daily menu » rate the banner | guess the city | one on oneforums map | privacy policy | DMCA | news magazine | posting guidelines

Go Back   SkyscraperCity > Infrastructure and Mobility Forums > Railways

Railways (Inter)national commuter and freight trains



Global Announcement

As a general reminder, please respect others and respect copyrights. Go here to familiarize yourself with our posting policy.


Reply

 
Thread Tools
Old April 7th, 2014, 11:45 PM   #261
khaled neguia4
Registered User
 
Join Date: Feb 2014
Posts: 19
Likes (Received): 1

khaled neguia4 no está en línea   Reply With Quote

Sponsored Links
Old April 25th, 2014, 07:25 PM   #262
abdeka
Algerian moderator
 
abdeka's Avatar
 
Join Date: Jun 2008
Posts: 21,627
Likes (Received): 13099

__________________
"Babylon in all its desolation is a sight not so awful as that of the human mind in ruins." Nelson DeMille, By the Rivers of Babylon.

Visit the ALGERIAN FORUM
abdeka no está en línea   Reply With Quote
Old June 29th, 2014, 12:20 PM   #263
abdeka
Algerian moderator
 
abdeka's Avatar
 
Join Date: Jun 2008
Posts: 21,627
Likes (Received): 13099

Dar El Beida (Algiers)



Blida



__________________
"Babylon in all its desolation is a sight not so awful as that of the human mind in ruins." Nelson DeMille, By the Rivers of Babylon.

Visit the ALGERIAN FORUM

Nexis liked this post
abdeka no está en línea   Reply With Quote
Old June 29th, 2014, 12:27 PM   #264
abdeka
Algerian moderator
 
abdeka's Avatar
 
Join Date: Jun 2008
Posts: 21,627
Likes (Received): 13099

High speed railway line (Oued Tlelat - Akid Abbes)























Amar Ghoul
__________________
"Babylon in all its desolation is a sight not so awful as that of the human mind in ruins." Nelson DeMille, By the Rivers of Babylon.

Visit the ALGERIAN FORUM
abdeka no está en línea   Reply With Quote
Old July 7th, 2014, 08:57 PM   #265
chaking-2014
Registered User
 
Join Date: May 2013
Posts: 428
Likes (Received): 493





[<iframe width="640" height="360" src="//www.youtube.com/embed/7SLb9R8C4hE?feature=player_embedded" frameborder="0" allowfullscreen></iframe>

Last edited by chaking-2014; July 7th, 2014 at 09:03 PM.
chaking-2014 no está en línea   Reply With Quote
Old July 7th, 2014, 09:09 PM   #266
chaking-2014
Registered User
 
Join Date: May 2013
Posts: 428
Likes (Received): 493

THE RAILWAY LAGHOUAT-DJELFA IN PHASE OF EXECUTION

7/07 12:52



LAGHOUAT-The proposed rail-Laghouat Djelfa has recently entered its actual implementation phase, after determining its route and site structures accompanying Has on Monday services of the wilaya.

As part of this project have been identified sites of implantation stations passenger and freight Laghouat, close to the new university campus for the first, and at the northern end of the city to the second in addition to art works and culverts planned has it said.

The new railway line 108 km, whose implementation was entrusted to the company Cosider, is part of a loop from Boumedfaâ (Ain-Defla) to Biskra, via the towns of Medea, Djelfa, Laghouat , Ghardaia, Hassi Messaoud and Touggourt.

At the same cade, technical studies have been launched to achieve wafer-Laghouat-Ghardaia Hassi Messaoud this loop, in addition to those of tench Laghouat-Tiaret via Aflou, within the loop of the West, has you know.

This railway project between the provinces of Laghouat and Djelfa is expected to open it as economic development opportunities for the region, in addition to additional transport option available to citizens, highlight the services of the wilaya .

National loop through the wilaya of Laghouat provides 800 km of lines for which was planned an investment of 100 billion dinars for the program 2010-2014 five-year development, the source said
http://www.ouargla-aps.dz/spip.php?article13950
chaking-2014 no está en línea   Reply With Quote
Old July 7th, 2014, 09:29 PM   #267
chaking-2014
Registered User
 
Join Date: May 2013
Posts: 428
Likes (Received): 493







chaking-2014 no está en línea   Reply With Quote
Old August 20th, 2014, 12:39 AM   #268
chaking-2014
Registered User
 
Join Date: May 2013
Posts: 428
Likes (Received): 493




Alstom to supply diesel railcars SNTF for € 200 million
SNTF

Quote:
SNTF assigned temporarily to French Alstom group, a contract to supply 17 diesel railcars to 21 billion dinars (200 million euros), has-been learned this Tuesday, Aug. 19 its DG, Yacine Benbjaballah. "These railcars are used to provide long-distance trips. They will connect Algiers to Oran, Annaba, Constantine, Bechar, "says Mr. Benjaballah TSA. The new railcars brand new can work with diesel or electricity assures the boss of the national railway company. "These railcars are known to withstand the weather conditions in southern Algeria and can operate with diesel or electricity. Algerian network is not yet electrified. We opted for the two energies because we are eager to improve the quality of service and we can do it without buying new hardware, "Mr. Benjaballah.

The final award of the contract to Alstom Transport will be made within ten days, according to the boss of SNTF. "It is an interim award phase. There is a deadline of ten days to see if there are appeals by competitors. After this period, we will rise to the development of the draft contract, "says Benjaballah.

In its 2011-2015 investment program, SNTF plans to spend 127 billion dinars to modernize the rail network and acquire 30 new locomotives to transport 84 million passengers and 13 million tons of cargo in 2015 In 2013 , SNTF transported 54 million passengers and 9,500 tons of cargo, according to official figures.
tsa.com
__________________

elekto liked this post
chaking-2014 no está en línea   Reply With Quote
Old August 20th, 2014, 09:55 PM   #269
chaking-2014
Registered User
 
Join Date: May 2013
Posts: 428
Likes (Received): 493

this train coradia liner v 200will replace all corail car train in algeria
chaking-2014 no está en línea   Reply With Quote
Old August 21st, 2014, 12:09 PM   #270
mouadh25
Registered User
 
mouadh25's Avatar
 
Join Date: Oct 2013
Location: Constantine
Posts: 952
Likes (Received): 1769

But nothing talks about the Coradia liner .. we dont know yet there have no official stattement that confirm that
mouadh25 no está en línea   Reply With Quote
Old August 21st, 2014, 06:26 PM   #271
Jeff Hawken
Registered User
 
Join Date: Jun 2009
Location: Crewe / Halkali
Posts: 101
Likes (Received): 26

Quote:
Originally Posted by chaking-2014 View Post
this train coradia liner v 200will replace all corail car train in algeria
17 railcars is nowhere near enough to replace all the loco-hauled trains as you suggest, particularly with the programme of line openings and expected increase in passenger numbers. SNTF are also tendering for more diesel-electric locomotives and coaches, so I don't expect the new Alstom trains to take over everything.
Jeff Hawken no está en línea   Reply With Quote
Old August 22nd, 2014, 12:12 PM   #272
abdeka
Algerian moderator
 
abdeka's Avatar
 
Join Date: Jun 2008
Posts: 21,627
Likes (Received): 13099

Quote:
Originally Posted by mouadh25 View Post
But nothing talks about the Coradia liner .. we dont know yet there have no official stattement that confirm that
Alstom confirmed for the Coradia.

__________________
"Babylon in all its desolation is a sight not so awful as that of the human mind in ruins." Nelson DeMille, By the Rivers of Babylon.

Visit the ALGERIAN FORUM

mouadh25 liked this post
abdeka no está en línea   Reply With Quote
Old August 22nd, 2014, 01:06 PM   #273
mouadh25
Registered User
 
mouadh25's Avatar
 
Join Date: Oct 2013
Location: Constantine
Posts: 952
Likes (Received): 1769

[QUOTE=abdeka;116716552]Alstom confirmed for the Coradia.

Yeah thats true and it is a BIG News as the Train in it self is a marvel,
But according to ;

Alstom told IRJ that the trains will be based on its Coradia Polyvalent product platform and it hopes to sign the contract with SNTF by the end of the year.

I dont think that will be for the immediate, it will take some time
mouadh25 no está en línea   Reply With Quote
Old August 25th, 2014, 02:11 PM   #274
mouadh25
Registered User
 
mouadh25's Avatar
 
Join Date: Oct 2013
Location: Constantine
Posts: 952
Likes (Received): 1769

More information about the Algerian Hight Speed Train

mouadh25 no está en línea   Reply With Quote
Old December 2nd, 2014, 07:05 PM   #275
dimlys1994
Moderator
 
dimlys1994's Avatar
 
Join Date: Dec 2010
Location: Dniepropetrovsk
Posts: 16,337
Likes (Received): 26123

From Railway Gazette:

Quote:
http://www.railwaygazette.com/news/i...a-upgrade.html

Siemens signalling for Beni Mansour – Bejaia upgrade
02 Dec 2014



ALGERIA: Siemens announced on December 2 that its ESTEL joint venture with national railway SNTF had been awarded a contract to supply signalling equipment for the double-tracking of the 90 km Beni Mansour – Bejaia route. Awarded by railway development agency ANESRIF, the contract is worth €95m to Siemens.

To support more frequent train services operating at up to 160 km/h, Siemens is to supply Trainguard 100 equipment for ETCS Level 1, as well as its Vicos operations control system, nine Simis W electronic interlockings, GSM-R and a RailCom Manager communications management system.

The contract also includes equipping an operations control centre in Bejaia, and training SNTF personnel on the new signalling and train control systems
dimlys1994 no está en línea   Reply With Quote
Old January 24th, 2015, 06:11 PM   #276
chaking-2014
Registered User
 
Join Date: May 2013
Posts: 428
Likes (Received): 493



__________________

dimlys1994 liked this post

Last edited by chaking-2014; January 24th, 2015 at 06:20 PM.
chaking-2014 no está en línea   Reply With Quote
Old January 25th, 2015, 02:03 PM   #277
chaking-2014
Registered User
 
Join Date: May 2013
Posts: 428
Likes (Received): 493





__________________

dimlys1994 liked this post
chaking-2014 no está en línea   Reply With Quote
Old January 28th, 2015, 07:12 PM   #278
chaking-2014
Registered User
 
Join Date: May 2013
Posts: 428
Likes (Received): 493

Railways: several projects initiated with a line In Salah - Tamanrasset


Quote:
A railway line connecting In Salah and Tamanrasset with 700km length will be realized. A call for national and international tender was launched on Wednesday , 28 January, by Anesrif ( ANESRIF ) to select an engineering firm for the project.
The announcement coincides with the protest movements that knows the south because of shale gas. But the South is not the only region affected by the new railway projects.
Two contracts were awarded to an Algerian- Spanish consortium . The first concerns the study of the electrification of the railway project linking Bordj Bou Arreridj in Annaba and the second concerns the line El Affroun ( Blida) - Oran and Senia line ( Orna ) - Arzew.
Two other contracts were awarded to the same Algerian- Spanish consortium . The first concerns the modernization review of safety facilities of signaling, telecommunications and energy of the railway line Sania (Oran) -ain Temouchent .
A contract for the electrification studies was awarded. The first lot covers railways Oued Tlélat (Oran) - Redjem Demouche ( Sidi Belabes ) of 152 km, Redjem Demouche- Ain Safra ( Naama ) 240 km , Ain Safra- Bechar ( 260km ) and Mecheria ( Naama ) - El -Bayad ( 130km) . The second is the line connecting Djelfa Laghouat (110 km). The last batch concerned Ramdane Djamel railway line ( Skikda ) in Jijel (136 km).
http://www.tsa-algerie.com/2015/01/2...h-tamanrasset/
chaking-2014 no está en línea   Reply With Quote
Old January 29th, 2015, 12:03 AM   #279
chaking-2014
Registered User
 
Join Date: May 2013
Posts: 428
Likes (Received): 493

Tax Identification Number (TIN): 000716097425528

INVITATION TO TENDER NATIONAL AND INTERNATIONAL RESTRICTED

* ANESRIF / GOP / ETG / No. 12/2014

1. Method of the tender:

The National Agency for Studies and Monitoring of the Realization of the Railway Investment (ANESRIF), Client Officer, is launching a National Offer Call and International Restricted.

2. Purpose and general consistency of the service:

Subject: Studies of the new railway line Bechar / Tindouf (Gare Djebilet) (950 Km).

consistency:

The purpose of this specification studies involve the development of studies on the new railway line Bechar / Tindouf (Gare Djebilet) (950 Km). These studies will be conducted in three phases and covers the following:
The tenderer will have to perform the following tasks:
- Phase 1: A Mission - Identification Studies,
- Phase 2: Mission B - Feasibility studies,
- Phase 3: Mission C - preparation of studies to the realization of investments.
Note: Details of deliverables for each task are defined in the specification.
3. Eligibility:
The invitation to tender national and international restricted is for design offices and design offices of groups having proof in the field of railway studies for Algerian registered bidders.

Foreign Bidders must submit the documentary evidence their competence in the field of railway studies, authenticated by the Algerian consular services.

Experience and proficiency required in rail studies must be justified by at least:

v Case of engineering:
- Either by (01) study of a new railway line of a linear 50 miles minimum, conducted during the ten (10) years (2004-2013), duly justified by a certificate of performance;

- Or by studies by discipline in the context of studies of several new lines of a linear 50 Km at least, made in the last ten (10) years (2004-2013), duly supported by a proper certificates execution. In this case, studies should include all the tasks mentioned above.
v Case of a group of consulting firms:
¨ solidarity group case:
Each member of the group must have its active realization:
- Either one (01) study of a new railway line of a linear 50 miles minimum, conducted during the ten (10) years (2004-2013), duly justified by a certificate of performance;
- Or (01) study discipline in the context of studies of several new railway lines of a linear 50 Km at least, made in the last ten (10) years (2004-2013), duly justified by for performance certificate. In this case, studies should include all the tasks mentioned above

¨ group Cases Spouse:

The consortium leader must have to its credit:

- Either one (01) study of a new railway line of a linear 50 miles minimum, conducted during the ten (10) years (2004-2013), duly justified by a certificate of performance;

- Or a study discipline in the context of studies of several new railway lines of a linear 50 Km at least, made in the last ten (10) years (2004-2013), duly justified by good Certifications execution. In this case, studies should include all the tasks mentioned above.

In both cases, group members should, each in respect to justify that they have to their credit the realization of the same nature and complexities of education benefits comparable to those in their care the grouping.

Certificates of satisfactory execution, when it comes to foreign bidders must be certified and authenticated by the Algerian consular services in the country where the services were performed for the awarded bidder (temporarily) market that will present them in a within twenty (20) days from the date of grant.

These certificates of satisfactory execution should be the same presented in the offer.

Beyond this period, the master of the Employer reserves the right to cancel the provisional allotment.

For the proof of performance to be admissible, this one will make clear the following:

- The implementation period of the relevant benefits;
- The nature of the services performed;
- The appreciation of the Contracting Agency (Client);
- The signature and the stamp customer representative;
- The place of performance of the services;
- The services provided by the consulting firm considered (in case of consortium).

Pursuant to Article 39 of Presidential Decree No. 10-236 of October 7, 2010, regulating public procurement, as amended and supplemented, "a bidder, alone or in group, can claim as its own skills and professional references. "

In the case of a consortium, the preliminary agreement protocol attached to the offer, must imperatively indicate that the agent has a majority, that the grouping is spouse or solidarity with the indication of the benefits of each office and turnout studies.

NB / authentication of certificates of good execution applies only to foreign bidders

4. Place of performance: Wilayas Bechar and Tindouf.

*

5. Place of withdrawal of the specifications:

The Consultants interested in this tender may withdraw the specification at the following address:

*

National Agency of Studies and Monitoring of Production

The Railway Investment (ANESRIF)
Directorate of Operations Management Planned / Department Tender
15a Rue Colonel Amir - Rouïba - Algiers

Against prior payment of a non-refundable sum of:

- Thirty thousand dinars (30, 000.00 DA) payable to account ANESRIF No. 00.100.647.03.300.300.390.55 - opened at the National Bank of Algeria (BNA) Agency 647 El Hamiz, Rouïba - Algiers.

- Three hundred Euros (€ 300) payable to account ANESRIF No. 00.100.647.03.100.100.12.95 - opened at the National Bank of Algeria (BNA) Agency 647 El Hamiz, Rouïba - Algiers.

*

The specification is released only tenderer or his duly authorized representative.

Receiving the file of the tender will be accompanied by a receipt of payment issued by the National Bank (BNA), or the transfer order.
6. Period of preparation, date and time of submission of tenders:
The bid preparation period is sixty (60) days, from the date of the first publication of the tender notice published in the press or in the BOMOP.

The offer must be filed on the last day of the period of bid preparation, no later than 12:00 (local time) against issuance of a receipt.
7. Period of validity of tenders

The tenderers will remain committed by their offers for a period equal to the period of bid preparation, plus three (03) months, starting from the date of submission of tenders for the day of bid opening.
8. Appointment of tenders:

Offers include technical offer and a financial offer.

The tenderer must submit the documents listed below:
Summary list of required documents: (a detailed list is in the specifications):
· Legalized copy of the approval in rail valid studies of the Algerian law school office or proof in the field of railway studies. For foreign bidders, documentary evidence their competence in the field of railway studies authenticated by Algerian consular services;

· The statutes of the design office (if it is a company) or if all the members of the study group offices, as well as the list of major shareholders or associates;

· The commercial register (in case of consortium, each member must provide the trade register on it) (certified copy);
· Extract from the trade register (in case of consortium, each member must provide the extract from the commercial register on it);

· The performance of certificates issued by organizations (customers) for similar benefits. These should make clear the linear line, the period of performance of the services in the nature of the services performed, the appreciation of Contracting Agency (Client), the signature and stamp of the client's representative , the place of performance of the services and the services provided by the research department concerned (in case of consortium);

· A provisional schedule of performance of the services, with the timing diagram specifying, inter alia deployment and load / months of staff, dated and signed with seal of the tenderer;

· The submission letter, duly filled, with date, stamp and signature of the tenderer;

· Estimated Details 1, 2, 3 duly completed, initialed on each page, dated, signed with seal of the tenderer at the end of the document;

· Summary Estimated Retail, duly completed, initialed on each page, dated, signed with seal of the tenderer at the end of the document.

*

9. Submission of tenders:

Bids from bidders shall be submitted in accordance with the reporting procedures defined in the specification.
10. Place of submission of tenders:
Tenders submitted in the form specified above must be submitted to the following address:

ANESRIF - Directorate of Operations Management Planned / Department Tender
15a Rue Colonel Amir Rouïba - Algiers

*

11. Opening of public meeting folds:

With this notice, bidders are invited to attend the opening of technical and financial bids on the day of submission of offers at 13:00 at the headquarters of ANESRIF - 15 bis, Rue Colonel Amir Rouiba- Algiers
http://www.anesrif.dz/fr/permalink/3104.html
chaking-2014 no está en línea   Reply With Quote
Old January 29th, 2015, 12:04 AM   #280
chaking-2014
Registered User
 
Join Date: May 2013
Posts: 428
Likes (Received): 493

chaking-2014 no está en línea   Reply With Quote


Reply

Tags
algeria, railways

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Related topics on SkyscraperCity


All times are GMT +2. The time now is 12:39 AM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2018, vBulletin Solutions Inc.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

tech management by Sysprosium