Old May 14th, 2012, 04:20 PM   #11561
nandan_ks
BengaLurina huduga
 
nandan_ks's Avatar
 
Join Date: Sep 2005
Location: ಬೆಂಗಳೂರು,
Posts: 2,661
Likes (Received): 257



CC http://karnatakanews.com
nandan_ks no está en línea   Reply With Quote

Sponsored Links
 
Old May 14th, 2012, 05:57 PM   #11562
globalcitizen29
YOLO
 
Join Date: May 2012
Location: Prague
Posts: 1
Likes (Received): 0

Are there any pictures of underground stations?
globalcitizen29 no está en línea   Reply With Quote
Old May 14th, 2012, 07:32 PM   #11563
rsrikanth05
Ladkiyon ka Hero
 
rsrikanth05's Avatar
 
Join Date: Mar 2009
Location: Kovai
Posts: 6,114
Likes (Received): 70

Quote:
Originally Posted by globalcitizen29 View Post
Are there any pictures of underground stations?
Construction pics were posted a few days ago.
rsrikanth05 no está en línea   Reply With Quote
Old May 14th, 2012, 11:03 PM   #11564
canarese
Registered User
 
canarese's Avatar
 
Join Date: Mar 2012
Posts: 70
Likes (Received): 6

Metro Phase-1 will run by December 2013

Sources : http://www.deccanchronicle.com/chann...ember-2013-653
http://www.deccanherald.com/content/...e-2-reach.html

Quote:
You can expect to travel along Phase-1 of the Metro Rail network by December 2013, but the trains will not stop at the interchange station at Majestic. Metro authorities said that though the line will be ready by next year, the construction of station may take few more months. At a conference organised by the Rotary Club of Bangalore, Managing Director of Bangalore Metro Rail Corporation Ltd (BMRCL), N. Sivasailam, said: “The construction of the station at Majestic may take three to more months more.”

He said the tunnel boring machine (TBM) will reach the Vidhana Soudha station from the Central College station by September or October of this year. But the controversial issue of shifting Dr. Ambedkar’s statue is yet to be resolved. Metro Phase-2: The Phase-2 of Namma Metro, which has four extensions and two arterial lines, has gone to the central government for sanction. The line from Gottigere to Nagawara via IIM-B, Dairy Circle, M.G. Road and Shivajinagar will have interchange station near M.G. Road, close to Manekshaw Parade Grounds on Kamraj Road.

Longest tunnel in the country: Phase-2 of Namma Metro will have the longest tunnel in the country at 13.79 km. The tunnel will come in the Gottigere-Nagawara stretch covering 21.25 km and 18 stations with six elevated and 12 underground stations. Mr. Sivasailam said the cost of acquisition of land and demolition in this densely populated area is so high that they opted to go underground. Phase-2 cost: The estimated cost of Phase-2 of Namma Metro project is projected at Rs 26405.14 crore. But this is not the final cost. Five percent has been added to account for inflation.
canarese no está en línea   Reply With Quote
Old May 15th, 2012, 04:47 AM   #11565
gurupr29
Registered User
 
Join Date: Oct 2011
Posts: 216
Likes (Received): 0

Push govt to speed up Metro work: N Sivasailam

Source : TOI
http://timesofindia.indiatimes.com/c...w/13144069.cms

Namma Metro is after all Nimma Metro , Bangalore Metro Rail Corporation Ltd (BMRC) managing director N Sivasailam said on Monday , while asking citizens to chip in to speed up the implementation of the city's ambitious mass rapid transit system project .There's a needfor industrialists , industry bodies and citizens to bring pressure on the government and other agencies to speed up work , Sivasailam told a meeting called by Rotary Club.Underlining the need for speedy completion of the project , he said Namma Metro was essential to free the city from traffic chaos .

Majestic Bottleneck:

He assured Rotarians that all the remaining corridors - northern , southern and western - will be operational by June-end 2013 . But construction of Majestic station will be delayed by more than 3-4 months as a result of which trains passing through the station won't stop there , he added . He added that of the two tunnel boring machines , one has started operations from Central College station to Vidhana Soudha . The other is expected to launch in 15 days .

Help Clear Hurdles:

Sivasailam listed Metro's differences with South Western Railways ,litigation with Wakf Boardover land acquisition near Minsk Square and delay in shifting of BR Ambedkar's statue in front of Vidhana Soudha as the hurdles to speedy completion of the project .
gurupr29 no está en línea   Reply With Quote
Old May 15th, 2012, 04:49 AM   #11566
gurupr29
Registered User
 
Join Date: Oct 2011
Posts: 216
Likes (Received): 0

After Metro phase 2, reach Mysore 45 mins faster

Source : DH
http://www.deccanherald.com/content/...e-2-reach.html

Namma Metro has some good news for regular commuters to Mysore. Once the phase 2 of the project is up and running - as part of which the East-West line will be extended upto the Kengeri satellite town - one can reach the City of Palaces 45 minutes earlier than usual.

This was disclosed by N Sivasailam, Managing Director of the Bangalore Metro Rail Corporation Limited (BMRCL), while delivering a talk on ‘Namma Metro’ at the Rotary House of Friendship on Monday.

Sivasailam said, currently, passengers to Mysore and beyond, from the heart of the City, had to pass through dense traffic. Once the Metro line to Kengeri is completed, these passengers could take KSRTC buses from Kengeri onwards.

About the progress on phase 1, Sivasailam said tunnelling work between Central College and Vidhana Soudha was expected to be completed by October.

Tunnel boring work on this stretch was coming across pure granite and at Central College, the accumulation of granite was two-metre deep, he said. Sivasailam said phase 1 is expected to get over by the end of 2013. He said, two-level station works at Majestic may take four more months to complete.

Longest tunnel in India

Sivasailam said as part of phase 2 of Namma Metro, BMRCL is set to dig the longest tunnel in the country - upto 12 km long. He said the tunnel is part of the arterial line between Gottigere and Nagawara.

Since the stretch is densely populated, Metro will go underground to save demolition of structures and land acquisition costs. This line will connect crucial zones like MG Road and Cantonment Railway station.
gurupr29 no está en línea   Reply With Quote
Old May 15th, 2012, 08:54 AM   #11567
JhonJ
Registered User
 
JhonJ's Avatar
 
Join Date: Dec 2011
Posts: 4,128
Likes (Received): 41

Metro phase II this year?

Quote:
BANGALORE: Managing Director of Bangalore Metro Rail Corporation Limited (BMRCL) N Sivasailam, on Monday, said that work on Phase 2 of Namma Metro would start in the second half of 2012.
“Central government’s approval is pending and we have been assured it will be processed expeditiously,” Sivasailam said. He was addressing a gathering of Rotarians in the city.
Commenting on various delays, Sivasailam said that the issue relating to relocation of B R Ambedkar statue on Vidhana Soudha premises had not been sorted out yet. However, he stated that the project was on schedule and the construction work would be completed by December, next year.
“Completion of Majestic station would be delayed by four months. We can start operations on all the sectors except Majestic,” he said.
On the likelihood of starting Metro operations to Bangalore International Airport, Sivasailam said that the plan was under consideration and BMRCL will take a decision in the next two months. He also hinted that the loan agreement process with State Bank of India was in its final stages for Phase 2.
Sivasailam added that Namma Metro would eventually adopt six car trains to accommodate more passengers, once more stations were open for public use.
“Our stations have already been designed to accommodate 6 cars with a capacity of 40,000 peak hour peak direction traffic,” he said.
He added that within six months, BMRCL had managed to meet operations and maintenance costs and earned an added profit of Rs 4 lakh.
source:http://expressbuzz.com/cities/bangal...ar/391898.html
JhonJ no está en línea   Reply With Quote
Old May 15th, 2012, 09:19 AM   #11568
nandan_ks
BengaLurina huduga
 
nandan_ks's Avatar
 
Join Date: Sep 2005
Location: ಬೆಂಗಳೂರು,
Posts: 2,661
Likes (Received): 257

Soil testing has started in EPIP Zone,opposite to KTPO, Whitefield for the Phase 2 of the project.
nandan_ks no está en línea   Reply With Quote
Old May 15th, 2012, 11:21 AM   #11569
DigitalOne
Registered User
 
Join Date: Oct 2010
Posts: 136
Likes (Received): 2

Ambedkar Statue

Quote:
Originally Posted by JhonJ View Post
With the current controversies surrounding Ambedkar cartoons, and also this BJP govt facing internal problems, I doubt the govt will take a decision on the Ambedkar statue issue before the next election in K'taka (scheduled for May 2013).
DigitalOne no está en línea   Reply With Quote
Old May 15th, 2012, 02:17 PM   #11570
Abhishek901
Registered User
 
Abhishek901's Avatar
 
Join Date: May 2009
Posts: 9,952
Likes (Received): 225

Quote:
Originally Posted by sudheendra2001 View Post
Regarding Track issue...Delhi metro Phase1 is with Broad guage and Phase 2 with Standard Gauge
Both lines crossing the double decker underground station at Rajiv chowk are broad gauge as both were part of Phase I.

Quote:
Originally Posted by gurupr29 View Post
Longest tunnel in India

Sivasailam said as part of phase 2 of Namma Metro, BMRCL is set to dig the longest tunnel in the country - upto 12 km long. He said the tunnel is part of the arterial line between Gottigere and Nagawara.
Longest tunnel in India is Delhi metro's yellow line's 24 km long twin tunnels from GTB Nagar stn to Saket stn. Mumbai metro is planning even longer tunnel for its Line 3 (Colaba - Seepz) at 33 km.
Abhishek901 no está en línea   Reply With Quote
Old May 15th, 2012, 03:18 PM   #11571
suraj.shekar
Registered User
 
Join Date: Apr 2012
Posts: 343
Likes (Received): 72

Thumbs up DMRC launches book on Sreedharan's management strategies

Feel its definitely worth a read.. Will pick it up asap...
http://www.deccanherald.com/content/...anagement.html

DMRC launches book on Sreedharan's management strategies
New Delhi, May 15, 2012, (PTI) :
'Metro Man' E Sreedharan's unique style of functioning which made Delhi Metro a success model is legendary by now and the management strategies he followed to achieve his goal is elaborated in a new book brought out by the new age transport system.

The book, which explores the journey of Delhi Metro from the concept to operation stage in detail, gives full credit to Sreedharan, who is enjoying his post-retirement days, for execution of all projects well in time.

'25 Management Strategies for Delhi Metro's Success: The Sreedharan Way' written by Delhi Metro's Chief Public Relations Officer Anuj Dayal takes readers to a roller coaster ride on the stupendous journey that the new age transport system has had in the national capital in the past 10 years.

The book was released today by Sreedharan's successor Mangu Singh, who effused praise on his predecessor explaining in detail the strategies and the risks involved in building the Delhi Metro Rail Corporation.

Dayal said the idea of writing a book on management strategies struck him when he got a call from a firm asking him to share the experiences of the organisation's success.

"The entire top management had been giving lectures across the world. So, I decided one day why not we record something. That is how this book was conceived. I jotted down the main principles followed by Sreedharan," he said.

The book also talks about all powers being vested with the Managing Director of decision-making and cites it as one of the principal reasons for the organisation's success.

Dayal said he has recorded the battle on whether to construct the Metro in standard or broad guage and the debate over the corridors at the initial stage.

In the book, Dayal says integrity of the people involved in building the system, professional competency, target orientation, emphasis on punctuality, cleanliness and safety, crisis management, delegation of powers and speedy decisions are some of the strategies that are followed at Delhi Metro.

Dayal has gone into detail on all 25 strategies and explained how they contributed to the success of the Delhi Metro.

Singh in his speech spoke about the Delhi Metro's journey and how it became operationally successful, a feat that has been achieved only by a few mass rapid transit systems in the world.

"The task was very difficult. It was the biggest infrastructure project ever taken in the country. We never had any expertise in this field. But Sreedharan tasted success," he said.

Singh said the most challenging task was to prove that Metro will be successful after the failure of Kolkata Metro.

He also recalled how Sreedharan "planted" some of Delhi Metro's engineers in a consultancy firm which was advising Metro so that they get trained.
suraj.shekar está en línea ahora   Reply With Quote
Old May 15th, 2012, 06:21 PM   #11572
Ashwin R
Registered User
 
Join Date: Feb 2012
Location: Bengaluru
Posts: 211
Likes (Received): 20

Quote:
Originally Posted by nandan_ks View Post
Is the first pic a bit old? Bcos I guess the road in which the bus is standing is currently blocked for the work!!
Ashwin R no está en línea   Reply With Quote
Old May 15th, 2012, 06:31 PM   #11573
Ashwin R
Registered User
 
Join Date: Feb 2012
Location: Bengaluru
Posts: 211
Likes (Received): 20

Quote:
Originally Posted by nandan_ks View Post

Is the first pic a bit old? Bcos I guess the road in which the bus is standing is currently blocked for the work!! (post 11559)
Ashwin R no está en línea   Reply With Quote
Old May 15th, 2012, 07:06 PM   #11574
nandan_ks
BengaLurina huduga
 
nandan_ks's Avatar
 
Join Date: Sep 2005
Location: ಬೆಂಗಳೂರು,
Posts: 2,661
Likes (Received): 257

Yeah, its about 2 weeks old. Here's a visual representation of today's status


Last edited by nandan_ks; May 15th, 2012 at 07:31 PM.
nandan_ks no está en línea   Reply With Quote
Old May 15th, 2012, 10:31 PM   #11575
lohit24
Registered User
 
lohit24's Avatar
 
Join Date: Apr 2009
Location: Austin, TX
Posts: 129
Likes (Received): 10

lohit24 no está en línea   Reply With Quote
Old May 16th, 2012, 07:17 AM   #11576
srivatsayb
Registered User
 
srivatsayb's Avatar
 
Join Date: Jan 2011
Location: Bengaluru
Posts: 603
Likes (Received): 6

Quote:
Originally Posted by nandan_ks View Post
Yeah, its about 2 weeks old. Here's a visual representation of today's status

LOL +1 Sakkatagi graphics maadidya...
srivatsayb no está en línea   Reply With Quote
Old May 16th, 2012, 07:51 AM   #11577
gentem
────✩
 
gentem's Avatar
 
Join Date: Apr 2010
Posts: 6,515
Likes (Received): 85

but that concrete beam is hanging in air

Quote:
Originally Posted by gurupr29 View Post
Source : TOI
http://timesofindia.indiatimes.com/c...w/13144069.cms


Majestic Bottleneck:

He assured Rotarians that all the remaining corridors - northern , southern and western - will be operational by June-end 2013 . But construction of Majestic station will be delayed by more than 3-4 months as a result of which trains passing through the station won't stop there , he added . He added that of the two tunnel boring machines , one has started operations from Central College station to Vidhana Soudha . The other is expected to launch in 15 days .
.
it will be difficult to change line

Last edited by gentem; May 16th, 2012 at 05:09 PM.
gentem no está en línea   Reply With Quote
Old May 16th, 2012, 06:55 PM   #11578
gurupr29
Registered User
 
Join Date: Oct 2011
Posts: 216
Likes (Received): 0

Quote:
Originally Posted by gentem View Post
but that concrete beam is hanging in air



it will be difficult to change line


I don't think there is requirement to change the track/line on Majestic. The train can change track at the end of station
example : For Green line the train starts from Peenya and end in Puttenhalli and in puttenhalli they can change the tracks.

Last edited by gurupr29; May 16th, 2012 at 07:01 PM.
gurupr29 no está en línea   Reply With Quote
Old May 16th, 2012, 07:03 PM   #11579
rsrikanth05
Ladkiyon ka Hero
 
rsrikanth05's Avatar
 
Join Date: Mar 2009
Location: Kovai
Posts: 6,114
Likes (Received): 70

Quote:
Originally Posted by gurupr29 View Post


I don't think there is requirement to change the track/line on Majestic. The train can change track at the end of station
example : For Green line the train starts from Peenya and end in Puttenhalli and in puttenhalli they can change the tracks.
Even if the have a temporary /adhoc switch like the one near MG Road, it'll be in the elevated area near Swastik.
rsrikanth05 no está en línea   Reply With Quote
Old May 16th, 2012, 08:22 PM   #11580
strike2
Registered User
 
strike2's Avatar
 
Join Date: Oct 2010
Posts: 1,503
Likes (Received): 229


I think gentem meant it is not possible for people to interchange between the two lines
strike2 no está en línea   Reply With Quote


Reply

Tags
bangalore, bangalore metro, bangalore namma metro, bengaluru, bengaluru metro, metro, namma metro, namma metro bangalore, traffic

Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT +2. The time now is 06:41 AM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2013, vBulletin Solutions, Inc.
Feedback Buttons provided by Advanced Post Thanks / Like v3.1.2 (Pro) - vBulletin Mods & Addons Copyright © 2013 DragonByte Technologies Ltd.
vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2013 DragonByte Technologies Ltd. (Resources saved on this page: MySQL 23.08%)

SkyscraperCity ☆ High there, what's up!

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu