|
|
| daily menu » rate the banner | guess the city | one on one |
|
|
#41 |
|
Enlightened user
Join Date: Feb 2004
Location: Porto
Posts: 5,750
Likes (Received): 31
|
^Is the A1 really being extended in the direction of Dubrovnik until 2008?
How are they going to do to cross that Bosnian bit of country? Is the motorway going through Bosnia, or is that being avoided by building the motorway in that croatian island paralel to the coast? Another thing... it the A-6 really completed?! Is Rijecta connected to Zagreb by motorway?! It sure doesn't look like that on www.viamichelin.com... and that map is updated. Same goes for the A-8 and A-9. Do they really exist as motorways?! Or are they just fast roads?
__________________
Long live rail freight!! |
|
|
|
|
|
#42 |
|
Enlightened user
Join Date: Feb 2004
Location: Porto
Posts: 5,750
Likes (Received): 31
|
Ok, i've checked on the website and confirmed that A-6, A-8 and A-9 are not motorways, but fast roads (single carrigeways) with no level crossings.Why are they called A-*, as if they're motorways?
__________________
Long live rail freight!! |
|
|
|
|
|
#43 |
|
Łodzioholik
Join Date: Feb 2006
Location: Łódź
Posts: 1,093
Likes (Received): 4
|
Fantastic photos and motorways!
|
|
|
|
|
|
#44 |
|
Registered User
Join Date: Jan 2007
Location: Mayagüez, Puerto Rico
Posts: 7,802
Likes (Received): 19
|
Great motorways,they look a lot like PuertoRican freeways (except these are more clean and with few traffic).
|
|
|
|
|
|
#45 | |
|
Enlightened user
Join Date: Feb 2004
Location: Porto
Posts: 5,750
Likes (Received): 31
|
Quote:
I could equally say that they look alot like portuguese freeways. And like all other freeways in europe.
__________________
Long live rail freight!! |
|
|
|
|
|
|
#46 |
|
Registered User
Join Date: Apr 2005
Location: Zagreb
Posts: 4,906
Likes (Received): 0
|
Completion of A6 as a full motorway is in 2008. A8 and A9 are called A* because they're going to be upgraded to a full motorway very soon, so they wanted to avoid confusion with changing the name later... Construction of A8 and A9 second lane is going to start very soon, maybe even this year, I don't know the date...
|
|
|
|
|
|
#47 | |
|
Registered User
Join Date: Apr 2005
Location: Zagreb
Posts: 4,906
Likes (Received): 0
|
Quote:
1. A bridge is being built from Croatian land to the Pelješac peninsula to avoid Bosnia 2. There will be the same old road through Bosnia as before, maybe there will be a highway built without exits in Bosnia, but that is still not known. |
|
|
|
|
|
|
#48 |
|
Road user
Join Date: May 2006
Location: Zwolle
Posts: 28,773
Likes (Received): 450
|
I heard they reconstruct them to motorways if enough traffic is there. That doesn't seems to be a problem with tourism in Istria.
|
|
|
|
|
|
#49 |
|
Registered User
Join Date: Apr 2005
Location: Zagreb
Posts: 4,906
Likes (Received): 0
|
![]() ![]() ![]() ![]() ![]() ![]()
|
|
|
|
|
|
#50 |
|
con los terroristas
Join Date: Aug 2005
Location: Bjelovar [HR]
Posts: 9,612
Likes (Received): 231
|
A6 is called A because it is going to be upgraded to full profile really soon. and it is not full fast road, it has some sections allready built in full motorway profile. so you have sitaution like this: from knot Bosiljevo (A1) there is about 2 km full profile built. then you have fast road till viaduct Hambarište (before exit Vrbovsko). then full profile, and again after tunnel Čardak fast road till toll station Grobnik, where it becomes full profiled again and lasts till entrance to Rijeka. at all - you have about 50 km of fast road and 30 km of motorway.
A8 and A9 actualy are signed as B8 and B9 (i'm not sure for B9, but B8 100%). B means "brza cesta" what means "fast road". those roads are under different concession company, so they decided to sign'em as B roads. all down the way at B8 you have B signs, not A |
|
|
|
|
|
#51 |
|
Road user
Join Date: May 2006
Location: Zwolle
Posts: 28,773
Likes (Received): 450
|
How about that A11 from Zagreb to Sisak? When will it be completed? Will it eventually extend into Bosnia? (Banja Luka or so).
|
|
|
|
|
|
#52 |
|
BANNED
Join Date: Feb 2006
Location: Banja Luka
Posts: 4,807
Likes (Received): 2
|
there is a plan for A11 extension to BiH, but it has to be done bilateral. Bosnia is building highway from Banja Luka to Prijedor so this highway ought to be extended toward Sisak and Zagreb. Federation of BiH also plans to connect on this highway from Bihac, but this plans are not sure.
|
|
|
|
|
|
#53 |
|
BANNED
Join Date: Feb 2006
Location: Banja Luka
Posts: 4,807
Likes (Received): 2
|
As for Neum nothing is decided yet. maybe highway toward Dubrovnik will go trough Herzegovina all the way. There are more possibilities.
|
|
|
|
|
|
#54 |
|
Road user
Join Date: May 2006
Location: Zwolle
Posts: 28,773
Likes (Received): 450
|
Cheapest will be that they build a motorway through that tiny piece of Bosnia without exits or border crossings.
We had that once on a provincial road in Limburg, The Netherlands, there were a few kilometers through Germany without exit-possibilities. |
|
|
|
|
|
#55 |
|
BANNED
Join Date: Feb 2006
Location: Banja Luka
Posts: 4,807
Likes (Received): 2
|
U don´t understand what i wanted to say, there is possibility that the highway would go all the way trough Herzegovina from Ploce or Neum till Dubrovnik and than to Montenegro, with an exit to Dubrovnik. It is much more cheaper and more ecological.
Something like this:
|
|
|
|
|
|
#56 |
|
Road user
Join Date: May 2006
Location: Zwolle
Posts: 28,773
Likes (Received): 450
|
How is the terrain on Bosnian side? Similar like around Zadar and Split?
A motorway to Montenegro would be very good for tourism and trade. |
|
|
|
|
|
#57 | |
|
Registered User
Join Date: Apr 2005
Location: Zagreb
Posts: 4,906
Likes (Received): 0
|
Quote:
1. Bosnia has no interest in this, there are no bigger Bosnian cities around 2. Croatia will build its own motorway till Dubrovnik, and that's right what we want to avoid - going through Bosnia. That's why we're building the bridge anyway
|
|
|
|
|
|
|
#58 |
|
Synchronized User
Join Date: Jun 2006
Location: Ljubljana
Posts: 19,308
Likes (Received): 441
|
__________________
|
|
|
|
|
|
#59 | |
|
BANNED
Join Date: Feb 2006
Location: Banja Luka
Posts: 4,807
Likes (Received): 2
|
Quote:
I have just said that possibility coz the croatian politicians and media talked and reported about that. It would be cheaper at least 2 times. |
|
|
|
|
|
|
#60 |
|
BANNED
Join Date: Feb 2006
Location: Banja Luka
Posts: 4,807
Likes (Received): 2
|
|
|
|
|
![]() |
| Thread Tools | |
| Display Modes | |
|
|