and entertainment on a base area of 6,000 m2, in connection with open-air Block F, which is to act as a promenade and festival square. Simultaneously, the reconstruction and expansion of the protected office building would be commenced. This building would also receive a new function, on a total area of 15,000 m2. In connection with the above, temporary utilisation would include housing leisure, entertainment and catering facilities, providing an “event site” on a section of the riverside (Block F), serving as a kind of prelude to the later atmosphere (“festival park”). Afterwards, the first green field investment is commenced on the commercial centre in Block A, on a net area of 20,000 m2, in line with the stage of the development of Block B including the commercial and office functions. The latter will provide a shopping arcade on 50,000 m2 and offices on another 50,000 m2. The residential development in the low-built area of Block J (row houses and blocks of flats along the riverside) will be started simultaneously but independently of the office and commercial developments. The area will be accessible through the already constructed passageway from Beöthy Street. The residential function will be extended in the process in Blocks I, G and H, where the riverside row houses will be followed by blocks of flats. The construction of the blocks will start from the Danube side and then progress towards the city. Considering the absorbing capacity of the market and the composition of the product portfolio, a total of 250-400 flats are expected to be delivered annually. Exploiting the area's unique characteristics, the next phase will comprise the implementation of unique iconographic elements that will add a new flavour to the city. In addition to the high-rise buildings (Blocks C and D), the construction of floating homes will also commence. The starting date for Blocks C and D, comprising mostly office functions (on a net area of approx. 130,000 m2) will depend largely on the demonstrated tenant absorbing capacity. After delivering the office development in Block B, the full office programme will be divided into several stages. Schedules for additional facilities (hotel, conference centre, sports centre) will also be based on operator requirements, starting from Kvassay Road, progressing towards the interior of the area. Assuming current market trends will not change, the construction and leasing of offices on a base area of 20-30,000 m2 every 2-3 years is a realistic target. After delivering the office development in Block B, the full office programme will be divided into several stages. Schedules for additional facilities (hotel, conference centre, sports centre) will also be based on operator requirements, starting from Kvassay Road, progressing towards the interior of the area. Assuming current market trends will not change, the construction and leasing of offices on a base area of 20-30,000 m2 every 2-3 years is a realistic target. After the completion of the above phases, the prestige of the entire development project will be greatly enhanced, which makes it possible to achieve the highest possible quality in the course of developing the most valuable areas. The next step is the implementation of the high-density and high-price luxury blocks of flats in Block F (200 in total). By this time, the former warehouse may be ripe for a change of function, housing high-profile loft flats from then on (110 in total).
|
|
|
|
|
|
#6 |
|
Some user
Join Date: Nov 2006
Location: Hungarian American in Budapest
Posts: 615
Likes (Received): 0
|
There are many, many concepts floating around in Budapest, and few are yet to become reality.
Compared to other places like Warsaw or Kiev, there isn't much going on in Budapest in terms of massive construction. Or, more accurately, there are many small projects going on in Budapest (such as rennovating the Matthias Church or giving 300+ km of roads a new layer of asphalt over the course 3 years) rather than a few (planned) huge ones. The 4th and 5th lines are exceptions to this. And then again, we ought to keep in mind that: a.) many of the projects don't have translations b.) there are few Hungarians in this forum compared to other nationalities c.) fewer still are willing to spend their time translating articles on the projects. The Budapest Sun is a good place to find articles on projects and updates written in English. -Ataman |
|
|
|
|
|
#7 |
|
novaguy
Join Date: Nov 2005
Location: ottawa
Posts: 369
Likes (Received): 0
|
Thanks for the updates.I was in Budapest last fall great city.
|
|
|
|
|
|
#8 |
|
Registered User
Join Date: May 2007
Location: Budapest
Posts: 470
Likes (Received): 1
|
For infos about the Álomsziget project check out this thread:
http://www.skyscrapercity.com/showthread.php?t=475384 |
|
|
|
|
|
#9 |
|
sensational
Join Date: Aug 2006
Location: Budapest
Posts: 11,081
Likes (Received): 520
|
I've never saw this thread before...
|
|
|
|
|
|
#10 |
|
Registered User
Join Date: May 2007
Location: Budapest
Posts: 470
Likes (Received): 1
|
|
|
|
|
|
|
#11 |
|
Higher, better
Join Date: Nov 2006
Location: Bratislava, Slovakia/Wareham, MA
Posts: 3,822
Likes (Received): 87
|
wow, that duna city looks really good!
|
|
|
|
|
|
#12 |
|
Registered User
Join Date: May 2007
Location: Budapest
Posts: 470
Likes (Received): 1
|
Market Central Ferihegy
Developed by AIG/Lincoln Hungary „Market Central Ferihegy” will be the first integrated retail park in Hungary. It is located in Vecsés, imminently adjacent to Budapest Ferihegy International Airport. The 16-hectare developement site is bordered by and directly visible from main road No 4, at the intersection of the by-pass road leading to M0. Market Central Ferihegy will comprise one storey „big box” and specialty stores, totalling 44,150 m2 of gross leasable area and a common parking area of 1,550 surface car parking spaces exclusive to customers of the retail park. The Market Central design concept offers a return to a more traditional urban shopping environment. The foundation stone of the building complex was laid down on 2th of March Here are some pics: ![]() ![]() ![]()
|
|
|
|
|
|
#14 |
|
sensational
Join Date: Aug 2006
Location: Budapest
Posts: 11,081
Likes (Received): 520
|
Great summary!But there are a lot more... |
|
|
|
|
|
#15 |
|
Registered User
Join Date: Sep 2005
Location: Szentendre, Hungary
Posts: 440
Likes (Received): 0
|
I have some other link:
Gozsdu udvar http://www.gozsduudvar.hu/ Károlyi városközpont http://www.lakasingatlan.hu/index.php Eiffel sqare http://www.convergen-ce.com/index.ph...D=PAGf_70eb253 Hungária center http://www.hungariacenter.hu/ Népliget center (this is the better) http://www.nepligetcenter.hu/ Átrium park http://www.atriumpark.hu/atrium.html BSR center http://www.bsr-center.hu/ Váci 33 http://www.wing.hu/wing/wing.head.page?nodeid=144 Spirál irodaház http://www.spiral.hu/ Office garten http://www.officegarden.hu/pages/grt_hu.html Somlói úti lakópark http://www.somloiut.hu/?content=main Sasadliget http://www.sasadliget.hu/ Sasadresort http://www.sasadresort.hu/ Milloft http://www.mill-lofts.hu/gallery.php?id=022 Ezt mindenkép nézzétek meg!!! http://www.konstruktiv.hu/ |
|
|
|
|
|
#16 |
|
Registered User
Join Date: May 2007
Location: Budapest
Posts: 470
Likes (Received): 1
|
Thank you BA for lengthening the list. I know there are a lot of projects besides the ones I wrote down so I only listed those which I could remember of. If any of you have further links, feel free to post it. This thread is here for these kinds of things in the end.
|
|
|
|
|
|
#17 |
|
Registered User
Join Date: Sep 2005
Location: Szentendre, Hungary
Posts: 440
Likes (Received): 0
|
|
|
|
|
|
|
#18 |
|
sensational
Join Date: Aug 2006
Location: Budapest
Posts: 11,081
Likes (Received): 520
|
Gateway Business Center Phase 1-2-3 at Árpád bridge
Budapest, 1138 Népfürdő utca 27. The Company expects to construct three office towers just off of Váci út, 100 metres from the Danube River and near the NewAge Business Center. The property is situated on approximately 11,250 square metres of land and is expected to have 36,298 square metres of lettable office space and underground parking. The property is being developed in three phases. STANDARD SPECIFICATION: open plan offices with partitioning possibilities individually controlled 4-pipe fan-coil air-conditioning system dry-cooling (winter cooling) raised floor/Perimeter cable trunks proximity card entrance system video camera surveillance (CCTV) in the whole building 9 modern high-speed elevators natural light in the offices openable windows wooden doors in steel frames anti-static carpet tiles T5 lighting with parabolic mirrors central UPS and double power supply fitted kitchens and wet blocks roof gardens ![]() ![]() ![]() ![]() Photos from a week ago... ![]() ![]() Photos today... ![]() ![]() ![]() ![]() (Last four via mobile phone...)
__________________
Last edited by Qtya; May 20th, 2007 at 01:15 PM. |
|
|
|
|
|
#19 |
|
#1 Bunny
Join Date: Mar 2007
Location: in the heart of somebody
Posts: 1,215
Likes (Received): 4
|
Árpád bridge is going to look nice at night!
I think there will farther Office Complexes in that area. Isn't Ablon building a nother one next to the Gateway? |
|
|
|
|
|
#20 |
|
Registered User
Join Date: May 2007
Location: Budapest
Posts: 470
Likes (Received): 1
|
I like the Gateway design. It looks above average at least
|
|
|
|
![]() |