In today's Mumbai Mirror.
Related to Metro works : When Metro engineers began the work, they had estimated they would have to design 11 different pier caps, the horizontal part of the T shaped structures that hold up the elevated corridor. They have so far designed 200 different pier caps! This was so because of the swarm of utilities that runs under our roads. Every pier, the vertical part of the 'T', needed an independent design to make sure the utilities were not disturbed. Since every pier was a new design, the pier caps changed too. ![]() For the rest of the article see : http://www.skyscrapercity.com/showth...11753&page=170 Last edited by fuwad; June 3rd, 2012 at 10:16 AM. |
|
|
|
|
|
#7144 |
|
indiadreams
Join Date: Sep 2009
Location: Mumbai
Posts: 2,281
Likes (Received): 115
|
It is for those who thought that the utilities will hamper underground lines, but will be a breeze for construction of elevated lines. All the utilities are placed at less than 15 feet depth from the ground level.On the contrary, the underground tunnel for water pipelines didnt have any major issue with any kind of utilities. Last edited by Indiadreams; June 3rd, 2012 at 10:31 AM. |
|
|
|
|
|
#7145 | |
|
indiadreams
Join Date: Sep 2009
Location: Mumbai
Posts: 2,281
Likes (Received): 115
|
Quote:
From Indian Oil junction to Costa Coffee at 7 bungalows park (or rather Enigma Lounge to be precise), the viaducts are complete. Even the viaducts to depot seem to be complete. But they have closed it for station construction. As CG has posted many times here, they have dug out a huge portion underneath the station. The whole problem is haphazard planning. Why not they estimate it properly. The margin of error is completely unacceptable. In this scenario they wanted to go elevated for Line 2. They will block the Kalanagar junction at BKC for around 8 years, if it ever happens. |
|
|
|
|
|
|
#7146 | |
|
Ladkiyon ka Hero
Join Date: Mar 2009
Location: Kovai
Posts: 6,097
Likes (Received): 70
|
Quote:
|
|
|
|
|
|
|
#7147 |
|
indiadreams
Join Date: Sep 2009
Location: Mumbai
Posts: 2,281
Likes (Received): 115
|
Yes,the valid reason is never-ending construction and lack of motivation to finish it fast and reopen the road.
|
|
|
|
|
|
#7148 |
|
Registered User
Join Date: Feb 2009
Posts: 5,234
Likes (Received): 1728
|
|
|
|
|
|
|
#7149 |
|
Registered User
Join Date: May 2011
Location: Mumbai / London
Posts: 939
Likes (Received): 56
|
|
|
|
|
|
|
#7150 |
|
Registered User
Join Date: Feb 2009
Posts: 5,234
Likes (Received): 1728
|
orange pillar is temp. The yellow crane is on top of bridge which runs on rails and can move 360 degree. The big crane on the back lifts the bridge sections from road puts it on the bridge and then the yellow crane lifts them to be assmebled in place.
|
|
|
|
|
|
#7151 |
|
Registered User
Join Date: Aug 2007
Posts: 8,468
|
I thought it would be have been done by now. Now that monsoons are approaching, are they going to delay it?
__________________
Infrastructure Geek :) |
|
|
|
|
|
#7152 |
|
Registered User
Join Date: Feb 2009
Posts: 5,234
Likes (Received): 1728
|
Monsoons have already arrived. Mono and metro work wil go on.
|
|
|
|
|
|
#7153 | |
|
Registered User
Join Date: May 2011
Location: Mumbai / London
Posts: 939
Likes (Received): 56
|
Quote:
now i dont think they will push the bridge on to the railway ... i think they will assmeble the bridge pice by pice ... using the top crane.. |
|
|
|
|
|
|
#7154 |
|
Registered User
Join Date: May 2011
Location: Mumbai / London
Posts: 939
Likes (Received): 56
|
how is it going on with WEH bridge??? they demolished one of the last segment earlier, is it re done now???
|
|
|
|
|
|
#7155 |
|
->
Join Date: Apr 2006
Location: Hanooz Dilli dur ast
Posts: 10,476
|
^ taken on June 1 - copyright Getty images
|
|
|
|
|
|
#7156 |
|
Aviation Enthusiast
Join Date: Aug 2009
Location: Mumbai
Posts: 500
Likes (Received): 41
|
^ That is still quite a good progress. The Truss on the western side has been dissembled.
|
|
|
|
|
|
#7157 |
|
Registered User
Join Date: May 2011
Location: Mumbai / London
Posts: 939
Likes (Received): 56
|
Thnx IU
|
|
|
|
|
|
#7158 |
|
Registered User
Join Date: Jun 2011
Posts: 52
Likes (Received): 0
|
yup.... i think they will be building the bridge piece by piece..... may be this what they are referring to as pushing..... if you see it in other way they are actually pushing the bridge slowly onto the railway lines (kinda) isn't it....!!!
|
|
|
|
|
|
#7159 |
|
Registered User
Join Date: Apr 2012
Posts: 70
Likes (Received): 7
|
As of now, the Mumbai Metro One Pvt Ltd (MMOPL) is constructing the steel bridge by using pre-cast concrete segments in which a number of small segments are cast between two pillars. The Western Railway has agreed to provide blocks of about two to four hours per day for the construction work.
The MMOPL, comprising Reliance Infrastructure, MMRDA and Veolia Transport, is considering another approach which involves constructing the 183-metre-long bridge by launching girders instead of segments. If this approach is taken, the bridge will require just a couple of girders as against many small segments. However, the alternative girder-launching method will require clearance from the Airport Authority of India (AAI). |
|
|
|
|
|