Old November 13th, 2014, 03:41 AM   #1021
ThatOneGuy
Psst! Check my signature!
 
ThatOneGuy's Avatar
 
Join Date: Jan 2012
Location: Toronto - Bucharest - Freeport
Posts: 21,487

This building makes the MIBC towers look 10 years out of date.
__________________

George_D, Edil Arda liked this post
ThatOneGuy no está en línea   Reply With Quote

Sponsored Links
Old November 13th, 2014, 07:00 AM   #1022
ultEmate
ульт
 
Join Date: May 2010
Posts: 2,146
Likes (Received): 26004

Well, maybe because they were built 10 years before Lakhta Center?

If the tower will turn out exactly like on renders, there are very few towers in the world which could compete with it in its futuristic looks. Shanghai Tower comes to mind.
__________________

remeslo liked this post
ultEmate no está en línea   Reply With Quote
Old November 13th, 2014, 07:07 PM   #1023
Blue Flame
Get Silly!
 
Blue Flame's Avatar
 
Join Date: Jul 2009
Location: Lexington,KY
Posts: 2,369
Likes (Received): 575

I don't think that any tower ever really looks as futuristic as it does in the renders. Renders have a way of exaggerating the building's better features.
Regardless, if this building looks even remotely like the renders, it will be absolutely amazing.
__________________
A cynic is nothing but a realist with experience.
Blue Flame no está en línea   Reply With Quote
Old November 13th, 2014, 09:08 PM   #1024
Dubai Skyscraper
Moderator
 
Dubai Skyscraper's Avatar
 
Join Date: Jul 2009
Location: Speyer, Germany
Posts: 11,972
Likes (Received): 2609

Quote:
Originally Posted by Blue Flame View Post
I don't think that any tower ever really looks as futuristic as it does in the renders. Renders have a way of exaggerating the building's better features.
Regardless, if this building looks even remotely like the renders, it will be absolutely amazing.
Shanghai Tower disagrees It looks just as futuristic as the renders suggested. Or Burj Dubai.
__________________
View thousands of 2D and 3D designs in our creative corner
Dubai Skyscraper no está en línea   Reply With Quote
Old November 14th, 2014, 10:29 AM   #1025
Aemilia
Registered User
 
Aemilia's Avatar
 
Join Date: Mar 2008
Posts: 157
Likes (Received): 35

the cladding with star shapes has been cancelled...
Aemilia no está en línea   Reply With Quote
Old November 15th, 2014, 05:41 PM   #1026
Blue Flame
Get Silly!
 
Blue Flame's Avatar
 
Join Date: Jul 2009
Location: Lexington,KY
Posts: 2,369
Likes (Received): 575

Quote:
Originally Posted by Dubai Skyscraper

Shanghai Tower disagrees It looks just as futuristic as the renders suggested. Or Burj Dubai.
Nah. The cladding on ST doesn't look nearly as good as the renderings portrayed it, imo. It's more than just the building, too. The background and suroundings never look as slick and futuristic in person.
__________________
A cynic is nothing but a realist with experience.
Blue Flame no está en línea   Reply With Quote
Old November 15th, 2014, 05:52 PM   #1027
LCIII
Registered User
 
Join Date: Jun 2011
Location: Live in NYC, heart in Seattle
Posts: 7,712
Likes (Received): 2713

Totally disagree. ST looks even better than its renderings.
__________________
LCIII no está en línea   Reply With Quote
Old November 20th, 2014, 07:13 PM   #1028
Ritmo-F
Pioneer
 
Ritmo-F's Avatar
 
Join Date: Oct 2011
Location: St. Petersburg
Posts: 10,900
Likes (Received): 55467

multifunctional building






link
__________________
Ritmo-F no está en línea   Reply With Quote
Old November 20th, 2014, 07:51 PM   #1029
ThatOneGuy
Psst! Check my signature!
 
ThatOneGuy's Avatar
 
Join Date: Jan 2012
Location: Toronto - Bucharest - Freeport
Posts: 21,487

Quote:
Originally Posted by Blue Flame View Post
Nah. The cladding on ST doesn't look nearly as good as the renderings portrayed it, imo. It's more than just the building, too. The background and suroundings never look as slick and futuristic in person.
The cladding on that tower is grimy, wait until it is cleaned before judging.
ThatOneGuy no está en línea   Reply With Quote
Old November 20th, 2014, 09:51 PM   #1030
SkYsCrApEr2013
The AlphaWolf of the Pack
 
SkYsCrApEr2013's Avatar
 
Join Date: May 2013
Location: Sydney
Posts: 1,748
Likes (Received): 2083

Quote:
Originally Posted by ThatOneGuy View Post
The cladding on that tower is grimy, wait until it is cleaned before judging.
I'm definitely sure it will look much better than the renderings
__________________
Top 10 tallest buildings:

Burj Khalifa, Shanghai Tower, Makkah Royal Clock Tower Hotel, Ping An Finance Center,
Goldin Finance 117, One World Trade Center, Chow Tai Fook Centre, Taipei 101, Shanghai World Financial Center and International Commerce Center.

R.I.P. Sawtooth Pack. You will be deeply missed.

I'm a really huge wolf lover! :D

I'M BACK!!!!
SkYsCrApEr2013 no está en línea   Reply With Quote
Old November 22nd, 2014, 10:22 PM   #1031
Blue Flame
Get Silly!
 
Blue Flame's Avatar
 
Join Date: Jul 2009
Location: Lexington,KY
Posts: 2,369
Likes (Received): 575

Quote:
Originally Posted by LCIII View Post
Totally disagree. ST looks even better than its renderings.
Well, your free to. I think ST, just like almost every other building I have seen, looked much slicker in the renders. The top particularly doesn't look as good as in the renders. Don't get me wrong though- it is definitely an awesome building, just not as awesome as the renders portrayed it.
__________________
A cynic is nothing but a realist with experience.
Blue Flame no está en línea   Reply With Quote
Old November 22nd, 2014, 10:28 PM   #1032
ThatOneGuy
Psst! Check my signature!
 
ThatOneGuy's Avatar
 
Join Date: Jan 2012
Location: Toronto - Bucharest - Freeport
Posts: 21,487

I don't think they're finished with the open rectangles at the top for ST.
ThatOneGuy no está en línea   Reply With Quote
Old November 28th, 2014, 09:51 AM   #1033
xerx
Moderator
 
xerx's Avatar
 
Join Date: Jul 2007
Location: СПб
Posts: 14,906

27.11.2014 (Сергей Р spb-projects.ru/forum)



screenshot:


__________________
xerx no está en línea   Reply With Quote
Old November 28th, 2014, 11:21 PM   #1034
CemenTT
Registered User
 
Join Date: Dec 2010
Location: Москва
Posts: 1,965
Likes (Received): 3658

Ноябрь 2014. Работы по демонтажу четвертого распорного диска в котловане под здание Башни. Распорный диск - это временная конструкция сдерживающий стены котлована до и во время строительства коробчатого фундамента здания Башни комплекса.



http://http://vk.com/lahtacenter
__________________

jackedi07, Munwon, sgollis, Erlenberg, ILNY liked this post
CemenTT está en línea ahora   Reply With Quote
Old November 29th, 2014, 12:04 AM   #1035
Bolkia
Registered User
 
Join Date: Nov 2014
Posts: 6
Likes (Received): 1

At least the most impressive Skyscraper currently in construction in St-Petersbourg
__________________

Anticalaca liked this post
Bolkia no está en línea   Reply With Quote
Old November 29th, 2014, 12:05 AM   #1036
ThatOneGuy
Psst! Check my signature!
 
ThatOneGuy's Avatar
 
Join Date: Jan 2012
Location: Toronto - Bucharest - Freeport
Posts: 21,487

In all of Europe I would say.
ThatOneGuy no está en línea   Reply With Quote
Old November 29th, 2014, 02:19 AM   #1037
Highcliff
Fake democracy
 
Join Date: May 2006
Location: São Paulo
Posts: 7,384
Likes (Received): 5011

a twisted pentagonal the shard....
Highcliff no está en línea   Reply With Quote
Old December 18th, 2014, 06:53 AM   #1038
Ritmo-F
Pioneer
 
Ritmo-F's Avatar
 
Join Date: Oct 2011
Location: St. Petersburg
Posts: 10,900
Likes (Received): 55467

Quote:
Lakhta Center Skyscraper: a floor per week



Alexander Bobkov Executive Director for Lakhta Center Multifunctional Complex JSC told BN whether international sanctions will affect the pace of Lakhta Center Project construction and why its investors are not ready to invest monies into the construction of a metro station in Primorsky district.

– Mr. Bobkov, they advised previously that by October this year the works related to pit excavation were to be completed. Do you meet the time schedule? When will the tower superstructure construction be started?

– At present the works related to the pit have been completed already. We comply with the time schedule approved at the beginning of the construction. Moreover all the most complicated engineering works related to soil excavation in an immediate vicinity to the Gulf of Finland has been completed. In relation to the uniqueness of the technologies used this part of the zero cycle was the most complicated for us. We have completed the works related to water disposal, protection of the entire underground space of the complex from underground water ingress and pile foundation installation, it is a complex engineering facility consisting of 2,080 piles (only under the tower 264 piles 2m in diameter 72m-82m deep are installed). It can be said that we have passed the lower elevation of the project and now start moving upwards. According to the time schedule the tower can be seen from above the construction fence as early as in August 2015 and the adjoining buildings of the Multifunctional Complex a month earlier.

– The skyscraper will have been completed by 2018. Is it possible to meet this deadline taking into account that it took so much time to complete the zero cycle works? At which pace do you plan to build the facilities, a floor per week or per month?

– As I have mentioned already, the duration of the preparatory time period was caused by the complex and unique underground works executed. However our project is not an exception. A thorough preparation is necessary for any high-rise construction of the similar level where it takes the same amount of time to build both the underground part and the superstructure. And now we have no doubts that we will meet the deadline announced by the investor.

Firstly we managed to pass a design and investigation stage where most developers get stuck. Secondly we have entirely completed engineering preparation of the entire construction site and above all built up a brilliant professional team of contractors. Professionalism and experience of the companies with which contracts have been awarded as well as a completed stage of the project underground part construction make it possible for us to look optimistically into the future.

The planned pace of the superstructure construction is very high. To meet the deadlines established we will have to build a tower floor per six or seven days. This pace should be achieved taking into account that the structural material for the frame and floorplates is reinforced concrete which requires time for strength gain.

However I would like to point out that alongside with the tower at the same time we will start building another multifunctional building which in relation to processes and construction volume will be more large-scale than the tower itself.

– When you started implementing the project the general political situation in the world absolutely differed from the current one. “Gazprom” faced international sanctions and according to forecasts they may be lifted as late as in 2017. Oil prices are going down. Do you have any fears that the investor might quit the project or reconsider it?

– I regard a situation when the project is completely stopped as a far-fetched. The fact is that it is a project which was planned long ago, in essence we are building a new house where most investor’s companies will move to. That’s why we hope that our construction project will be protected from the consequences of sanctions for the company. At present funding is provided in accordance with the time schedule. Our project requires considerable funding but in general it is not critical for Gazprom. Of course it is rather difficult to make any predictions at the moment how the events will unfold but for the time being there are no causes of fears.

– Are domestic construction companies or only foreign companies subcontracted?

– I will not disclose a secret that we have to employ foreign companies because domestic companies are not so experienced in building such facilities. But only Russian companies are employed by us for all the works not related to unique technologies. This is everything related to preliminary stage, design and construction of utilities, water disposal, geology. And the foreign companies employed by us subcontract local subcontractors and specialists, engineers, mechanical engineers, etc. We do not see anything bad in it because our companies acquire valuable knowledge and skills in using advanced technologies and considerable amount of money for the works completed by them.

I would like to add that despite the sanctions almost all foreign companies regarded as world leaders in high-rise construction are ready to be involved in the project implementation. I am sure we have employed the best, no one refused from cooperation with us and now they not just execute their work but spread knowledge to Russian companies.

– Why was a decision made under Lakhta Center Project to reject a hotel in fabour of a co-working center? Did you think that it would be not in demand in the new economic situation?

– A hotel will be built in the complex by all means but at later stages. The thing is that under the project we received n instruction from our investor to build additional offices. And therefore the part of the complex, the area about 30,000 sq.m. which had been originally allocated for a hotel was converted into offices. We had to considerably re-design the project which slightly reduced a pace. It was planned earlier that Gazprom companies would occupy about two-thirds of the office part of the complex but nowadays the request is all the offices. It means that there are unlikely to be outside tenants in the business part of the complex.

However with account for Gazprom employees a hotel will be required by all means. The geography of the company’s activity is vast, meetings with employees onbusiness trips mount to hundreds a day and it is quite logical to arrange the work so that staff on business trips can be accommodated close to the office center. A hotel will be built on our own or by a hotel operator. It will be 4 star, aimed at business class. We are confident that the hotel will be 100% occupied. We have selected a hotel operator already, it is Crowne Plaza Hotels belonging to Continental Hotels Group.

– Is it yet known which Gazprom companies will move to Lakhta Center?

– It is primarily Gazprom neft. Our complex is its headquarters and this company will occupy about 40% of offices. The Gazprom Corporate Center will likely to move to such a building. And the final list of specific companies and departments will be made up a bit later, by 2017.
link
__________________

Munwon, sgollis, Zaz965 liked this post
Ritmo-F no está en línea   Reply With Quote
Old December 20th, 2014, 11:24 AM   #1039
Bassik
chief horror
 
Bassik's Avatar
 
Join Date: Jun 2010
Location: Saint-Petersburg/Moscow
Posts: 4,731
Likes (Received): 2426

pouring concrete in the work


Quote:
Originally Posted by CemenTT View Post
Бетонные рекорды

В минувшие выходные состоялись первые работы по заливке фундамента прилегающего к башне многофункционального здания «Лахта центра». Фундамент здания с атриумом – это железобетонная плита толщиной два метра и площадью три футбольных поля. Несколько недель собирался арматурный каркас, и в вечером 12 декабря началась заливка первой захватки (части) ростверка.

Тщательные подготовительные работы позволили провести всю заливку чётко и слажено. Каждый автомобиль-бетоносмеситель, прибывавший на стройплощадку, проходил контрольное взвешивание, снятие пробы бетона, проверку на температуру и подвижность смеси. Только после этого его допускали в очередь к заливке. Одновременно работали 7 бетонных насосов, закачивающих смесь к самому месту захватки.

Работы шли всю ночь и следующий день. Бетон непрерывно поставлялся с 9 бетонных заводов с разных концов города. Заливка специально была назначена на самое «непробочное» время недели, чтобы возможные дорожные заторы не задержали автомиксеры в пути.

В настоящий момент продолжаются работы по заливки следующей захватки. Общий объем бетона, который будет залит в фундаментную

плиту здания с атриумом, составляет 44 000 кубометров.









http://vk.com/lahtacenter
__________________

Kirgam, oscillation, Munwon, sgollis, DJaCoNdA and 1 others liked this post
Bassik no está en línea   Reply With Quote
Old December 20th, 2014, 06:13 PM   #1040
Munwon
Registered User
 
Munwon's Avatar
 
Join Date: Dec 2010
Location: Busan
Posts: 3,439
Likes (Received): 3183

Go Russia!
__________________

TurboB, Nneznajka, croomm, Anticalaca, nookie and 3 others liked this post
Munwon no está en línea   Reply With Quote


Reply

Tags
europe, gazprom, saint petersburg, supertall

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Related topics on SkyscraperCity


All times are GMT +2. The time now is 09:52 AM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2017, vBulletin Solutions Inc.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2017 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2017 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu