Old August 13th, 2008, 08:37 AM   #81
eddy123
Registered User
 
eddy123's Avatar
 
Join Date: Mar 2008
Location: Dubai
Posts: 147
Likes (Received): 0

update

Pilling in Zone 1 is almost completed. Zone 2 will start next month. Zone 1 have the appartments closer to the mainland, Amwaj, Zamourud and Marmar. Zone 2 are the others. Construction (Zone 1) is believed to start Sept (well, we will have Ramadan in September so working days will be shorter) and construction will take 18 months. (April 2010) Al Hamra Construction company is appointed to built, hope their people don't strike :-)

http://2ndcity.wordpress.com/2008/07...ainees-in-uae/

As the sales office located at Al Marjan is open only during weekdays it will be diffelcult to visit the model homes. I will have to take a day off, we will see.

Ed
eddy123 no está en línea   Reply With Quote

Sponsored Links
 
Old August 15th, 2008, 09:32 AM   #82
eddy123
Registered User
 
eddy123's Avatar
 
Join Date: Mar 2008
Location: Dubai
Posts: 147
Likes (Received): 0

photo's of demo appartment BA

So I went to visit the two model appartments on Al Marjan Island, Bab Al Bahr project. They have displayed a type BA (1 bedroom) and a 2 bedroom appartment, not sure which type but similar to BA with large balcony.

When I arrived, electricity was down (generator) so couldn't see well the dark areas, although the photo's are OK.

My general impression was OK, not great but also not to bad. Quality of the materials used are mid to low class so don't expect the best. Colors choosen of kitchen, cabinets, dressors etc light brown (BA) and dark brown for the 2 bedroom apt. We didn't like the choosen colors for the BA type so we consider an complete overhaul. We also didn't like the brown orrange tiles, to be honest they appear to look cheap.

Kitchen was fitted with an electric zone cooking range, oven, refrigerator and washmachine. As they are not integrated I'm not sure if it will be part of this sale. I'm concerned about any connection for the dryer which was not considered. A condens dryer might do but where to place? It would have been nice if all the equipment was integrated. No location spotted for a dishwasher.

In their setup the TV was placed next to the balcony door more and less blocking this passage, the cable connection is there as well. You can also not hang the TV (LCD) due to the curtains unless you do without them.

The furniture etc was poorly choosen, sofa's to large and colors wrong. It would have been better to hire the people who has done it for Emaar (Street of Dreams) which did a great job for them.

Ok here the pictures, enjoy....or not.

Sales Office

Balcony BA

Balcony BA

Balcony BA

Balcony BA

dinningroom BA

Livingroom BA

Livingroom BA

Bed room BA

Bedroom

Master bedroom bath BA

Master Bedroom Bath BA

Corridor BA

Kitchen BA

Kitchen BA

Kitchen BA





Piling



eddy123 no está en línea   Reply With Quote
Old August 15th, 2008, 01:48 PM   #83
beer51
Registered User
 
Join Date: Nov 2007
Posts: 664
Likes (Received): 1

Thanks for that eddy, did you see any activity on Blu Mirage.
beer51 no está en línea   Reply With Quote
Old August 16th, 2008, 07:47 AM   #84
eddy123
Registered User
 
eddy123's Avatar
 
Join Date: Mar 2008
Location: Dubai
Posts: 147
Likes (Received): 0

activity

Not sure although there was moderate activity going on on the Island but LHB for sure.

Ed
eddy123 no está en línea   Reply With Quote
Old August 17th, 2008, 08:34 PM   #85
VISTANA23
Registered User
 
Join Date: Mar 2008
Posts: 33
Likes (Received): 0

Thanks for the pictures Eddy. Hopefully someone from te compan will note your comments
VISTANA23 no está en línea   Reply With Quote
Old August 18th, 2008, 09:32 AM   #86
eddy123
Registered User
 
eddy123's Avatar
 
Join Date: Mar 2008
Location: Dubai
Posts: 147
Likes (Received): 0

can they do better?

Quote:
Hopefully someone from te compan will note your comments
Well they probable do, as I noticed before.

I will however send my remarks to Spectrum (consultancy), maybe they are still able to make changes. Of course the deal they made regarding the tiles are coming from next door www.rakceramics.com, not sure from where they bought the kitchen but definetly from some local company, custom fitted.

My villa in the Meadows, (Dubai) has the same kind of local made quality kitchen, which is now falling apart. I warned Emaar about this but they ignored me as so many were complaining about this. It would be an huge investment to change them all.

Hopefully Rakeen will have a second look at it.

I rather prefer they will hand me the appartment over without kitchen and tiling or at least give the buyer some options.

Maybe we should jointly request this, one voice doesn't count.

Ed
eddy123 no está en línea   Reply With Quote
Old August 21st, 2008, 01:03 PM   #87
bizzybonita
ĐЯ ฿฿ שίŧђ Ħīĝђ קΘฬξЯ
 
bizzybonita's Avatar
 
Join Date: Jul 2006
Posts: 11,493
Likes (Received): 2

Part of piling at Bab Al Bahr ends

on Thursday, August 21, 2008

Rakeen has announced the completion of the piling works for half of the residential component of the Bab Al Bahr and is set to proceed with the construction of the residential units.

The master-planner and land developer of the Ras Al Khaimah Government emphasised that the unobstructed workflow has been a significant success after a critical shortage of building materials as well as sharp increase in prices have affected several construction projects across the region.

Rakeen also reported that main contractor Al Hamra Construction Company will start the piling work and construction of the second half of the residential area shortly as the Dh1.2 billion mixed-use resort development remains firmly ahead of schedule.

"Consistency is an important factor in the highly competitive real estate sector," said Wahid Attalla, Member of the Board, Rakeen.

"Investors and property buyers want to be constantly reassured of the state of their investments and there is no better way to boost their confidence than to remain consistent and committed to the construction schedule."

Bab Al Bahr is the first development project on Al Marjan Island, Rakeen's coral shaped atoll that extends four kilometres into the Arabian Gulf. It offers 360-degree view of the Gulf.
__________________
฿ĪẐẐΫ ฿Ǿ₦ŦẪ 2013
bizzybonita no está en línea   Reply With Quote
Old August 21st, 2008, 05:12 PM   #88
jeffers
Registered User
 
jeffers's Avatar
 
Join Date: Mar 2008
Posts: 624
Likes (Received): 0

Were those interiors styled in the 1980's ?? sorry I just had to ask..
jeffers no está en línea   Reply With Quote
Old August 25th, 2008, 01:49 PM   #89
VISTANA23
Registered User
 
Join Date: Mar 2008
Posts: 33
Likes (Received): 0

Quote:
Originally Posted by eddy123 View Post
Well they probable do, as I noticed before.

I will however send my remarks to Spectrum (consultancy), maybe they are still able to make changes. Of course the deal they made regarding the tiles are coming from next door www.rakceramics.com, not sure from where they bought the kitchen but definetly from some local company, custom fitted.

My villa in the Meadows, (Dubai) has the same kind of local made quality kitchen, which is now falling apart. I warned Emaar about this but they ignored me as so many were complaining about this. It would be an huge investment to change them all.

Hopefully Rakeen will have a second look at it.

I rather prefer they will hand me the appartment over without kitchen and tiling or at least give the buyer some options.

Maybe we should jointly request this, one voice doesn't count.

Ed
Eddy is there a contact at Rakeen - maybe people should email them ?
Thanks
VISTANA23 no está en línea   Reply With Quote
Old August 25th, 2008, 09:52 PM   #90
VISTANA23
Registered User
 
Join Date: Mar 2008
Posts: 33
Likes (Received): 0

Has anyone received contracts for Bab al Bahr yet. My second payment is due but I have received no paperwork as yet. Can anyone advise if they have received and whether they have made their payments ?
Thanks
VISTANA23 no está en línea   Reply With Quote
Old August 26th, 2008, 07:54 AM   #91
Faraz Mirza
Our Property World
 
Faraz Mirza's Avatar
 
Join Date: Jul 2008
Location: london
Posts: 3
Likes (Received): 0

contracts

Quote:
Originally Posted by VISTANA23 View Post
Has anyone received contracts for Bab al Bahr yet. My second payment is due but I have received no paperwork as yet. Can anyone advise if they have received and whether they have made their payments ?
Thanks
You should have definitely received your contract by now. One of the things developers are famous for is their failure to provide receipts or any confirmations on receiving funds.

Very often there are failures by banks to put references on the international transfers made and often funds are not allocated properly by developers.

Call Rakeen on 00971 7 2446562 and chase up the contracts.
__________________
Make a great living by investing in the UAE
Faraz Mirza no está en línea   Reply With Quote
Old August 26th, 2008, 05:37 PM   #92
eddy123
Registered User
 
eddy123's Avatar
 
Join Date: Mar 2008
Location: Dubai
Posts: 147
Likes (Received): 0

Yes I got it

I have received the contract and signed it. I went myself to Spectrum office on the Sheikh Zayed road. I have also paid my second installment and got a receipt on the spot.
eddy123 no está en línea   Reply With Quote
Old September 8th, 2008, 10:00 PM   #93
VISTANA23
Registered User
 
Join Date: Mar 2008
Posts: 33
Likes (Received): 0

Video on Bab al Bahr available on the following page

http://www.bab-al-bahr.com/index.htm
VISTANA23 no está en línea   Reply With Quote
Old September 16th, 2008, 01:21 PM   #94
SBond
Registered User
 
Join Date: Feb 2008
Posts: 6
Likes (Received): 0

Quote:
Originally Posted by beer51 View Post
Thanks for that eddy, did you see any activity on Blu Mirage.
Actually just been on the island, the work has started, but being ramadan and all might be a bit slow. However, in the followin weeks to come im sure it will show alot more improvement. Ive also looked at LHB... im afraid its not as impressive as the Blu Mirage...
SBond no está en línea   Reply With Quote
Old September 16th, 2008, 02:52 PM   #95
Yousuf27
Registered User
 
Join Date: May 2007
Posts: 615
Likes (Received): 0

Quote:
Originally Posted by SBond View Post
Actually just been on the island, the work has started, but being ramadan and all might be a bit slow. However, in the followin weeks to come im sure it will show alot more improvement. Ive also looked at LHB... im afraid its not as impressive as the Blu Mirage...
In what sense is LHB not as impressive as BM; - do you mean the progress, the quality of work - or maybe some other aspect? LHB was along way ahead of all the other developments; - has the situation changed there? I was there in April and at that time LHB was going great guns, BAB was just beginning and no other development had been started.
Yousuf27 no está en línea   Reply With Quote
Old September 16th, 2008, 03:22 PM   #96
rudeboy
Registered User
 
Join Date: Aug 2008
Posts: 34
Likes (Received): 0

looks like i missed out on this one
rudeboy no está en línea   Reply With Quote
Old September 21st, 2008, 09:39 AM   #97
234sale
Registered User
 
234sale's Avatar
 
Join Date: Sep 2006
Location: Dubai/Brighton
Posts: 8,725
Likes (Received): 3




__________________
my UAE updates ©skyscraperlist.com. my photography 500px
234sale no está en línea   Reply With Quote
Old September 21st, 2008, 06:13 PM   #98
eddy123
Registered User
 
eddy123's Avatar
 
Join Date: Mar 2008
Location: Dubai
Posts: 147
Likes (Received): 0

Financing

I tried to finance my buy at the recommended bank but their service is very bad and slow. My emails are not returned on my questions, so I have enough of them. Does anybody knows another bank who is accepting this project?

Ed
eddy123 no está en línea   Reply With Quote
Old September 24th, 2008, 01:34 PM   #99
beer51
Registered User
 
Join Date: Nov 2007
Posts: 664
Likes (Received): 1

SBond Thanks for the update.
beer51 no está en línea   Reply With Quote
Old November 8th, 2008, 07:22 PM   #100
VISTANA23
Registered User
 
Join Date: Mar 2008
Posts: 33
Likes (Received): 0

Does anyone have an update on progress and current status on Bab al Bahr
Thanks
VISTANA23 no está en línea   Reply With Quote


Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT +2. The time now is 08:53 AM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2013, vBulletin Solutions, Inc.
Feedback Buttons provided by Advanced Post Thanks / Like v3.1.2 (Pro) - vBulletin Mods & Addons Copyright © 2013 DragonByte Technologies Ltd.
vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2013 DragonByte Technologies Ltd. (Resources saved on this page: MySQL 23.08%)

SkyscraperCity - In Urbanity We Trust

Hosted by Blacksun, dedicated to this site too!
Forum server management by DaiTengu