daily menu » rate the banner | guess the city | one on one

Go Back   SkyscraperCity > Continental Forums > United Arab Emirates - دار زايـــد > Completed Projects and Thread Archive > Completed Projects


Reply

 
Thread Tools Display Modes
Old November 21st, 2006, 02:56 AM   #2801
robertaas
Registered User
 
Join Date: Jan 2006
Location: Pyongyang
Posts: 120
Likes (Received): 0


Looking down at the Millenium Tower. :-)
robertaas no está en línea   Reply With Quote

Sponsored Links
 
Old November 22nd, 2006, 05:05 AM   #2802
megatower
BANNED
 
megatower's Avatar
 
Join Date: Jun 2006
Location: chicago
Posts: 1,221
Likes (Received): 0

i was looking at the site Dubai Mega projects, and i was looking at the burj Dubai and i noticed that a column of info said " EMAAR have made some more changes of the design and the final height is much taller than originally expected." how tall was the final height in the 1st place ???? here's the link, the info is under the Headlines http://www.dubaimegaprojects.com/
megatower no está en línea   Reply With Quote
Old November 22nd, 2006, 09:14 AM   #2803
megatower
BANNED
 
megatower's Avatar
 
Join Date: Jun 2006
Location: chicago
Posts: 1,221
Likes (Received): 0

i watched that Dubai mega projects. and i had a question about the burj Dubai complex. on the video said that the burj Dubai complex will have 70 high rises. and i looked on aerial pic's of renders and it doesn't look like 70 high rises. is there really going to be 70 high rises at the burj Dubai complex ?? i looked on emporis, and they only show 34 high rises, here's the link
http://www.emporis.com/en/wm/zo/?id=100292,
megatower no está en línea   Reply With Quote
Old November 22nd, 2006, 05:16 PM   #2804
dubaiflo
visit my homepage
 
dubaiflo's Avatar
 
Join Date: Jan 2005
Location: Munich | Dubai | London
Posts: 15,864
Likes (Received): 1

because there are still more to be released, the boxes u can see in the model.
dubaiflo no está en línea   Reply With Quote
Old November 22nd, 2006, 06:08 PM   #2805
megatower
BANNED
 
megatower's Avatar
 
Join Date: Jun 2006
Location: chicago
Posts: 1,221
Likes (Received): 0

Quote:
Originally Posted by dubaiflo View Post
because there are still more to be released, the boxes u can see in the model.
can you post the model please
megatower no está en línea   Reply With Quote
Old November 22nd, 2006, 07:49 PM   #2806
Bikes
sababa
 
Bikes's Avatar
 
Join Date: Mar 2005
Location: Warsaw, Budapest, Berlin
Posts: 4,158
Likes (Received): 120

Cool stuff Face, how did you get the webcam working? It doesnt work for me since months
Bikes no está en línea   Reply With Quote
Old November 22nd, 2006, 10:27 PM   #2807
SYDNEY
NEW ZEALAND
 
SYDNEY's Avatar
 
Join Date: Nov 2003
Posts: 23,922
Likes (Received): 762

Quote:
Originally Posted by robertaas View Post
Kia ora. :-)
In the skytower visitors will only get up to 190 meters if staying on the inside of the tower. On the outside there are guided tours allowing you to climb up to 270 meters. You also have the possibility to make a bungy-like jump from the tower. I don't think Burj Dubai would allow that kind of activities.

To me it was anyway sufficient to walk over the glass part of the floor on the obeservation deck looking down at the streets nearly 200 meters below. :-)
Kia Ora Mate ! Yeah you are right Only after my fourth visit up to the viewing deck was I able to stand on the glass and look down - it is very scarey ..... I can only imagine what it will be like at the top of The Burj Dubai - AWESOME !

Great thread boys, keep up the good work.
__________________
Connoisseur of Beauty

SYDNEY no está en línea   Reply With Quote
Old November 22nd, 2006, 11:21 PM   #2808
Shad
Sup ?
 
Join Date: Jul 2005
Location: Abu Dhabi, UAE
Posts: 293
Likes (Received): 0

itz abt time tht they should start putting up glass...itz 87 floors now
Shad no está en línea   Reply With Quote
Old November 22nd, 2006, 11:26 PM   #2809
ZZ-II
I love Skyscrapers
 
ZZ-II's Avatar
 
Join Date: May 2006
Location: Near Ingolstadt in Bavaria
Posts: 28,309
Likes (Received): 443

Posted by Krys in the World Forums:

Quote:
Originally Posted by Krys View Post
Things seem to move a bit as I received this from Intl Construction :

Cladding work on the 800 m-plus Burj Dubai has yet to start and the delay could mean the iconic tower misses its planned 2008 completion.

Having reached 87 storeys the Besix, Arabtec Samsung joint venture (JV) has yet to start cladding work. The exposed concrete core now stands at 300 m.

Difficulties in sourcing the cladding following Switzerland-based Schmidlin’s collapse in February were originally being blamed for the lack of progress.

Schmidlin LLC UAE, which is a locally owned company, is continuing to supply the project in a joint venture with Arabian Aluminium. It was awarded the 120000 m2 facade contract 12 months ago. “Following the collapse of Schmidlin in Switerland several UAE companies stepped in to offer financial help to Schmidlin LLC UAE,” said a company spokesman.

Refuting claims it is to blame for the late supply of cladding the spokesman told iC, “We’re assembling the cladding now and have completed the test rig. We expect to start testing on Friday and, if the tests go as expected, could be on site next week. There are other concerns that have stopped us proceeding as planned, including design changes to the height.”

Speculation is now centring on the floor slabs and columns. “There are concerns over the structural integrity of the building. Certain calculations are being called into question,” said another source working within the project.

Countering this claim, Emaar’s project manager at the Burj, Greg Sang, told iC, “The timetable has been effected by the collapse of Schmidlin. We’re a little bit behind but we expect to put in place measures that ensure we’re on track to meet our original completion date.

"Normally you’d be looking to do a floor in three to four or perhaps seven days depending on the technical requirements of the job, we’re still working on the details but I expect to meet the dateline we’ve set with an accelerated installation timetable," said Mr Sang.

“Construction of high rise towers in the UAE usually sees the cladding contractor following on the concrete core as soon as possible. When a tower reaches 70 storeys, for example, the cladding should have reached the mid 40s,” said the project insider.

"You can drive past the building and you’ll see there’s no cladding, so you can draw your own conclusions as to when completion will be reached," he added.
__________________
Download the most up-to-date list of all Supertalls on this planet here:
Last Tower added: Eurasia - Moscow - 309m

The Supertall-City-Ranking:

Last City added: Changzhou

Follow me on Twitter: @Minecraft_87

Visit my Photo-Website: www.foto-kotzur.de
ZZ-II está en línea ahora   Reply With Quote
Old November 23rd, 2006, 02:21 AM   #2810
Dubai_Steve
Dubai State of Mind
 
Dubai_Steve's Avatar
 
Join Date: Jan 2005
Posts: 8,708
Likes (Received): 40

Quote:
Originally Posted by megatower View Post
can you post the model please
Dubai_Steve está en línea ahora   Reply With Quote
Old November 23rd, 2006, 09:42 AM   #2811
megatower
BANNED
 
megatower's Avatar
 
Join Date: Jun 2006
Location: chicago
Posts: 1,221
Likes (Received): 0

nice pic, but i dont know what's burj high rises and what's not lol. could you draw a line around the area
megatower no está en línea   Reply With Quote
Old November 23rd, 2006, 11:01 AM   #2812
griftre
Registered User
 
Join Date: May 2005
Posts: 160
Likes (Received): 0

FLASH report!!!

Schmidlin LLC will be replaced by Al Abbar + Gartner for the curtainwall package. Confirmation report will follow. (Source: Schmidlin LLC Burj Dubai Site Office Employee, guy requests to be anonymous)


Sad day for burj Dubai... I really regret hearing this sad news.
griftre no está en línea   Reply With Quote
Old November 23rd, 2006, 11:40 AM   #2813
malec
Rrrraaaaaahhhhhhh!!!!!!!
 
malec's Avatar
 
Join Date: Apr 2005
Location: Cork
Posts: 10,452
Likes (Received): 9

Well the original people supposed to do it went bankrupt
malec no está en línea   Reply With Quote
Old November 23rd, 2006, 11:52 AM   #2814
AltinD
The Modecator
 
AltinD's Avatar
 
Join Date: Jul 2004
Location: Tiranë / DUBAI / Vienna
Posts: 29,779
Likes (Received): 555

But Al Abbar is Emaar's CEO company.
AltinD no está en línea   Reply With Quote
Old November 23rd, 2006, 11:59 AM   #2815
malec
Rrrraaaaaahhhhhhh!!!!!!!
 
malec's Avatar
 
Join Date: Apr 2005
Location: Cork
Posts: 10,452
Likes (Received): 9

I know that but what does this mean for the tower?
malec no está en línea   Reply With Quote
Old November 23rd, 2006, 12:43 PM   #2816
Bikes
sababa
 
Bikes's Avatar
 
Join Date: Mar 2005
Location: Warsaw, Budapest, Berlin
Posts: 4,158
Likes (Received): 120

This was known before, i just dont understand this latest article. The first facade test was done by Schmidlin LLC then they have destroyed tons of claddings afaik. And the latest test was done by Al Abbar already, or am i mistaken? This is why they said that Burj is 4-5 month behind the scheduled completion date.
Bikes no está en línea   Reply With Quote
Old November 23rd, 2006, 03:31 PM   #2817
griftre
Registered User
 
Join Date: May 2005
Posts: 160
Likes (Received): 0

Quote:
Originally Posted by AltinD View Post
But Al Abbar is Emaar's CEO company.
Actually, the podium package was already awarded to Al Abbar, you can check their website, http://www.alabbargroup.com/portfolio/burjdxb.htm,
the real story behind this major shake-up will never be published.

maybe it's just because of the technical capability of Schmidlin LLC, in which they don't have the support of the main office in Switzerland, that's why they were moved out from the project, right now, as far as I know, there is a 6-month handing over of information to the new contractor. Well, in that case, this is again a major delay to the project.
griftre no está en línea   Reply With Quote
Old November 23rd, 2006, 10:08 PM   #2818
malec
Rrrraaaaaahhhhhhh!!!!!!!
 
malec's Avatar
 
Join Date: Apr 2005
Location: Cork
Posts: 10,452
Likes (Received): 9

So we wont see glass for 6 months again???
malec no está en línea   Reply With Quote
Old November 23rd, 2006, 11:02 PM   #2819
Face81
Registered User
 
Face81's Avatar
 
Join Date: Aug 2004
Location: London | Dubai
Posts: 5,354
Likes (Received): 39

Quote:
Originally Posted by Bikes View Post
Cool stuff Face, how did you get the webcam working? It doesnt work for me since months

I have wasta LOL

Whenever you want pics, just ask
__________________
We will never forget any of you...
The late Sheikh Maktoum Bin Rashid Al Maktoum [1943 - 2006]
The late Sheikh Zayed Bin Sultan Al Nahyan [1918 - 2004]
The late Sheikh Rashid Bin Saeed Al Maktoum [1912 - 1990]
Face81 no está en línea   Reply With Quote
Old November 23rd, 2006, 11:08 PM   #2820
megatower
BANNED
 
megatower's Avatar
 
Join Date: Jun 2006
Location: chicago
Posts: 1,221
Likes (Received): 0

Quote:
Originally Posted by malec View Post
So we wont see glass for 6 months again???
this is getting to fucking ridiculous
megatower no está en línea   Reply With Quote


Reply

Tags
burj dubai, downtown, dubai, tallest building

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT +2. The time now is 04:40 PM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2013, vBulletin Solutions, Inc.
Feedback Buttons provided by Advanced Post Thanks / Like v3.1.2 (Pro) - vBulletin Mods & Addons Copyright © 2013 DragonByte Technologies Ltd.
vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2013 DragonByte Technologies Ltd. (Resources saved on this page: MySQL 23.08%)

SkyscraperCity ☆ High there, what's up!

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu