daily menu » rate the banner | guess the city | one on oneforums map | privacy policy (aug.2, 2013) | DMCA policy | flipboard magazine

Go Back   SkyscraperCity > European Forums > UK & Ireland Architecture Forums > Projects and Construction > Manchester Metro Area

Manchester Metro Area For Manchester, Salford and the surrounding area.



Reply

 
Thread Tools
Old May 24th, 2011, 08:42 PM   #1
VoldemortBlack
Want a coffee after this?
 
VoldemortBlack's Avatar
 
Join Date: Oct 2009
Location: North Manchester M28
Posts: 3,782
Likes (Received): 4

Greater Manchester Developments and Forum Directory

Manchester Developments Thread

--------------------------------------------------------------------------------

image hosted on flickr


1) MediaCityUK
2) Metrolink Expansions
3) NOMA/Co-op Headquarters/Angel Meadows Development
4) Eastlands Masterplan
5) Piccadilly Gateway refurbishment
6) Metrolink Second City Crossing
7) New Wakefield Street Student Tower
8) Chapel Street Regeneration/High Street Plans
9) First Street/Central Spine
10) Ordsall Curve/Flyover
11) Victoria Station New Roof & Major refurbishment
12) Spinningfields Expansion(?) (mentioned on the Central Salford Thread)
13) Sarah Village Completion
14) Holiday Inn NQ
15) Airport City & Enterprise Zone
16) All Manchester University Developments
17) New/Refurbished Transport Interchanges for Bolton, Rochdale & Altrincham
18) Greengate.
19) BMX Arena
20) Travelodge on the Boddingtons site.
21) Soapworks on Ordsall Riverside/Ivy Wharf
22) Central Park (Metrolink station (or stop ) and GM Police Headquarters)
23) Axis, Albion Street (maybe, maybe not?)
24) Electrification of Eccles & Bolton (Blackrod) Lines and rumours of electrification of Rochdale & Littleborough line.



That's just from what I can remember off the top of my head, feel free to add to it

Last edited by b4mmy; May 25th, 2011 at 10:12 AM.
VoldemortBlack no está en línea   Reply With Quote

Sponsored Links
 
Old October 23rd, 2011, 12:17 AM   #2
VoldemortBlack
Want a coffee after this?
 
VoldemortBlack's Avatar
 
Join Date: Oct 2009
Location: North Manchester M28
Posts: 3,782
Likes (Received): 4

This needs updating.

1) Finishing off of BBC-side of MediaCity. Fitting out of retail units/restaurants etc.
2) Beginning of ITV-side of MediaCity, should start construction any day now!
3) Finishing off of Co-op Headquarters, and;
4) Starting of consultations involving which companies will build the NOMA/Angel Meadows masterplan, and
4a) Indigo Hotel/City Buildings
5) Eastlands Masterplan, still not heard much on this apart from the sports fields, which I guess will enter consultation stages soon?
6) Metrolink Second City Crossing
7) Finishing off of New Wakefield Street-33 floors.
8) Chapel Street - finishing off of roadworks and information on new developments incl..
9) Conversion of building on Trinity Street into a hotel,
10) Peel Park & Frederick Road Salford University Developments.
11) Improvement works to Salford Crescent Railway Station
12) First Street
13) Ordsall Curve; Northern Hub.
14) Manchester Victoria Station; funding given(?), toilets currently being refurbished as part of Phase 1. Ticket Barriers expected by the end of the year.
15) Holiday Inn Northern Quarter is now complete.
16) Chethams School of Music Expansion - finishing off.
17) Airport City & Enterprise Zone
18) Greengate - bridge almost complete, new plaza still under construction and consulation has begun on one of the two buildings scheduled to overlook the scheme.
19) BMX Arena is now complete.
20) New bridge linking Velopark station with Velodrome is also complete.
21) Manchester University Developments
22) Transport Interchange improvements in Altrincham, Bolton and Rochdale.
23) Travelodge at Boddingtons site now complete.
24) Soapworks; exterior nearing completion but no details as yet as to which restaurants/cafes/shops will be moving in.
25) Electrification of Victoria to Liverpool line appears to be in full swing now, bridges in Eccles have already been reinforced and have reopened, meaning the more detailed works are ready to begin.
25a) We also have the electrification of the Victoria to Blackpool via Preston & Bolton line to look forward to, although I don't think any physical work has started on that yet.
26) Northern Hub; rumours that the line to Leeds could also be electrified.
26a) Usage of derelict platforms at Salford Central station for the Victoria to Liverpool stopper service.
27) Ordsall Park & Radclyffe Park development, new Morrisons etc.
28) Primark refurbishment, I'm looking forward to this. It'll improve the area so much.
29) Bridge over Corporation St is now complete and has reopened.
30) Conversion of the Triangle into a Covent-Garden style affair. Re-renamed "The Corn Exchange".
31) The Oast House at Spinningfields.
32) Avenue North at Spinningfields.
33) Gateway House reclad, Piccadilly.
34) Manchester House reclad, Spinningfields.
35) Holiday Inn behind Piccadilly Station.
36) Urbis opening as the National Football Museum.
37) Improvements to Deansgate station.
38) DfT Improvements to various stations across Greater Manchester, including possibility of a new station at White City.
39) Halle Orchestra relocating to St Peter's Church, Ancoats.
40) St Peter's Square refurb.
40a) Elizabeth House demolition/building of new office block on site.
40b) Relocation of the cenotaph to the Peace Gardens
40c) Refurbishment of Central Library.
40d) Relocation of current Metrolink platforms at St Peter's Square and addition of a new island platform for Second City Crossing.

41) Metrolink; Chorlton line now open and doing well.
42) Metrolink; Central Park & Velopark lines due to open in New Year, depending on TMS issues.
43) Metrolink; closure of Moseley Street stop/station.
44) Metrolink; Completion of Central Park, Velopark & Oldham and Rochdale lines due in the next year.
45) Metrolink; Pending decisions about whether or not to build the Trafford Centre/Port Salford/Wythenshawe Loopline or Stockport lines.
46) Metrolink; TfGM have decided to replace all the T68s with more M5000s.
47) Metrolink; TMS already rolled out from Trafford Bar to St Werbeugh's Road and Pomona to Eccles, but still has to be rolled out across the rest of the network.
48) Metrolink; Bury Line is currently being upgraded to the new Metrolink branding.
49) Metrolink; Abraham Moss station open, Woodlands Road soon to close.
50) Metrolink; Consultations about new Queens station due to start soon.
VoldemortBlack no está en línea   Reply With Quote
Old November 22nd, 2011, 06:03 PM   #3
nq
 
nq's Avatar
 
Join Date: May 2010
Posts: 1,256

SSC GREATER MANCHESTER DIRECTORY

MAIN

Official Manchester Thread
(General)

Apartments
Art
- Graffiti
- Sculptures/Statues
Concert Venues & Exhibition Halls
Conferences
Economy
Events
- Manchester International Festival
- Manchester at MIPIM
Governance - GMCA & AGMA
Hotels
Housing
Knowledge Capital
Leisure Attractions
Maps
- Google Street View
- Google Earth
Media
Offices
Parks, Squares & Open Spaces
- Squares
Peel
Photos
- Aerial Photos
- Greater Manchester Photo Thread
- Skyline Photos
Pubs, Bars, Clubs & Restaurants
Retail
Student Accommodation
Universities
Webcams


AREAS

Ancoats
Boddingtons
Castlefield
- Granada TV Site
- Museum of Science and Industry
Central Salford
- Greengate
- Middlewood Locks
- Ordsall
- Ordsall Riverside
Chinatown
Civic Quarter
- Former Odeon Cinema
- London Scottish House
- Sky Park
- St Peter's Square
- Theatre Royal
Hulme
- Birley Fields
- Hippodrome
Irwell River Park
Medieval Manchester
NOMA - Masterplan
Northern Quarter
- Mackie Mayor
- Stevenson Square
Oxford Road Corridor (Corridor Manchester)
- BBC Oxford Road Site
- First Street
- Manchester Science Park
Piccadilly
- Former Employment Exchange
- London Road Fire Station
- Mayfield
- Piccadilly Basin
- Piccadilly Gardens
- Piccadilly Gateway
- The Wall
Retail Core
- Corn Exchange
- King Street
- Renaissance Hotel | Deansgate
Salford Quays
- MediaCityUK
Southern Gateway
- Great Jackson Street
Spinningfields
Victoria Station
- Fish Dock

Greater Manchester Developments

Bolton
Brunswick
Bury
East Manchester
- Beswick Community Hub
- Chancellor Place
- Etihad Campus - Collar Site
- Holt Town
- New Islington
- The Sharp Project
Eccles
Enterprise Zone
- Airport City
- MediPark
- World Logistics Hub
Oldham
- Old Town Hall
Port Salford
Rochdale
Stockport
- Woodford
Trafford
- Pomona
- Stretford Mall
- Trafford Park
- Trafford Quays
Wigan

Macclesfield


TRANSPORT

General

Airport
- City Airport
Bus & Coach Stations
Bus Rapid Transit / Cross City Bus Routes
Electrification
- Manchester-Leeds
- Manchester-Liverpool-Preston-Blackpool
Failed/Abandoned Schemes
High Speed Rail
Metrolink
- Metrolink Extension
- Metrolink Future
Northern Hub
- Ordsall Curve - Piccadilly To Victoria Direct Rail Link
Old/Former Transport
Railway Stations
- Oxford Road Station
- Piccadilly Station
- Victoria Station
Roads
- A556 Bypass M6-M56
- SEMMMS
Smart Card
TfGM
Tram-Train
Water Taxis


PLANNING

Altair | Altrincham App
Astley & Byrom House Site | Quay Street Pre
Axis | Albion Street On Hold
Brazennose House | Brazennose Street App
Central Retail Park | Great Ancoats Street App
City Wharf | New Bailey Street App
Didsbury Point Hospital App
1 Ellesmere Street App
100/101 Embankment | Greengate App
Exchange Quay Towers App
Gateway House | Piccadilly Station Approach App
Goods & Leadbetters / House 4 Life | Greengate Pre
76-78 Great Ancoats Street App
Hanover Building | NOMA App
Hill Quays Penthouse Level | 1 Jordan Street App
Holiday Inn | Aytoun Street Demo
Hotel Indigo/City Buildings App
Hotel La Tour | New Bailey Street App
Landmark | Oxford Street App
Manor Wharf | Adelphi Street Refused
MBS Redevelopment - Hotel & Executive Education Centre App
MediaCityUK Phases 4-7 Pro
Milliners Wharf | Pollard Street | Phase 2 App
Origin | Princess Street On Hold
Project Digital / Tomorrow
Radisson Extension - Theatre Royal | Peter Street Pre
River Street Apart-Hotel App
Siemens | Princess Parkway Pre
Springfield Lane | Salford App
2 St Peter's Square App
3 St Peter's Square App
One Water Street Pre
Yotel | 12-16 Piccadilly App

Sport
Belle Vue Aces Speedway Stadium Pre
Swinton Stadium | Salford Pre
.
__________________

b4mmy liked this post

Last edited by nq; February 19th, 2014 at 01:24 PM.
nq no está en línea   Reply With Quote
Old January 30th, 2012, 08:13 PM   #4
VoldemortBlack
Want a coffee after this?
 
VoldemortBlack's Avatar
 
Join Date: Oct 2009
Location: North Manchester M28
Posts: 3,782
Likes (Received): 4

This month (starting Wednesday), these are the developments we can expect to see happening in Manchester;

February 2012

- Virgin Money will open on King St
- Chethams' School of Music; construction will complete however the building won't open until April
- On the 14th, Jamie's Italian Restaurant will open in the old HSBC "island" building on/near King St.
- Work will start on the recladding of the tower blocks in Islington, Salford (the two tower blocks which can be seen from Chapel St as you enter the city centre)
- From the 24th February until the 4th March, they'll be a Manchester History Festival in the Town Hall.


See the M'cr Construction Timeline in the Exchange Square subforum for the development timeline for the rest of the year.

Have a happy February!
__________________
The VB Manchester Construction Timeline

All the projects, events and developments in Manchester. Updated every month!
JUNE 2012 UPDATE COMING SOON!!!

http://www.skyscrapercity.com/showthread.php?t=1484027


VB'S Manchester Transport Maps
... as featured on ProjectMapping.co.uk

All of my rail and Metrolink maps past present and future in one place. Here.

Be sure to check out DeanUK's Metrolink Forum!!

b4mmy liked this post
VoldemortBlack no está en línea   Reply With Quote
Old May 22nd, 2012, 07:13 PM   #5
VoldemortBlack
Want a coffee after this?
 
VoldemortBlack's Avatar
 
Join Date: Oct 2009
Location: North Manchester M28
Posts: 3,782
Likes (Received): 4

Manchester Developments List May 2012

MAY 2012

Projects currently under construction

- New Wakefield St Student Tower | 33 Floors | Nearing Completion
- Central Reference Library + Town Hall Extension Refurb
- Number 1 St Peter's Square | 14 Stories
- Irish World Heritage Centre | Queens Road
- Victoria Warehouse | Old Trafford | Renovation Ongoing
- Soapworks | Exchange Quay
- Premier Inn | Dale St, Piccadilly | 11 Floors
- Manchester Metropolitan Business School | Low Ormond St
- Derwent Street Apartments | Ordsall | 4, 8 & 10 floors
- ITV and Coronation St Studios | Trafford MediaCityUK
- Number 1 Angel Square | Victoria | 17 floors
- National Football Museum | Victoria
- Greengate Redevelopment
- Ibis Hotel & Fabrica | 7 Floor Hotel, 5 floor office | Ancoats
- Primark Refurbishment | Piccadilly Gardens
- Victoria Station Redevelopment | Minor preliminary work has already begun, major work starts next year
- Hanover House | Refurbishment into offices | Starts soon
- Printworks Refurbishment | New Mezannine
- Triangle Redevelopment | "Corn Exchange" | New look shopping centre
- Piccadilly Station new mezannine | Nearing completion
- Salford Riverside | New Bailey St to Lowry Hotel | Nearing completion (park still to open)
- Resurfacing of Trafford Waterfront | The Quays | Nearing completion
- Tower 12 | Spinningfields | New offices and restaurants

Metrolink projects

- Oldham Line is now in the driver testing stage. Rumours that it'll open on June 7th.
- Droylsden Line is nearing completion. TfGM in discussions on whether or not to open the line as far as Velopark on matchdays
- Old trams (T68s) currently being phased out and replaced by the new M5000s
- Work has now started on the various structures for the Airport line
- Rochdale Line will supposedly open by the end of the year
- Work on the Ashton and East Didsbury lines is ongoing
- Bury line refurbishment now complete.
- Altrincham Interchange redevelopment

Projects Proposed or Approved but not yet U/C

- River Street | Hulme | 40 Floors | Residential
- Sillivan Way | Salford | Tallest 17 stories | Residential
- Ordsall Riverside
- Manchester Enterprise Zone | Airport (and MediPark)
- St Peter's Square Regeneration | Moving tram stop
- Indigo Hotel and Marco Pierre White Restaurant | Victoria
- Travelodge | Piccadilly Gardens
- First St North + South
- Exchange Quay Towers | Hotel, offices etc
- New Bailey St | Salford | Offices + Hotel
- Springfield Lane | Salford | Supermarket + Residential
- Port Salford | Pending more informatin
- Gary Neville Supporter's Club and Hotel | 10 floors
- Batleys | Harbour City | Offices, two new hotels, retail, leisure etc
- Motel One | Piccadilly | 17 floors
- Gateway House Piccadilly | Reclad
- Peel Park & Frederick Road Campus | Salford University
- Birley Fields Campus | Hulme
- Harbour City Apartment Block | About 20 floors
- Anchorage Office Block



__________________
The VB Manchester Construction Timeline

All the projects, events and developments in Manchester. Updated every month!
JUNE 2012 UPDATE COMING SOON!!!

http://www.skyscrapercity.com/showthread.php?t=1484027


VB'S Manchester Transport Maps
... as featured on ProjectMapping.co.uk

All of my rail and Metrolink maps past present and future in one place. Here.

Be sure to check out DeanUK's Metrolink Forum!!

b4mmy liked this post

Last edited by VoldemortBlack; May 28th, 2012 at 12:25 PM.
VoldemortBlack no está en línea   Reply With Quote
Old October 5th, 2012, 02:56 PM   #6
VDB
Registered User
 
VDB's Avatar
 
Join Date: Jun 2012
Posts: 6,430
Likes (Received): 1918

October 2012

To tie in with my Construction Timeline, I've done another map of all the developments in (central) Manchester at the minute; approved, U/C and proposed.

Take a look in more detail by clicking the link below the map. Click the icons on the interactive map to find out more details about the project



https://maps.google.co.uk/maps/ms?ms...417f489f&msa=0





To sum up, by this time next year (October 2013) we'll have the following projects under construction:-

- Sillivan Way, Salford. 17 story residential block
- Motel One, Piccadilly, 17 stories
- First Street North, new Melia Hotel and Arts Centre, as well as new apartments, offices and a public square
- Gary Neville Hotel and Supporter's Club, Old Trafford, 10 stories
- I+Spinningfields Office Block - abt 10 stories?
- Block E3, Chapel Street. 6 storey residential block
- Number 1SPS - 14 storey office block
- Birley Fields, Hulme MMU Campus
- Victoria Station refurbishment
- Angel Square Masterplan
- Indigo Hotel, Victoria

and, as far as Metrolink is concerned...

- the Rochdale line will have opened
- the East Didsbury line will have opened
- the Droylsden line will have opened
- TMS will be operational in the City Centre, on the Bury Line, Altrincham Line, Oldham Rochdale Line, East Didsbury Line, Droylsden Line, Eccles Line, MediaCityUK Line and at Cornbrook.
- the Airport line will be a hive of activity
- Preparations for opening to Ashton will be in place



__________________

b4mmy liked this post
VDB está en línea ahora   Reply With Quote
Old January 20th, 2013, 10:32 PM   #7
VDB
Registered User
 
VDB's Avatar
 
Join Date: Jun 2012
Posts: 6,430
Likes (Received): 1918

January 2013 Update

It's time for an update. Here's a list of all the U/C and Approved projects in and around Central Manchester currently. There's also a few proposed projects. I've also added a dedicated transport section now because we seem to investing a lot of time and effort into our infrastructure, which is absolutely no bad thing!

Projects currently under construction

Projects 100% likely to start construction in the next 8 months

Projects which have a more-than 50% chance of starting construction in the next 8 months

Projects which have a less-than 50% chance of starting construction in the next 8 months






Building Projects currently Under Construction (U/C)


Number 1 St Peter's Square | 14 stories | U/C

Library and Town Hall Extension Redevelopment | U/C

Sillivan Way | 17 floors & other resi blocks | U/C

Bengal St Apartments | 10, 8 & 6 floors | U/C

Citylabs | Oxford Road | 5 floors | U/C

MMU Student Campus Masterplan | Birley Fields, Hulme | U/C

Derwent St Apartments | Ordsall | 4, 8 & 10 floors | U/C

Irish World Heritage Centre | Queens, North Manchester | U/C

Riverside House Apartments | Blackfriars | 5 floors | U/C

Soapworks | 380,000 sqft office space + retail | Ordsall Riverside | U/C

Ordsall Park Phase 2 | Ordsall | New Apartments surrounding the park | ~ 4 floors | U/C

Ibis Hotel & Fabrica | Great Ancoats St | 7fl hotel, 5fl offices | U/C - Phase 2 due to start soon

ITV Studios & Coronation St | Trafford Wharf | U/C

Meia Hotel | 11 Floors | First St | U/C

Home Cultural Centre | First St | U/C

Whitworth Art Gallery Extension | U/C

Aniline Site | Manchester City FC Training Ground | U/C

Brunswick Estate Regeneration | 522 new homes and retail area | U/C





Building Projects which are currently approved


Regeneration of Old Trafford | ~ 100 new homes | Approved

Hotel La Tour | Salford | 14 floors | Approved

Block E3 Apartments | Chapel St | 6 floors | Approved


River St Tower | 42 floors | Approved

Gary Neville's Hotel | Old Trafford | 10 floors | Approved

Motel One | Piccadilly | 14 floors | Approved


Exchange Quay Towers | 24 floor office block | 12 floor hotel | Approved

Odeon Site Office Block | ~ 14 floors | Offices | Approved

Peterloo House 3 St Peter's Square | ~ 14 stories | Approved


New Islington Milliner's Wharf Phase 2 | Residential Block | 8 floors | Approved

Indigo Hotel | Victoria | 11 floors | Approved

Redevelopment of Hanover House | Offices & Market Retail | Victoria | Approved

Hathersage Road Apartments | Victoria Park | 6 floors | Approved

Apartments on Ordsall Riverside | 8-10 floors | Approved






Transport (Electrification, Station Redevelopment & Metrolink) Projects


Metrolink East Manchester to Droylsden | Due to open Feb 11th | U/C

Metrolink to Rochdale | 5 new stations | U/C

Metrolink to East Didsbury | 5 new stations | U/C


Metrolink 2nd City Crossing | 1 new station | Approved

Expansion of Metrolink Station at St Peter's Square | Approved

Expansion of Metrolink Station at Victoria | Approved


Salford Crescent Train Station Redevelopment | U/C

Metrolink Oldham Town Centre Line | 4 new stations | U/C

Metrolink Rochdale Town Centre Line | 1 new station | U/C

Metrolink Airport Line | 15 new stations | U/C


New Metrolink Station at Queens Road | Queens, North Manchester | Approved

Metrolink Port Salford Line | ~ 9 new stations | Proposed

Metrolink Wythenshawe Loop Line | ~ 2 new stations | Proposed

Metrolink Tram Train to Wigan, Rose Hill, Glossop, Hadfield and Marple | ~ 50 new stations | Proposed

Expansion and Redevelopment of Deansgate-Castlefield Station | Proposed


Electrification of line to Liverpool via Newton le Willows | U/C

Electrification of line to Bolton & Blackpool | Approved

Electrification of line to Rochdale & Leeds | Approved

Electrification of line to Stalybridge & Huddersfield | Approved

Redevelopment of Victoria Station | Approved - work starts in March


Ordsall Curve & Northern Hub | Approved

Expansion of Piccadilly | 2 new platforms | Proposed

Oxford Road Station | Reutilisation of elevator and subway access | Approved / U/C
__________________

b4mmy liked this post

Last edited by VDB; April 30th, 2013 at 11:08 PM.
VDB está en línea ahora   Reply With Quote
Old March 16th, 2013, 12:23 AM   #8
VDB
Registered User
 
VDB's Avatar
 
Join Date: Jun 2012
Posts: 6,430
Likes (Received): 1918

March 2013 Update

Quite a lot has happened in the past 2 months, looks like we can finally see light at the end of this 5-year-long tunnel.

Here's an update including much more detailed developments, with a bit more easy-to-read scale;

______________________________________________________________


Projects currently Under Construction

Projects 100% likely to start construction in the next few months

Projects which have a more than 50% chance of starting construction in the next few months

Projects which have a less than 50% chance of starting construction in the next few months


______________________________________________________________



Projects currently Under Construction


Birley Fields Student Hub Building | 8 floors | Hulme

"Puzzlebox Apartments" | Northern Quarter/Smithfield | 10 floors

Number 1 St Peter's Square | Offices | 14 floors

Travelodge Piccadilly Gardens | Renovation | 6 floors

Brown Brother's Hotel | 6 & 10 floors | Salford

Whitworth Park Student Accommodation | Denmark Road | 10 floors

Aniline Site Masterplan | Etihad Campus

Citilabs Biomedical Centre | University | Oxford Road

Network Rail North West Operating Centre | Ardwick

Sillivan Way Salford | Resi Masterplan | 17 floors & others

ITV Studios | Trafford Wharf

Manchester Central Library & THX Redevelopment | St Peter's Square

Whitworth Art Gallery Extension

Soapworks Phase 2

Riverside House | Blackfriars | 5 floors

Renaker@ Royal Paragon | Ancoats

St Peter's Square Regeneration

Beswick Community Hub & Connel Sixth Form | Beswick

Metrolink | East Didsbury Line

Metrolink | Ashton Under Lyne Line

Metrolink | Oldham Town Centre Line

Metrolink | Rochdale Town Centre Line

Metrolink | Airport Line

Salford Crescent Train Station Redevelopment

Northern Hub | Victoria to Liverpool Electrification

Altrincham Transport Interchange Redevelopment

Rochdale Transport Interchange Redevelopment

New Islington Free School



There has been a 7% increase in number of projects Under Construction since January (+2)

____________________________________________________________________________________________________________




Projects 100% likely to start construction in the next 8 months


Manchester Victoria Station | New Roof & Redevelopment

National Graphene Institute | University | 5 floors

Hotel La Tour | Salford | 14 floors

Motel One | Piccadilly | 14 floors

Gary Neville Hotel and Supporter's Club | Old Trafford | 10 floors

Airport City Enterprise Zone | Airport

First St | Home | 4 floors

First St | Vita Student | 14 floors

First St | Other buildings

Metrolink | Second City Crossing

Springfield Lane | Salford | Supermarket + 40 apartments

Gateway House + New Hotel | Piccadilly

Bolton Transport Interchange Redevelopment

Oxford Road Station Subway Reopening

New Islington | 2 new apartment blocks, 7 houses


There has been a 21% decrease in the amount of projects that are 100% likely to start in the next 8 months, since January (-4)

_____________________________________________________________________________________________________________




Projects which have a more than 50% chance of starting construction in the next 8 months



76-78 Great Ancoats Street | Apartments | 13 floors

River St | Serviced Apartments | 42 floors

Northern Hub | Ordsall Curve

Northern Hub | Victoria to Leeds Electrification

Northern Hub | Victoria to Rochdale and beyond Electrification

Northern Hub | Victoria to Blackpool, Bolton and Preston Electrification

Hotel Indigo & Marco Pierre White Restaurant | Victoria | 13 floors

Axis Albion Street | Residential | 20 floors




There has been a 37% increase in the number of projects which have a more-than 50% chance of starting construction in the next 8 months, since January (+3)


__________________________________________________________________________________________________________________




Projects which have a less than 50% chance of starting construction in the next 8 months



First St South Masterplan

Greengate 1 | 180,000sqft | Offices | 10 floors

Ramada Hotel | Deansgate/Victoria/Cathedral | 36 floors

Exchange Quay Towers | 24 floors and others | Exchange Quay

Number 3 St Peter's Square | Offices | 14 floors

Odeon Site | St Peter's Square/Oxford Road | Offices | 14 floors

Ikea Granada Neighbourhood

The Avenue Spinningfields | New roof proposed

I+ Spinningfields | Offices | 12 floors

Quay House | Spinningfields | Reconstruction





There has been a 100% increase in the number of projects which have a less-than 50% chance of starting construction in the next 8 months, since January (+5)


____________________________________________________________________________________________________________



Overall, there has been a 10% increase in the number of entries made here, on the Development Page, since the last entry in January 2013.
__________________

b4mmy liked this post

Last edited by VDB; April 30th, 2013 at 11:25 PM.
VDB está en línea ahora   Reply With Quote
Old June 2nd, 2013, 04:18 PM   #9
VDB
Registered User
 
VDB's Avatar
 
Join Date: Jun 2012
Posts: 6,430
Likes (Received): 1918

This is the Manchester Development update for June 2013. I want to start doing these every 3/4 months or so. The last update was by myself in March 2013.

The ↑UP, ↓DOWN and ↑NEW indicators are based on the time between the last update in March 2013 and this update in June, and are referring to the various stages of the development process; 1) Completed, 2) U/C, 3) Projects Likely to start soon, 4) Projects unlikely to start soon, and, 5) Dead projects. This process is a system.

You may also notice from the below timeline that I have not only ordered projects into U/C, Complete, Starting soon etc - but I've also took the time to put the projects which, say, are most likely to start construction soon at the top. For instance; Motel One on Piccadilly. This has not started construction yet but the demolition process and site clearance is ongoing. This means that Motel One has found itself high up the list of "Projects Likely to Start Very Soon"; because once demolition has complete the building will commence.



Completed Projects
- Projects which have completed since March 2013 (not much doing here!)
- The list of 'stuff' below will drop off the list next time I update it because it is no longer active in terms of construction/development.

- ↑UP East Didsbury Metrolink Extension
- ↑UP Sillavan Way Salford | 6 floors | Apartments





Projects Currently Under Construction
- Projects currently actively under construction; by way of cranes and actual erection of building; NOT by drilling or clearing of site (this does not equate to 'construction'.)
- Projects near the top are ones which I expect to finish and complete soon. Those near the bottom are either newly U/C OR will not complete for a long time (Airport Line 2016)


- TRANSPORT | Salford Crescent Station Redevelopment
- ITV Studios Coronation St | Trafford Wharf
- Manchester Central Library / THX Redevelopment | St Peter's Square
- Birley Fields | Multi Storey Car Park | Hulme
- Whitworth Park/Denmark Road Student Buildings | ~8 floors
- Riverside House Student Accommodation | Blackfriars | 5 floors
- METROLINK | Ashton Under Lyne Metrolink Extension
- TRANSPORT | Rochdale Transport Interchange
- METROLINK | Rochdale Town Centre Line
- METROLINK | Oldham Town Centre Metrolink Extension
- TRANSPORT | Altrincham Transport Interchange Redevelopment
- Brown Brothers Hotel | Trinity Salford | 10 & 6 floors
- Network Rail North West Operating Centre | Ardwick
- Renaker @ Royal Paragon Ancoats | 5 floor office extension
- ↑UP Travelodge Piccadilly Gardens | 10 floors
- ↑UP One Smithfield Square | Apartments Northern Quarter | 10 floors
- Whitworth Art Gallery Extension
- Aniline Site Masterplan | Etihad Campus/Beswick
- Birley Fields | MMU Student Hub | Hulme
- Beswick Community Hub & Connel Sixth Form | Beswick
- ↑UP Sillavan Way Salford | 9 Floors | Apartments
- ↑UP Gary Neville's Hotel | 10 floors | Old Trafford
- ↑UP Sillavan Way Salford | 10 floors | Apartments
- TRANSPORT | Liverpool to Victoria Electrification
- ↑UP First St Multistorey Car Park
- No.1 St Peter's Square | Offices | 14 floors
- ↑UP Manchester Victoria Station Redevelopment
- METROLINK | Airport Line Metrolink Extension






Projects Likely to Start Construction very soon
- Projects which I think are ready to begin construction.
- Those at the top of the list are ones which are most likely to begin very soon (as in the next few weeks) - those nearer the bottom may pass by a few months before they begin.


- ↑UP "Vimto" Apartments | Chapel St | 6 floors
- ↑UP "Nuovo" Apartments | Great Ancoats Street | 12 floors
- Birley Fields | 6 & 8 storey apartments and townhouses | Hulme
- Airport City Enterprise Zone
- TRANSPORT | Reopening of Oxford Road subway
- National Graphene Institute | 5 Floors
- ↓DOWN St Peter's Square Redevelopment
- ↑NEW Ordsall Lowry Wharf | 9 & 11 Floors
- HOME | First St | Cinema, Theatre
- Melia Hotel | 12 floors | First St
- METROLINK | Second City Crossing Metrolink Extension
- Vita Student Accommodation | First St | 14 floors
- MotelOne | 14 floor hotel | Piccadilly
- ↑NEW Grafton St Car Park | 8 floors | MRI
- Hotel la Tour | 14 floors | Salford Riverside







Projects which might start construction in the next 5 months
- These projects have less 'tight' schedules. These developments are ones which won't start construction tomorrow; but will probably start within the next 5 months
- The projects nearer the top are most likely to begin sooner rather than later - projects nearer the bottom are most likely to begin later rather than sooner.



- ↑UP "Chapel St Manchester" Student Accommodation | 5 floors
- ↓DOWN TRANSPORT | Bolton Transport Interchange Redevelopment
- ↓DOWN New Islington Free School | New Islington
- ↓DOWN New Islington | 2 new apartment blocks + 7 'houses'
- ↑NEW Soapworks Phase 2 | Ivy Wharf / Exchange Quay | ~9 floors | Offices
- ↑NEW Grafton Street Car Park | 8 floors | MCR Royal Infirmary
- ↑NEW Salford Central Hotel | 7 floors | "Plot A4"
- ↑UP Sillivan Way Salford | Apartments | 17 floors
- ↑NEW Milliner's Wharf Apartments | 7 floors
- ↓DOWN Springfield Lane Salford | Supermarket + 40 apartments
- ↑UP Greengate 1 Office Block | 10 floors | 180,000sqft | Approved
- 76-78 Great Ancoats St Apartments | 13 floors | Approved
- ↑UP Odeon Site / "Landmark" | Offices | 14 floors | Oxford Road
- ↑UP Axis Albion Tower Apartments | 20 floors
- ↑NEW Manchester Business School Redevelopment | 19 floor hotel | Approved
- ↑NEW 1 Hardman Street Spinningfields | Offices | 5 floors
- ↑NEW Number 2 St Peter's Square | 11 floors | Offices
- Number 3 St Peter's Square | Offices | 14 floors
- TRANSPORT | Ordsall Chord
- ↑UP River Street Tower | Serviced Apartments | 42 floors
- TRANSPORT | Electrification from Victoria to Leeds






Dead Projects or Projects Unlikely to Start in the next 5 Months
- Projects which have either evidently died since the last update (developer gone bust), or
- Projects for which little or no news has come out and it looks as though the development is dead
- River St Tower looked dead to me and it was about to go in this list a week ago, save for the email I got back off them indicating that the project was not dead.
- If no news comes out of projects in this list between now and the next update, the project will be swiped off the list altogether in the next update. That make sense?


- ↓DOWN Gateway House Redevelopment / New 7 floor hotel | Piccadilly
- ↑NEW Ramada Hotel Reconstruction | 36 floors | Deansgate
- ↑NEW The Avenue Spinningfields | Proposed new roof and overhaul of retail
- ↑NEW Quay House Reconstruction / Redevelopment | Spinningfields
- TRANSPORT | Electrification from Victoria to Rochdale
- Exchange Quay Towers | 12 & 24 floors
- ↑NEW Peel Event City/Krakos Site | 250 bed hotel and new office blocks
- ↑NEW Ikea Granada City Neighbourhood
- ↓DOWN River Street Tower | Serviced Apartments | 42 floors
- ↓DOWN Indigo Hotel Victoria | 13 floors | Marco Pierre White Restaurant etc
- ↑NEW Salford University Gateway | 7 floors | Salford

VDB está en línea ahora   Reply With Quote
Old August 1st, 2013, 09:30 AM   #10
VDB
Registered User
 
VDB's Avatar
 
Join Date: Jun 2012
Posts: 6,430
Likes (Received): 1918

Development Update August 2013

Reposting here.

Here's the construction update for August - last one I did was at the beginning of June.

Completed Projects
- Projects which have completed since June 2013
- The list of 'stuff' below will drop off the list next time I update it because it is no longer active in terms of construction/development.


- Whitworth Park/Denmark Road Student Buildings | ~8 floors
- ITV Studios Coronation St | Trafford Wharf
- Riverside House Student Accommodation | Blackfriars | 5 floors
- TRANSPORT | Salford Crescent Station Redevelopment
- Manchester Airport Control Tower



Projects Currently Under Construction
- Projects currently actively under construction.
- Projects near the top are ones which I expect to finish and complete soon. Those near the bottom are either newly U/C OR will not complete for a long time.


- METROLINK | Queens Road Metrolink Station
- METROLINK | Ashton Under Lyne Metrolink Extension
- TRANSPORT | Rochdale Transport Interchange
- METROLINK | Rochdale Town Centre Line
- Birley Fields | Multi Storey Car Park | Hulme
- TRANSPORT | Reopening of Oxford Road subway
- TRANSPORT | Altrincham Transport Interchange Redevelopment
- METROLINK | Oldham Town Centre Metrolink Extension
- Brown Brothers Hotel | Trinity Salford | 10 & 6 floors
- Sillavan Way Salford | 10 floors | Apartments
- First St | Plot 1A | Food Podium
- Network Rail North West Operating Centre | Ardwick
- Whitworth Art Gallery Extension
- X1 Salford Quays | Apartments | 5 floors
- "The Point" New Islington | Apartments | 5 floors
- Soapworks Phase 2 | Ivy Wharf / Exchange Quay | ~9 floors | Offices
- "Nuovo" Apartments | Great Ancoats Street | 12 floors
- Renaker @ Royal Paragon Ancoats | 5 floor office extension
- Travelodge Piccadilly Gardens | 10 floors
- Islington Wharf Mews | 46 waterside houses/apartments
- First St Multistorey Car Park
- One Smithfield Square | Apartments Northern Quarter | 10 floors
- Birley Fields | 6 & 8 storey apartments and townhouses | Hulme
- Aniline Site Masterplan | Etihad Campus/Beswick
- Birley Fields | MMU Student Hub | Hulme
- Citilabs Biomedical Centre | University | 5 floors
- Beswick Community Hub & Connel Sixth Form | Beswick
- "Vimto" Apartments | Chapel St | 6 floors
- Manchester Central Library / THX Redevelopment | St Peter's Square
- "Hotel Footbfall" | 10 floors | Old Trafford
- HOME Cultural Centre | First St
- No.1 St Peter's Square | Offices | 14 floors
- National Graphene Institute | 5 Floors
- TRANSPORT | Liverpool to Victoria Electrification
- Sillavan Way Salford | 17 Floors | Apartments
- Melia Hotel | 12 floors | First Street
- Vita Student Accommodation | 14 floors | First Street
- Ordsall Lowry Wharf | 9 & 11 Floors
- Manchester Victoria Station Redevelopment
- METROLINK | Airport Line Metrolink Extension




"Shovel Ready" Projects - construction starting very soon
- Projects which I think are ready to begin construction.
- Those at the top of the list are ones which are most likely to begin very soon (as in the next few weeks) - those nearer the bottom may pass by a few months before they begin.


- METROLINK | Second City Crossing Metrolink Extension
- Airport City Enterprise Zone
- Hotel la Tour | Salford | 14 floors
- MotelOne | 14 floor hotel | Piccadilly
- Salford Central Hotel | 7 floors | "Plot A4"
- Grafton St Car Park | 8 floors | MRI
- St Peter's Square Redevelopment
- Manchester Business School Redevelopment | 20 floor hotel | Approved
- Indigo Hotel Victoria | 15 floors | Marco Pierre White Restaurant




"Orange Projects" - Not shovel ready but not dead either
- These projects have less 'tight' schedules. These developments are ones which won't start construction tomorrow; but will probably start within the next 5 months
- The projects nearer the top are most likely to begin sooner rather than later - projects nearer the bottom are most likely to begin later rather than sooner.


- University Techincal College (UTC) | MediaCityUK | 4 floors
- 1 Hardman Street Spinningfields | Offices | 5 floors
- Brunswick Redevelopment | £113m
- Milliner's Wharf Apartments | 7 floors
- Greengate 1 Office Block | 11 floors | 180,000sqft | Approved
- New Islington Free School | New Islington
- "Chapel St Manchester" Student Accommodation | 5 floors
- Number 2 St Peter's Square | 12 floors | Offices
- TRANSPORT | Bolton Transport Interchange Redevelopment
- Springfield Lane Salford | Supermarket + 40 apartments
- TRANSPORT | Airport Station Fourth Platform
- TRANSPORT | Ordsall Chord
- Dominvs Hotel | Aytoun St | Hotel 10 floors (demolition of Employment Exchange)
- Greengate | 31 & 21 floors | Apartments




Red Projects - Not likely to begin soon
- Projects which have either evidently died since the last update (developer gone bust), or;
- Projects for which little or no news has come out and it looks as though the development is dead
- If no news comes out of projects in this list between now and the next update, the project will be swiped off the list altogether in the next update.


- Axis Albion Tower Apartments | 20 floors
- Etihad Stadium Expansion | 60,000 seats
- Corn Exchange Redevelopment | Food & Retail
- I+Spinningfields | Offices | 7 floors
- Greengate 1 Office Block | 10 floors | 180,000sqft | Approved
- Ancoats Dispensary Building Regeneration
- Meadows-Chapel Street Bridge | Salford | Subject to Design Competition
- Overseas House | Deansgate/Quay St | 6 storey office extension
- Peel Holdings | 16 storey hotel | Trafford Centre Southern Gateway
- "Landmark" Odeon Site | Offices | 14 floors
- Mayfield | Conference and Event & Leisure District | Conversion
- Quay House Reconstruction / Redevelopment | Spinningfields
- Royal and Paragon | Kennedy Building | Office | 9 floors
- Peel Event City/"Krakos Site" | 250 bed hotel and new office blocks
- Ikea Granada City Neighbourhood
- 76-78 Great Ancoats St Apartments | 13 floors | Approved
- First Street South | 20 Storey Student Tower + Supermarket
- Number 3 St Peter's Square | Offices | 14 floors
- TRANSPORT | Electrification from Victoria to Leeds
- TRANSPORT | Electrification from Victoria to Rochdale
- Trafford Quays Masterplan
- Yotel Hotel | Piccadilly | 20 floors
- "Sharma" Apartment Block | 9 floors | Plymouth Grove
- BBC Oxford Road Site | "Graphene Valley" | Vision
- Ramada Hotel Reconstruction | 36 floors | Deansgate
- Salford University Gateway | 7 floors | Salford


________________________________________________________________


CRANE COUNT

- A few of you may or may not read the Crane Count Thread; I'll repost the entry I made there;

- Number of cranes in red brackets.
- Cranes erected since last Count in bold


- Aniline Site | Eastlands City | (2 cranes)
- First Street | HOME | (1 crane)
- Number One St Peter's Square | (2 cranes)
- Sillivan Way Salford | (2 cranes)
- Citilabs University | (1 crane)
- Whitworth Art Gallery Extension | (1 crane)
- Birley Fields Hulme | (4 cranes)
- Northern Quarter Smithfield Square | (1 crane)
- Travelodge Piccadilly Gardens | (1 crane)
- First St | Vita (1 crane)
- Victoria Station (1 [mobile] crane)




The recovery continues. It has, however, been a slightly sluggish month - only 2 'permanent' cranes erected. However the development list is showing a very positive term for construction starts - with First St at the epicentre of all this. Manchester's only two proper cranes were erected here, with plenty more to come soon.

The next cranes will come from ...

- HOME (1 more crane)
- Melia Hotel (2)
- First St MSCP (1)
- Hotel la Tour (1)
- MBS Hotel (2)
- Motel One Hotel (1)
VDB está en línea ahora   Reply With Quote
Old November 1st, 2013, 02:01 PM   #11
VDB
Registered User
 
VDB's Avatar
 
Join Date: Jun 2012
Posts: 6,430
Likes (Received): 1918

DEVELOPMENT UPDATE NOVEMBER 2013

Here's the quarterly development update for Manchester, including a full list of projects pending, shovel ready and under construction;

Completed Projects
- Projects which have completed since August 2013
- The list of 'stuff' below will drop off the list next time I update it because it is no longer active in terms of construction/development.


- ↑UP Birley Fields | Multi Storey Car Park | Hulme
- ↑UP METROLINK | Ashton Under Lyne
- ↑UP TRANSPORT | Rochdale Transport Interchange
- ↑NEW Quay House Spinningfields | Exterior Lighting





Projects Currently Under Construction
- Projects currently actively under construction; by way of cranes and actual erection of building or even drilling in the ground.
- Projects near the top are ones which I expect to finish and complete soon. Those near the bottom are either newly U/C OR will not complete for a long time.



- ITV Studios | Trafford Quays
- METROLINK | Queens Road Metrolink Station
- TRANSPORT | Manchester to WCML Electrification
- METROLINK | Oldham Town Centre Line
- METROLINK | Rochdale Town Centre Line
- TRANSPORT | Reopening of Oxford Road subway
- Sillavan Way Salford | 10 floors | Apartments
- Travelodge Piccadilly Gardens | 10 floors
- X1 Salford Quays | Apartments | 5 floors
- "The Point" New Islington | Apartments | 5 floors
- "Nuovo" Apartments | Great Ancoats Street | 12 floors
- Brown Brothers Hotel | Trinity Salford | 10 & 6 floors
- Network Rail North West Operating Centre | Ardwick
- TRANSPORT | Oldham Town Centre - Mumps Interchange
- Manchester Central Library / THX Redevelopment | St Peter's Square
- TRANSPORT | Altrincham Transport Interchange Redevelopment
- First St | Plot 1A | Food Podium
- Whitworth Art Gallery Extension
- TRANSPORT | Todmorden Curve
- Soapworks Phase 2 | Ivy Wharf / Exchange Quay | ~9 floors | Offices
- Renaker @ Royal Paragon Ancoats | 5 floor office extension
- Islington Wharf Mews | 46 waterside houses/apartments
- First St Multistorey Car Park
- One Smithfield Square | Apartments Northern Quarter | 10 floors
- Drama Hub at Sharp Project
- Birley Fields | 6 & 8 storey apartments and townhouses | Hulme
- Aniline Site Masterplan | Etihad Campus/Beswick
- Etihad Campus; New Bridge
- Birley Fields | MMU Student Hub | Hulme
- Citilabs Biomedical Centre | University | 5 floors
- MMU Student Union | 4 floors | Rosamund St West
- 1 Hardman Street Spinningfields | Offices | 5 floors
- Beswick Community Hub & Connel Sixth Form | Beswick
- "Vimto" Apartments | Chapel St | 6 floors
- "Hotel Football" | 10 floors | Old Trafford
- Premier Inn Salford | 7 floors
- HOME Cultural Centre | First St
- Lowry Wharf Salford | 11 floors
- 1 Ellesmere Street Castlefield | 3fl | Apartments
- No.1 St Peter's Square | Offices | 14 floors
- National Graphene Institute | 5 Floors
- Salford University Gateway | 7 floors | Salford
- TRANSPORT | Manchester to Liverpool Electrification
- "Chapel St Manchester" Student Accommodation | 5 floors
- Sillavan Way Salford | 17 Floors | Apartments
- Melia Hotel | 12 floors | First Street
- Vita Student Accommodation | 14 floors | First Street
- Ordsall Lowry Wharf | 9 floors
- Sillivan Way Salford | 9 storey apartment block
- Royal and Paragon | Kennedy Building | Office | 9 floors
- MotelOne | 14 floor hotel | Piccadilly
- Manchester Victoria Station Redevelopment
- METROLINK | Airport Line Metrolink Extension
- TRANSPORT | Airport Station Fourth Platform
- TRANSPORT | Electrification from Victoria to Leeds







"Shovel Ready" Projects - construction starting soon
- Projects which I think are ready to begin construction.
- Those at the top of the list are ones which are most likely to begin very soon (as in the next few weeks) - those nearer the bottom may pass by a few months before they begin.


- Cow Hollow Hotel | Newton St | Northern Quarter
- Manchester Business School Redevelopment | 20 floor hotel | Approved
- Salford New Bailey | Multistorey Car Park
- Bollin House | Apartments | Edge St Northern Quarter | 6 floors
- METROLINK | Second City Crossing Metrolink Extension
- TRANSPORT | Salford Central Platforms 3&4
- Hanover House Refurbishment | Offices
- Corn Exchange Redevelopment | Food & Retail
- TRANSPORT | City-Quays Water Taxi
- Grafton St Car Park | 8 floors | MRI
- Airport City Enterprise Zone
- Greengate | 31 & 21 floors | Apartments
- Indigo Hotel Victoria | 15 floors | Marco Pierre White Restaurant
- St Peter's Square Redevelopment





Orange Projects - Not shovel ready but not dead either
- These projects have less 'tight' schedules. These developments are ones which won't start construction tomorrow; but will probably start within the next 5 months
- The projects nearer the top are most likely to begin sooner rather than later - projects nearer the bottom are most likely to begin later rather than sooner.


- University Techincal College (UTC) | MediaCityUK | 4 floors
- Brunswick Redevelopment | £113m
- Yotel Hotel | Piccadilly | 20 floors
- Milliner's Wharf Apartments | New Islington | 8 + 9 floors
- Deansgate Castlefield Metrolink Station Redevelopment
- RNCM Refurbishment | Oxford Road | £2.8m
- Barnes Hospital | Cheadle | Restoration & New Apartments
- Holiday Inn | Former Employment Exchange | Aytoun St | 10 floors
- Number 2 St Peter's Square | 12 floors | Offices
- Ordsall Chord | Salford | Piccadilly-Victoria Direct
- Greengate 1 Office Block | 11 floors | 180,000sqft | Approved
- TRANSPORT | Metrolink Port Salford Line
- New Islington Free School | New Islington
- I+Spinningfields | Offices | 9 floors
- TRANSPORT | Bolton Transport Interchange Redevelopment
- TRANSPORT | Ordsall Chord
- Axis Albion Tower Apartments | 20 floors
- Meadows-Chapel Street Bridge | Salford | Subject to Design Competition





Red Projects - Not likely to begin soon
- Projects which have either evidently died since the last update (developer gone bust), or
- Projects for which little or no news has come out and it looks as though the development is dead


- Quay House Spinningfields | Redevelopment | 19 stories
- Hotel la Tour | Salford | 14 floors
- Etihad Stadium Expansion | 60,000 seats
- "Landmark" Odeon Site | Offices | 14 floors
- Greengate 1 Office Block | 10 floors | 180,000sqft | Approved
- Tymarco Buildings | 2x14 floors | 344 Apartments
- Ancoats Dispensary Building Regeneration
- Astley & Bryom House | Offices | Quay Street | 14 floors
- Overseas House | Deansgate/Quay St | 6 storey office extension
- Peel Holdings | 16 storey hotel | Trafford Centre Southern Gateway
- Mayfield | Conference and Event & Leisure District | Conversion
- The Avenue Spinningfields | Proposed new roof and overhaul of retail
- Eleska House Hotel | Redevelopment of listed building | Northern Quarter
- Granada Neighbourhood | Allied London / Manchester City Council
- First Street South | 20 Storey Student Tower + Supermarket
- TRANSPORT | Electrification from Victoria to Rochdale
- Trafford Quays Masterplan
- "Sharma" Apartment Block | 9 floors | Plymouth Grove
- Gateway House Redevelopment / New 7 floor hotel | Piccadilly
- BBC Oxford Road Site | "Graphene Valley" | Vision
- TRANSPORT | Electrification of line between Manchester and The Lakes
- Salford Reds Masterplan | Waterpark Hotel Casino Bars & Training Base
- MediaCityUK Future Phases | Plot E2 | Pre-Proposed | Hotel/Student | 11 floors
- Piccadilly Gateway Redevelopment | HS2 Terminal | Holt Town, etc.



______________________________________________________________


BREAKDOWN


Substantial Builds
- Proposals/UC's that are over 10 floors in height
- Blue projects are U/C


- Number One St Peter's Square | 14 floors
- Vita Student | First St | 14 floors
- Melia Hotel | First St | 14 floors
- One Smithfield Square | Apartments N4 | 10 floors
- Sillivan Way Salford | Apartments | 10 floors
- Sillivan Way Salford | Apartments | 17 floors
- Lowry Wharf Salford | Apartments | 11 floors
- Lowry Wharf Salford | Apartments | 9 floors
- Nuovo Apartments | Great Ancoats Street | 12 floors
- "Hotel Football" | Old Trafford | 10 floors

- Hotel la Tour | Salford | 14 floors
- Manchester Business School Hotel | 20 floors
- Motel One Hotel | Piccadilly | 14 floors
- Greengate 1 | 180,000sqft Offices | 11 floors
- Axis Tower | Apartments | 22 floors
- Greengate Canopus | Apartments | 31 & 21 floors
- Greengate Canopus | Apartments | 11 + 13 floors
- First Street South Tower | Student accommodation | 20 floors
- Hotel Indigo | Victoria | 14 floors
- Number Two St Peter's Square | Offices | 12 floors
- Yotel Hotel | Piccadilly | 20 floors
- Dominvs Hotel | Aytoun Street | 10 floors
- 76-78 Great Ancoats Street | 12 floors
- Tymarco Buildings | 2x14 floors | 344 Apartments




Hotels
- Tourist industry currently booming!
- Blue projects are U/C


- Travelodge Piccadilly Gardens | 10 storey extension
- Brown Brothers Hotel | Salford | 6 floors
- Melia Hotel | First St | 14 floors
- "Hotel Football" | Old Trafford | 10 floors

- Eleska House Northern Quarter
- Motel One | Piccadilly | 14 floors
- Dominvs Hotel | Aytoun Street | 10 floors
- Yotel Hotel | Piccadilly | 20 floors
- MBS Hotel | West Booth Street | 20 floors
- Cow Hollow Hotel Northern Quarter
- Hotel Indigo Victoria | 14 floors
- Premier Inn Salford | 7 floors
- Trafford Centre Southern Gateway Hotel | 16 floors
- River Street Serviced Apartments | 42 floors
- Ramada Hotel Redevelopment | 36 floors


Infastructure
- Lots of government investment in Manchester's infastructure lately.
- Blue projects are U/C


- Metrolink | Rochdale Town Centre
- Metrolink | Oldham Town Centre
- Rochdale Interchange
- Oldham Interchange
- Metrolink | Queens Road Station
- Metrolink | Airport extension
- Wythenshawe Interchange

- Bolton Interchange
- Altrincham Interchange
- Victoria Station Redevelopment

- Salford Crescent Station Redevelopment
- Salford Central Station Platforms 3&4
- Metrolink | Port Salford Line
- Deansgate-Castlefield Metrolink Station
- Fourth platform at Manchester Airport station
- Guided busway Leigh > Salford > Manchester
- Electrification Victoria > Eccles > Liverpool
- Electrification Victoria > Stalybridge > Leeds

- Piccadilly Platforms 15+16
- Ordsall Curve
- Oxford Road subway works
- Metrolink Park and Ride - Radcliffe & Whitefield



Apartments
- Blue projects are U/C
- Includes student accommodation


- Northern Quarter | One Smithfield Square | 10 floors
- Sillivan Way Salford | 17 floors
- Sillivan Way Salford | 10 floors
- Sillivan Way Salford | 9 floors
- Milliner's Wharf | New Islington | 8 + 9 floors
- Ordsall Wharf | 9 + 11 floors
- New Islington Mews
- The Point New Islington
- X1 Salford Quays

- X1 Salford Town Hall
- X1 Manchester Chapel Street
- Vimto Gardens 6 floors

- Sharma Plymouth Grove 9 floors
- Birley Fields Townhouses
- Nuovo Great Ancoats Street
- Vita Student First Street
- 1 Ellesmere Street Castlefield

- First Street South Student Tower 20 floors
- Tymarco Buildings | 2x14 floors | 344 Apartments


_______________________________________________________________


Will do the analysis and statistics over the next few hours
VDB está en línea ahora   Reply With Quote
Old February 12th, 2014, 08:19 PM   #12
VDB
Registered User
 
VDB's Avatar
 
Join Date: Jun 2012
Posts: 6,430
Likes (Received): 1918

FEBRUARY 2014 DEVELOPMENT UPDATE

Figured I should post this here too....

Completed Projects
- Projects which have completed since November 2013
- The list of 'stuff' below will drop off the list next time I update it because it is no longer active in terms of construction/development.


- TRANSPORT | Rochdale Transport Interchange Redevelopment
- ITV Studios | Trafford Quays
- TRANSPORT | Manchester to WCML Electrification
- METROLINK | Queens Road Metrolink Station
- TRANSPORT | Oldham Town Centre - Mumps Interchange
- METROLINK | Oldham Town Centre Line
- Travelodge Piccadilly Gardens | 10 floors






Projects Currently Under Construction
- Projects currently actively under construction; by way of cranes and actual erection of building; NOT by drilling or clearing of site (this does not equate to 'construction'.)
- Projects near the top are ones which I expect to finish and complete soon. Those near the bottom are either newly U/C OR will not complete for a long time.



- Network Rail North West Operating Centre | Ardwick
- Citilabs Biomedical Centre | University | 5 floors
- X1 Salford Quays | Apartments | 5 floors
- TRANSPORT | Reopening of Oxford Road subway
- METROLINK | Rochdale Town Centre Line
- Birley Fields | MMU Student Hub | Hulme
- Sillavan Way Salford | 10 floors | Apartments
- "The Point" New Islington | Apartments | 5 floors
- "Nuovo" Apartments | Great Ancoats Street | 12 floors
- Brown Brothers Hotel | Trinity Salford | 10 & 6 floors
- METROLINK | Airport Line Metrolink Extension
- Manchester Central Library / THX Redevelopment | St Peter's Square
- TRANSPORT | Altrincham Transport Interchange Redevelopment
- First St | Plot 1A | Food Podium
- Whitworth Art Gallery Extension
- TRANSPORT | Todmorden Curve
- Soapworks Phase 2 | Ivy Wharf / Exchange Quay | ~9 floors | Offices
- Renaker @ Royal Paragon Ancoats | 5 floor office extension
- Islington Wharf Mews | 46 waterside houses/apartments
- First St Multistorey Car Park
- One Smithfield Square | Apartments Northern Quarter | 10 floors
- Ordsall Lowry Wharf | 9 floors
- Potato Wharf Apartment Block | Finishing off
- Drama Hub at Sharp Project
- Birley Fields | 6 & 8 storey apartments and townhouses | Hulme
- Aniline Site Masterplan | Etihad Campus/Beswick
- Etihad Campus; New Bridge
- TRANSPORT | Bolton Transport Interchange Redevelopment
- MMU Student Union | 4 floors | Rosamund St West
- 1 Hardman Street Spinningfields | Offices | 5 floors
- Beswick Community Hub & Connel Sixth Form | Beswick
- "Vimto" Apartments | Chapel St | 6 floors
- "Hotel Football" | 10 floors | Old Trafford
- TRANSPORT | Metrolink Park & Rides at Radcliffe & Whitefield
- Premier Inn Salford | 7 floors
- HOME Cultural Centre | First St
- 1 Ellesmere Street Castlefield | 3fl | Apartments
- No.1 St Peter's Square | Offices | 14 floors
- National Graphene Institute | 5 Floors
- Deansgate Castlefield Metrolink Station Redevelopment
- Salford University Gateway | 7 floors | Salford
- FC United Stadium | 5000+ seats | Moston
- TRANSPORT | Manchester to Liverpool Electrification
- "Chapel St Manchester" Student Accommodation | 5 floors
- Library Walk Link | St Peter's Square
- Sillavan Way Salford | 17 Floors | Apartments
- Melia Hotel | 12 floors | First Street
- Redevelopment of Ancoats Tower Blocks
- Vita Student Accommodation | 14 floors | First Street
- St Peter's Square Redevelopment
- Sillivan Way Salford | 9 storey apartment block
- Royal and Paragon | Kennedy Building | Office | 9 floors
- MotelOne | 14 floor hotel | Piccadilly
- Salford University; Peel Park Campus | 5fl x 5 / 9fl x 7 / 7fl x 1 blocks
- Manchester Victoria Station Redevelopment
- Redevelopment of Pendleton | Tower Blocks, new homes, etc
- Greengate | 31 & 21 floors | Apartments | Phase One
- METROLINK | Second City Crossing; Victoria to Exchange Square
- METROLINK | Second City Crossing; St Peter's to Exchange Square
- TRANSPORT | Airport Station Fourth Platform
- Etihad Stadium | 48,000 Seats | Expansion
- TRANSPORT | Electrification from Victoria to Stalybridge (eventually Leeds)







"Shovel Ready" Projects - construction starting very soon
- Projects which I think are ready to begin construction.
- Those at the top of the list are ones which are most likely to begin very soon (as in the next few weeks) - those nearer the bottom may pass by a few months before they begin.


- Oxford Street Cross-Town Bus Priority & New Cycle Lanes
- University Techincal College (UTC) | MediaCityUK | 4 floors
- TRANSPORT | City-Quays Water Taxi
- Cow Hollow Hotel | Newton St | Northern Quarter
- Milliner's Wharf Apartments | New Islington | 8 + 9 floors
- Yotel Hotel | Piccadilly | 20 floors
- Bollin House | Apartments | Edge St Northern Quarter | 6 floors
- Ancoats Dispensary Building Regeneration
- TRANSPORT | Salford Central Platforms 3&4
- Corn Exchange Redevelopment | Food & Retail
- Salford New Bailey | Multistorey Car Park
- Cotton Building, Spinningfields | Offices | 9 floors
- Gateway House Redevelopment / New 7 floor hotel | Piccadilly
- Grafton St Car Park | 8 floors | MRI
- Airport City Enterprise Zone
- Indigo Hotel Victoria | 15 floors | Marco Pierre White Restaurant
- Greengate 1 Office Block | 11 floors | 180,000sqft | Approved







Orange Projects - Not shovel ready but not dead either
- These projects have less 'tight' schedules. These developments are ones which won't start construction tomorrow; but will probably start within the next 5 months
- The projects nearer the top are most likely to begin sooner rather than later - projects nearer the bottom are most likely to begin later rather than sooner.



- Tymarco Buildings | 2x14 floors | 344 Apartments
- Number 2 St Peter's Square | 12 floors | Offices
- New Islington Free School | New Islington
- X1 Salford Quays Phase 2 | Two New 6 Storey Resi Blocks
- Overseas House | Deansgate/Quay St | 6 storey office extension
- Springfield Lane Supermarket + 40 properties | Central Salford
- Coronation St Studios Tour | Granada
- Gotham Hotel | King St
- Brunswick Redevelopment | £113m
- Refurbishment of Newbank & Riverbank Towers, Salford
- One Spinningfields Offices | 20 stories
- RNCM Refurbishment | Oxford Road | £2.8m
- "Landmark" Odeon Site | Offices | 14 floors
- Kratos Site | 6 storey, 203 bedroom hotel | Trafford Park
- Freemasons Hall Bridge Street Redevelopment
- Barnes Hospital | Cheadle | Restoration & New Apartments
- Peel Park Redevelopment | £2.1m | Salford
- Montana House, Princess Street | Addition of two floors
- Holiday Inn | Former Employment Exchange | Aytoun St | 8 floors
- Salford New Bailey Office Block | 100,000sqft
- Hanover House Refurbishment | Offices
- Mayfield | Conference and Event & Leisure District | Conversion
- High St / Market St Advertising Boards
- New Islington Free School | New Islington
- Axis Albion Tower Apartments | 20 floors
- The Avenue Spinningfields | Redevelopment | Highline-style unit
- Meadows-Chapel Street Bridge | Salford | Subject to Design Competition






Red Projects - Newly proposed or not likely to begin soon
- New projects, visions, pre-planning etc
- Some projects get moved down here if they don't look like they'll begin soon



- X1 The Exchange | Salford Quays | 11 floors apartments
- X1 Eastbank | 284 apartments | New Islington
- Motel One Cross Street | Commercial Buildings | 5 floor extension
- Eclectic Hotel, Booth Street, Spring Gardens | 40 rooms
- Astley & Bryom House | Offices | Quay Street | 14 floors
- New Office Block | Fountain St/ Marble St | Former Oddfellows House
- Peel Holdings | 16 storey hotel | Trafford Centre Southern Gateway
- Eleska House Hotel | Redevelopment of listed building | Northern Quarter
- Granada Neighbourhood | Allied London / Manchester City Council
- Mayfield Masterplan | Piccadilly | 680,000sqft offices, 1,300 homes, 350 hotel beds
- TRANSPORT | Electrification from Victoria to Rochdale
- TRANSPORT | Ordsall Chord | Salford | Piccadilly-Victoria Direct
- TRANSPORT | Metrolink Trafford Centre Line
- Trafford Quays Masterplan
- Pomona Docks Masterplan | Cornbrook Hub
- "Sharma" Apartment Block | 9 floors | Plymouth Grove
- Exchange Quay Twin Towers | 23 & 15 floors
- Manchester Business School Redevelopment | 20 floor hotel | Approved
- BBC Oxford Road Site | "Graphene Valley" | Vision
- TRANSPORT | Metrolink Tram-Train
- 10-12 Whitworth Street West | Pilio Hotel | 18 floors
- Collar Site | New Hotel & Casino | SPECULATED
- TRANSPORT | Electrification of line between Manchester and The Lakes
- Salford Reds Masterplan | Waterpark Hotel Casino Bars & Training Base
- MediaCityUK Future Phases | Plot E2 | Pre-Proposed | Hotel/Student | 11 floors
- Piccadilly Gateway Redevelopment | HS2 Terminal | Holt Town, etc. | LONG TERM.

_______________________________________________________________

Click here for the analysis (then scroll down)

The next update will be on May 1st, 2014; in three month's time.
VDB está en línea ahora   Reply With Quote
Old February 17th, 2014, 03:41 PM   #13
gothicform
Bossman
 
gothicform's Avatar
 
Join Date: Jul 2002
Location: s****horpe
Posts: 30,431
Likes (Received): 2239

hey there... is it possible to link to the threads in this superb update?
gothicform no está en línea   Reply With Quote
Old February 23rd, 2014, 06:05 PM   #14
VDB
Registered User
 
VDB's Avatar
 
Join Date: Jun 2012
Posts: 6,430
Likes (Received): 1918

Quote:
Originally Posted by gothicform View Post
hey there... is it possible to link to the threads in this superb update?
Sorry I haven't replied sooner I hadn't seen that the thread had been bumped!

I can if you want, however it'll take a while! (Happy to do it though)

Please note though that a few projects share the same thread - so like "Salford Quays Projects" represents pretty much everything outside of MediaCity, etc
VDB está en línea ahora   Reply With Quote


Reply

Tags
development summary

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT +2. The time now is 08:18 PM.


Powered by vBulletin® Version 3.8.8 Beta 1
Copyright ©2000 - 2014, vBulletin Solutions, Inc.
Feedback Buttons provided by Advanced Post Thanks / Like v3.2.5 (Pro) - vBulletin Mods & Addons Copyright © 2014 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2014 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu