is it possible to use the space under the jog flyover as parking/taxi stand for the WEH station??
|
|
|
|
|
|
#7122 | |
|
Ladkiyon ka Hero
Join Date: Mar 2009
Location: Kovai
Posts: 6,079
Likes (Received): 70
|
Quote:
EDIT: Saw this on the BLR Metro thread. It is about the Hyd Metro, which is being executed by L&T under PPP [BOT] like MM1. Good for Hyd, but isn't this what help up majority of MM1? Railways? --> http://www.skyscrapercity.com/showpo...ostcount=11704
__________________
Sign this petition for Introduction of Volvo Buses in Coimbatore city!|Donate to Wikimedia India today! Last edited by rsrikanth05; May 29th, 2012 at 07:14 AM. |
|
|
|
|
|
|
#7123 |
|
Registered User
Join Date: Apr 2010
Location: Pune/Mumbai
Posts: 967
Likes (Received): 25
|
just a query - If some ones buys a Ticket for Local train from say Kalyan to Borivilli, currently Its just 1 ticket with interchange at Dadar.
Now if someone wants to use the same route after VAG is ready, that person will have to buy 3 tickets 1 till Ghatkopar on Local train then the Metro till Andheri, then from there- Local to Borivilli. The cost will be much more and time saved may be negated by additional time to buy 2 additional tickets( 1 for metro and another from local from Andheri to Borivilli) and also additional interchange for metro which means walking to Metro station. So probably people using this route may not use Metro unless there is a single ticket. Irrespective of this VAG will still be heavily used for people going to SEEPZ,Lokhandwala etc. |
|
|
|
|
|
#7124 | |
|
Registered User
Join Date: Jun 2011
Posts: 336
Likes (Received): 3
|
Quote:
|
|
|
|
|
|
|
#7125 |
|
Registered User
Join Date: Jun 2011
Posts: 336
Likes (Received): 3
|
Plans to add 44 more coaches to first Metro
A new traffic study is now forcing Mumbai Metro One Pvt Ltd (MMOPL) to take mitigating measures to ensure that commuters do not travel like sardines packed in a tin in Mumbai's first metro train from Versova to Ghatkopar.
A new traffic survey commissioned by MMOPL and undertaken by a Hong Kong based consultant, MVA Systra, shows that traffic projections made for the Versova-Andheri-Ghatkopar (VAG) corridor were off the mark. The number of people travelling on the route is more than what was earlier expected. In an earlier survey conducted by Delhi Metro Rail Corporation for Mumbai, it had been projected that in 2031 the number of daily passengers would be 8.82 lakh but the new survey has shown that it could be as high as 15 lakh. “Metro will trigger steep increase in ridership in the first few years as realignment of traffic will happen. This will ensure that all the trains in operation will get occupied immediately,” MVA Systra said in its report. As per the earlier estimates, the metro would have a ridership of 6.8 lakh commuters in 2015. The new report says that it could be over 7.2 lakh. In 2021 the number is expected to be 10 lakh as against the earlier estimate of 6.8 lakh. An alarmed MMOPL has now written to the nodal agency Mumbai Metropolitan Region Development Authority (MMRDA) asking for permission to buy 44 more coaches (rakes) to ensure that the trains do not get crowded. A proposal to buy the additional rakes was also put up during the MMOPL board meeting held last week. Under the original plan, MMOPL was to purchase 64 coaches worth over Rs. 700 crore from a Chinese company, CSR Nanjing. It had plans to deploy 16 trains of four coaches each into service when services would start. It has now requested MMRDA to allow it to purchase 44 more coaches. The total cost of the coaches is around USD 72 mn and they can be either deployed as 11 new trains or used to augment the four-coach trains into six-coach trains. MMOPL was planning to purchase these rakes earlier as well. However, the new survey results have now forced the agency to ensure that the orders are placed well in advance so that the metro does not get crowded. http://www.hindustantimes.com/India-...e1-862761.aspx |
|
|
|
|
|
#7126 |
|
Registered User
Join Date: Feb 2009
Posts: 5,221
Likes (Received): 1687
|
MMRDA had proposed a single smart card to be used in BEST,railways,metro,monorail. BEST is onboard while railways as always are hard to please. MMRDA is stil goin ahead with remaing three. Railways have smart cards,coupons which hardly takes time to take out a ticket,i am sure even metro/mono wil something seamless like this . People wil stil same time if compared to anything movin on road
|
|
|
|
|
|
#7127 | |
|
Ladkiyon ka Hero
Join Date: Mar 2009
Location: Kovai
Posts: 6,079
Likes (Received): 70
|
Quote:
BEST, Mono, Metro in one. IR in the other. The IR ATVM Card works on all CR/WR/Harbour lines so no issues. |
|
|
|
|
|
|
#7128 |
|
akspatil
Join Date: May 2012
Location: mumbai
Posts: 6
Likes (Received): 0
|
gap between bridge increased as they removed stage of one side on WE highway andheri
http://www.youtube.com/watch?v=RDl2t...ature=youtu.be
__________________
@K$H@¥ |
|
|
|
|
|
#7129 |
|
Ladkiyon ka Hero
Join Date: Mar 2009
Location: Kovai
Posts: 6,079
Likes (Received): 70
|
Aah, so they're dismantling the Form Trawler ...
|
|
|
|
|
|
#7130 |
|
Registered User
Join Date: Jan 2011
Posts: 692
Likes (Received): 43
|
The bridge construction is simply magnificent. Reliance deserves all the credit for constructing under such tough conditions. However, when are they planning to start the revenue service?
|
|
|
|
|
|
#7131 |
|
Registered User
Join Date: Feb 2009
Posts: 5,221
Likes (Received): 1687
|
The bridge is constructed by VSL,of BWSL fame. Reliance sub contracted the work is a different Q though
|
|
|
|
|
|
#7132 |
|
akspatil
Join Date: May 2012
Location: mumbai
Posts: 6
Likes (Received): 0
|
cable stayed bridge gap increased
__________________
@K$H@¥ |
|
|
|
|
|
#7133 | |
|
Ladkiyon ka Hero
Join Date: Mar 2009
Location: Kovai
Posts: 6,079
Likes (Received): 70
|
Quote:
You mean Commercial ops? SOmeone posted your video a page ago. You can congratulate Reliance on having the presence of mind to sub contract it to them. |
|
|
|
|
|
|
#7134 |
|
Registered User
Join Date: Apr 2009
Location: Kolkata/Mumbai/Dallas
Posts: 4,217
Likes (Received): 126
|
HT
Plans to add 44 more coaches to first Metro A new traffic study is now forcing Mumbai Metro One Pvt Ltd (MMOPL) to take mitigating measures to ensure that commuters do not travel like sardines packed in a tin in Mumbai's first metro train from Versova to Ghatkopar. A new traffic survey commissioned by MMOPL and undertaken by a Hong Kong based consultant, MVA Systra, shows that traffic projections made for the Versova-Andheri-Ghatkopar (VAG) corridor were off the mark. The number of people travelling on the route is more than what was earlier expected. In an earlier survey conducted by Delhi Metro Rail Corporation for Mumbai, it had been projected that in 2031 the number of daily passengers would be 8.82 lakh but the new survey has shown that it could be as high as 15 lakh. “Metro will trigger steep increase in ridership in the first few years as realignment of traffic will happen. This will ensure that all the trains in operation will get occupied immediately,” MVA Systra said in its report. As per the earlier estimates, the metro would have a ridership of 6.8 lakh commuters in 2015. The new report says that it could be over 7.2 lakh. In 2021 the number is expected to be 10 lakh as against the earlier estimate of 6.8 lakh. An alarmed MMOPL has now written to the nodal agency Mumbai Metropolitan Region Development Authority (MMRDA) asking for permission to buy 44 more coaches (rakes) to ensure that the trains do not get crowded. A proposal to buy the additional rakes was also put up during the MMOPL board meeting held last week. Under the original plan, MMOPL was to purchase 64 coaches worth over Rs. 700 crore from a Chinese company, CSR Nanjing. It had plans to deploy 16 trains of four coaches each into service when services would start. It has now requested MMRDA to allow it to purchase 44 more coaches. The total cost of the coaches is around USD 72 mn and they can be either deployed as 11 new trains or used to augment the four-coach trains into six-coach trains. MMOPL was planning to purchase these rakes earlier as well. However, the new survey results have now forced the agency to ensure that the orders are placed well in advance so that the metro does not get crowded. |
|
|
|
|
|
#7135 |
|
Ladkiyon ka Hero
Join Date: Mar 2009
Location: Kovai
Posts: 6,079
Likes (Received): 70
|
Posted and criticised in the previous page.
|
|
|
|
|
|
#7136 |
|
Registered User
Join Date: Apr 2009
Posts: 1,236
Likes (Received): 45
|
Traffic curbs in Andheri, Santa Cruz
TNN Mumbai: The traffic police have announced road restrictions in Andheri for Metro work and in Santa Cruz for skywalk construction. “S V Road in Andheri will be closed from Rajiv Gandhi junction to Amboli junction on the north-bound stretch, and from the Andheri (W) subway to Rajiv Gandhi junction on the south-bound stretch,” an official said. “It will remain in effect till June 21.” In Santa Cruz (E), no vehicle will be allowed from Hans Bugra to Vakola junction. Traffic on both sides will use the stretch from Hans Bugra junction to Vakola junction. This will be in effect from 11pm on June 2 till midnight on June 3. http://epaper.timesofindia.com/Defau...&ViewMode=HTML |
|
|
|
|
|
#7137 |
|
Registered User
Join Date: Feb 2009
Posts: 5,221
Likes (Received): 1687
|
They forgot to post the timings. It wil be from 12 am to 5 am every night during that period
|
|
|
|
|
|
#7138 |
|
Ladkiyon ka Hero
Join Date: Mar 2009
Location: Kovai
Posts: 6,079
Likes (Received): 70
|
Which is Rajiv Gandhi jn on SV Road in Andheri?
|
|
|
|
|
|
#7139 |
|
indiadreams
Join Date: Sep 2009
Location: Mumbai
Posts: 2,279
Likes (Received): 112
|
I guess it is JP Road-SV Road junction (or may be Andheri E-W bridge) from the description. Except for the person who named it, none would have heard of Rajiv Gandhi junction, why not use practical names?
And when are they going to open the closed roads? They promised that JP road near depot will be opened in 2 months. Now it is more than 15 months and yet no signs of opening it. Andheri Kurla Road-WEH junction is closed since mid 2008!!! Last edited by Indiadreams; June 2nd, 2012 at 11:15 AM. |
|
|
|
|
|
#7140 | |
|
Ladkiyon ka Hero
Join Date: Mar 2009
Location: Kovai
Posts: 6,079
Likes (Received): 70
|
Quote:
Once they're done, they can't be kept shut. |
|
|
|
|
![]() |