Old May 20th, 2014, 09:27 PM   #5321
Arnorian
Registered User
 
Arnorian's Avatar
 
Join Date: Jul 2010
Location: Moesia Superior
Posts: 2,734
Likes (Received): 14631

I've updated the map, I corrected a couple of mistakes.

A4

Prosek - Crvena Reka L=22,5 km, EIB, ongoing
LOT 1 - road and bridges from Prosek to Tunnel Bancarevo, JV Aktor i Terna, started 15. march 2012, deadline 01.09.2015
LOT 2 - road and bridges from Tunnel Bancarevo to Crvena Reka, JV Aktor i Terna, started 15. march 2012. godine, deadline 01.09.2015
LOT 3 - Tunnel Bancarevo, Subterra A.S., started 15. march 2012. godine, deadline 01.03.2015

Crvena Reka – Čiflik L= 12,7 km, EBRD, ongoing
AKTOR S.A., started 10.10.2011, deadline 31.10.2014

Parallel noncommercial road Bela Palanka – Pirot (west), EBRD
Trace Group Hold plc. started 08.04.2014, deadline 08.04.2015.

Čiflik – Staničenje L= 12,07 km, EIB
Consstructiones Rubau, started 20.06.2013, deadline 20.09.2015.

Staničenje – Pirot East L= 16,64 km, EIB
Aktor S.A., started 20.06.2013, deadline 20.09.2015.

Pirot East – Dimitrovgrad L= 14,3 km, Alpine Bau GmbH - contract canceled
New contract with Trace Group Hold plc., started 05.05.2014, deadline 31.12.2015
LOT 1 from Pirot East to Sukovo
LOT 2 from Sukovo to Dimitrovgrad

Dimitrovgrad bypass L= 8,6 km, WB, ongoing
Contract for LOT 1 and LOT 2 with Alpine Bau GmbH canceled, started 14.04.2010
Tender for continuation opened on 25.04.2014, evaluation of offers underway
LOT 1 – road
LOT 2 – bridges

LOT 3 – tunnels Progon and Pržojna Padina, ongoing, Terna S.A., started 10.10. 2011, deadline 31.12.2015

A1

Grabovnica – Grdelica, L=5,6 km, WB, ongoing
Terna S.A., started 25.06.2012, deadline25.11.2015

Grdelica – Caričina Dolina, L= 11,8 km, EIB,
LOT 1 - road and bridges from Gornje Polјe to Tunnel Predejane, JV AZVI SA & TADDEI SpA. started 11.10.2013, deadline 31.12.2015.
LOT 2 - road and bridges from Predejane to Caričina Dolina, JV Trace group hold plc i Mostovik llc (Bulgaria), started 11.10.2013, deadline 31.12.2015
LOT 3 - Tunnel Predejane, Consortium Alliance X (ADVAL JSC and Road & Bridges ltd) Bulgaria, started 18.09.2013, deadline 05.09.2016.

Caričina Dolina – Vladičin Han, L= 14,3km, EIB
LOT 4 - Tunnel Manajle, Consortium Alliance X (ADVAL JSC and Road & Bridges ltd) Bulgaia, started 18.09.2013, deadline 05.09.2016
LOT 5 - road and bridges from Caričina Dolina to Tunnel Manajle, JV Integral Inženjering Prijedor putevi, started 18.09.2013, deadline 05.06.2015
LOT 6 - road and bridges, from Tunnel Manajle to Vladičin Han, tender open, submitting deadline 12.06.2014

Vladičin Han - Donji Neradovac, L= 26,3 km, WB, ongoing
Terna S.A., started 25.06.2012
LOT 1 - road and bridges from Vladičin Han to Prevalac, 10.1km, deadline 25.06.2014
LOT 2 - road and bridges from Prevalac to Suvi Dol, 9 km, deadline 12.09.2015
LOT 3 - road and bridges from Suvi Dol -to Donji Neradovac, 7.2 km, deadline 03.09.2015

Donji Neradovac – Levosoje, L= 16 km, finansing byRepublic of Serbia and HiPERB Plan of Greece
LOT 2 - from Donji Neradovac to Srpska Kuća, L= 8 km, Aktor SA. completed 14.11.2013
LOT 1 - from Srpska Kuća to Levosoje, L= 8 km, project documentation sent to for approuval to HiPERB Plan, main project and expropriation completed
__________________

MichiH, panchevo, Daniel749, violinivo, crimio and 3 others liked this post

Last edited by Arnorian; May 20th, 2014 at 10:05 PM.
Arnorian no está en línea   Reply With Quote

Sponsored Links
Old May 20th, 2014, 09:44 PM   #5322
panchevo
pseudosveshtenik
 
panchevo's Avatar
 
Join Date: Jan 2014
Location: Serbistan
Posts: 1,746
Likes (Received): 3520

Quote:
Originally Posted by MichiH View Post
So, two A1 sections near Vladičin han should be completed in June, won't they? Will they also be opened (entirely) for traffic or is it not possible to opened that 10+x km section b/c it begins at the Manajle tunnel and ends near Prevalac w/o i/c?
Quote:
ЛОТ 6 - Траса и мостови Тунел Манајле - Владичин Хан. Тендер објављен. Рок за доставу понуда: 12.06.2014.
this means that the LOT6 tunel manajle - vladicin han section is tendered, and the deadline for the offers is 12.06.2014.

Quote:
ЛОТ 1 - Траса и мостови Владичин Хан – Превалац 10.1км. Рок завршетка изградње 25.06.2014.
and this means that the deadline for vladicin han - prevalac 10km section is 25.06.2014.
now this is a surprise for me, maybe its a typing error or maybe there is a motorway god afterall and he decided to be mercyful to us...
__________________
The INFIDEL

MichiH liked this post

Last edited by panchevo; May 20th, 2014 at 09:53 PM.
panchevo no está en línea   Reply With Quote
Old May 20th, 2014, 09:51 PM   #5323
cinxxx
I ♥ Timişoara
 
cinxxx's Avatar
 
Join Date: Oct 2010
Location: München
Posts: 22,236
Likes (Received): 18300

Are there problems because of the floodings with roads from Skopje to Kovin and then Vrsac?
Are there problems expected? I should drive there actually on 31. May, should I worry?

I was thinking to make a stop on the way in Nis, how is the situation there?
cinxxx no está en línea   Reply With Quote
Old May 20th, 2014, 10:04 PM   #5324
Arnorian
Registered User
 
Arnorian's Avatar
 
Join Date: Jul 2010
Location: Moesia Superior
Posts: 2,734
Likes (Received): 14631

No problems on that route.
Arnorian no está en línea   Reply With Quote
Old May 30th, 2014, 02:30 PM   #5325
Arnorian
Registered User
 
Arnorian's Avatar
 
Join Date: Jul 2010
Location: Moesia Superior
Posts: 2,734
Likes (Received): 14631

Construction of the second carriageway of the Belgrade bypass from Dobanovci interchange to the Ostružnica bridge over the Sava has started.



Quote:
Originally Posted by vladygark View Post
__________________

čarli, MichiH, violinivo, aleksandar_s, Gubot liked this post
Arnorian no está en línea   Reply With Quote
Old May 30th, 2014, 05:32 PM   #5326
MichiH
Registered User
 
Join Date: Jan 2013
Location: Lower Franconia
Posts: 4,406
Likes (Received): 2082

Quote:
Originally Posted by Arnorian View Post
Construction of the second carriageway of the Belgrade bypass from Dobanovci interchange to the Ostružnica bridge over the Sava has started.
Sorry for my dumb question but the Belgrade bypass will be a motorway after completion, so it should be contained in my damn list. I've found the project page - also in Serbian - and the wikipedia article but unfortunately I don't get it .

The first carriageway is completed in section A. Section C is not yet u/c. The first carriageway is partly completed in section B b/n Dobanovci and Orlovaca (or Resnik?). The works on the remaining part of section B have never been started, haven't they?

The second carriageway is not yet completed or even u/c in section B. The works on the first ~9km section have been started in May 2014 - to be completed until 20xx? What's about section A, it seems like there is a 2.7km section still u/c isn't it (since 20xx, until 20xx)?
MichiH no está en línea   Reply With Quote
Old May 30th, 2014, 09:11 PM   #5327
Arnorian
Registered User
 
Arnorian's Avatar
 
Join Date: Jul 2010
Location: Moesia Superior
Posts: 2,734
Likes (Received): 14631

Yeah, it's a mess. I hope this map can clarify the situation. Finishing dates are fool's errands.



lines (two-lane carriageway with hard shoulder):
- blue: completed
- red: under construction
- gray: short-term plan
- dashed: long-term plan

circles (interchange/intersection):
- blue: completed interchange
- red: interchange under construction
- green: completed interchange, waiting completion of the second carriageway
- magenta: partly completed interchange, waiting completion of both carriageway (at the moment parallel intersection service ramp used for through traffic, not all entrance/exit directions available)
- gray: planned interchange
- crossed-over: at-grade intersection, not a grade-separated interchange
__________________

Last edited by Arnorian; May 30th, 2014 at 09:33 PM.
Arnorian no está en línea   Reply With Quote
Old May 30th, 2014, 09:27 PM   #5328
MichiH
Registered User
 
Join Date: Jan 2013
Location: Lower Franconia
Posts: 4,406
Likes (Received): 2082

Thanks you very much . But sorry, I have to annoy you again:
Do you have any information about the estimated completion of the two u/c A1 projects? When have to works been started for the 2nd carriageway near Batajnica?
MichiH no está en línea   Reply With Quote
Old May 30th, 2014, 09:41 PM   #5329
Arnorian
Registered User
 
Arnorian's Avatar
 
Join Date: Jul 2010
Location: Moesia Superior
Posts: 2,734
Likes (Received): 14631

It's hard to tell the when the Batajnica interchange and the missing section of the second carriageway will be finished. Dates given officially so far have been broken many times. My estimate is late this year or next year. I think the works started in 2006, but I'm not sure.
__________________

MichiH liked this post
Arnorian no está en línea   Reply With Quote
Old June 2nd, 2014, 03:12 PM   #5330
panchevo
pseudosveshtenik
 
panchevo's Avatar
 
Join Date: Jan 2014
Location: Serbistan
Posts: 1,746
Likes (Received): 3520

officials recently said that the batajnica interchange will be completed by summer of 2015... (which is a catastrophe having in mind when the construction started)

@arnorian
i'm afraid that the intersection between the pancevo road and the SMT will be at-grade..
__________________
The INFIDEL

MichiH liked this post

Last edited by panchevo; June 2nd, 2014 at 03:57 PM.
panchevo no está en línea   Reply With Quote
Old June 2nd, 2014, 03:50 PM   #5331
sponge_bob
Registered User
 
Join Date: Aug 2013
Posts: 3,953
Likes (Received): 2204

This is a good example of forward planning. Build a half profile motorway first and put in full profile foundations so that adding the second carriageway is easy in future.

Pity more countries don't do this more often instead of building full profile or nothing....generally nothing in many cases. Only former Yugoslav states and Hungary seem to do it.

sponge_bob no está en línea   Reply With Quote
Old June 2nd, 2014, 03:57 PM   #5332
Arnorian
Registered User
 
Arnorian's Avatar
 
Join Date: Jul 2010
Location: Moesia Superior
Posts: 2,734
Likes (Received): 14631

Overpasses, underpasses and even tunnels have been done for the second carriageway. But the most important is the finished land expropriation, it can causes severe delays because the courts are very slow if the owners of that land refuse the settlement. The Ostružnica bridge over the Sava is missing only the second deck. But the problem is large number of accidents on such semi-finished roads.

Last edited by Arnorian; June 2nd, 2014 at 04:05 PM.
Arnorian no está en línea   Reply With Quote
Old June 2nd, 2014, 04:39 PM   #5333
SRC_100
Registered User
 
SRC_100's Avatar
 
Join Date: May 2014
Posts: 3,084
Likes (Received): 3275

Quote:
Originally Posted by sponge_bob View Post
This is a good example of forward planning. Build a half profile motorway first and put in full profile foundations so that adding the second carriageway is easy in future.
I can`t agree with you. Always there is better to build the full profile motorway, because it takes cca. same time as a half-profile, and costs only cca. 20% more than half-profile when you take into consideration that you have to build all viaducts and bridges as for full profile.
SRC_100 no está en línea   Reply With Quote
Old June 2nd, 2014, 05:23 PM   #5334
volodaaaa
Registered User
 
volodaaaa's Avatar
 
Join Date: Apr 2013
Location: Bratislava, Slovakia
Posts: 3,231
Likes (Received): 1750

Just curious:

The 90° curve in Novi Grad has some purpose or is leftover of something or what. I always wonder when I drive through
__________________
Been/drove my car in: SK, CZ, D, A, H, PL, I, F, E, RSM, CH, FL, SLO, HR, SRB, BiH, MK, GR, BG, RO

volodaaaa no está en línea   Reply With Quote
Old June 2nd, 2014, 06:20 PM   #5335
Arnorian
Registered User
 
Arnorian's Avatar
 
Join Date: Jul 2010
Location: Moesia Superior
Posts: 2,734
Likes (Received): 14631

It is planned as a full four-road intersection. The road leading north towards the new Danube bridge is under construction. To the east an expansion of a street is planned (I think as 3+3), because Zemun is lacking a major artery.

Arnorian no está en línea   Reply With Quote
Old June 2nd, 2014, 08:05 PM   #5336
panchevo
pseudosveshtenik
 
panchevo's Avatar
 
Join Date: Jan 2014
Location: Serbistan
Posts: 1,746
Likes (Received): 3520

ugrinovacka 3+3?
not in this decade...
__________________
The INFIDEL
panchevo no está en línea   Reply With Quote
Old June 2nd, 2014, 08:53 PM   #5337
Arnorian
Registered User
 
Arnorian's Avatar
 
Join Date: Jul 2010
Location: Moesia Superior
Posts: 2,734
Likes (Received): 14631

It may be 2+2, I'm not sure.
Arnorian no está en línea   Reply With Quote
Old June 2nd, 2014, 09:09 PM   #5338
panchevo
pseudosveshtenik
 
panchevo's Avatar
 
Join Date: Jan 2014
Location: Serbistan
Posts: 1,746
Likes (Received): 3520

that would be great but also highly unlikely any time soon...

in my opinion, upgrading "zmaj" interchange must be top priority after completion of the borca bridge!

even today this retarded interchange is dangerous and when the new danube bridge and the SMT are completed - the situation there will go from bad to worse...
__________________
The INFIDEL
panchevo no está en línea   Reply With Quote
Old June 2nd, 2014, 09:20 PM   #5339
cinxxx
I ♥ Timişoara
 
cinxxx's Avatar
 
Join Date: Oct 2010
Location: München
Posts: 22,236
Likes (Received): 18300

The surface of the E75 from Leskovac to Smederevo is not the best, unfortunatly.
Also, something should be done against people crossing the motorway and people wanting to sell you strawberries at the exit toll booths.
cinxxx no está en línea   Reply With Quote
Old June 3rd, 2014, 10:01 AM   #5340
volodaaaa
Registered User
 
volodaaaa's Avatar
 
Join Date: Apr 2013
Location: Bratislava, Slovakia
Posts: 3,231
Likes (Received): 1750

Quote:
Originally Posted by cinxxx View Post
The surface of the E75 from Leskovac to Smederevo is not the best, unfortunatly.
Also, something should be done against people crossing the motorway and people wanting to sell you strawberries at the exit toll booths.
And something with insufficiently illuminated old Zastava cars driving on left lane at 60kph

But what is wrong with people selling strawberries at exit toll booths? Once I bought the Serbian flag there.
__________________
Been/drove my car in: SK, CZ, D, A, H, PL, I, F, E, RSM, CH, FL, SLO, HR, SRB, BiH, MK, GR, BG, RO

volodaaaa no está en línea   Reply With Quote


Reply

Tags
путеви, motorways, putevi, serbia, srbija

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Related topics on SkyscraperCity


All times are GMT +2. The time now is 11:45 PM.


Powered by vBulletin® Version 3.8.11 Beta 4
Copyright ©2000 - 2018, vBulletin Solutions Inc.
Feedback Buttons provided by Advanced Post Thanks / Like (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

vBulletin Optimisation provided by vB Optimise (Pro) - vBulletin Mods & Addons Copyright © 2018 DragonByte Technologies Ltd.

SkyscraperCity ☆ In Urbanity We trust ☆ about us | privacy policy | DMCA policy

tech management by Sysprosium