Old March 7th, 2017, 12:33 AM   #16181
geogregor
Registered User
 
geogregor's Avatar
 
Join Date: Dec 2006
Location: London
Posts: 15,523
Likes (Received): 19165

Quote:
Originally Posted by Christian_AT View Post
TBM or not is a topic of the geologic condition of the hill/mountain

TBM works best in solid massive rock, if you try to use a TBM in a very soft rock area it wont work and get stucked
Quote:
Originally Posted by Dantiscum View Post
Well they used it for the tunnel under the Vistula river in Gdańsk, where the soil is very soft and wet...
It has nothing to do with the "hardness of rock". TBMs can be used in both, soft and hard rocks. Here the problem is with complicated geologic conditions and different layers of rocks. TBMs work best in uniform conditions.
geogregor no está en línea   Reply With Quote

Sponsored Links
Old March 7th, 2017, 09:36 PM   #16182
Maciek_CK
Great Scott!
 
Maciek_CK's Avatar
 
Join Date: Dec 2007
Location: Kielce
Posts: 937
Likes (Received): 1026

Quote:
Originally Posted by Dantiscum View Post
no TBM? Are they going to drill the tunnels with those excavators or what?
As I've mentioned before, due to complicated geological conditions, the tunnel will be built using the New Austrian Tunnelling Method (NATM).

http://www.rynekinfrastruktury.pl/wi...one-57665.html
__________________
Keep calm and generate 1.21 jigowatts of electricity.

LMB liked this post
Maciek_CK no está en línea   Reply With Quote
Old March 7th, 2017, 10:31 PM   #16183
ChrisZwolle
Road user
 
ChrisZwolle's Avatar
 
Join Date: May 2006
Location: Zwolle
Posts: 43,604
Likes (Received): 19391

A 1941 map showing a proposed Autobahn from Frankfurt an der Oder to Falkenburg (now Złocieniec).


Photo credit: aswnl

You can see the alignment east of Złocieniec.
ChrisZwolle está en línea ahora   Reply With Quote
Old March 8th, 2017, 12:08 AM   #16184
Kpc21
Registered User
 
Join Date: Oct 2008
Location: Łódź
Posts: 18,377
Likes (Received): 6778

We still have some reminders of motorways being built by Germans during the WW2. Especially the Berlin-Kaliningrad (Königsberg then) road, the one which was a Germans' pretext to start the war.

https://en.wikipedia.org/wiki/Berlinka

It seems, the map shows a part of it as "under construction" (solid lines instead of dashed ones).
Kpc21 no está en línea   Reply With Quote
Old March 8th, 2017, 01:57 AM   #16185
Kanadzie
Registered User
 
Kanadzie's Avatar
 
Join Date: Jan 2014
Posts: 2,375
Likes (Received): 748

I wonder why they planned this road? It seems to serve no purpose, even in "Reichsgau Wartheland"...
__________________
100 coups de fouet, si vous n'ętes pas morts de rire !

LMB liked this post
Kanadzie no está en línea   Reply With Quote
Old March 8th, 2017, 04:48 AM   #16186
rakcancer
Registered User
 
rakcancer's Avatar
 
Join Date: Sep 2010
Location: XYZ
Posts: 1,198
Likes (Received): 1170

Quote:
Originally Posted by ChrisZwolle View Post
A 1941 map showing a proposed Autobahn from Frankfurt an der Oder to Falkenburg (now Złocieniec).

You can see the alignment east of Złocieniec.
I dig a bit in google maps and found possible continuation of that alignment all the way to place south of Siennica village (below road between Siennica and Zabinek ).:





__________________

ChrisZwolle, Luki_SL, RipleyLV, loloo, SRC_100 liked this post
rakcancer no está en línea   Reply With Quote
Old March 8th, 2017, 11:54 AM   #16187
Kemo
Registered User
 
Join Date: Jan 2012
Location: Segiet
Posts: 10,735
Likes (Received): 18772


Recently there has been a discussion on this road and other planned German motorways in today's Poland here on our forum: http://www.skyscrapercity.com/showth...208131&page=88
_______________

Construction permits were issued for two remaining sections of S6 motorway Szczecin - Koszalin:

S6: Ustronie Morskie - Bielice (S11) 25.1km (March 2017 to May 2019) – projectmap

S6: Nowogard-East - north of Płoty-North 20.3km (March 2017 to May 2019) – projectmap

Last edited by Kemo; March 8th, 2017 at 07:54 PM.
Kemo no está en línea   Reply With Quote
Old March 9th, 2017, 11:04 PM   #16188
Andrzej_3598
Registered User
 
Join Date: Jul 2007
Location: Greater Warsaw Area
Posts: 190
Likes (Received): 11

Quote:
Originally Posted by KarolisGr View Post
What's the actual situation with S8 construction from Marki to Radzymin outside Warsaw?

Seen some pictures of one section by guys who used DK631 to bypass Warsaw while on the way from Lithuania. Judging by the current construction state, the opening date of July 2017 seems not realistic.
Sep/Oct 2017 - likely
Andrzej_3598 no está en línea   Reply With Quote
Old March 15th, 2017, 06:58 PM   #16189
Kemo
Registered User
 
Join Date: Jan 2012
Location: Segiet
Posts: 10,735
Likes (Received): 18772

Construction permit was issued for the bypass of Szczecinek (part of S11 motorway Koszalin - Poznań):

S11: Szczecinek-North - Turowo 12.0km (March 2017 to April 2019) – projectmap
Kemo no está en línea   Reply With Quote
Old March 16th, 2017, 11:10 PM   #16190
Kemo
Registered User
 
Join Date: Jan 2012
Location: Segiet
Posts: 10,735
Likes (Received): 18772

A recap on upcoming scheduled road openings:

DK74, bypass of Wieluń (13.2 km, 2+1 lanes, grade-separated) will be opened on 31st March.

S7 Radom-South - Skarżysko Kamienna-North, scheduled for April, will probably be delayed. Maybe they will somehow manage to finish the section that runs along the old route (near Szydłowiec). But there is no connection to DK7 at Radom-South (it is a part of another contract) and it is unclear whether a temporary connection will be built or not.

S3, second carriageway of Gorzów Wielkopolski bypass, scheduled for April, will be delayed for sure. Dragados wants to change the deadline to September.

S7 Nidzica - Napierki, scheduled for May. Good progress on ths section, there should be no delays.

S7 Jędrzejów - Moczydło, scheduled for May. At least a two month delay is projected.
Kemo no está en línea   Reply With Quote
Old March 17th, 2017, 01:09 AM   #16191
Kemo
Registered User
 
Join Date: Jan 2012
Location: Segiet
Posts: 10,735
Likes (Received): 18772

DK82 overpassing DW809 in Lublin (Lublin's main east-west artery, here).

This is not a very significant project, but aerial photos are always nice

Quote:
Originally Posted by marti:) View Post












Kemo no está en línea   Reply With Quote
Old March 19th, 2017, 04:59 PM   #16192
Piotr1234
Registered User
 
Join Date: May 2007
Location: @41.9021608,12.453287,20z
Posts: 1,784
Likes (Received): 884

Construction S6 in progress, over 140km new roads to be done by 2020.

__________________
"IN GOD WE TRUST"

Chris80678, Luki_SL, baderman, yunit liked this post
Piotr1234 no está en línea   Reply With Quote
Old March 19th, 2017, 11:41 PM   #16193
Chris80678
Registered User
 
Join Date: Sep 2007
Location: York
Posts: 803
Likes (Received): 168

The northern Wieluń bypass (opening 31.03.2017) will take a lot of transit traffic out of the town, however it does need another south and west bypass to divert northbound and southbound traffic on DK43 and DK45 away from Wieluń. Traffic could use the northern bypass as far as Biała interchange and then use the west and south bypass to avoid Wieluń to rejoin the existing DK43 and DK45 south of Wieluń
Chris80678 no está en línea   Reply With Quote
Old March 27th, 2017, 12:26 AM   #16194
Nowax
Nowa Huta
 
Nowax's Avatar
 
Join Date: Jan 2010
Location: Krakow Poland
Posts: 852
Likes (Received): 1601

S7 Krakow - East Bypass

Quote:
Originally Posted by Carte View Post


__________________
Nowa Huta Wzg

makaveli6, SRC_100, baderman, 8166UY, gr_kanev liked this post
Nowax no está en línea   Reply With Quote
Old March 27th, 2017, 01:21 AM   #16195
Nowax
Nowa Huta
 
Nowax's Avatar
 
Join Date: Jan 2010
Location: Krakow Poland
Posts: 852
Likes (Received): 1601

S7 Lubien - Rabka section

Quote:
Originally Posted by Nowohucianka View Post
Obiekt 15+16 - ok. km 721+200
8.

9.


Portal Północny Tunelu - Ok. km 721+900
10.

11.

12.

13.


Portal Południowy Tunelu - ok. km 724+000
14.

15.


Więcej zdjęć z II odcinka:
lotnicze
obiekty
__________________
Nowa Huta Wzg

SRC_100, baderman, simondanut liked this post
Nowax no está en línea   Reply With Quote
Old March 27th, 2017, 01:22 AM   #16196
Nowax
Nowa Huta
 
Nowax's Avatar
 
Join Date: Jan 2010
Location: Krakow Poland
Posts: 852
Likes (Received): 1601

Quote:
Originally Posted by Nowohucianka View Post
Węzeł Skomielna - Obiekt 18 - ok. km 724+300
16.

17.

18.


Obiekt 20
19.

20.
__________________
Nowa Huta Wzg
Nowax no está en línea   Reply With Quote
Old March 27th, 2017, 02:02 PM   #16197
Kemo
Registered User
 
Join Date: Jan 2012
Location: Segiet
Posts: 10,735
Likes (Received): 18772

A construction permit was issued for a section of S17 motorway (Warszawa - Lublin):

S17: Ruda - Skrudki 20.2km (March 2017 to June 2019) – projectmap

This section includes the bypass of Ryki.
Kemo no está en línea   Reply With Quote
Old March 28th, 2017, 02:02 PM   #16198
Eulanthe
Registered User
 
Join Date: Dec 2006
Posts: 1,228
Likes (Received): 411

News from the GDDKiA is that the Poznań-Wronczyn section of the S5 is only 34% complete. They're saying that it might be technically possible to open the road by the end of the year, but it's clear to everyone here that the contractor simply isn't able to pay the bills properly and that there's no chance of it opening then.

http://epoznan.pl/news-news-75151-No...tym_roku&#8221

I'll be surprised if this opens by the end of August 2018. It's frustrating, because this section (along with Wrocław-Trzebnica) is badly, badly needed.
Eulanthe no está en línea   Reply With Quote
Old March 28th, 2017, 05:39 PM   #16199
Kemo
Registered User
 
Join Date: Jan 2012
Location: Segiet
Posts: 10,735
Likes (Received): 18772

Tenders for S61 / DK63 / DK64 - bypass of Łomża will be launched soon (this week)

Kemo no está en línea   Reply With Quote
Old March 30th, 2017, 02:26 AM   #16200
ufonut
Atlantyda
 
ufonut's Avatar
 
Join Date: Jul 2007
Posts: 2,015
Likes (Received): 1732

[S3] Sulechów - Nowa Sól Południe by Maciej78









__________________
Global Trekker
ufonut no está en línea   Reply With Quote


Reply

Tags
autostrady, expressways, highway, motorways, polish motorways, polish roads, polskie drogi, road

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Related topics on SkyscraperCity


All times are GMT +2. The time now is 11:46 AM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2018, vBulletin Solutions Inc.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

tech management by Sysprosium