Old September 26th, 2009, 09:07 AM   #3481
LMB
Once BMW, always Honda
 
LMB's Avatar
 
Join Date: May 2008
Location: München
Posts: 664
Likes (Received): 44

Quote:
Originally Posted by ChrisZwolle View Post
But I don't mind my tax euros coming into good use in Poland, i.e. motorways.
Good, because it wasn't mean as a troll post. Rather a thank-you reminder.
LMB no está en línea   Reply With Quote

Sponsored Links
Old September 26th, 2009, 11:17 AM   #3482
bleetz
one.man.army
 
bleetz's Avatar
 
Join Date: Feb 2009
Posts: 793
Likes (Received): 396

Do they normally build roads during winter too, or will they pause until spring?
bleetz no está en línea   Reply With Quote
Old September 26th, 2009, 11:31 AM   #3483
japan
Registered Abuser
 
japan's Avatar
 
Join Date: Nov 2003
Location: Leave'em kids alone
Posts: 2,328
Likes (Received): 117

Quote:
Originally Posted by bleetz View Post
Do they normally build roads during winter too, or will they pause until spring?
They normally do unless it gets too cold and/or snowy.
__________________
Skreślić Drogę Czerwoną z planów rozbudowy Gdańska!

'W siedemdziesięciu dwóch procentach wypadków, kiedy ludzie powołują się na statystykę, podają liczby, które sami wymyślili.' - Jo Nesbo
japan no está en línea   Reply With Quote
Old September 26th, 2009, 11:55 AM   #3484
bleetz
one.man.army
 
bleetz's Avatar
 
Join Date: Feb 2009
Posts: 793
Likes (Received): 396

I wonder what the limit is because it will certainly be below zero for most of the winter in Poland. Can they work in such temperatures? Does it not affect the durability of the asphalt, etc. (expansion/contraction due to temperature differences)?
bleetz no está en línea   Reply With Quote
Old September 26th, 2009, 12:09 PM   #3485
ChrisZwolle
Road user
 
ChrisZwolle's Avatar
 
Join Date: May 2006
Location: Zwolle
Posts: 43,612
Likes (Received): 19400

Usually, asphalt cannot be poured in rain or during sub-zero temperatures. However, they have invented stuff like "cold asphalt" which can also be poured at lower temperatures, however, I don't know if it can be done in Polish winters, which tend to be cold. Temperatures below -20 can occur.

I thought the general winter break was from december 15th through march 15th...
ChrisZwolle no está en línea   Reply With Quote
Old September 26th, 2009, 01:12 PM   #3486
Mateusz
Registered User
 
Mateusz's Avatar
 
Join Date: Feb 2007
Location: Sheffield
Posts: 6,536
Likes (Received): 235

Well we had also winter in April and Novermber as well

I think in case of concrete they use some kind of heaters
Mateusz no está en línea   Reply With Quote
Old September 26th, 2009, 02:54 PM   #3487
kalle_sg
Registered User
 
kalle_sg's Avatar
 
Join Date: Apr 2008
Location: Oxford
Posts: 3,484
Likes (Received): 2244

Quote:
Originally Posted by ChrisZwolle View Post
I thought the general winter break was from december 15th through march 15th...
And you were right - that's how it is according to all deals between GDDKiA and building companies. However, the companies keep working as long, as the weather conditions allow them. This way they make sure there won't be any delays.
kalle_sg no está en línea   Reply With Quote
Old September 26th, 2009, 03:04 PM   #3488
ChrisZwolle
Road user
 
ChrisZwolle's Avatar
 
Join Date: May 2006
Location: Zwolle
Posts: 43,612
Likes (Received): 19400

So, with these "24 or 36 months" construction time, 2 times 3 months winter break are included in that?
ChrisZwolle no está en línea   Reply With Quote
Old September 26th, 2009, 03:10 PM   #3489
bleetz
one.man.army
 
bleetz's Avatar
 
Join Date: Feb 2009
Posts: 793
Likes (Received): 396

They could still cut trees in planned road paths during winter!
bleetz no está en línea   Reply With Quote
Old September 26th, 2009, 03:45 PM   #3490
kalle_sg
Registered User
 
kalle_sg's Avatar
 
Join Date: Apr 2008
Location: Oxford
Posts: 3,484
Likes (Received): 2244

Quote:
Originally Posted by ChrisZwolle View Post
So, with these "24 or 36 months" construction time, 2 times 3 months winter break are included in that?
AFAIK, in deals like that you have to remember, that one year is only 9 months, and not 12

So for instance, if construction time is 24 months, beginning April 2010, then it ends October 2012. The company is provided with 24 "construction months" and none of those three during wintertime is counted as "construction month".
kalle_sg no está en línea   Reply With Quote
Old September 26th, 2009, 04:11 PM   #3491
Andrzej_3598
Registered User
 
Join Date: Jul 2007
Location: Greater Warsaw Area
Posts: 190
Likes (Received): 11

A2 Stryków-Konotopa section

All the contracts (Design/Build) for A2 Stryków - Konotopa section will be signed on 2009-09-28 13:30. Event will take place in Ministry of Infrastructure office.

Announcement (in Polish) you may find here:

http://www.mi.gov.pl/2-482be1a920074-1791776-p_1.htm

Andrzej_3598 no está en línea   Reply With Quote
Old September 26th, 2009, 04:18 PM   #3492
Mateusz
Registered User
 
Mateusz's Avatar
 
Join Date: Feb 2007
Location: Sheffield
Posts: 6,536
Likes (Received): 235

Our minister Grabarczyk is quite determined to get so many projects forward. Good stuff
Mateusz no está en línea   Reply With Quote
Old September 26th, 2009, 06:22 PM   #3493
bleetz
one.man.army
 
bleetz's Avatar
 
Join Date: Feb 2009
Posts: 793
Likes (Received): 396

Will this complete the Warsaw - Lodz section?
bleetz no está en línea   Reply With Quote
Old September 26th, 2009, 06:32 PM   #3494
ChrisZwolle
Road user
 
ChrisZwolle's Avatar
 
Join Date: May 2006
Location: Zwolle
Posts: 43,612
Likes (Received): 19400

Yeah, by May 2012.
ChrisZwolle no está en línea   Reply With Quote
Old September 26th, 2009, 06:45 PM   #3495
bleetz
one.man.army
 
bleetz's Avatar
 
Join Date: Feb 2009
Posts: 793
Likes (Received): 396

Wow, this is very ambitious! What about the section border-Poznan? Is that scheduled to be completed by 2012 too?
bleetz no está en línea   Reply With Quote
Old September 26th, 2009, 06:47 PM   #3496
Warsawbynight
Registered User
 
Warsawbynight's Avatar
 
Join Date: Jan 2009
Location: Warszawa/Częstochowa
Posts: 1,084
Likes (Received): 21

Quote:
Originally Posted by bleetz View Post
Wow, this is very ambitious! What about the section border-Poznan? Is that scheduled to be completed by 2012 too?
Obviously yes! The whole motorway from german border to Warsaw must be completed for EURO 2012.
__________________
Poland - CENTRAL Europe
Warsawbynight no está en línea   Reply With Quote
Old September 26th, 2009, 06:51 PM   #3497
Chris80678
Registered User
 
Join Date: Sep 2007
Location: York
Posts: 804
Likes (Received): 171

Any news or updates on when we can expect the A4 from Wieliczka to Szarów to be completed and opened for use?
The construction of this short section of motorway has gone on far too long
Chris80678 no está en línea   Reply With Quote
Old September 26th, 2009, 06:56 PM   #3498
Timon91
Error
 
Join Date: Feb 2008
Location: just outside Germany
Posts: 5,783
Likes (Received): 46

That section seems to be one of the very few sections that is giving problems at the moment.
__________________
My Flickr account.
Some of my photoseries: Northern Ireland, Prague, Boston, Alaska part 1, 2, 3, Smoggy Moscow, Warsaw, Wrocław, Kiev, Donetsk, Odessa and Chişinău.
Timon91 no está en línea   Reply With Quote
Old September 26th, 2009, 07:07 PM   #3499
PLH
Moderator
 
PLH's Avatar
 
Join Date: Mar 2007
Location: Warszawa / Łódź
Posts: 11,841
Likes (Received): 2823

Yeah, that's true. Good that the company building it (Dragados) has won only few tenders by now.

@Chris80678

The length of a road des not matter at all - it can be both 10 or 100 kms ling and the construction time will be always around 2 years. This is because you have to keep the same price for 1 km.
PLH no está en línea   Reply With Quote
Old September 26th, 2009, 07:14 PM   #3500
Chris80678
Registered User
 
Join Date: Sep 2007
Location: York
Posts: 804
Likes (Received): 171

So its unlikely the A4 from Wieliczka to Szarów will be open and ready for use by the end of this year?
It is good that the tendering process for continuing the A4 to Rzeszów has speeded up considerably so that work on ensuring that at least Rzeszów and
Tarnów are conneted to the motorway network can start more quickly
Rzeszów is probably the most important on the A4 east of Kraków so the sooner the two places are connected by motorway the better
Chris80678 no está en línea   Reply With Quote


Reply

Tags
autostrady, expressways, highway, motorways, polish motorways, polish roads, polskie drogi, road

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Related topics on SkyscraperCity


All times are GMT +2. The time now is 07:18 AM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2018, vBulletin Solutions Inc.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

tech management by Sysprosium