daily menu » rate the banner | guess the city | one on oneforums map | privacy policy | DMCA | news magazine | posting guidelines

Go Back   SkyscraperCity > Infrastructure and Mobility Forums > Highways & Autobahns

Highways & Autobahns All about automobility



Global Announcement

As a general reminder, please respect others and respect copyrights. Go here to familiarize yourself with our posting policy.


Reply

 
Thread Tools
Old June 5th, 2017, 10:24 PM   #16341
Chris80678
Registered User
 
Join Date: Sep 2007
Location: York
Posts: 803
Likes (Received): 168

I am looking forward to S7 Nidzica to Napierki opening very soon
Chris80678 no está en línea   Reply With Quote

Sponsored Links
Old June 6th, 2017, 04:59 PM   #16342
Kemo
Registered User
 
Join Date: Jan 2012
Location: Segiet
Posts: 10,724
Likes (Received): 18751

A design & build contract was signed for S61 E67 Via Baltica motorway, section Suwałki - PL/LT border at Budzisko. 24.6 km, completion date summer 2020.
Kemo no está en línea   Reply With Quote
Old June 6th, 2017, 09:19 PM   #16343
Chris80678
Registered User
 
Join Date: Sep 2007
Location: York
Posts: 803
Likes (Received): 168

How long does it take for a former DK road to be de-classified to a gmina road? Take for example DK46 which used to pass through Nysa but will now no longer be a DK or DW road (because of the new recently opened bypass which replaces it). I know it partly depends on local authorities of town concerned

Last edited by Chris80678; June 6th, 2017 at 09:26 PM.
Chris80678 no está en línea   Reply With Quote
Old June 6th, 2017, 09:24 PM   #16344
Kemo
Registered User
 
Join Date: Jan 2012
Location: Segiet
Posts: 10,724
Likes (Received): 18751


Formally, it happens instantly (so old DK46 in Nysa is no longer a DK). But these roads are de-classified to DW (droga wojewódzka) first, and then if the voivodship doesn't want them, it de-classifies them further.
Kemo no está en línea   Reply With Quote
Old June 6th, 2017, 09:25 PM   #16345
Chris80678
Registered User
 
Join Date: Sep 2007
Location: York
Posts: 803
Likes (Received): 168

Quote:
Originally Posted by Kemo View Post

Formally, it happens instantly (so old DK46 in Nysa is no longer a DK). But these roads are de-classified to DW (droga wojewódzka) first, and then if the voivodship doesn't want them, it de-classifies them further.
Thank you for such a swift answer, if only openstreetmap and targeo.pl were as fast to update their maps
Chris80678 no está en línea   Reply With Quote
Old June 6th, 2017, 09:32 PM   #16346
Piotr1234
Registered User
 
Join Date: May 2007
Location: @41.9021608,12.453287,20z
Posts: 1,781
Likes (Received): 881

Nice pictures from the plane. .....construction of the new S6


http://www.skyscrapercity.com/showpo...postcount=3058
__________________
"IN GOD WE TRUST"
Piotr1234 no está en línea   Reply With Quote
Old June 6th, 2017, 10:24 PM   #16347
Kemo
Registered User
 
Join Date: Jan 2012
Location: Segiet
Posts: 10,724
Likes (Received): 18751


Openstreetmap is already updated (if you zoom in)
Kemo no está en línea   Reply With Quote
Old June 6th, 2017, 10:32 PM   #16348
Kpc21
Registered User
 
Join Date: Oct 2008
Location: Łódź
Posts: 18,361
Likes (Received): 6769

Quote:
Originally Posted by Kemo View Post

Formally, it happens instantly (so old DK46 in Nysa is no longer a DK). But these roads are de-classified to DW (droga wojewódzka) first, and then if the voivodship doesn't want them, it de-classifies them further.
The reason why they changed it was that the municipalities (gmina) were complaining that it's too expensive for a small municipality to maintain such a big road.
Kpc21 no está en línea   Reply With Quote
Old June 7th, 2017, 12:35 AM   #16349
Nowax
Nowa Huta
 
Nowax's Avatar
 
Join Date: Jan 2010
Location: Krakow Poland
Posts: 852
Likes (Received): 1600

S7 Krakow - Eastern Bypass





















https://www.facebook.com/aerialmediapl/
__________________
Nowa Huta Wzg

SRC_100, steve5, Alpin2.0, Luki_SL, macrumin and 13 others liked this post
Nowax no está en línea   Reply With Quote
Old June 7th, 2017, 09:06 AM   #16350
Chris80678
Registered User
 
Join Date: Sep 2007
Location: York
Posts: 803
Likes (Received): 168

According to Polish forum 29th June is 99% certain as opening date for this part of S7
Chris80678 no está en línea   Reply With Quote
Old June 7th, 2017, 09:49 AM   #16351
Chris80678
Registered User
 
Join Date: Sep 2007
Location: York
Posts: 803
Likes (Received): 168

Quote:
Originally Posted by Kemo View Post

Openstreetmap is already updated (if you zoom in)
I can see that but the old DK46 through Nysa is still showing as a DK road
Chris80678 no está en línea   Reply With Quote
Old June 7th, 2017, 12:09 PM   #16352
Kemo
Registered User
 
Join Date: Jan 2012
Location: Segiet
Posts: 10,724
Likes (Received): 18751


Because it is a connection with DK41.
Kemo no está en línea   Reply With Quote
Old June 7th, 2017, 03:16 PM   #16353
Chris80678
Registered User
 
Join Date: Sep 2007
Location: York
Posts: 803
Likes (Received): 168

Quote:
Originally Posted by Kemo View Post

Because it is a connection with DK41.
Until eastern half of Nysa bypass opens in September / October
Chris80678 no está en línea   Reply With Quote
Old June 10th, 2017, 04:38 PM   #16354
Kemo
Registered User
 
Join Date: Jan 2012
Location: Segiet
Posts: 10,724
Likes (Received): 18751

Construction of S7 and S5 in Ostróda.

Kemo no está en línea   Reply With Quote
Old June 11th, 2017, 02:42 PM   #16355
MajKeR_
ˇLa Ley y la Justicia!
 
Join Date: Feb 2009
Location: República de San Escobar
Posts: 3,611
Likes (Received): 9092

At the title someone renamed S5 nicely, one should use teleportation to drive DK17 staying in Ostróda.
__________________
No půdź sam synek, půdź do nos sam, tu momy fajer, tu fajer jes, ja!

Kiedy padł ten pierwszy strzał, Kosteczku, to wszystko się zaczęło, zaczęli strzelać ci grenszuce, których chłopcy jeszcze nie zdążyli rozbroić, i zaczęli strzelać ci chłopcy, którzy już mieli jakieś karabiny albo nulachty, i posypało się trochę strzałów. Słyszałeś krzyki:
- Erich dostoł! - i do dziś nie wiesz, czy to krzyczał grenszuc, czy powstaniec.
Szczepan Twardoch, „Morfina”, o wybuchu I powstania śląskiego.
MajKeR_ está en línea ahora   Reply With Quote
Old June 11th, 2017, 08:22 PM   #16356
ufonut
Atlantyda
 
ufonut's Avatar
 
Join Date: Jul 2007
Posts: 2,015
Likes (Received): 1732

By Henry Gale

Summer in Ostroda.

__________________
Global Trekker
ufonut está en línea ahora   Reply With Quote
Old June 12th, 2017, 04:28 PM   #16357
[email protected]
Registered User
 
J@nek's Avatar
 
Join Date: Jul 2007
Location: NowySącz/Poznań/Toronto
Posts: 1,343
Likes (Received): 169

I don't believe anyone mentioned but construction on yet another section of Polish Highway will start soon.

The S-7 connecting Kraków with Warsaw. Construction on a 29 km section will start soon between the Warsaw Chopin Airport and Grójec (south of Warsaw). This is an important artery as it will make access to the Airport easy from southern Poland.

http://www.money.pl/d/popup.htm?http...39/b416807.jpg
J@nek no está en línea   Reply With Quote
Old June 12th, 2017, 05:05 PM   #16358
MichiH
Registered User
 
Join Date: Jan 2013
Location: Lower Franconia
Posts: 4,403
Likes (Received): 2082

I think it's a design&build contract and the design phase has not yet started...
__________________

Which new motorways are currently under construction?
Which new motorways will be opened next?

See 'New motorway projects' thread

** Please help completing and updating of the list **

Been/driven: A, AND, B, CDN, CH, CZ, D, DK, E, EST, F, FIN, FL, GB, H, I, L, LV, LT, N, NL, P, PL, RO, S, SLO, USA (My cumulative travel mapping)
MichiH no está en línea   Reply With Quote
Old June 13th, 2017, 09:53 AM   #16359
SRC_100
Registered User
 
SRC_100's Avatar
 
Join Date: May 2014
Posts: 3,084
Likes (Received): 3275


You are right. What`s more, any contract hasn`t been signed yet, but hope for summer (august).
SRC_100 no está en línea   Reply With Quote
Old June 14th, 2017, 12:29 PM   #16360
Kemo
Registered User
 
Join Date: Jan 2012
Location: Segiet
Posts: 10,724
Likes (Received): 18751

Upcoming road openings.

Three sections of S7 motorway are likely to be opened this month:

Nidzica - Napierki (22.3 km) - rumoured date - next Friday
Radom - Szydłowiec (17.8 km) - rumoured date - next Friday
Kraków Nowa Huta - Kraków Przewóz (4.3 km) - rumoured date - 29.06.

S3 motorway - bypass of Gorzów Wielkopolski is supposed to be opened in full profile till the end of June

DK15/25 expressway, bypass of Inowrocław (16.8 km) will probably be opened in July.

S19 expressway Sokołów Małopolski - Stobierna is already completed and could be opened to Sokołów-East, but it will probably wait until August, when a temporary connection to DK19 at Sokołów-North will be finished.

Two sections of S11 motorway (bypasses of Jarocin and Ostrów Wielkopolski) will be completed in summer and opened in August (probably).

Last edited by Kemo; June 14th, 2017 at 12:37 PM.
Kemo no está en línea   Reply With Quote


Reply

Tags
autostrady, expressways, highway, motorways, polish motorways, polish roads, polskie drogi, road

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Related topics on SkyscraperCity


All times are GMT +2. The time now is 06:16 PM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2018, vBulletin Solutions Inc.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

tech management by Sysprosium